HomeMy WebLinkAboutExtra Space - Carmel_ Civils (07-13-2020 progress updates).pdf116th ST. CONSTRUCTION PLANS FOR CARMEL SELF STORAGE 147 & 155 WEST CARMEL DRIVE CARMEL, IN 46032 DOCKET #PZ20010015-17 DP ADLS UV V C001 TITLE SHEET W190582-C001 title NO SCALE HAMILTON COUNTY PROJECT LOCATION PROJECT LOCATION AREA MAP LOCATION MAP PROJECT BM HARRISON MONUMENT AT THE EAST QUARTER CORNER OF SECTION 36, TOWNSHIP18 NORTH, RANGE 03 EAST PER HAMILTON COUNTY SURVEYOR'S OFFICE CORNER NUMBER 18033606. LOCATED IN THE SOUTHBOUND LANE OF RANGELINE ROAD APPROXIMATELY 190 FEET NORTH OF THE INTERSECTION OF EXECUTIVE DRIVE AND RANGELINE ROAD. ELEV.844.55 (NAVD 88) SITE TBM CUT 'X' ON THE SOUTH BONNET BOLT OF A FIRE HYDRANT LOCATED APPROXIMATELY 22 FEET NORTHWEST OF THE NORTHWEST CORNER OF THE SURVEYED REAL ESTATE ON THE SOUTH SIDE OF CARMEL DRIVE. ELEV.831.54 (NAVD 88) BENCHMARK INFORMATION APPROXIMATELY 4.3 ACRES LOCATED AT 147 AND 155 WEST CARMEL DRIVE - PART OF SOUTHEAST 1 4, SECTION 36, TOWNSHIP 18 NORTH, RANGE 3 EAST, CLAY TOWNSHIP, HAMILTON COUNTY, INDIANA LAND DESCRIPTION PLANS PREPARED FOR ADAM FRENCH PROPERTY, LLC 9000 KEYSTONE CROSSING, SUITE 660 INDIANAPOLIS, IN 46240 TELEPHONE: (317) 733-6400 CONTACT PERSON: JIM ADAMS EMAIL: JADAMS@FILCOLTD.COM 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION. 2. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES IN THE VICINITY OF THE CONSTRUCTION AREA PRIOR TO STARTING CONSTRUCTION 3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO NOTIFY AND COORDINATE CONSTRUCTION WITH ALL RESPECTIVE UTILITIES. 4. ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE SCOPE OF WORK SECTION ARE ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTORS. 5. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS FOR EXCAVATIONS; FINAL RULE 29 CFR PART 1926, SUBPART "P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET IN DEPTH. 6. IN ADDITION, EXCAVATION EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN OF A TRENCH SAFETY SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER. 7. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR TO MAINTAIN QUALITY CONTROL THROUGHOUT THIS PROJECT. 8. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL STANDARDS. 9. THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. 10. ANY FIELD TILES ENCOUNTERED DURING EXCAVATION SHALL BE REPAIRED AND CONNECTED TO NEW W W W G G N00°01'56"W(M) N00°49'00"E(D) 178.64'(M) 180.08'(D) WEST CARMEL DRIVE S00°05'46"E(M) S00°45'10"W(D) 411.64' N00°05'46"W(M) N00°45'10"E(D) 398.63' S89°17'51"W(M) N89°51'24"W(D) 226.23' S89°17'51"W(M) N89°51'24"W(D) 206.01' N89°25'05"E(M) S89°43'58"E(D) 206.02' N00°50'56"W(M) N89°26'06"E(M) S89°42'58"E(D) 189.95' S00°50'56"E(M) S00°00'00"E (D) 181.33'(M) 182.73'(D) N89°48'49"E(M) S89°20'15"E(D) 190.00' N89°25'05"E(M) S89°43'58"E(D) 241.02' N00°01'56"W(M) N00°49'00"E(D) 4.56' S89°17'51"W(M) N89°51'24"W(D) 299.23' DELTA=10°06'20" R=561.07' T=49.61' L=98.96' CH BRG=N83°08'42"W(M) CH LEN=98.83' G G G G G W W W W C E E E E E E E E E E E E W W G G G G G C C C * C101 EXISTING CONDITIONS W190582-C100 existing conditions REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 W S N E PROJECT BM HARRISON MONUMENT AT THE EAST QUARTER CORNER OF SECTION 36, TOWNSHIP18 NORTH, RANGE 03 EAST PER HAMILTON COUNTY SURVEYOR'S OFFICE CORNER NUMBER 18033606. LOCATED IN THE SOUTHBOUND LANE OF RANGELINE ROAD APPROXIMATELY 190 FEET NORTH OF THE INTERSECTION OF EXECUTIVE DRIVE AND RANGELINE ROAD. ELEV.844.55 (NAVD 88) SITE TBM CUT 'X' ON THE SOUTH BONNET BOLT OF A FIRE HYDRANT LOCATED APPROXIMATELY 22 FEET NORTHWEST OF THE NORTHWEST CORNER OF THE SURVEYED REAL ESTATE ON THE SOUTH SIDE OF CARMEL DRIVE. ELEV.831.54 (NAVD 88) BENCHMARK INFORMATION 8 E OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU G W W W G G W WEST CARMEL DRIVE G G G G G W W W W C E E E E E E E E E E E E W W G G G G G C C C C C C C C C W W W W WEST CARMEL DRIVE G G PROPOSED BUILDING 20,121SF± PER FLOOR F.F.E. = 829.85 D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D C STM STM STM STM STM STM STM STM STM STM STM STM STM ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS W W W W W W W W W W W W W W W W W W E E E E E E E E E E DRY POND IP IP IP IP SD SD SD SD SD SD SD SD SD SD SD SD SD SD SF SF SF SF SF SF SF IP SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF 6 SEDIMENTATION/SILT FENCE INSTALLATION PREFABRICATED SILT FENCE 1. LAY OUT THE LOCATION OF THE FENCE SO THAT IT IS PARALLEL TO THE CONTOUR OF THE SLOPE AND AT LEAST 10 FEET BEYOND THE TOE OF THE SLOPE TO PROVIDE A SEDIMENT STORAGE AREA. TURN THE ENDS OF THE FENCE UP SLOPE SUCH THAT THE POINT OF CONTACT BETWEEN THE GROUND AND THE BOTTOM OF THE FENCE END TERMINATES AT A HIGHER ELEVATION THAN THE TOP OF THE FENCE AT ITS LOWEST POINT. 2. EXCAVATE AN EIGHT-INCH DEEP BY FOUR-INCH WIDE TRENCH ALONG THE ENTIRE LENGTH OF THE FENCE LINE. INSTALLATION BY PLOWING IS ALSO ACCEPTABLE. 3. INSTALL THE SILT FENCE WITH THE FILTER FABRIC LOCATED ON THE UP-SLOPE SIDE OF THE EXCAVATED TRENCH AND THE SUPPORT POSTS ON THE DOWN-SLOPE SIDE OF THE TRENCH. 4. DRIVE THE SUPPORT POSTS AT LEAST 18 INCHES INTO THE GROUND, TIGHTLY STRETCHING THE FABRIC BETWEEN THE POSTS AS EACH IS DRIVEN INTO THE SOIL. MINIMUM OF 12 INCHES OF THE FILTER FABRIC SHOULD EXTEND INTO THE TRENCH. 5. LAY THE LOWER FOUR INCHES OF FILTER FABRIC ON THE BOTTOM OF THE TRENCH AND EXTEND IT TOWARD THE UP-SLOPE SIDE OF THE TRENCH. 6. BACKFILL THE TRENCH WITH SOIL MATERIAL AND COMPACT IT IN PLACE. NOTE: IF THE SILT FENCE IS BEING CONSTRUCTED ON-SITE, ATTACH THE FILTER FABRIC TO THE SUPPORT POSTS AND ATTACH WOODEN LATHE TO SECURE THE FABRIC TO THE POSTS. ALLOW FOR AT LEAST 12 INCHES OF FABRIC BELOW GROUND LEVEL. COMPLETE THE SILT FENCE INSTALLATION, FOLLOWING STEPS 1 THROUGH 6 ABOVE. MAINTENANCE _ INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS. _ IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. NOTE: ALL REPAIRS SHOULD MEET SPECIFICATIONS AS OUTLINED WITHIN THIS MEASURE. _ REMOVE DEPOSITED SEDIMENT WHEN IT IS CAUSING THE FILTER FABRIC TO BULGE OR WHEN IT REACHES ONE-HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT. WHEN CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, GRADE THE SITE TO BLEND WITH THE SURROUNDING AREA, AND STABILIZE. REFERENCE IN CHAPTER 7 PAGES 215-221 IN THE INDIANA STORM WATER QUALITY MANUAL 2-WOOD POST/STAKES WRAPPED WITH SILT FENCE AND ROTATED AT LEAST ONE FULL TURN TO SECURE SILT FENCE END IN PLACE SILT FENCE SILT FENCE POST TO JOIN TO ENDS OF TWO FENCES. EMBEDDED SILT FENCE MATERIAL MIN. 8" INTO GROUND W/ 4" LAID ALONG