Loading...
HomeMy WebLinkAboutVan Niekerk-L2.02 Construction Plan.REV10-21ter Main DN DNFFE BM 0'0" Porch Foundation -1'9" -3'3" -5'10" -6'0" -3'0" TW -2'5" BW -3'3" -3'2" -3'0" -4'6" -4'11" -6'0" -4'7" -8'7" -3'2" -6'6" -4'3 M G TS -2'3" BS -3'3" COPING -3'1" COPING -3'1" -3'2" TS -2'2 BS -3'2" -3'2" TW -1'0" BW -3'0" -3'0" -3'0" TS -3'2" BS -3'8" -3'8" -3'9" -3'9" -3'2" -3'3" 7'-6"6'-712"7'-4" 27'-11" 54'-4"8'5'-2"2'-1" 5'-11" 13'-81 2"9'-2"2' 16'-10"5'-9"25' 18'-8"19'-8" 19'-8" 7'8'-2" 3'-8 " 7' 7'-1112"3'-91 2" 4'-81 2" 19'-11 2" 12'-6" 4'-101 2"15'-6"10'-2"8'-2"7'-81 2" 4'-9"14'-212"10'-4"11'-412"4'-6" 15' Drai nage Eas ementGASGAS GAS GAS GASGASGASGASGASGASGASGAS GAS GAS GAS GAS GASGAS 15'-312"15' Drainage Easement 35' Drainage Utility & Sanitary Sewer Easement40' Building Setback Line Water Main DN DNM G 7'-6"6'-712"7'-4" 27'-11" 54'-4"8'5'-2"2'-1" 5'-11" 13'-812"9'-2"2'16'-10"5'-9"25' 18'-8"19'-8" 19'-8"7'8'-2" 3'-8" 7' 7'-1112"3'-91 2" 4'-812" 19'-11 2" 12'-6" 4'-1012"15'-6"10'-2"8'-2"7'-812" 4'-9"14'-212"10'-4"11'-412"4'-6"23'-7"123'-1"111'-8" 15' Drainage Easement 15'-312"10579 NOMA COURT CARMEL, IN 46032Van N iekerk R E SI DE N C E 1:20 R E A R B A S E P L A N These designs and i d e as ar e t h e property of BPI and covered under an Artistic Copyright. Use of BPI's designs by a t h ird p arty wi t h o u t B P I ' s written co ns ent i s c o p y r i g h t infringement and is punishable by law; however, BPI shall not be liable for any reason if the designs are used by a third p a r t y wi t h o u t written consent. C. 2020 BPI Outdoor Living LA/D: KS DRAFTED BY: KS L2.01 DATE: 9-16-20 10-21-20 NOTES: - GREENSPACE MITIGATION LOT COVERAGE = 37,143 SF / 0.85 ACRE EXISTING CONDITIONS: IMPERVIOUS = 6,168.67 SF PERVIOUS = 30,974.33 SF GREENSPACE = 0.83 % PROPOSED CONDITIONS: IMPERVIOUS = 9,356.85 SF PERVIOUS = 27,786.15 SF GREENSPACE = 0.75 % BOUNDARY PLAN 1:40 11/02/20