HomeMy WebLinkAboutP2 - OVERALL SECOND FLOOR FIRE PROTECTION PLAN1
B C D E F G H I J K L M N
2
3
4
5
6
7
8
9
10
11
12
13
14
15
OA
MECHANICAL
201
ACTIVE
MEZZANINE
202
ELEVATOR
119
STAIR
118
FIRE PROTECTION MAINS
FROM BELOW
FFFF
ZONE 1ZONE 1ZONE 1ZONE 4ZONE 4ZONE 4
ZONE 3
ZONE 2
ZONE 3ZONE 4 FIRE PROTECTION
LIMITS (46,570 SQ./FT.)
ZONE 3 FIRE PROTECTION
LIMITS (46,570 SQ./FT.)
ZONE 2 FIRE PROTECTION
LIMITS (46,570 SQ./FT.)
ZONE 1 FIRE PROTECTION
LIMITS (21,540 SQ./FT.)
FIRE PROTECTION
MAIN DOWN
ZONE 1FIRE PROTECTION PLAN GENERAL NOTES
A. ALL FIRE PROTECTION WORK PERFORMED ON THIS
PROJECT SHALL BE SIZED PER HYDRAULIC
CALCULATIONS. CONTRACTOR IS RESPONSIBLE
FOR COORDINATION WITH ALL DUCTWORK,
RACEWAYS, CABLE TRAYS CONDUITS, STRUCTURAL
MEMBERS, PIPING AND ARCHITECTURAL CEILING
HEIGHTS AND DESIGN INTENT. ALL FIRE
PROTECTION WORK SHALL BE DONE IN
ACCORDANCE WITH NFPA 13, ALL APPLICABLE
STATE AND LOCAL CODES AND THE AUTHORITY
HAVING JURISDICTION TO DELIVER A PENALTY FREE
SYSTEM.
B. REFER TO DIVISION 21 FOR ALL AUTOMATIC WET
PIPE SPRINKLER SYSTEM REQUIREMENTS.
C. ALL SPRINKLER PIPING SYSTEM INSTALLATION
SHALL BE COORDINATED WITH OTHER TRADES AS IT
RELATES TO ACCESS AND SERVICEABILITY OF THAT
TRADES EQUIPMENT (I.E.: MECHANICAL UNITS,
LIGHTS...) ANY SPRINKLER SYSTEM PIPING
DETERMINED BY THE ENGINEER TO BE IN CONFLICT
WITH OTHER TRADES WILL BE RELOCATED WITH ALL
COST TO BE BORNE BY THE FIRE PROTECTION
CONTRACTOR.
D. REFER TO ARCHITECTURAL BUILDING SECTIONS,
WALL SECTIONS AND STRUCTURAL DRAWINGS FOR
STRUCTURAL STEEL ELEVATIONS AND SPACE
AVAILABLE ABOVE THE FINISHED CEILING. PROVIDE
ALL APPROPRIATE SUPPORT AND BRACING TO THE
BUILDING STRUCTURE AS REQUIRED FOR
INSTALLATION OF PIPING WITHIN THE GIVEN
CONDITIONS.
E. THE CONTRACTOR SHALL ENSURE THAT NO PIPING
OR EQUIPMENT WILL BE INSTALLED WITHIN 12'-0" OF
ANY EXTERIOR BUILDING WALL OPENING. OPENINGS
SHALL INCLUDE BUT SHALL NOT BE LIMITED TO
RELIEF AIR, LOUVERS... TO PREVENT FREEZING OF
PIPING AND EQUIPMENT. PIPING INSTALLED WITHIN
THIS SPECIAL ZONE AND ANY DAMAGE RESULTING
FROM THIS INSTALLATION WILL BE COMPLETELY
RESTORED AND ALL ASSOCIATED COST BORNE BY
THIS CONTRACTOR.PLANNORTHN
WS ECOPYRIGHT 2019 BY FANNING/HOWEY ASSOCIATES, INC.
KEY PLAN
NORTH
WWW.FHAI.COM
ARCHITECT
CONSULTANT
SOUTHWEST
7/16/2019 9:37:07 AM\\data1\citrixprofiles$\jelkins\My Documents\218052.00_PLUM_jelkinsHZQQL.rvtPROJECT NUMBER: 218052.00
INDOOR FACILITY
AT BADGER
FIELDS
CLAY TOWNSHIP
5459 E MAIN STREET
CARMEL, INDIANA
OVERALL SECOND FLOOR FIRE
PROTECTION PLAN
PFP2.02
PROJECT ISSUE DATE: JULY 16, 2019
DRAWN BY: JE
SCALE: 1/16" = 1'-0"
OVERALL SECOND FLOOR FIRE PROTECTION PLAN PROFESSIONA L ENGIN EERNo.
PE 19800147
STATE OFREGISTER
E
DINDIA N ATIMOTHYC.LEH
MANREV.
NO.DESCRIPTION DATE