BOTTOM OF TRENCH. SOIL SLICING IN ACCORDANCE WITH ASTM D 6462 8.2.2 IS ALSO ACCEPTABLE. GEOTEXTILE FABRIC LAID ON DOWN SLOPE SIDE AND BOTTOM OF TRENCH 8"X4" TRENCH TO BE BACKFILLED AND COMPACTED WOVEN FILTER FABRIC SILT FENCE MATERIAL COVER POST 2"X2" WOOD OR 1.33 LBS/FOOT STEEL 6' MAX. SPACING EMBEDDED SILT FENCE MATERIAL MIN. 8" INTO GROUND W/ 4" LAID ALONG BOTTOM OF TRENCH. SOIL SLICING IN ACCORDANCE WITH ASTM D 6462 8.2.2 IS ALSO ACCEPTABLE. GEOTEXTILE FABRIC LAID ON DOWN SLOPE SIDE AND BOTTOM OF TRENCH POST 2"X2" WOOD OR 1.33 LBS/FOOT STEEL 8' MAX. SPACING WIRE FENCE 14 GUAGE (MIN)-6" MESH REQ'D. IN SWALES OR AREAS OF CONCENTRATED FLOW NONWOVEN FILTER FABRIC - SECURE TO POSTS WITH 2" LATH EROSION CONTROL BLANKET STAPLE PATTERN 1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP's), INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECP'S IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30 CM) OF RECP'S EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP'S WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF RECP'S BACK OVER SEED AND COMPACTED SOIL. SECURE RECP'S COVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE RECP'S. 3. ROLL THE RECP'S (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. RECP'S WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP's MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THOUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL RECP's MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING ON RECP's TYPE. 5. CONSECUTIVE RECP'S SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE RECP's WIDTH. NOTE: IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE R STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSAY TO PROPERLY SECURE THE RECP's. 2"-5" (5 CM-12.5CM) 12" (30 CM) 6" (15 CM) 6" (15 CM) SLOPE INSTALLATION OUTLET EROSION CONTROL PROTECTION DRAIN PIPE WITH FLAIRED END SECTION DEPTH OF RIP-RAP AS INDICATED ON PLAN 12" MINIMUM AW= FEET GEOTEXTILE FABRIC OR WELL GRADED AGGREGATE AT= FEET AL= APRON LENGTH AT= APRON THICKNESS AW= APRON WIDTH STONE PLACED AROUND END OF DRAIN PIPE TO PREVENT SLOPE EROSION AND UNDERCUTTING OF THE PIPE ENERGY DISSIPATER (OUTLET PROTECTION) 1. DIVERT SURFACE WATER RUNOFF AROUND THE STRUCTURE DURING CONSTRUCTION SO THAT THE SITE CAN BE PROPERLY DEWATERED FOR FOUNDATION PREPARATION. 2. EXCAVATE FOUNDATION AND APRON AREA SUBGRADES BELOW DESIGN ELEVATION TO ALLOW FOR THICKNESS OF THE FILTER MEDIUM AND RIPRAP. 3. COMPACT ANY FILL USED IN SUBGRADE PREPARATION TO THE DENSITY OF SURROUNDING UNDISTURBED SOIL MATERIAL. 4. SMOOTH SUBGRADE ENOUGH TO PROTECT GEOTEXTILE FABRIC FROM TEARING. WEST CARMEL DRIVE S00°05'46"E(M) S00°45'10"W(D) 411.64' N00°05'46"W(M) N00°45'10"E(D) 398.63' S89°17'51"W(M) N89°51'24"W(D) 226.23' N00°50'56"W(M) N89°26'06"E(M) S89°42'58"E(D) 189.95' S00°50'56"E(M) S00°00'00"E (D) 181.33'(M) 182.73'(D) N89°48'49"E(M) S89°20'15"E(D) 190.00' N89°25'05"E(M) S89°43'58"E(D) 241.02' S89°17'51"W(M) N89°51'24"W(D) 299.23' DELTA=10°06'20" R=561.07' T=49.61' L=98.96' CH BRG=N83°08'42"W(M) CH LEN=98.83' PROPOSED BUILDING 20,121SF± PER FLOOR F.F.E. = 829.85 ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS DRY POND S2 S1 S3 S2 A1 B1 H1 P1 P1 H3 B2 H4 H5 P2 P1 P1 H3 H3 P3 P3 P1 P3 H7 B3 B6 P1 B5 B6 B4 NOTE: 12"X18" 18 GAUGE HOT DIP GALVANIZED NON-REFLECTIVE SIGN WITH 12' POST DRIVEN 4 FEET INTO GROUND. POST SHALL BE 12' LONG GALVANIZED 2 1/2" OD STEEL POSTS. SET BOTTOM OF SIGN 7' ABOVE GRADE. USE 6" PIPE BOLLARD FILLED W/ CONCRETE ONLY WHEN SIGN IS IN PAVED AREA OR SIDEWALK 1'-6" 3'-9" 7'-0" (MIN) VARIES ACCESSIBLE SIGN BOLLARD MOUNT DETAIL ALL SIGNS SHALL COMPLY WITH U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION'S "MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES", LOCAL CODES AND AS SPECIFIED. MOUNT SIGNS TO POST IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. WHERE PARKING SPACES THAT ARE RESERVED FOR PERSONS WITH DISABILITIES ARE DESIGNATED TO ACCOMMODATE WHEELCHAIR VANS, A VAN ACCESSIBLE (R7-8P) PLAQUE SHALL BE MOUNTED BELOW THE R7-8 SIGN. THE R7-8SIGN SHALL HAVE A GREEN LEGEND AND BORDER AND A WHITE WHEELCHAIR SYMBOL ON A BLUE SQUARE ALL ON A WHITE BACKGROUND. THE R7-8P PLAQUE SHALL HAVE A GREEN LEGEND AND BORDER ON A WHITE BACKGROUND. 3'-6" 3 LBS./FT. GALVANIZED CHANNEL SIGN POST PER INDOT STANDARD SPECIFICATION SEC. 910.14. ACCESSIBLE SIGNS ACCESSIBLE PARKING SYMBOL DETAIL STANDARD DUTY CONCRETE PAVING SECTION STANDARD DUTY ASPHALT PAVING SECTION INTEGRAL WALK AND CURB DETAIL C201 SITE PLAN DETAILS W190582-C201 site det (NO SCALE) 4"-#53 AGGREGATE (INDOT) 6" CONC. (4000 PSI) W/FIBER ADDITIVE (NO SCALE) 6"-#53 AGGREGATE (INDOT) 2.5"-HMA 19.0MM BASE 1.5"- HMA 9.5MM SURFACE (NO SCALE) THIS SIGN TYPICAL AT ALL ACCESSIBLE PARKING SPACES THIS SIGN TYPICAL AT ALL VAN ACCESSIBLE PARKING SPACES PENALTY SIGN WITH WORDING AS REQUIRED BY STATE OR LOCAL LAW SLOPE TOP OF CONCRETE GROUND/PAVING SURFACE E OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU G W W W G G W WEST CARMEL DRIVE G G G PROPOSED BUILDING 20,121SF± PER FLOOR F.F.E. = 829.85 D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D C STM STM STM STM STM STM STM STM STM STM STM STM STM ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS W W W W W W W W W W W W W W 6 E OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU G W W W G G W WEST CARMEL DRIVE G G G PROPOSED BUILDING 20,121SF± PER FLOOR F.F.E. = 829.85 C STM STM STM STM STM STM STM STM STM STM STM STM STM ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS W W W W W W W W W W W W W W W W W W E E E E E E E E E E DRY POND 330' OF DURASLOT SLOTTED DRAIN RATED FOR LIGHT PASSENGER VEHICLE TRAFFIC 381' OF 10" HDPE 12" INV=824.08 OUTLET CONTROL STR TC=827.50 12" RCP OUTLET INV=824.40 HYDRO INTERNATIONAL FIRST DEFENSE HIGH CAPACITY 8' UNIT TC=829.20 12" HDPE INV=824.08 12" RCP INV=824.08 DIVERSION STR 12" RCP INV=824.68 DIFFERENCE FROM INLET INVERT SERVES AS WEIR 12" INV=824.02 12" HDPE INV=824.02 12" RCP INV=824.02 12" HDPE INV=824.06 C601 DRAINAGE DETAILS W190582-C602 drainage det REQUIREMENTS FOR ALL STORM SEWER BENCHWALLS BENCH WALLS SHALL BE SHAPED AND FORMED FOR A CLEAN TRANSITION WITH PROPER HYDRAULICS TO ALLOW THE SMOOTH CONVEYANCE OF FLOWS THROUGH THE MANHOLE OR BOX INLET. THE BENCH WALL SHALL FORM A DEFINED CHANNEL, TO A MINIMUM HEIGHT OF 80-PERCENT OF THE INSIDE DIAMETER OF THE INLET AND OUTLET PIPES TO FORM A "U" SHAPED CHANNEL, CONSTRUCTED AT A MINIMUM ½-INCH PER FOOT SLOPE TO THE MANHOLE WALL. WHERE A FLOW CHANNEL IS CONSTRUCTED AS AN INTEGRAL PART OF THE PRE-CAST BASE, IT SHALL BE SHAPED