Loading...
HomeMy WebLinkAboutS001 FOUNDATION PLAN-Layout112'-0" 16'-8" 3'-0" 16'-8" 11'-4" 12'-0" 17'-8" 7'-0" 9'-8" 2'-4"11'-0" 17'-8" 11'-0" 12'-8" 15'-8" 9'-0" 2'-0" 10" 22'-1" 58'-0" 42" x 42" x 12" CONC PAD W/ 3 # 5'S EACH WAY 3-1/2" STEEL COL W12 x 35 BEAM POCKET NOTE: BASEMENT CONTRACTOR TO VERIFY BEARING HEIGHTS OF BEAM POCKETS PROVIDE FILL FOR CONCRETE PORCH ON GRADE PROVIDE FILL FOR CONCRETE PORCH ON GRADE PROVIDE FILL FOR CONCRETEPORCH ON GRADEHOLD DOWN 8" HOLD DOWN 8" HOLD DOWN 8" HOLD DOWN 8"10" 4'-2" 10" 10'-2 1/4" 17'-1 3/4" 10" 18'-4" 1'-0" 37'-4" 1'-0"5'-0" 6'-0" 12'-1 3/4" 10'-8" 10" 6'-6" 8" 6'-6"8'-0" 4'-4" 8" 5'-0" 2'-8" 9'-10" 13'-8" 24'-6" 1'-0" 19'-4" 5'-0" 10" 12'-0 1/2" 10" 5'-1 1/2" 4'-0" 10" 16'-0" 10" 15'-2" 11'-2"9'-0" 6'-2 1/4" 18'-0 1/4" 8'-1 1/2"9'-0" 10"9'-4"9'-2" 6'-0 1/2"56'-0"10" 4'-7 1/2" 5'-0" 12'-8 1/2" 5'-8" 8" 10'-2" 17'-0" 17'-4" 15'-4" 11'-4" 12'-8"4'-2 1/4" 6'-2 1/4"12'-0"10"8"3'-0" 10"9'-6 1/2" 10" 3'-0"SUMP PIT FOR GYM FIELD VERIFY EXACT LOCATION SUMP PITS (2) VERIFY EXACT LOCATIONS FIELD VERIFY PENETRATIONS THRU WALL FOR PLUMBING AND ELECTRIC 12'-0"17'-11 3/8" 3'-3" 5'-8 1/2"34'-8" 17'-8" 5'-8" 1'-4"3'-0" 40'-0" 12'-8" 3'-0"58'-8" 16'-3" 3'-1" 16'-3" 9'-3"4'-2 1/4" 10" 4'-2" 10" 5'-2" 3'-4" 3'-11" 5'-0"8'-0"10" 23'-0" 57'-0"16'-0" 5'-8" 21'-8"26'-11"8'-3" 10'-6" 38'-2"15'-8" 48'-0" ENGINEERED FLOOR PROVIDER TO TRACE AND VERIFY LOADS FROM ROOF AND LEVEL TWO - NOTIFY DESIGNER OF ANY DISCREPANCIES PRIOR TO FABRICATION. BEAM POCKET BEAM POCKET BEAM POCKET 2'-4" 3'-0"3'-3"4'-3 3/4" 8" x 16" FTG 8" x 16" FTG 8" x 16" FTG TOP OF FTG TOP OF WALL BRICK LEDGE 99'-9-7/8" 96'-8" 94'-9-7/8" TOP OF FTG TOP OF WALL BRICK LEDGE 99'-9-7/8" 96'-8" 94'-9-7/8" TOP OF FTG TOP OF WALL BRICK LEDGE 99'-9-7/8" 96'-8" 94'-9-7/8" TOP OF FTG TOP OF WALL BRICK LEDGE 99'-9-7/8" 96'-8" 94'-9-7/8" TOP OF FTG TOP OF WALL BRICK LEDGE 97'-0" 96'-8" 94'-0" SLAB @ +95'-1-7/8" SLAB @ +97'-0" SLAB @ +89'-1-7/8"SLAB @ +89'-1-7/8" SLAB @ +89'-1-7/8" SLAB @ +97'-8" SLAB @ +95'-1-7/8" SLAB @ +97'-6" SLAB @ +100'-8-3/4" TOP OF FTG TOP OF WALL BRICK LEDGE 97'-0" 96'-8" 94'-0" TOP OF FTG TOP OF WALL BRICK LEDGE 97'-0" 96'-8" 94'-0" TOP OF FTG TOP OF WALL BRICK LEDGE 98'-9-7/8" 96'-8" 88'-9-7/8" TOP OF FTG TOP OF WALL BRICK LEDGE 98'-9-7/8" 96'-8" 88'-9-7/8" TOP OF FTG TOP OF WALL BRICK LEDGE 98'-9-7/8" 96'-8" 88'-9-7/8" TOP OF FTG TOP OF WALL BRICK LEDGE 98'-9-7/8" 96'-8" 