HomeMy WebLinkAboutP1 - OVERALL FIRST FLOOR FIRE PROTECTION PLANP P P P
1
B C D E F G H I J K L M N
2
3
4
5
6
7
8
9
10
11
12
13
14
15
OA
OFFICE
117
TEAM / MEET
121
MECHANICAL
108
STAIR
105
TRAINING ROOM
104
CORRIDOR
101
FIELD HOUSE
100
SHELL SPACE
109
MENS
110
WOMENS
111
VESTIBULE
116LOBBY
115
ELEVATOR
119
STAIR
118
STORAGE
120
STORAGE
122
RECEIVING
124
ELECTRICAL
107
STORAGE
106
OFFICE / TICKET
114
STORAGE
113
WOMENS
RESTROOM
102
MENS RESTROOM
103
DVCA-1
FIRE PROTECTION MAINS
UP TO SECOND FLOORF
FFFFIRE PROTECTION MAIN
FROM SECOND FLOOR
ZONE 1ZONE 16" INCOMING FIRE PROTECTION
SUPPLY FROM BELOW SLABZONE 1ZONE 1 FIRE PROTECTION
LIMITS (21,540 SQ./FT.)
6" FIRE PROTECTION DOWN
AND OUT TO FIRE
DEPARTMENT CONNECTION
NOTE: REFER TO WET PIPE
SPRINKLER RISER DETAIL,
THIS SHEET, FOR TAMPER
SWITCH AND FLOW SWITCH
LOCATIONS.
FIRE PROTECTION PLAN GENERAL NOTES
A. ALL FIRE PROTECTION WORK PERFORMED ON THIS
PROJECT SHALL BE SIZED PER HYDRAULIC
CALCULATIONS. CONTRACTOR IS RESPONSIBLE
FOR COORDINATION WITH ALL DUCTWORK,
RACEWAYS, CABLE TRAYS CONDUITS, STRUCTURAL
MEMBERS, PIPING AND ARCHITECTURAL CEILING
HEIGHTS AND DESIGN INTENT. ALL FIRE
PROTECTION WORK SHALL BE DONE IN
ACCORDANCE WITH NFPA 13, ALL APPLICABLE
STATE AND LOCAL CODES AND THE AUTHORITY
HAVING JURISDICTION TO DELIVER A PENALTY FREE
SYSTEM.
B. REFER TO DIVISION 21 FOR ALL AUTOMATIC WET
PIPE SPRINKLER SYSTEM REQUIREMENTS.
C. ALL SPRINKLER PIPING SYSTEM INSTALLATION
SHALL BE COORDINATED WITH OTHER TRADES AS IT
RELATES TO ACCESS AND SERVICEABILITY OF THAT
TRADES EQUIPMENT (I.E.: MECHANICAL UNITS,
LIGHTS...) ANY SPRINKLER SYSTEM PIPING
DETERMINED BY THE ENGINEER TO BE IN CONFLICT
WITH OTHER TRADES WILL BE RELOCATED WITH ALL
COST TO BE BORNE BY THE FIRE PROTECTION
CONTRACTOR.
D. REFER TO ARCHITECTURAL BUILDING SECTIONS,
WALL SECTIONS AND STRUCTURAL DRAWINGS FOR
STRUCTURAL STEEL ELEVATIONS AND SPACE
AVAILABLE ABOVE THE FINISHED CEILING. PROVIDE
ALL APPROPRIATE SUPPORT AND BRACING TO THE
BUILDING STRUCTURE AS REQUIRED FOR
INSTALLATION OF PIPING WITHIN THE GIVEN
CONDITIONS.
E. THE CONTRACTOR SHALL ENSURE THAT NO PIPING
OR EQUIPMENT WILL BE INSTALLED WITHIN 12'-0" OF
ANY EXTERIOR BUILDING WALL OPENING. OPENINGS
SHALL INCLUDE BUT SHALL NOT BE LIMITED TO
RELIEF AIR, LOUVERS... TO PREVENT FREEZING OF
PIPING AND EQUIPMENT. PIPING INSTALLED WITHIN
THIS SPECIAL ZONE AND ANY DAMAGE RESULTING
FROM THIS INSTALLATION WILL BE COMPLETELY
RESTORED AND ALL ASSOCIATED COST BORNE BY
THIS CONTRACTOR.DDDDTO ZONE #2
(TYP)
F.S.
T.S.
MAIN DRAIN LINE TO
TO FLOOR
PIPE STAND BOLTED
FINISHED
FLOOR
BUILDING EXTERIOR
T.S.
F.S.
SWITCH
FLOW
FLANGE/SPIGOT
6"
T.S. T.S.
2" MAIN DRAIN VALVE
SIZE PER HYDRAULIC
CALCULATIONS (TYP)
F.S. F.S.
SPRINKLER HEADS
INCOMING 6" FIRE
PROTECTION WATER
SERVICE
DOUBLE CHECK VALVE ASSEMBLY
WITH TEST COCKS
WATTS NO. 757 (6")
INCOMING 6" FIRE
DEPARTMENT CONNECTION
SERVICE
TO ZONE #3
SPRINKLER HEADS
TO ZONE #4
SPRINKLER HEADS
TO ZONE #1
SPRINKLER HEADS
T.S. T.S.PLANNORTHN
WS ECOPYRIGHT 2019 BY FANNING/HOWEY ASSOCIATES, INC.
KEY PLAN
NORTH
WWW.FHAI.COM
ARCHITECT
CONSULTANT
SOUTHWEST
7/16/2019 9:37:04 AM\\data1\citrixprofiles$\jelkins\My Documents\218052.00_PLUM_jelkinsHZQQL.rvtPROJECT NUMBER: 218052.00
INDOOR FACILITY
AT BADGER
FIELDS
CLAY TOWNSHIP
5459 E MAIN STREET
CARMEL, INDIANA
OVERALL FIRST FLOOR FIRE
PROTECTION PLAN
PFP2.01
PROJECT ISSUE DATE: JULY 16, 2019
DRAWN BY: JESCALE: 1/16" = 1'-0"
OVERALL FIRST FLOOR FIRE PROTECTION PLAN
N.T.S.
WET PIPE SPRINKLER RISER
DETAIL1 PROFESSIONA L ENGIN EERNo.
PE 19800147
STATE OFREGISTER
E
DINDIA N ATIMOTHYC.LEH
MANREV.
NO.DESCRIPTION DATE