HomeMy WebLinkAboutA010.0 EXTERIOR ELEVATIONS-Layout2GARAGE FLOOR
+19'-2-7/8"
LEVEL ONE
100'-0"
LEVEL TWO
111'-1-3/4"
TRUSS BEARING
109'-9-5/8"
LEVEL ONE
100'-0"
LEVEL TWO
111'-1-3/4"
122'-8-3/4"
GYM ENTRY
97'-8"
RAFTER BEARING
CHIMNEY
130'-4"
AB B
D
D
G
H
12
5 12
5
12
5 12
5
ARCHITECTURAL SHINGLES
5 : 12 PITCH
ARCHITECTURAL SHINGLES
5 : 12 PITCH
J
M
M
K
K
BRICK VENEER
BNDCH-8S
BNDCH-8S
BRICK VENEER
BRICK VENEER
BRICK VENEER
BRICK VENEER
BRICK BASEBRICK BASE
SECTION THRU
GYM ENTRY
BUILDING CORNICE
SEE WALL SECTIONS
FOR DETAILS
BUILDING CORNICE
SEE WALL SECTIONS
FOR DETAILS
BUILDING CORNICE
SEE WALL SECTIONS
FOR DETAILS
10" ROUND
COLUMNS
VERIFY STEPS
W/ LANDSCAPE
VERIFY STEPS
W/ LANDSCAPE
VERIFY STEPS
W/ LANDSCAPE
1/2" / FT SLOPE 11'-5 1/4"10'-3 7/8"MICRO LAM
BRICK
ARCH
BRICK
ARCH9'-0"9'-0"GUTTER
MICRO LAM
2 x 12 TR SLOPED
2 x 6 TR FLAT JOISTS
T & G CAR SIDING
2B ROYAL
FLU CAP
GARAGE FLOOR
+19'-2-7/8"
LEVEL ONE
100'-0"
LEVEL TWO
111'-1-3/4"
TRUSS BEARING
109'-9-5/8"
GYM FLOOR
95'-1-7/8"
GARAGE FLOOR
+19'-2-7/8"
LEVEL ONE
100'-0"
LEVEL TWO
111'-1-3/4"
MAIN ENTRY
101'-0"
RAFTER BEARING
122'-8-3/4"
TRUSS BEARING
109'-9-5/8"
TRUSS BEARING
122'-8-3/4"
CHIMNEY
130'-4"
A
A AB
12
5
12
5 12
5
ARCHITECTURAL SHINGLES
5 : 12 PITCH
ARCHITECTURAL SHINGLES
5 : 12 PITCHJ
J J
K
BNDCH-8S
BNDCH-8S
BRICK VENEER
BRICK VENEER
BRICK BASEBRICK BASE
BUILDING CORNICE
SEE WALL SECTIONS
FOR DETAILS
BUILDING CORNICE
SEE WALL SECTIONS
FOR DETAILSBUILDING CORNICE
SEE WALL SECTIONS
FOR DETAILS
BUILDING CORNICE
SEE WALL SECTIONS
FOR DETAILS BRICK SOLDIERBRICK SOLDIER BRICK SOLDIER
VERIFY STEPS
W/ LANDSCAPE
DOOR LINK 450/451
FLUSH DOORS
DOOR LINK 450/451
FLUSH DOORS
DOOR LINK 450/451
FLUSH DOORS
ELEVATION BEYOND
6' x 12" BRICK WALL W/
CAST STONE CAP
SEE LANDSCAPE PLAN
2B ROYAL
FLU CAP
A
B
4'-9"
6" 3'-0" 6"
8'-3" 8" 4" 7"11"8" 4" 7"1'-7"11"8" 1'-7"6" 3'-0" 6" 3'-0" 6"
C
9'-3"7"4" 8" 11" 6" 3'-6" 6" 3'-6" 6"
G
H
3'-0"
3'-3"
J
K7 5/8"7 5/8"6'-6"
6'-9"
L
7'-9"7 5/8"7'-6"
M
E
5'-0"
6" 3'-3" 6"8" 4" 7"11"1'-7"HEAD AND SILL DETAILS
VERIFY ALL DIMENSIONS W/ ACTUAL
DOORS AND WINDOWS - PROVIDE
POSITIVE DRAINAGE FOR BRICK FLASHING
D8" 4" 7" 6" 3'-0" 6"6" 3'-0" 6" 1'-7"3'-0"
10'-3" 7 5/8" 10'-0"
6" 12'-0" 6" 8" 4" 7" 1'-7"6" 6'-0" 6"8" 4" 7" 1'-7" TRUSS BEARING
122'-8-3/4"
GYM FLOOR
95'-1-7/8"
CC
12
5
12
5
ARCHITECTURAL SHINGLES
5 : 12 PITCH
L L BNDCH-8SBNDCH-8S
BRICK VENEER
BRICK VENEER
BRICK BASEBRICK BASE
BUILDING CORNICE
SEE WALL SECTIONS
FOR DETAILS
B
H
12
5
12
5
ARCHITECTURAL SHINGLES
5 : 12 PITCH K
BRICK VENEER
BUILDING CORNICE
SEE WALL SECTIONS
FOR DETAILS
VERIFY STEPS
W/ LANDSCAPE
N
B
K
7'-8"9'-0"ARCHITECTURAL SHINGLES
5 : 12 PITCH
BRICK VENEER
BRICK ARCH
W/ CURVED STEEL LINTEL
VERIFY STEPS
W/ LANDSCAPE
PROVIDE RAILING
PER CODE
MTL CAP FLASHING
2
EXTERIOR
ELEVATIONS
ALL IDEAS, DESIGNS AND PLANS INDICATED OR
REPRESENTED BY THESE DRAWINGS ARE OWNED
BY, AND THE PROPERTY OF STUART R SHADE, RA.
CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE
FOR ALL DIMENSIONS ON THE JOB SITE. ALL RIGHTS
RESERVED, EXCEPT FOR USES EXPRESSLY
PERMITTED IN WRITING.
SHEET NUMBER:
DATE:
SRS ARCHITECTS
200 S RANGELINE, SUITE 226
CARMEL, INDIANA 46032
PHONE: 317-989-6248
E-MAIL : sshade@mitschdesign.com
REV 1:PROJECT :NEW RESIDENCEREVISED CONSTRUCTION SET 10_16_20CARMEL, INDIANA 46032BISHOPS GATE @ WEST CLAYLOT 410 AND 411 - BIRD CAGE WALK @ HORSEFERRY RDINC.
SCALE:
N
3/16"=1'-0"
NORTH ELEVATION - MAIN
SCALE:
E
3/16"=1'-0"
EAST ELEVATION - ALLEY
SCALE:
N
3/16" = 1'-=0"
NORTH ELEVATION
10/29/20