AND FORMED AS DESCRIBED ABOVE, WITH THE EXCEPTION THAT THE BOTTOM OF THE FLOW CHANNEL MAY BE FORMED FROM THE BOTTOM OF INLET AND OUTLET PIPES IF THE PIPE WALL THICKNESS IS NOT GREATER THAN ONE (1) INCH. FOR CAST-IN-PLACE FLOW CHANNELS, THE BOTTOM INVERT OF ALL PIPES ENTERING A MANHOLE SHALL BE AT LEAST THREE (3) INCHES ABOVE THE TOP OF THE BASE SLAB TO THE OUTLET INVERT SO THE FINISHED SEWER CHANNEL MAY BE INSTALLED AND SHAPED. FOR CONNECTIONS TO EXISTING STORM SEWER STRUCTURES, FLOW CHANNELS SHALL BE SHAPED, AS SPECIFIED HEREIN, AS IF IT WERE A NEW MANHOLE OR BOX INLET STRUCTURE. SPECIFICATIONS FOR ALL STORM SEWER CASTINGS ALL STORM WATER INLETS AND CATCH BASINS SHALL HAVE THE WORDS "NO DUMPING, DRAINS TO STREAM", OR SIMILARLY APPROVED MESSAGE, CAST IN RAISED OR RECESSED LETTERS AT A MINIMUM OF 1" IN HEIGHT. IN ADDITION, A SYMBOL OF A FISH SHALL ALSO BE CAST WITH THE LETTERS. REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 C602 DRAINAGE DETAILS E OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU G W W W G G W WEST CARMEL DRIVE G G G PROPOSED BUILDING 20,121SF± PER FLOOR F.F.E. = 829.85 C STM STM STM STM STM STM STM STM STM STM STM STM STM ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS W W W W W W W W W W W W W W W W W W E E E E E E E E E E DRY POND C603 OVERFLOW ROUTING PLAN W190582-C601 OVERFLOW ROUTING PLAN REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 C604 OVERFLOW ROUTING PLAN W190582-C601 OVERFLOW ROUTING PLAN REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS W S N E ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 ELECTRICAL RISER GUY ANCHOR ELECTRIC JUNCTION BOX ORNAMENTAL LIGHT GENERATOR STREET LIGHT ELECTRIC MANHOLE ELECTRIC OUTLET UTILITY POLE UTILITY POLE W/ TRANSFORMER TRANSFORMER E OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU G W W W G G W WEST CARMEL DRIVE G G G C STM STM STM STM STM STM STM STM STM STM STM STM STM ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS W W W W W W W W W W W W W W W W W W E E E E E E E E E E DRY POND GENERAL UTILITY NOTES 1. THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND LOCATION SERVICE AT LEAST 72 HOURS PRIOR TO ANY WORK AND SHALL CONTACT THE OWNER AND/OR ENGINEER SHOULD UTILITIES APPEAR TO BE IN CONFLICT WITH THE PROPOSED IMPROVEMENTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 2. THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE (2) "B" BORROW OR EQUIV. GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTOR DENSITY #8 CRUSHED STONE OR APPROVED EQUIVALENT CLASS I BEDDING MATERIAL HAND TAMPED OR WALKED INTO PLACE TYPICAL BEDDING SECTION - PVC & HDPE ALL BEDDING & INITIAL BACKFILL SHALL BE INSTALLED IN 6" TO 12" BALANCED LIFTS A MIN. 9" CLEARANCE SHALL BE PROVIDED ON EACH SIDE OF THE INSTALLED PIPE Bc = OUTSIDE DIAMETER D = INSIDE DIAMETER D = DEPTH OF BEDDING MATERIAL BELOW PIPE (1) REGULAR BACKFILL GREATER THAN 5' (1) EDGE OF PAVEMENT, CURB, GUTTER OR SIMILAR STRUCTURE IN THE PUBLIC RIGHT-OF-WAY MIN. 6" TOPSOIL TO ENSURE GRASS GROWTH IF NOT UNDER PAVEMENT 12" MIN. Bc C801 UTILITY PLAN DETAILS W190582-C801 util det (NO SCALE) 4" REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS C900 SPECIFICATIONS W190582-C900 spec EROSION CONTROL SPECIFICATIONS 1. THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS. 2. TEMPORARY SEEDING WILL BE APPLIED TO ANY AREAS LEFT INACTIVE FOR 15 DAYS OR MORE. 3. PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND FINISHED GRADE. 4. PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION. 5. ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. 6. ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS. 7. IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED. 8. DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. 9. THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER. 10. IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORMWATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY.. 11. FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS. EARTHWORK SPECIFICATIONS 1. SCOPE OF WORK 1.A. EXTENT: THE WORK REQUIRED UNDER THIS SECTION CONSISTS OF ALL EXCAVATING, FILLING, ROUGH GRADING AND RELATED ITEMS NECESSARY TO COMPLETE THE WORK INDICATED ON THE DRAWINGS AND DESCRIBED IN THE SPECIFICATIONS. 1.A.1. IN GENERAL THE ITEMS OF WORK TO BE PERFORMED UNDER THIS SECTION SHALL INCLUDE CLEARING AND GRUBBING, REMOVAL OF TREES AND STUMPS (WHERE REQUIRED), PROTECTION OF TREES TO REMAIN, STRIPPING AND STORAGE OF TOPSOIL, FILL, COMPACTION AND ROUGH GRADING OF ENTIRE SITE AS INDICATED ON THE DRAWINGS. 1.A.2. EXCAVATED MATERIAL THAT IS SUITABLE MAY BE USED FOR FILLS. ALL UNSUITABLE MATERIALS AND ALL SURPLUS EXCAVATED MATERIAL NOT REQUIRED SHALL BE REMOVED FROM THE SITE. THE LOCATION OF DUMP AND LENGTH OF HAUL SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 1.A.3. PROVIDE AND PLACE ANY ADDITIONAL FILL MATERIAL FROM OFF THE SITE AS MAY BE NECESSARY TO PRODUCE THE GRADES REQUIRED. FILL OBTAINED FROM OFF SITE SHALL BE OF KIND AND QUALITY AS SPECIFIED TO FILLS HEREIN AND THE SOURCE APPROVED BY THE ENGINEER AND OWNER. 1.A.4. THE CONTRACTOR SHALL ACCEPT THE SITE AS HE FINDS IT AND SHALL REMOVE ALL TRASH, RUBBISH AND DEBRIS FROM THE SITE PRIOR TO STARTING EXCAVATION. 1.B. WORK INCLUDED: THE FOLLOWING ITEMS OF RELATED WORK ARE SPECIFIED AND INCLUDED IN OTHER SECTIONS OF THESE SPECIFICATIONS. 1.B.1. EXCAVATION, GRADING AND BACKFILLING FOR UTILITY LINES. 1.B.2. STORM DRAINAGE SYSTEMS. 1.B.3. SANITARY SEWER SYSTEMS. 1.B.4. WATER SUPPLY SYSTEMS. 1.B.5. DRIVES AND PAVING. 2. BENCHMARKS C901 SPECIFICATIONS W190582-C900 spec REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 ” C902 SPECIFICATIONS W190582-C900 spec NOTE: THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. SANITARY SEWAGE SPECIFICATIONS PART 1 - GENERAL 1. SUMMARY 1.A. SECTION INCLUDES: 1.A.1. SANITARY SEWER DRAINAGE PIPING, FITTINGS, ACCESSORIES, CLEANOUTS, AND BEDDING. 1.A.2. CONNECTION OF SITE SANITARY SEWER SYSTEM TO MUNICIPAL SANITARY SEWER SYSTEMS. 