Loading...
HomeMy WebLinkAboutS001.08" 22'-2" 3'-2" 76'-4" 25'-10" 7'-8" 76'-4" 19'-10" 16'-8"5'-6" 7'-0" 13'-10"24'-6"53'-0"6'-4" 11'-0" 8" 8" FURNACE SUMP PIT LOCATIONMAY VARY BASEMENT6' CONCRETE WALLW/PONY WALL ABOVEWH GARAGE SLABBASEMENT34'-8" 18'-4"53'-0"8" 6'-8" 6'-2" 13'-10"3'-9" 35'-4"15'-8" 8" 8" 12'' 8" 24'-10" 4'-0" 8" 8"8"8"7'-2"5'-6" 16'-8"3'-6" 2'-9" 1'-7"6'-4" 42'-10" CRAWLSPACEUNINHABITABLE16'-8" 18'-8" 4'-0" 4-0 4-0 HS @ 6'-8" EGRESS W/AREA WELL &PERMANENT LADDER PERCODE 3'-6" 8"PORCH19'-0" 9'-6" 4'-0" 12'-9" AREA WELLPER CODE 4-0 4-0 HS @ 6'-8" EGRESS W/AREA WELL &PERMANENT LADDER PERCODE AREA WELLPER CODE 10'-0"15'-10" 17'-8" 8'-2" 8'-0"10.5"Hx6.25"W BEAM POCKET 36"x36" PAD FTG 36"x36" PAD FTG 30"x30" PAD FTG 10.5"Hx6.25"W BEAM POCKET 10"Hx4"W BEAM POCKET 30"x30" PAD FTG 8'-0" 23'-7" 15'-0" 10'-10" 8" 12''8" 8"8" UNLESS NOTED OTHERWISENOTE: ALL FLR. CEILING HEIGHTS9'-0" BSMT 1'-4 1/2" 16'-3"1'-4 1/2"PORCH10'-6" 7'-8"8'-4" 8"8" 15'-10" 8"8"David Weekley Homesare guidelines for construction use only.specifications, shown on this document,The measurements, dimensions, and otherstructure may vary. This document maynot be relied on as a representation ofThe actual specifications of the finishedwhat the completed structure will look like.AUTOCAD 2004C Scale:Rev.: Date:Lot:Blk:Sect:Proj. No.:Job No.:422400262600WOODSIDE AT WEST CLAY CARMEL, INSOUTH 5890-A PENDULA INDIANAPOLIS FS-1 08/04/17 MM, JP, JM Weekley Homes L.P. 20171/8" = 1'-0"02/20/18 JH13707 SOUNDVIEW PLACE10/13/20