Loading...
HomeMy WebLinkAboutP1 - OVERALL FIRST FLOOR FIRE PROTECTION PLANP P P P 1 B C D E F G H I J K L M N 2 3 4 5 6 7 8 9 10 11 12 13 14 15 OA OFFICE 117 TEAM / MEET 121 MECHANICAL 108 STAIR 105 TRAINING ROOM 104 CORRIDOR 101 FIELD HOUSE 100 SHELL SPACE 109 MENS 110 WOMENS 111 VESTIBULE 116LOBBY 115 ELEVATOR 119 STAIR 118 STORAGE 120 STORAGE 122 RECEIVING 124 ELECTRICAL 107 STORAGE 106 OFFICE / TICKET 114 STORAGE 113 WOMENS RESTROOM 102 MENS RESTROOM 103 DVCA-1 FIRE PROTECTION MAINS UP TO SECOND FLOORF FFFFIRE PROTECTION MAIN FROM SECOND FLOOR ZONE 1ZONE 16" INCOMING FIRE PROTECTION SUPPLY FROM BELOW SLABZONE 1ZONE 1 FIRE PROTECTION LIMITS (21,540 SQ./FT.) 6" FIRE PROTECTION DOWN AND OUT TO FIRE DEPARTMENT CONNECTION NOTE: REFER TO WET PIPE SPRINKLER RISER DETAIL, THIS SHEET, FOR TAMPER SWITCH AND FLOW SWITCH LOCATIONS. FIRE PROTECTION PLAN GENERAL NOTES A. ALL FIRE PROTECTION WORK PERFORMED ON THIS PROJECT SHALL BE SIZED PER HYDRAULIC CALCULATIONS. CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH ALL DUCTWORK, RACEWAYS, CABLE TRAYS CONDUITS, STRUCTURAL MEMBERS, PIPING AND ARCHITECTURAL CEILING HEIGHTS AND DESIGN INTENT. ALL FIRE PROTECTION WORK SHALL BE DONE IN ACCORDANCE WITH NFPA 13, ALL APPLICABLE STATE AND LOCAL CODES AND THE AUTHORITY HAVING JURISDICTION TO DELIVER A PENALTY FREE SYSTEM. B. REFER TO DIVISION 21 FOR ALL AUTOMATIC WET PIPE SPRINKLER SYSTEM REQUIREMENTS. C. ALL SPRINKLER PIPING SYSTEM INSTALLATION SHALL BE COORDINATED WITH OTHER TRADES AS IT RELATES TO ACCESS AND SERVICEABILITY OF THAT TRADES EQUIPMENT (I.E.: MECHANICAL UNITS, LIGHTS...) ANY SPRINKLER SYSTEM PIPING DETERMINED BY THE ENGINEER TO BE IN CONFLICT WITH OTHER TRADES WILL BE RELOCATED WITH ALL COST TO BE BORNE BY THE FIRE PROTECTION CONTRACTOR. D. REFER TO ARCHITECTURAL BUILDING SECTIONS, WALL SECTIONS AND STRUCTURAL DRAWINGS FOR STRUCTURAL STEEL ELEVATIONS AND SPACE AVAILABLE ABOVE THE FINISHED CEILING. PROVIDE ALL APPROPRIATE SUPPORT AND BRACING TO THE BUILDING STRUCTURE AS REQUIRED FOR INSTALLATION OF PIPING WITHIN THE GIVEN CONDITIONS. E. THE CONTRACTOR SHALL ENSURE THAT NO PIPING OR EQUIPMENT WILL BE INSTALLED WITHIN 12'-0" OF ANY EXTERIOR BUILDING WALL OPENING. OPENINGS SHALL INCLUDE BUT SHALL NOT BE LIMITED TO RELIEF AIR, LOUVERS... TO PREVENT FREEZING OF PIPING AND EQUIPMENT. PIPING INSTALLED WITHIN THIS SPECIAL ZONE AND ANY DAMAGE RESULTING FROM THIS INSTALLATION WILL BE COMPLETELY RESTORED AND ALL ASSOCIATED COST BORNE BY THIS CONTRACTOR.DDDDTO ZONE #2 (TYP) F.S. T.S. MAIN DRAIN LINE TO TO FLOOR PIPE STAND BOLTED FINISHED FLOOR BUILDING EXTERIOR T.S. F.S. SWITCH FLOW FLANGE/SPIGOT 6" T.S. T.S. 2" MAIN DRAIN VALVE SIZE PER HYDRAULIC CALCULATIONS (TYP) F.S. F.S. SPRINKLER HEADS INCOMING 6" FIRE PROTECTION WATER SERVICE DOUBLE CHECK VALVE ASSEMBLY WITH TEST COCKS WATTS NO. 757 (6") INCOMING 6" FIRE DEPARTMENT CONNECTION SERVICE TO ZONE #3 SPRINKLER HEADS TO ZONE #4 SPRINKLER HEADS TO ZONE #1 SPRINKLER HEADS T.S. T.S.PLANNORTHN WS ECOPYRIGHT 2019 BY FANNING/HOWEY ASSOCIATES, INC. KEY PLAN NORTH WWW.FHAI.COM ARCHITECT CONSULTANT SOUTHWEST 7/16/2019 9:37:04 AM\\data1\citrixprofiles$\jelkins\My Documents\218052.00_PLUM_jelkinsHZQQL.rvtPROJECT NUMBER: 218052.00 INDOOR FACILITY AT BADGER FIELDS CLAY TOWNSHIP 5459 E MAIN STREET CARMEL, INDIANA OVERALL FIRST FLOOR FIRE PROTECTION PLAN PFP2.01 PROJECT ISSUE DATE: JULY 16, 2019 DRAWN BY: JESCALE: 1/16" = 1'-0" OVERALL FIRST FLOOR FIRE PROTECTION PLAN N.T.S. WET PIPE SPRINKLER RISER DETAIL1 PROFESSIONA L ENGIN EERNo. PE 19800147 STATE OFREGISTER E DINDIA N ATIMOTHYC.LEH MANREV. NO.DESCRIPTION DATE