1.B. RELATED REQUIREMENTS: 1.A.1. EARTHWORK: TRENCHING, BACKFILL, AND COMPACTION FOR UTILITIES 1.A.2. SEWER MANHOLES, FRAMES, AND COVERS 1.A.3. CAST-IN-PLACE STRUCTURAL CONCRETE 2. REFERENCES 2.A. THE PUBLICATIONS LISTED BELOW FORM A PART OF THIS SPECIFICATION TO THE EXTENT REFERENCED. PUBLICATIONS ARE REFERENCED WITHIN THE TEXT BY THE BASIC DESIGNATION ONLY. 2.B. ASTM INTERNATIONAL (ASTM): 2.B.1. ASTM A74 - CAST IRON SOIL PIPE AND FITTINGS 2.B.2. ASTM A746 - DUCTILE IRON GRAVITY SEWER PIPE 2.B.3. ASTM C425 - COMPRESSION JOINTS FOR VITRIFIED CLAY PIPE AND FITTINGS 2.B.4. ASTM C564 - RUBBER GASKETS FOR CAST IRON SOIL PIPE AND FITTINGS 2.B.5. ASTM C700 - VITRIFIED CLAY PIPE, EXTRA STRENGTH, STANDARD STRENGTH, AND PERFORATED 2.B.6. ASTM D2241 - POLY (VINYL CHLORIDE) (PVC) PRESSURE-RATED PIPE (SDR SERIES) 2.B.7. ASTM D2657 - HEAT-JOINING POLYOLEFIN PIPE AND FITTINGS 2.B.8. ASTM D3034 - TYPE PSM POLY (VINYL CHLORIDE) (PVC) SEWER PIPE AND FITTINGS 2.B.9. ASTM D3035 - POLYETHYLENE (PE) PLASTIC PIPE USING FLEXIBLE ELASTOMERIC SEALS 2.B.10. ASTM D3139 - JOINTS FOR PLASTIC PRESSURE PIPE USING FLEXIBLE ELASTOMERIC SEALS 2.B.11. ASTM D3261 - BUTT HEAT FUSSION POLYETHYLENE (PE) PLASTIC FITTINGS FOR POLYETHYLENE PLASTIC PIPE AND TUBING 2.B.12. ASTM F477 - ELASTOMERIC SEALS (GASKETS) FOR JOINING PLASTIC PIPE 2.B.13. ASTM F1417 - STANDARD TEST METHOD FOR INSTALLATION ACCEPTANCE OF PLASTIC GRAVITY SEWER LINES USING LOW-PRESSURE AIR. 2.C. AMERICAN WATER WORKS ASSOCIATION (AWWA): 2.C.1. AWWA C111 - RUBBER_GASKET JOINTS FOR DUCTILE IRON PRESSURE PIPE AND FITTINGS 2.C.2. AWWA C600 - DUCTILE-IRON WATER MAINS AND THEIR APPURTENANCES 2.C.3. AWWA C900 - POLYVINYL CHLORIDE (PVC) PRESSURE PIPE, 4 IN. THROUGH 12 IN, FOR WATER DISTRIBUTION 2.C.4. AWWA C901 - POLYETHYLENE (PE) PRESSURE PIPE, TUBING AND FITTINGS 1/2 INCH THROUGH 3 INCHES, FOR WATER DISTRIBUTION 2.C.5. AWWA C906 - POLYETHYLENE (PE) PRESSURE PIPE AND FITTINGS, 4 INCH THROUGH 63 INCH, FOR WATER DISTRIBUTION 3. SUBMITTALS 3.A. PROJECT RECORD DOCUMENTS: 3.A.1. ACCURATELY RECORD ACTUAL LOCATIONS OF PIPE RUNS, CONNECTIONS, CLEANOUTS, AND INVERT ELEVATIONS. 3.A.2. IDENTIFY AND DESCRIBE UNEXPECTED VARIATIONS TO SUBSOIL DECIDUOUS SHRUBS EVERGREEN SHRUBS PLANT SCHEDULE PLAN KEY BOTANICAL NAME COMMON NAME SIZE QUANTITY ROOT CONDITION B & B BARE CONT ON CENTER SPACING SPECIAL INSTRUCTIONS PfG SxG SPIRAEA X 'GOLD MOUND' POTENTILLA FRUTICOSA 'GOLDFINGER' GOLDFINGER POTENTILLA GOLD MOUND SPIREA #2 #3 X X SEE PLAN SEE PLAN MIN 18" MIN 18" BkG IgC ILEX GLABRA 'CHAMZIN' BUXUS X KOREANA 'GREEN GEM' GREEN GEM BOXWOOD NORDIC HOLLY 18" 18" X X SEE PLAN SEE PLAN MIN 18" MIN 18" 12 9 11 15 MATURE SIZE 3'T x 3'W 30"T x 36"W 2'T x 2'W 4'T x 4'W TREES TD TAXODIUM DISTICHUM BALD CYPRESS 6 X SEE PLAN MIN 6' 35'T x 20'W BN BETULA NIGRA RIVER BIRCH 6 X SEE PLAN MIN 6' 35'T x 20'W E OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU G W W W G G W WEST CARMEL DRIVE C C C C G G G PROPOSED BUILDING 20,121SF± PER FLOOR F.F.E. = 829.85 C STM STM STM STM STM STM STM STM STM STM STM STM STM ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS W W W W W W W W W W W W W W W W W W E E E E E E E E E E DRY POND LANDSCAPE PLAN NOTES SEED / SOD (ALTERNATE) - FOR SEED, REFER TO PERMANENT SEEDING CHART ON SHEET L201 LANDSCAPE DETAIL SHEET. SOD SHALL BE CERTIFIED GRADE CULTIVATED GRASS SOD: OF "ADVENTURE BLEND" TURF TYPE TALL FESCUE (BY GENERAL CONTRACTOR). LANDSCAPE BED EDGE (TYP.) MULCH NATIVE PLANTINGS FOR THE BASIN BOTTOM. REFER TO THE SWPPP SHEETS FOR PLANTING SCHEDULE. W190582-L100 GENERAL NOTES 1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT LIST, THE PLAN SHALL DICTATE. IF IN QUESTION, CONTACT THE LANDSCAPE DESIGNER. 2. ANY EXISTING TREE(S) THAT MAY REQUIRE REMOVAL BUT ARE NOT SHOWN ON THE PLAN AS BEING REMOVED SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT. TREE(S) MAY BE RELOCATED (OR REPLACED) TO AN APPROVED ALTERNATE LOCATION ONSITE FOLLOWING LANDSCAPE ARCHITECT APPROVAL. 3. ALL SHRUBS PLANTING AREAS TO BE COVERED WITH 3" THICK LAYER OF SHREDDED HARDWOOD BARK MULCH. ALL GROUND COVER BEDS SHALL BE COVERED WITH 1" SHREDDED HARDWOOD BARK MULCH. BARK MULCH SHALL BE APPROVED BY LANDSCAPE DESIGNER AND SHALL BE UNIFORM IN TEXTURE AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR LUMBERING OPERATIONS. NO UTILITY MULCH OR PROCESSED TREE TRIMMINGS WILL BE ALLOWED. 4. AN APPROVED PRE-EMERGENT HERBICIDE SHALL BE APPLIED IN ALL PLANTING AND GROUND COVER BEDS AT RATES SPECIFIED BY MANUFACTURER FOR EACH VARIETY OF PLANT. 5. FINAL PLACEMENT OF PLANT MATERIALS, ETC. SHALL BE APPROVED BY LANDSCAPE DESIGNER BEFORE PLANTING OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH A WOODED STAKE INDICATING VARIETY AND SIZE OF TREE. ALL GROUND COVER AND MULCH BED LINES SHALL BE MARKED BY A HIGHLY VISIBLE PAINT LINE WITH OCCASIONAL WOOD STAKES FOR REFERENCE. ALL STAKES SHALL BE REMOVED FOLLOWING PLANTINGS OPERATIONS. LANDSCAPE DESIGNER RESERVES THE RIGHT TO ADJUST PLANT LOCATIONS ON SITE. 6. NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE ALLOWED. IF PLANTS ARE SHOWN TO BE UNAVAILABLE, THE CONTRACTOR SHALL NOTIFY LANDSCAPE DESIGNER PRIOR TO BID DATE IN WRITING. ALL PLANTS SHALL BE INSPECTED AND TAGGED WITH PROJECT IDENTIFICATION AT NURSERY OR CONTRACTORS OPERATION PRIOR TO MOVING TO JOB SITE. PLANTS MAY ALSO BE INSPECTED AND APPROVED OR REJECTED ON THE JOB SITE. 7. ALL PLANTS ARE TO MEET OR EXCEED AMERICAN STANDARDS FOR NURSERY STOCK, LATEST EDITION, AS SET FORTH BY AMERICAN ASSOCIATION OF NURSERYMEN. 8. PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE PLACED WHERE THEY WILL NOT CONFLICT WITH CONSTRUCTION OPERATIONS AND AS DIRECTED BY OWNER. 9. ALL NEW LANDSCAPE PLANTINGS SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FOLLOWING FINAL INSPECTION BY LANDSCAPE DESIGNER. AT THE END OF THIS PERIOD, PLANT MATERIAL TERMED DEAD OR UNSATISFACTORY BY LANDSCAPE DESIGNER SHALL BE REPLACED AT NO ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR. 10. THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND FEES THAT MAY BE REQUIRED FOR HIS PORTION OF WORK. 11. PEAT MOSS TO BE USED ON PROJECT SHALL BE A DOMESTIC OR IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR AND COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS TO ALSO BE MILDLY ACIDIC IN CHARACTER AND SHALL MEET APPROVAL OF LANDSCAPE DESIGNER. 12. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE DESIGNER IN WRITING PRIOR TO BID DATE OF ANY PLANTS THAT HE FEELS MAY NOT SURVIVE IN LOCATIONS NOTED. 13. ALL LANDSCAPING PLANTINGS TO BE MAINTAINED FOR 1 YEAR FOLLOWING TURNOVER. MAINTENANCE TO INCLUDE WATERING, WEEDING, CULTIVATION, MULCHING, MOWING AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF PLANTINGS. NOTE: AT END OF MAINTENANCE PERIOD, CONTRACTOR TO REMOVE GUYING AND STAKING FROM TREES. 14. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF WORK AS REQUESTED BY LANDSCAPE DESIGNER. 15. BACKFILL FOR TREE AND SHRUB PLANTING SHALL BE 75% APPROVED TOPSOIL AND 25% APPROVED PEAT MOSS. TOP LAYER OF BACKFILL SHALL BE 100% EXISTING TOPSOIL. A 5-10-5 ANALYSIS SLOW RELEASE FERTILIZER SHALL BE INCORPORATED INTO BACKFILL AT APPROVED RATES. 