Loading...
HomeMy WebLinkAboutP2 - OVERALL SECOND FLOOR FIRE PROTECTION PLAN1 B C D E F G H I J K L M N 2 3 4 5 6 7 8 9 10 11 12 13 14 15 OA MECHANICAL 201 ACTIVE MEZZANINE 202 ELEVATOR 119 STAIR 118 FIRE PROTECTION MAINS FROM BELOW FFFF ZONE 1ZONE 1ZONE 1ZONE 4ZONE 4ZONE 4 ZONE 3 ZONE 2 ZONE 3ZONE 4 FIRE PROTECTION LIMITS (46,570 SQ./FT.) ZONE 3 FIRE PROTECTION LIMITS (46,570 SQ./FT.) ZONE 2 FIRE PROTECTION LIMITS (46,570 SQ./FT.) ZONE 1 FIRE PROTECTION LIMITS (21,540 SQ./FT.) FIRE PROTECTION MAIN DOWN ZONE 1FIRE PROTECTION PLAN GENERAL NOTES A. ALL FIRE PROTECTION WORK PERFORMED ON THIS PROJECT SHALL BE SIZED PER HYDRAULIC CALCULATIONS. CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH ALL DUCTWORK, RACEWAYS, CABLE TRAYS CONDUITS, STRUCTURAL MEMBERS, PIPING AND ARCHITECTURAL CEILING HEIGHTS AND DESIGN INTENT. ALL FIRE PROTECTION WORK SHALL BE DONE IN ACCORDANCE WITH NFPA 13, ALL APPLICABLE STATE AND LOCAL CODES AND THE AUTHORITY HAVING JURISDICTION TO DELIVER A PENALTY FREE SYSTEM. B. REFER TO DIVISION 21 FOR ALL AUTOMATIC WET PIPE SPRINKLER SYSTEM REQUIREMENTS. C. ALL SPRINKLER PIPING SYSTEM INSTALLATION SHALL BE COORDINATED WITH OTHER TRADES AS IT RELATES TO ACCESS AND SERVICEABILITY OF THAT TRADES EQUIPMENT (I.E.: MECHANICAL UNITS, LIGHTS...) ANY SPRINKLER SYSTEM PIPING DETERMINED BY THE ENGINEER TO BE IN CONFLICT WITH OTHER TRADES WILL BE RELOCATED WITH ALL COST TO BE BORNE BY THE FIRE PROTECTION CONTRACTOR. D. REFER TO ARCHITECTURAL BUILDING SECTIONS, WALL SECTIONS AND STRUCTURAL DRAWINGS FOR STRUCTURAL STEEL ELEVATIONS AND SPACE AVAILABLE ABOVE THE FINISHED CEILING. PROVIDE ALL APPROPRIATE SUPPORT AND BRACING TO THE BUILDING STRUCTURE AS REQUIRED FOR INSTALLATION OF PIPING WITHIN THE GIVEN CONDITIONS. E. THE CONTRACTOR SHALL ENSURE THAT NO PIPING OR EQUIPMENT WILL BE INSTALLED WITHIN 12'-0" OF ANY EXTERIOR BUILDING WALL OPENING. OPENINGS SHALL INCLUDE BUT SHALL NOT BE LIMITED TO RELIEF AIR, LOUVERS... TO PREVENT FREEZING OF PIPING AND EQUIPMENT. PIPING INSTALLED WITHIN THIS SPECIAL ZONE AND ANY DAMAGE RESULTING FROM THIS INSTALLATION WILL BE COMPLETELY RESTORED AND ALL ASSOCIATED COST BORNE BY THIS CONTRACTOR.PLANNORTHN WS ECOPYRIGHT 2019 BY FANNING/HOWEY ASSOCIATES, INC. KEY PLAN NORTH WWW.FHAI.COM ARCHITECT CONSULTANT SOUTHWEST 7/16/2019 9:37:07 AM\\data1\citrixprofiles$\jelkins\My Documents\218052.00_PLUM_jelkinsHZQQL.rvtPROJECT NUMBER: 218052.00 INDOOR FACILITY AT BADGER FIELDS CLAY TOWNSHIP 5459 E MAIN STREET CARMEL, INDIANA OVERALL SECOND FLOOR FIRE PROTECTION PLAN PFP2.02 PROJECT ISSUE DATE: JULY 16, 2019 DRAWN BY: JE SCALE: 1/16" = 1'-0" OVERALL SECOND FLOOR FIRE PROTECTION PLAN PROFESSIONA L ENGIN EERNo. PE 19800147 STATE OFREGISTER E DINDIA N ATIMOTHYC.LEH MANREV. NO.DESCRIPTION DATE