Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
E9-1 - ELECTRICAL DETAILS
Support Structure Conduit Beam Clamp Beam Clamp Conduit Clamps Slotted Channel to Support 400% of Conduit Weight Slotted Channel to Support 400% of Conduit Weight. Double Nut Top and Bottom Beam Clamp Threaded Rod Conduit Clamps EXIT NOTES: 1. EQUIPMENT MOUNTING HEIGHTS SHALL BE INDICATED UNLESS OTHERWISE NOTED ON THE DRAWINGS OR IN THE SPECIFICATIONS. 2. CONCEAL RECEPTACLE BEHIND WATER COOLER. VERIFY EXACT MOUNTING HEIGHTS. 3. WHERE DEVICES ARE LOCATED IN MASONRY WALLS LOCATE DEVICE WITHIN COARSING SO THAT MOUNTING INDICATED HERE IN IS NOT EXCEEDED. 4. ALL RECEPTACLES ABOVE KITCHEN COUNTER AND NEAR BATH VANITIES SHALL BE INSTALLED HORIZONTALLY AT +44" AFF TO TOP OF THE BOX. CEILING F H S F STV VC IC F96"96"48"48"72"48"36"20"20"20"NOTE 220"20"96"96"72"96"48"20"48"48"84"SYMBOLS: FLOOR W WC J C S M D M ROOFING (BY OTHERS) BUILT-UP ROOF DECK. (BY OTHERS) STEPPED PVC BOOT CONDUIT STAINLESS STEEL CLAMPS SPUN ALUMINUM FLASHING BASE CONDUIT J F CONTROL C SVT 1. ALL EQUIPMENT SHOWN DARK IS TO BE PROVIDED BY DIVISION 26. 2. ALL EQUIPMENT SHOWN SHADED IS BY OTHER DIVISION. 3. SHOULD THE COOLER EQUIPMENT CONTRACTOR PROVIDE A COOLER UNIT MANUFACTURER THAT REQUIRES ADDITIONAL CONDUIT AND WIRING THAN SHOWN, THE COST FOR SUCH WORK SHALL BE THE RESPONSIBILITY OF THE COOLER EQUIPMENT CONTRACTOR. NOTES: 208V, 3∅COOLER POWER FEED PER EQUIPMENT CABLE AND CONDUIT SCHEDULE 240V, 3P FUSED DISCONNECT SWITCH (BY COOLER MFR.) TO 208/120V PANEL PER PLANS 4#10, #10G., 3/4"C. 2#10, #10G., 3/4"C. JUNCTION BOX EVAPORATOR MOTOR(S) BY COOLER MFR. THERMOSTAT AND SOLENOID VALVE BY COOLER MFR. TO 208/120V PANEL PER PLANS C CONTROL SVT 1. ALL EQUIPMENT SHOWN DARK IS TO BE PROVIDED AND INSTALLED. 2. ALL EQUIPMENT SHOWN SHADED IS BY FREEZER MANUFACTURER. 3. SHOULD THE FREEZER EQUIPMENT CONTRACTOR PROVIDE A FREEZER UNIT MANUFACTURER THAT REQUIRES ADDITIONAL CONDUIT AND WIRING THAN SHOWN, THE COST FOR SUCH WORK SHALL BE THE RESPONSIBILITY OF THE FREEZER EQUIPMENT CONTRACTOR. NOTES: 208V, 3∅FREEZER POWER FEED PER EQUIPMENT CABLE AND CONDUIT SCHEDULE 240V, 3P FUSED DISCONNECT SWITCH (BY FREEZER MFR.) TO 208/120V PANEL PER PLANS EVAPORATOR EQUIPMENT (THERMOSTAT, SOLENOID VALVE, DRAIN HEATER AND AND TERMINAL BLOCK BY FEEDER MFR). WIRING. 4#10, #10G., 3/4"C. EVAPORATOR EQUIPMENT (THERMOSTAT, SOLENOID VALVE, DRAIN HEATER AND AND TERMINAL BLOCK BY FEEDER MFR). WIRING.10'-0"10 '-0"10'-0" #6 AWG COPPER CABLE EXOTHERMICALL Y WELD CABLE TO GROUND RODS 3/4" DIA. X 10' LONG COPPER CLAD STEEL GROUND ROD 3/0 COPPER CABLE PROJECT NUMBER DATE CERTIFIED BY: REVISIONS ISSUE DRAWING © 2019 Halstead Architects All Rights Reserved- - - - - - - 100% CONSTRUCTION DOCUMENTS E9.1 20015Owner 09/01/2020 ELECTRICAL DETAILSSitara Indian Restaurant13080 GRAND BOULEVARDCARMEL, IN 4603212" = 1'-0" 1.5" AND SMALLER CONDUIT SUPPORT DETAIL1 12" = 1'-0" 2" AND LARGER CONDUIT SUPPORT DETAIL2 12" = 1'-0" ELECTRICAL ELEVATION3 12" = 1'-0" CONDUIT ROOF PENETRATION DETAIL4 12" = 1'-0" COOLER WIRING DIAGRAM5 12" = 1'-0" FREEZER WIRING DIAGRAM6 12" = 1'-0" GROUNDING TRIANGLE DETAIL7 10/20/20