16. PROVIDE MINIMUM 4" PLANTING SOIL IN ALL GROUND COVER AND FLOWER AREAS WITH MIXTURE COMPRISING OF ONE PART COMMERCIAL GRADE 'POTTING SOIL,' 5 PARTS TOPSOIL AND 4 PARTS PEAT MOSS. A FULL 4" LAYER OF APPROVED SHREDDED FIBROUS PEAT MOSS MAY BE USED IN LIEU OF PLANTING MIX. 17. PLANTS SHALL BEAR A TAG SHOWING GENUS, SPECIES AND VARIETY. REMOVE AT TIME OF FINAL ACCEPTANCE. 18. PLANTS SHALL BE CERTIFIED BY THE STATE OF INDIANA DEPARTMENT OF NATURAL RESOURCES AND FREE FROM DISEASE OR HAZARDOUS INSECTS. 19. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL EXISTING UTILITIES PERTAINING TO THEIR PHASE OF WORK. UTILITIES ARE SHOWN TO BE APPROXIMATE. CALL UTILITY LOCATE PRIOR TO ANY PLACEMENT OF PLANT MATERIAL OR OTHER LANDSCAPE MATERIAL. 20. CONTRACTOR TO REVIEW THE SWPPP SERIES PLANS FOR STABILIZATION (SEEDING/SOD/MULCH) REQUIREMENTS. L100 LANDSCAPE PLAN REQUIREMENT: PROVIDED: LANDSCAPE ORDINANCE REQUIREMENTS RANGE LINE ROAD OVERLAY - SECTION 3.79 RL-OL PARKING STANDARDS - D. PARKING AREAS SHALL BE LOCATED AT THE REAR OR SIDE OF BUILDINGS, AND SCREENED CONSISTENT WITH THE STANDARDS OF BUFFERYARD TYPE "A" AS DESCRIBED IN ARTICLE 5, SECTION 5.21: BUFFERYARD STANDARDS BUFFERYARD TYPE "A" = - MIN. FRONT AND SIDE YARD = 5' - MIN. REAR YARD = 10' - MIN. SHADE OR EVERGREEN TREES PER 100' = 4 RANGE LINE ROAD OVERLAY - SECTION 3.75 RL-OL LANDSCAPING STANDARDS - A. PROTECTION OF EXISTING TREES AND VEGETATION - 1. SITES WITHIN THE RL-OL DISTRICT WITH EXISTING TREES OR STANDS SHALL PROTECT AND INCORPORATE THEM INTO THE OVERALL SITE DESIGN. THE LANDSCAPE PLAN SHALL PRESERVE NOT LESS THAN 50% OF ALL TREES THAT ARE: A. 6" DBH OR LARGER AND B. LOCATED WITHIN THE BUFFERYARD OR GREENBELT NA REQUIRED: NA PER PLAN AS SPACE ALLOWS. NA REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS W S N E ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 BUFFERYARD TYPE "D" = - 8 SHADE TREES, 2 ORNAMENTAL TREES, AND 20 SHRUBS PER 100'. 10 SHADE 2 ORNAMENTAL 26 SHRUBS 10 SHADE 2 ORNAMENTAL 26 SHRUBS CONDITIONS AND LOCATION OF UNCHARTED UTILITIES. 4. PROJECT CONDITIONS 4.A. COORDINATE WORK WITH TERMINATION OF SANITARY SEWER CONNECTION OUTSIDE BUILDING AND CONNECTION TO MUNICIPAL SEWER UTILITY SERVICE. PART 2 - PRODUCTS 1. SEWER PIPE, FITTINGS, AND JOINTS 1.A. POLYVINYL CHLORIDE PIPE (PVC): ASTM D 3034, RATED SDR 35 UNLESS OTHERWISE SPECIFIED BY THE UTILITY COMPANY. PIPE SHALL BE CONTINUALLY MARKED WITH MANUFACTURER'S NAME, PIPE SIZE, CELL CLASSIFICATION, SDR RATING, AND ASTM D 3034 CLASSIFICATION. 1.A.1. PIPE JOINTS: INTEGRALLY MOLDED BELL ENDS, ASTM D 3034, TABLE 2, WITH FACTORY SUPPLIED ELASTOMERIC GASKETS AND LUBRICANT. 1.B. VITRIFIED CLAY PIPE (VCP): ASTM C700: USE ONLY IF REQUIRED BY LOCAL JURISDICTION. 1.B.1. FITTINGS: ASTM C700 1.B.2. JOINTS: ASTM C425 1.B.3. GASKETS: ASTM C425. GASKETS SHALL BE MANUFACTURED FROM HIGH GRADE, PROPERLY VULCANIZED ELASTOMERIC COMPOUND CONSISTING OF EITHER BASIC NATURAL OR SYNTHETIC RUBBER. GASKET MANUFACTURING TOLERANCES SHALL COMPLY WITH RUBBER MANUFACTURER'S ASSOCIATION TOLERANCES FOR GASKETS. 1.B.4. LUBRICANT: SUITABLE FOR LUBRICATING JOINT COMPONENTS; NO DETERIORATING EFFECTS ON GASKET OR PIPE MATERIAL, WILL NOT SUPPORT GROWTH OF FUNGI OR BACTERIA, AND SHALL BE OF TYPE RECOMMENDED BY GASKET MANUFACTURER. 1.C. FORCE MAIN: 1.C.1. HIGH-DENSITY POLYETHYLENE PIPE (HDPE): AWWA C901 AND C906, ASTM D3035, SDR 11 FOR 150 PSI PRESSURE RATING. 1.C.1.1. FITTINGS: MOLDED, AWWA C901 OR C906. 1.C.1.2. JOINTS: BUTT FUSION, ASTM D2657, FLANGED GASKET JOINTS AT INTERFACE 1.C.2. POLYVINYL CHLORIDE PIPE (PVC): FOR LESS THAN 4 INCHES IN DIAMETER, ASTM D2241 FOR PUSH-ON OR SOLVENT WELD JOINTS, AND FOR PIPE 4 INCHES IN DIAMETER AND LARGER, AWWA C900, CLASS 150 WITH PUSH-ON JOINTS. 1.C.2.1. JOINTS/FITTINGS: PUSH-ON, ASTM D3139 WITH ASTM F477 GASKETS. 1.C.2.2. SOLVENT CEMENT: ASTM D2564. 1.C.3. DUCTILE IRON PIPE (DIP): ASTM A746, CLASS 50, INSIDE NOMINAL DIAMETER AS SHOWN ON THE DRAWINGS, BELL AND SPIGOT END. 1.C.4. DUCTILE IRON PIPE JOINT DEVICE: AWWA C111, RUBBER GASKET JOINT DEVICES. 2. PIPE ACCESSORIES 2.A. PIPE JOINTS: MECHANICAL CLAMP RING TYPE, STAINLESS STEEL EXPANDING AND CONTRACTING SLEEVE, NEOPRENE-RIBBED GASKET FOR POSITIVE SEAL. 2.B. FITTINGS: SAME MATERIAL AS PIPE MOLDED OR FORMED TO SUIT PIPE SIZE AND END DESIGN, IN REQUIRED TEE, BENDS, ELBOWS, CLEANOUTS, REDUCERS, TRAPS, ETC. 3. CLEANOUTS AND MANHOLES 3.A. MANHOLES SHALL CONFORM TO SECTION 02536. 3.B. LID AND FRAME: PROVIDE IN ACCORDANCE WITH SECTION 02536. PROVIDE TRAFFIC GRADE AND RATED COVERS AND FRAMES WHERE CLEANOUTS AND MANHOLES ARE WITHIN PAVEMENT, WITH THE LETTERS “SSCO” OR “SANITARY SEWER” RESPECTIVELY CAST INTO THE COVER. 3.C. SHAFT CONSTRUCTION: CAST IRON SHAFT OF INTERNAL DIAMETER AS SPECIFIED ON CONSTRUCTION DRAWINGS WITH 2500 PSI CONCRETE COLLAR FOR CLEANOUTS. 4. APPURTENANCES 4.A. TRACE WIRE: MAGNETIC DETECTABLE CONDUCTOR (#12 COPPER), BRIGHTLY COLORED PLASTIC COVERING, IMPRINTED WITH “SANITARY SEWER SERVICE” IN LARGE LETTERS. PART 3 - EXECUTION 1. EXAMINATION 1.A. VERIFY THAT TRENCH CUT AND EXCAVATION IS READY TO RECEIVE WORK AND EXCAVATIONS, DIMENSIONS, AND ELEVATIONS ARE AS INDICATED ON CONSTRUCTION DRAWINGS. 2. PREPARATION 2.A. HAND TRIM EXCAVATIONS TO REQUIRED ELEVATIONS. CORRECT OVER EXCAVATION WITH BEDDING MATERIAL. 2.B. REMOVE LARGE STONES OR OTHER HARD MATTER THAT COULD DAMAGE PIPE OR IMPEDE CONSISTENT BACKFILLING OR COMPACTION. 3. BEDDING 3.A. EXCAVATE TRENCH AND PLACE BEDDING MATERIAL IN ACCORDANCE WITH THE EARTHWORK SPECIFICATIONS.. 4. INSTALLATION - PIPE 4.A. INSTALL TYPE AND CLASS OF PIPE AS SHOWN ON THE DRAWINGS. PIPES SHALL BE LAID AND MAINTAINED TO THE REQUIRED LINE AND GRADE WITH NECESSARY FITTINGS, BENDS, MANHOLE RISERS, CLEANOUTS AND OTHER APPURTENANCES PLACED AT THE REQUIRED LOCATIONS. THE PIPE SHALL BE INSTALLED WITH UNIFORM BEARING UNDER THE FULL LENGTH OF THE BARREL OF THE PIPE. THE PIPE SHALL BE INSPECTED FOR DEFECTS AND CRACKS BEFORE BEING LOWERED INTO THE TRENCH. DEFECTIVE, DAMAGED OR UNSOUND PIPE, OR PIPE THAT HAS HAD ITS GRADE DISTURBED AFTER LAYING SHALL BE TAKEN UP AND REPLACED. COMMENCE INSTALLATION AT LOWEST POINT WITH THE BELL END UPGRADE. 4.B. NO PIPE SHALL BE LAID IN WATER OR WHEN TRENCH CONDITIONS ARE UNSUITABLE FOR WORK. 4.C. PIPE CONNECTING TO MANHOLES OR OTHER STRUCTURES SHALL TERMINATE FLUSH INSIDE OF THE STRUCTURE WALL. 4.D. JOINTS FOR PVC AND CISP SHALL BE THOROUGHLY LUBRICATED WITH AN APPROVED LUBRICANT BEFORE PIPE SECTIONS ARE SLIPPED TOGETHER. OPEN ENDS SHALL BE FULLY PROTECTED WITH A STOPPER TO PREVENT EARTH OR OTHER MATERIAL FROM ENTERING THE PIPE DURING CONSTRUCTION. CAREFULLY FREE INTERIOR OF THE PIPE FROM DIRT, CEMENT AND OTHER DELETERIOUS MATERIAL AS THE WORK PROGRESSES. 