Loading...
HomeMy WebLinkAboutFS2-1 - FIRST FLOOR PLAN - FIRE SUPPRESSION24x3621x48 21x4221x42 21x4221x42 21x48 21x48 21x36 21x48 21x48 24x48B C E F G H 6 7 8 6 6 7 7 8 8 B B C C E E F F G G H H VEST. 101 LOBBY 102 COOLER 114 STORAGE 113 SOUTH DINING 106 TLT 103 ALCOVE 104 TLT 105 KITCHEN 112 PICK UP 107 WAIT STATION 108DISHWASHING 111 NORTH DINING 109 PRIVATE DINING 110 A. ALL WORK SHALL BE IN ACCORDANCE WITH THE BEST QUALITY STANDARDS OF THE TRADE AND SHALL CONFORM WITH ALL FEDERAL, STATE AND LOCAL CODES AND STANDARDS. THE SAME ARE MADE A PART OF THESE CONTRACT DOCUMENTS, THE SAME AS IF REPEATED HEREIN. B. CONTRACT DOCUMENTS CONSIST OF BOTH THE PROJECT MANUAL AND DRAWINGS AND BOTH ARE INTENDED TO BE COMPLIMENTARY -ANYTHING APPEARING ON EITHER MUST BE EXECUTED THE SAME AS IF SHOWN ON BOTH. C. THE CONTRACTOR SHALL INCLUDE IN BID PROPOSAL ALL COSTS REQUIRED TO COMPLETELY AND PROPERLY INSTALL ALL WORK REQUIED FOR THE PROJECT AND SHALL EXAMINE THE SCOPE OF WORK OF OTHER TRADES PRIOR TO SUBMITTING A BID PROPOSAL. D. CONSTRUCTION DOCUMENTS SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE, HOWEVER, SYSTEMS HAVE BEEN SHOWN DIAGRAMATICALLY AND IN SOME CASES, ENLARGED FOR CLARITY. ANY OFFSETS, ADDITIONAL FITTINGS AND/OR APPURTENANCES REQUIRED TO PROVIDE A COMPLETE AND COORINATE SYSTEM SHALL BE BORNE BY THE CONTRACTOR. E. PROVIDE AND INSTALL AUTOMATIC SPRINKLER SYSTEMS AS REQUIRED IN ALL NEW AREAS UNLESS OTHERWISE NOTED. THE FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND ADJUST HIS WORK ACCORDING TO ANY VERIATIONS OR DEVIATIONS FROM THOSE SHOWN ON THE PLANS. F. THE DESIGN AND INSTALLATION OF THE FIRE PROTECTION SYSTEM SHALL CONFORM TO THE NATIONAL FIRE PROTECTION ASSOCIATION CODES (NFPA) STANDARDS AND RECOMMENDED PRACTICES, LATEST EDITIONS ADOPTED BY THE STATE OF INDIANA. ALL APPLICABLE STATE AND LOCAL FIRE PREVENTION BUREAU'S STATUTES AND CODES AND REQUIREMENTS OF OWNER'S INSURANCE UNDERWRITER. INCLUDE ALL PIPE AND FITTINGS, APPROVED WATER FLOW DETECTING ALARM DEVICES, PRESSURE GAUGES, SPRINKLER HEADS, INDICATIONG VALVES, FIRE DEPARTMENT CONNECTIONS AND OTHER MATERIALS NEEDED TO PROVIDE A COMPLETE AND OPERABLE CODE COMPLIANT SYSTEM. G. THE FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN LAYOUT OF THE SPRINKLER SYSTEMS AS REQUIRED FOR THE NEW AND REMODELED AREAS. THE ENTIRE BUILDING SHALL BE SPRINKLED PER INDIANA BUILDING CODES AND NFPA 13, LATEST ENFORCED EDITION. H. SPRINKLER PIPING INSTALLATION SHALL BE COORDINATED WITH OTHER TRADES, EQUIPMENT, DUCTWORK, STRUCTURAL STEEL, ELECTRICAL PANELS, RACEWAYS, ARCHITECTURAL DESIGN INTENT; INCLUDING REFLECTED CEILING PLANS AND CEILING TILE DIMENSIONS PRIOR TO INSTALLATION. PRIPING NOT COORDINATED MAY NEED TO BE REMOVED AND/OR REPLACED. ANY REMOVAL REQUIRED DUE TO INCOMPLETE COORDINATION, SHALL BE DONE BY THE SPRINKLER CONTRACTOR, ALL COSTS SHALL BE BORNE BY THE SPRINKLER CONTRACTOR. I. THE FIRE PROTECTION CONTRACTOR SHALL PROVIDE AND INSTALL CEILING ACCESS PANELS FOR ACCESS TO SHUT-OFF VALVES, CONTROL VALVES, DRAIN VALVES, ETC. LOCATED ABOVE NON-ACCESSIBLE CEILINGS. COORDINATE LOCATION OF ACCESS PANELS WITH ARCHITECT/ENGINEER. J. ALL ELECTRICAL AND MECHANICAL ROOMS SHALL BE SPRINKLED WITH HIGH TEMPERATURE SPRINKLER HEADS. K. NO PIPING SHALL BE ROUTED OVER OR THRU ELECTRICAL OR IT CLOSETS, UNLESS IT IS TO SERVICE EQUIPMENT OR DEVICES IN THE SPACE. L. REFER TO THE ARCHITECTURAL LIFE SAFETY PLANS. M. SEE SHEET M0.1 FOR SYMBOLS AND ABBREVIATIONS. N. SEE SHEET FS0.2 FOR FIRE SUPPRESSION SPECIFICATIONS. GENERAL SHEET NOTES PROJECT NUMBER DATE CERTIFIED BY: REVISIONS ISSUE DRAWING © 2019 Halstead Architects All Rights Reserved- - - - - - - 100% CONSTRUCTION DOCUMENTS FS2.1 20015Owner 09/01/2020 FIRST FLOOR PLAN - FIRE SUPPRESSIONSitara Indian Restaurant13080 GRAND BOULEVARDCARMEL, IN 46032SCALE: 1/8" = 1'-0" 1 First Floor Plan -Fire Suppression 10/20/20