88'-9-7/8" TOP OF FTG TOP OF WALL BRICK LEDGE 98'-9-7/8" 96'-8" 88'-9-7/8" TOP OF FTG TOP OF WALL98'-9-7/8" 88'-9-7/8" TOP OF FTG TOP OF WALL BRICK LEDGE 98'-9-7/8" 96'-8" 88'-9-7/8" TOP OF FTG TOP OF WALL BRICK LEDGE 98'-9-7/8" 96'-8" 88'-9-7/8" TOP OF FTG TOP OF WALL BRICK LEDGE 99'-9-7/8" 96'-8" 94'-9-7/8" TOP OF FTG TOP OF WALL97'-0" 94'-9-7/8" TOP OF FTG TOP OF WALL 97'-8" 88'-9-7/8" TOP OF FTG TOP OF WALL 98'-9-7/8" 88'-9-7/8" WALL HGT CHANGE WALL HGT CHANGE NOTE: FINAL HEIGHTS OF ALL WALLS AND FOOTINGS TO BE FIELD VERIFIED WITH EXISTING CONDITIONS BY CONTRACTOR PRIOR TO INSTALLATION OF CONCRETE. ANY DISCREPANCIES SHALL BE MADE KNOWN TO THE ARCHITECT PRIOR TO INSTALLATION OF FOOTINGS AND WALL FORMS. BASEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN OF STEEL REINFORCING IN POURED WALLS AS REQUIRED TO MEET APPLICABLE BUILDING CODES. FRONT STEP FOUNDATION TO BE FIELD VERIFIED WITH LANDSCAPE PROVIDER BRICK LEDGE 1'-0" 8'-0" 1'-0" 3'-0"6'-4" POURED CONC STEPS 6'-4" 12" BLOCK FOUNDATION ON 12" X 24" FOOTING 12" BLOCK FOUNDATION ON 12" X 24" FOOTING 6'-2"6'-6" 23'-8"CONCRETE CONTROL JOINTS SHALL BE INSTALLED ACCORDING TO NATIONAL CONCRETE INSTITUTE STANDARDS. STEEL LINTEL 3'-0" 6'-2"56'-0"30'-0"3'-0" 91'-8"114'-0" 4'-8" 1'-8" 8'-0"21'-8"8'-0" CONCRETE CONTRACTOR TO PROVIDE CERTIFIED SHOP DRAWINGS FOR POURED CONCRETE WALLS AND FOOTERS W12 x 35 W12 x 35W12 x 35W12 x 35 W12 x 35 W12 x 35 STEEL BEAM SUPPLIER TO SUPPLY CERTIFIED SHOP DRAWINGS FOR BEAM AND COLUMN DETAILS AND TO VERIFY BEAM SIZE FOR FLOOR AND POINT LOADS 1'-10" TOP OF FTG TOP OF WALL BRICK LEDGE 91'-5-7/8" 88'-9-7/8" 90'-9-7/8" HOLD DOWN CONC 8'-6-1/8" FOR WINDOW WELL 7'-2"8 A 8 A 8 B 8 A 8 C 8 D 9 E 9 E 9 F 9 F 9 G 9 H 9 H 10 I 10 I 10 J 10 J 10 K 11 3 11 1 11 1 11 2 11 1B 3 FOUNDATION PLAN SCALE: F 1/4"=1'-0" FOUNDATION PLAN ALL IDEAS, DESIGNS AND PLANS INDICATED OR REPRESENTED BY THESE DRAWINGS ARE OWNED BY, AND THE PROPERTY OF STUART R SHADE, RA. CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS ON THE JOB SITE. ALL RIGHTS RESERVED, EXCEPT FOR USES EXPRESSLY PERMITTED IN WRITING. SHEET NUMBER: DATE: SRS ARCHITECTS 200 S RANGELINE, SUITE 226 CARMEL, INDIANA 46032 PHONE: 317-989-6248 E-MAIL : sshade@mitschdesign.com REV 1:PROJECT :NEW RESIDENCEREVISED CONSTRUCTION SET 10_27_20CARMEL, INDIANA 46032BISHOPS GATE @ WEST CLAYLOT 410 AND 411 - BIRD CAGE WALK @ HORSEFERRY RDINC. TOTAL BASEMENT AREA - 2560 SF 10/29/20