4.E. MAINTAIN SEPARATION OF POTABLE WATER MAIN FROM SEWER PIPING AT CROSSINGS A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL. 4.F. INSTALL HDPE PIPING AND FITTINGS TO AWWA C901 AND C906. BUTT FUSION WELDED PER ASTM D3261. 4.G. ROUTE PIPE IN STRAIGHT LINE PARALLEL TO ROADS, BUILDINGS AND ADJACENT UTILITIES AND AS SHOWN ON THE DRAWINGS. 4.H. ESTABLISH ELEVATIONS OF BURIED PIPING WITH SUFFICIENT COVER AS RECOMMENDED BY PIPE MANUFACTURER TO ENSURE NOT LESS THAN 3 FEET OF COVER, EXCEPT AS NOTED ON DRAWINGS. 4.I. FORM AND PLACE CONCRETE FOR THRUST BLOCKS AT EACH ELBOW OF PIPE FORCE MAIN. SEE CONSTRUCTION DRAWING FOR DETAILS OF CONSTRUCTION. 4.J. BACKFILL TRENCH IN ACCORDANCE WITH SECTION 02300. 4.K. INSTALL TRACE WIRE CONTINUOUS OVER TOP OF NON-METAL PIPE. BURY 6 INCHES MINIMUM BELOW FINISH GRADE, ABOVE PIPELINE. 5. INSTALLATION - CLEANOUTS AND MANHOLES 5.A. FORM BOTTOM OF EXCAVATION CLEAN AND SMOOTH TO CORRECT ELEVATION. 5.B. FOR CLEANOUTS, FORM AND PLACE CAST_IN_PLACE CONCRETE BASE PAD WITH PROVISION FOR SANITARY SEWER PIPE TO BE INSTALLED TO PROPER ELEVATIONS. 5.C. FOR MANHOLES, CONSTRUCT INVERTS ACCORDING TO THE FOLLOWING GUIDELINES: 5.C.1. INVERT CHANNEL SHALL BE SMOOTH AND ACCURATELY SHAPED TO A SEMICIRCULAR BOTTOM TO MATCH WITH THE INSIDE OF THE ADJACENT SEWER SECTION. 5.C.2. INVERT CHANNELS AND STRUCTURE BOTTOMS SHALL BE SHAPED WITH MORTAR AND LEAN CONCRETE. 5.C.3. CHANGES IN SIZE AND GRADE OF INVERT SHALL BE MADE GRADUALLY AND EVENLY. 5.C.4. CHANGES IN THE DIRECTION OF THE SEWER ENTERING BRANCH OR BRANCHES SHALL HAVE A TRUE CURVE OF AS LARGE A RADIUS AS THE MANHOLE WILL PERMIT. 5.D. FOR MANHOLES, PROVIDE MANHOLE RINGS, FRAME, AND COVER AS SHOWN ON THE CONSTRUCTION DRAWINGS. 6. FIELD QUALITY CONTROL 6.A. FIELD QUALITY CONTROL SHALL BE CONDUCTED BY THE CONTRACTOR IN ACCORDANCE WITH SECTION 01452. 6.B. PIPES AND JOINTS SHALL NOT BE COMPLETELY BACKFILLED UNTIL AFTER INSPECTION, TESTING, AND APPROVAL BY THE OWNER AND LOCAL JURISDICTION. 6.C. PRIOR TO TESTING FOR LEAKAGE, THE PIPE TRENCH SHALL BE BACKFILLED TO AT LEAST THE SPRING LINE OF THE PIPE. IF REQUIRED TO PREVENT PIPE MOVEMENT DURING TESTING, ADDITIONAL BACKFILL SHALL BE ADDED LEAVING THE PIPE JOINTS UNCOVERED TO PERMIT INSPECTION. 6.D. EXFILTRATION TEST 6.D.1. EACH SECTION OF SEWER LINE BETWEEN SUCCESSIVE MANHOLES SHALL BE TESTED BY CLOSING THE LOWER END OF THE SEWER TO BE TESTED AND THE INLET SEWER OF THE UPPER MANHOLE, USING STOPPERS. 6.D.2. FILL THE MANHOLE AND PIPE WITH WATER TO A POINT WHICH PRODUCES A MAXIMUM OF 3 FEET OF HEAD ABOVE THE INVERT OF THE SEWER AT THE CENTER OF THE UPPER MANHOLE; OR IF GROUNDWATER IS PRESENT, 3 FEET OF HEAD ABOVE THE AVERAGE ADJACENT GROUNDWATER LEVEL. 6.D.3. THE ALLOWABLE LEAKAGE SHALL BE 200 GAL/INCH OF PIPE DIAMETER/MILE/DAY 6.E. INFILTRATION TEST 6.E.1. IF EXCESSIVE GROUND WATER IS ENCOUNTERED IN THE CONSTRUCTION OF A SECTION OF THE SEWER, THE EXFILTRATION TEST SHALL NOT BE USED. 6.E.2. THE UPPER AND LOWER ENDS OF THE SEWER TO BE TESTED SHALL BE CLOSED SUFFICIENTLY TO PREVENT THE ENTRANCE OF WATER. 6.E.3. PUMPING OF GROUND WATER SHALL BE DISCONTINUED FOR AT LEAST 3 DAYS; THEN INFILTRATION SHALL BE TESTED. 6.E.4. INFILTRATION INTO EACH SECTION OF SEWER BETWEEN ADJOINING MANHOLES SHALL NOT EXCEED THAT ALLOWED FOR THE EXFILTRATION TEST, EXCEPT THAT HEAD CONDITIONS SHALL BE A MAXIMUM OF 6 FEET. 6.F. THE EXFILTRATION TEST MAY BE LIMITED TO THE MANHOLES ONLY WHEN THE AUTHORITY HAVING JURISDICTION DOES NOT REQUIRE THE TEST AND THE CONSTRUCTION MANAGER WAIVES THE TEST. THE INFILTRATION TEST WILL ALWAYS BE REQUIRED WHEN EXCESSIVE GROUND WATER IS ENCOUNTERED IN ADDITION TO THE AIR TEST. 6.G. AIR TEST: GRAVITY SYSTEMS SHALL BE AIR TESTED BETWEEN MANHOLES AT 3.5 PSI FOR 5 MINUTES PER ASTM F1417 FOR PLASTIC PIPES. 6.H. ALL MANHOLES SHALL BE AIR TESTED IN ACCORDANCE WITH ASTM C1244-93 (STANDARD TEST METHOD FOR CONCRETE SEWER MANHOLES BY NEGATIVE AIR PRESSURE (VACUUM) TEST). 6.I. DEFLECTION TEST: 6.I.1. DEFLECTION TESTS SHALL BE CONDUCTED ON ALL PLASTIC PIPE USING A MANDREL WITH A DIAMETER EQUAL TO 95 PERCENT OF THE INSIDE DIAMETER OF THE PIPE. THE TEST SHALL BE PERFORMED WITHOUT MECHANICAL PULLING DEVICES. 6.I.2. ALLOWABLE DEFLECTION: MAXIMUM ALLOWABLE PIPE DEFLECTION SHALL NOT EXCEED 5 PERCENT OF NOMINAL INSIDE DIAMETER. 6.I.3. MANDREL: MANDREL, GO/NO-GO, DEVICE SHALL BE CYLINDRICAL IN SHAPE AND CONSTRUCTED WITH EITHER 9 OR 16 EVENLY SPACED ARMS OR PRONGS. MANDRELS WITH FEWER ARMS WILL BE REJECTED AS NOT SUFFICIENTLY ACCURATE. CONTACT LENGTH OF MANDREL'S ARMS SHALL EQUAL OR EXCEED NOMINAL INSIDE DIAMETER OF SEWER TO BE INSPECTED. CRITICAL MANDREL DIMENSIONS SHALL CARRY TOLERANCE OF 0.01-INCH MAXIMUM. CONTRACTOR SHALL PROVIDE MANDREL AND NECESSARY EQUIPMENT FOR MANDREL TEST. 6.I.4. PROCEDURE: MANDREL SHALL BE HAND-PULLED THROUGH FLEXIBLE PIPE SEWER LINES NO EARLIER THAN 30 DAYS AFTER TRENCH HAS BEEN COMPLETELY BACKFILLED. SECTIONS OF SEWER NOT PASSING MANDREL SHALL BE UNCOVERED AND REBEDDED, REROUNDED, OR REPLACED TO SATISFACTION OF OWNER OR GOVERNING AGENCY. REPAIRED SECTION SHALL BE RETESTED. 6.J. HYDROSTATIC TEST: FORCE MAIN PIPING SHALL BE HYDROSTATICALLY TESTED AT 150 PSI IN ACCORDANCE WITH AWWA C 600. 6.K. PROVIDE MEASURING DEVICES, METERS, WATER, MATERIALS, AND LABOR FOR MAKING THE REQUIRED TESTS. 6.L. TESTS SHALL BE CONDUCTED IN THE PRESENCE OF THE CONSTRUCTION MANAGER OR HIS DESIGNEE. TEST DATA SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL. END OF SECTION REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 2.A. MAINTAIN CAREFULLY ALL BENCHMARKS, MONUMENTS AND OTHER REFERENCE POINTS, IF DISTURBED OR DESTROYED REPLACE AS DIRECTED BY ENGINEER. 3. PROTECTION OF TREES 3.A. GENERAL PROTECTION: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF TOPS, TRUNKS AND ROOTS OF EXISTING TREES ON THE PROJECT SITE THAT ARE TO REMAIN. EXISTING TREES SUBJECT TO CONSTRUCTION DAMAGE SHALL BE BOXED, FENCED OR OTHERWISE PROTECTED BEFORE ANY WORK IS STARTED, DO NOT STOCKPILE WITHIN BRANCH SPREAD. REMOVE INTERFERING BRANCHES WITHOUT INJURY TO TRUNKS AND COVER SCARS WITH TREE PAINT. 4. REMOVAL OF TREES 4.A. REMOVE ALL TREES AND STUMPS FROM AREA TO BE OCCUPIED BY ROAD AND SURFACED AREAS. REMOVAL OF TREES OUTSIDE THESE AREAS SHALL ONLY BE DONE AS NOTED ON DRAWINGS OR APPROVED BY THE OWNER. 4.B. ALL BRUSH, STUMPS, WOOD AND OTHER REFUSE FROM THE TREES SHALL BE REMOVED FROM SITE OR BURNED WITH PROPER PERMITS (WHERE APPLICABLE). 5. STRIPPING OF TOPSOIL 5.A. REMOVE TOPSOIL TO A DEPTH OF 6 INCHES (OR MORE IF REQUIRED) FROM THE AREAS TO BE OCCUPIED BY ROADS, WALKS, BUILDINGS, AND PARKING AREAS. PILE AND STORE TOPSOIL AT A LOCATION WHERE IT WILL NOT INTERFERE WITH CONSTRUCTION OPERATIONS. TOPSOIL SHALL BE REASONABLY FREE FROM SUBSOIL, DEBRIS AND STONES. 6. SITE GRADING 6.A. GRADES: DO ALL CUTTING, FILLING, COMPACTING OF FILLS AND ROUGH GRADING REQUIRED TO BRING ENTIRE PROJECT AREA TO SUBGRADE AS SHOWN ON THE DRAWINGS. UNDERCUT OPEN AREAS 4 INCHES FOR TOPSOIL. 6.B. ROUGH GRADING: THE TOLERANCE FOR PAVED AREAS SHALL NOT EXCEED 0.10 FEET ABOVE ESTABLISHED SUBGRADE. ALL OTHER AREAS SHALL NOT EXCEED 0.10 FEET PLUS OR MINUS THE ESTABLISHED GRADE. PROVIDE ROUNDING AT TOP AND BOTTOM OF BANKS AND OTHER BREAKS IN GRADE. ALL OPEN AREAS SHALL BE GRADED A MINIMUM OF 0.5% AND A MAXIMUM OF 3:1 SLOPE. 6.C. SUBGRADE SHALL BE PROOFROLLED WITH SUITABLE EQUIPMENT AND ALL SPONGY AND OTHERWISE UNSUITABLE MATERIAL SHALL BE REMOVED AND REPLACED WITH SUITABLE MATERIAL. 6.D. SUBGRADE FOR STREETS AND PAVED AREAS SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR. 6.E. SEE PROJECT MANUAL AND SOILS REPORT FOR REQUIREMENTS REGARDING UNDERCUTTING AND SUBGRADE PREPARATION FOR PAVEMENT. 6.F. ALL FILL MATERIAL SHALL BE FORMED FROM SOIL FREE OF DELETERIOUS MATERIAL. PRIOR TO PLACEMENT OF FILL, A SAMPLE OF THE PROPOSED MATERIAL SHALL BE SUBMITTED TO THE SOILS ENGINEER FOR APPROVAL. THE FILL MATERIAL SHALL BE PLACED IN LAYERS NOT TO EXCEED 8" IN LOOSE THICKNESS AND SHALL BE SPREAD AND COMPACTED AT THE PROPER MOISTURE CONTENT. 6.G. ALL FILL MATERIAL IN AREAS OUTSIDE OF BUILDING AND PAVEMENT AREAS SHALL BE COMPACTED LIGHTLY WITH EACH LIFT AND PROTECTED FORM EROSION. AREAS OF BUILDING CONSTRUCTION SHALL HAVE SUITABLE FILL MATERIAL PLACED AND COMPACTED IN ACCORDANCE WITH THE SOILS ENGINEER'S REPORT (MINIMUM 95% MODIFIED PROCTOR). 7. DISPOSITION OF UTILITIES 7.A. RULES AND REGULATIONS GOVERNING THE RESPECTIVE UTILITIES SHALL BE OBSERVED IN EXECUTING ALL WORK UNDER THIS SECTION. 7.B. IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO VERIFY ALL EXISTING UTILITIES AND CONDITIONS PERTAINING TO HIS PHASE OF THE WORK. IT SHALL ALSO BE THE CONTRACTORS RESPONSIBILITY TO CONTACT THE OWNERS OF THE VARIOUS UTILITIES BEFORE WORK IS STARTED. THE CONTRACTOR SHALL NOTIFY IN WRITING THE OWNERS OR THE ENGINEERS OF ANY CHANGES, ERRORS OR OMISSIONS FOUND ON THESE PLANS OR IN THE FIELD BEFORE WORK IS STARTED OR RESUMES. 7.C. WHERE ACTIVE UTILITIES ARE ENCOUNTERED BUT NOT SHOWN ON THE DRAWINGS, THE ENGINEER SHALL BE ADVISED BEFORE WORK IS CONTINUED. 7.D. INACTIVE AND ABANDONED UTILITIES ENCOUNTERED IN EXCAVATING AND GRADING OPERATIONS SHALL BE REPORTED TO THE ENGINEER. THEY SHALL BE REMOVED, PLUGGED OR CAPPED AS DIRECTED BY THE ENGINEER. 8. SEEDING PREPARATION 8.A. SOLVE ANY SURFACE OR SUBSURFACE DRAINAGE PROBLEMS AND CONSTRUCT PERMANENT EROSION CONTROL STRUCTURES. 8.B. REMOVE ALL ROCKS, ROOTS OR OTHER MATERIALS THAT MAY INTERFERE WITH SEEDBED PREPARATION. 8.C. PERFORM THE MAJOR FILLING SHAPING AND SMOOTHING OF GULLIED OR SEVERELY ERODED AREAS. PAVING SPECIFICATIONS 1. SCOPE OF WORK 1.A. THE WORK REQUIRED UNDER THIS SECTION INCLUDES ALL EXTERIOR CONCRETE AND BITUMINOUS PAVING AND RELATED ITEMS NECESSARY TO COMPLETE THE WORK INDICATED ON DRAWINGS AND DESCRIBED IN THE SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO: ALL DRIVES, PARKING AREAS IN CONTRACT LIMITS CURBS AND GUTTERS SIDEWALKS AND CONCRETE SLABS, EXTERIOR STEPS 2. MATERIALS 2.A. CONCRETE: CONCRETE SHALL BE READY-MADE AND SHALL BE A MIX OF PROPORTIONED FINE AND COARSE AGGREGATES WITH PORTLAND CEMENT AND WATER. MINIMUM CEMENT CONTENT SHALL BE 6 BAGS PER CUBIC YARD OF CONCRETE AND MAXIMUM WATER CONTENT SHALL BE 5.5 U.S. GALLONS PER SACK OF CEMENT, INCLUDING MOISTURE IN THE AGGREGATE. SLUMP FOR NORMAL WEIGHT CONCRETE SHALL BE A MAXIMUM OF 4 INCHES AND A MINIMUM OF 2 INCHES. THE SLUMP OF MACHINE PLACE CONCRETE SHALL BE NO LESS THAN 1-1/4 INCHES NOR MORE THAN 3 INCHES. STANDARD TEST ASTM C0143 SHALL BE USED TO MEASURE SLUMP. MINIMUM COMPRESSIVE STRENGTH OF CONCRETE AT 28 DAYS SHALL BE 4000 PSI. ALL EXTERIOR CONCRETE SHALL HAVE AIR ENTRAINMENT OF 5% TO 8% BY VOLUME PER ASTM C0260. RETEMPERING OF DELIVERED CONCRETE WILL NOT BE ALLOWED. CONCRETE SHALL BE COMPOSED OF: 2.A.1. PORTLAND CEMENT: CONFORMING TO ASTM C-150, TYPE IA OR TYPE IIIA. 2.A.2. AGGREGATES: CONFORMING TO ASTM C-33. 2.A.3. WATER: SHALL BE CLEAR AND FREE FROM INJURIOUS AMOUNTS OF OILS, ACIDS, ALKALIC ORGANIC MATERIALS OR OTHER DELETERIOUS SUBSTANCES. 2.B. WELDED STEEL WIRE FABRIC: WHERE REQUIRED FOR CONCRETE REINFORCEMENT SHALL CONFORM TO ASTM A185. 2.C. PRE MOLDED JOINT FILLER: SHALL BE NON-EXTRUDING TYPE MEETING ASTM D-544, EXCEPT THAT PRE MOLDED JOINT FILLER USED IN CONCRETE WALK CONSTRUCTION MAY BE EITHER NON-EXTRUDING OR RESILIENT. 2.D. BITUMINOUS PAVEMENT MATERIALS: ALL MATERIALS PROPOSED FOR THE CONSTRUCTION OF BITUMINOUS PAVEMENTS SHALL COMPLY WITH THE INDIANA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS LATEST VERSION SHALL BE USED. 2.E. COMPACTED AGGREGATE SUB-BASE: SHALL BE CRUSHED STONE OR GRAVEL. CRUSHED GRAVEL SHALL BE A MINIMUM OF 35% CRUSHED MATERIAL. FINES SHALL BE LIMITED TO A MAXIMUM OF 8% OF THE TOTAL. MATERIAL SHALL BE FREE FROM AN EXCESS OF FLAT, ELONGATED, THINLY LAMINATED SOFT OR DISINTEGRATED PIECES, AND SHALL BE FREE FROM FRAGMENTS COATED WITH DIRT. COMPACTED AGGREGATE SHALL BE GRADED AS FOLLOWS: PER LATEST REVISIONS. SIEVE SIZE % PASSING 1-1/2" 100 1" 80-100 3/4" 79-90 1/2" 55-80 #4 35-60 #8 25-50 #30 12-30 #200 5-10 3. APPLICATION 3.A. GRADING: DO ANY NECESSARY GRADING IN ADDITION TO THAT PERFORMED IN ACCORDANCE WITH EARTHWORK SECTION, TO BRING SUB GRADES, AFTER FINAL COMPACTION, TO THE REQUIRED GRADES AND SECTIONS FOR SITE IMPROVEMENT. 3.B. PREPARATION OF SUB-GRADE: REMOVE SPONGY AND OTHERWISE UNSUITABLE MATERIAL AND REPLACE WITH STABLE MATERIAL. NO TRAFFIC WILL BE ALLOWED ON PREPARED SUB-GRADE PRIOR TO PAVING. 3.C. COMPACTION OF SUB-GRADE: THE FIRST 6 INCHES BELOW THE SUB-GRADE SHALL BE COMPACTED TO AT LEAST 100% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE PROVISIONS OF AASHTO T-99. WATER SHALL BE PREVENTED FOR STANDING ON THE COMPACTED SUB-GRADE 3.D. UTILITY STRUCTURES: CHECK FOR CORRECT ELEVATION OF ALL MANHOLE COVERS, INLETS, VALVE BOXES AND SIMILAR STRUCTURES LOCATED WITHIN AREAS TO BE PAVED AND MARK, OR HAVE MADE ANY NECESSARY ADJUSTMENTS IN SUCH STRUCTURES. 3.E. PLACING CONCRETE: 3.E.1. SUBGRADE: PLACE CONCRETE ONLY ON A MOIST, COMPACTED SUBGRADE OF BASE FREE FROM LOOSE MATERIAL. PLACE NO CONCRETE ON A MUDDY OR FROZEN SUBGRADE 3.E.2. FORMS: ALL FORMS SHALL BE FREE FROM WARP, TIGHT ENOUGH TO PREVENT LEAKAGE AND SUBSTANTIAL ENOUGH TO MAINTAIN THEIR SHAPE AND POSITION WITHOUT SPRINGING OR SETTING, WHEN CONCRETE IS PLACED. FORMS SHALL BE CLEAN AND SMOOTH IMMEDIATELY BEFORE PLACING CONCRETE. 3.E.3. PLACING CONCRETE: CONCRETE SHALL BE DEPOSITED SO AS TO REQUIRE AS LITTLE HANDING AS PRACTICABLE. WHEN CONCRETE IS TO BE PLACED AT AN ATMOSPHERIC TEMPERATURE OF 35 DEGREES F, OR LESS, PARAGRAPH 702.10 OF THE INDIANA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS, LATEST REVISION SHALL BE FOLLOWED. 3.F. CONCRETE CURB: 3.F.1. EXPANSION JOINTS: SHALL BE 1/2 INCH THICK PRE MOLDED AT ENDS OF ALL RETURNS AND A MAXIMUM SPACING OF 100 FEET. 3.F.2. CONTRACTION JOINTS: UNLESS OTHERWISE PROVIDED, CONTRACTION JOINTS SHALL BE JOINTS SPACED 10 FEET ON CENTER. 3.F.3. FINISH: TAMP AND SCREED CONCRETE AS SOON AS PLACED, AND FILL ANY HONEYCOMBED PLACES, FINISH SQUARE CORNERS TO 1/4 INCH RADIUS AND OTHER CORNERS TO RADII SHOWN. 3.G. CONCRETE WALKS AND EXTERIOR STEPS: 3.G.1. SLOPES: PROVIDE ¼ INCH PER FOOT CROSS SLOPE. MAKE ADJUSTMENTS IN SLOPES A WALK INTERSECTIONS AS NECESSARY TO PROVIDE PROPER DRAINAGE. 3.G.2. DIMENSIONS: WALKS AND STEPS SHALL BE ONE COURSE CONSTRUCTION AND OF WIDTHS AND DETAILS SHOWN ON THE DRAWINGS. 3.G.3. FINISH: SCREED CONCRETE AND TROWEL WITH A STEEL TROWEL TO A HARD DENSE SURFACE AFTER SURFACE WATER HAS DISAPPEARED. APPLY MEDIUM BROOM FINISH AND SCRIBE CONTROL JOINTS AT 6 FEET SPACING. PROVIDE ½ INCH EXPANSION JOINTS WHERE SIDEWALKS INTERSECT, AND AT A MAXIMUM SPACING OF 48 FEET BETWEEN EXPANSION JOINTS. 3.H. CURING CONCRETE: EXCEPT AS OTHERWISE SPECIFIED, CURE ALL CONCRETE BY ONE OF THE METHODS DESCRIBED IN SECTION 501.17 OF THE INDIANA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS, LATEST REVISION SHALL BE USED. 3.I. BITUMINOUS PAVEMENT: HOT ASPHALT CONCRETE (TYPE B OR C) PAVEMENT SHALL BE AS SPECIFIED IN SECTION 401/402 OF THE INDIANA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS, LATEST REVISIONS SHALL BE USED. PAVING WILL NOT BE PERMITTED DURING UNFAVORABLE WEATHER OR WHEN THE TEMPERATURE IS 40 DEGREES F. AND FALLING. 3.J. COMPACTED AGGREGATE SUB-BASE: THE THICKNESS SHOWN ON THE DRAWINGS IS THE MINIMUM THICKNESS OF THE FULL COMPACTED SUB-BASE. COMPACTION SHALL BE ACCOMPLISHED BY ROLLING WITH A SMOOTH WHEELED ROLLER WEIGHING 8 TO 10 TONS. COMPACT TO 95% COMPACTION USING STANDARD TESTING PROCEDURES. ALONG CURBS, HEADERS AND WALLS AND AT ALL PLACES NOT ACCESSIBLE TO THE ROLLER, THE AGGREGATE MATERIAL SHALL BE TAMPED WITH MECHANICAL TAMPERS OR WITH APPROVED TAMPERS. STORM SEWER SPECIFICATIONS 1. SCOPE OF WORK 1.A. THE WORK UNDER THIS SECTION INCLUDES ALL STORM SEWERS, STORM WATER INLETS, AND RELATED ITEMS, INCLUDING EXCAVATING AND BACKFILLING, NECESSARY TO COMPLETE THE WORK SHOWN ON THE DRAWINGS. 2. MATERIALS 2.A. STORM SEWERS: 2.A.1. REINFORCED CONCRETE SEWER PIPE SHALL CONFORM TO ASTM C-76 CLASS 3 LATEST REVISION WITH JOINTS CONFORMING TO ASTM C-443 LATEST REVISION. 2.A.2. STORM SEWERS HANCOR "HIQ" PIPE AND ADS OR APPROVED EQUAL: WITH THE FOLLOWING REQUIREMENTS: 2.A.2.a. 4 INCH THROUGH 10 INCH MEETING AASHTO M252 TYPE S. 12 INCH THROUGH 36 INCH MEETING AASHTO M294 TYPE S. 2.A.2.b. GASKETS MEETING ASTM D1056 GRADE 2A2. 2.A.2.c. FITTINGS MEETING ASSHTO M252 OR AASHTO M294, MEETING ASTM D3350 CELL CLASSIFICATION 324420C: OR ASTM D3350 TYPE III, CLASS C, CATEGORY 4, GRADE P33. 2.B. DRAINAGE STRUCTURES: 2.B.1. PRECAST REINFORCED CONCRETE DRAINAGE SECTIONS AND STEPS SHALL CONFORM TO ASTM C-478 LATEST REVISION AND LATEST REVISION OF INDOT PRECAST STRUCTURE DETAILS. 2.B.2. CASTINGS SHALL BE OF UNIFORM QUALITY, FREE FROM BLOW HOLES, POROSITY, HARD SPOTS, SHRINKAGE DISTORTION OR OTHER DEFECTS, THEY SHALL BE SMOOTH AND WELL CLEANED BY SHOT BLASTING OR BY SOME OTHER APPROVED METHOD. THEY SHALL BE COATED WITH ASPHALT PAINT WHICH SHALL RESULT IN A SMOOTH COATING. TOUGH AND TENACIOUS WHEN COLD, NOT TACKY OR BRITTLE. THEY SHALL BE GRAY IRON MEETING ASTM A-48 LATEST REVISION. 2.B.3. JOINTS - STRUCTURE SECTIONS SHALL BE JOINTED WITH RUBBER TYPE GASKETS, THE RUBBER TYPE GASKETS SHALL MEET ASTM C-443 LATEST REVISION. 2.C. SUBDRAINS: 2.C.1. PERFORATED PLASTIC PIPE SUBDRAINS SHALL CONFORM TO ASTM D3034, SDR 35, ASTM D2729, OR ASTM F405. 3. APPLICATION 3.A. PERMITS AND CODES: THE INTENT OF THIS SECTION OF THE SPECIFICATIONS IS THAT THE CONTRACTOR'S BID ON THE WORK COVERED HEREIN SHALL BE BASED UPON THE DRAWINGS AND SPECIFICATIONS BUT THAT THE WORK SHALL COMPLY WITH ALL, APPLICABLE CODES AN REGULATIONS AS AMENDED BY ANY WAIVERS. CONTRACTOR SHALL FURNISH ALL BONDS NECESSARY TO GET PERMITS FOR CUTS AND CONNECTIONS TO EXISTING SEWERS. 3.B. LOCAL STANDARDS: THE TERM "LOCAL STANDARDS" AS USED HEREIN MEANS THE STANDARDS OF DESIGN AND CONSTRUCTION OF THE RESPECTIVE MUNICIPAL DEPARTMENT AND/OR UTILITY COMPANY. 3.C. EXISTING IMPROVEMENTS: MAINTAIN IN OPERATING CONDITION ALL ACTIVE UTILITIES, SEWERS AND OTHER DRAINS ENCOUNTERED IN THE SEWER INSTALLATION. REPAIR TO THE SATISFACTION OF THE OWNER ANY DAMAGE TO EXISTING ACTIVE IMPROVEMENTS. 3.D. WORKMANSHIP: TO CONFORM TO ALL LOCAL, STATE AND NATIONAL CODES AND TO BE APPROVED BY ALL LOCAL AND STATE AGENCIES HAVING JURISDICTION. 3.E. TRENCHING: LAY ALL PIPE IN OPEN TRENCHES, EXCEPT WHEN THE LOCAL AUTHORITY GIVE WRITTEN PERMISSION FOR TUNNELING. OPEN THE TRENCH SUFFICIENTLY AHEAD OF PIPE LAYING TO REVEAL ANY OBSTRUCTIONS. THE WIDTH OF THE TRENCH SHALL BE THE INSIDE PIPE DIAMETER PLUS 24 INCHES FOR 12 INCHES ABOVE THE PIPE. SHEET AND BRACE TRENCH AS NECESSARY TO PROTECT WORKMEN AND ADJACENT STRUCTURES. ALL TRENCHING TO COMPLY WITH OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION STANDARDS. KEEP TRENCHES FREE FROM WATER WHILE CONSTRUCTION IS IN PROGRESS. UNDER NO CIRCUMSTANCES LAY PIPE OR APPURTENANCES IN STANDING WATER. CONDUCT THE DISCHARGE FORM TRENCH DEWATERING TO DRAINS OR NATURAL DRAINAGE CHANNELS. 3.F. SPECIAL SUPPORTS: WHENEVER, IN THE OPINION OF THE ENGINEER, THE SOIL AT OR BELOW THE PIPE GRADE IS UNSUITABLE FOR SUPPORTING SEWERS AND APPURTENANCES SPECIFIED IN THIS SECTION, SUCH SPECIAL SUPPORT, IN ADDITION THOSE SHOWN OR SPECIFIED, SHALL BE PROVIDED AS THE ENGINEER MAY DIRECT, AND THE CONTRACT WILL BE ADJUSTED. 3.G. BACKFILLING 3.G.1. RCP BACKFILLING: FOR DEPTH OF AT LEAST 12 INCHES ABOVE THE TOP OF THE PIPE, BACKFILL WITH EARTH OR GRANULAR MATERIAL FREE FROM LARGE STONES, ROCK FRAGMENTS, ROOTS OR SOD. TAMP THIS BACKFILL THOROUGHLY TAKING CARE NOT TO DISTURB THE PIPE. FOR THE REMAINING TRENCH DEPTH, BACKFILL WITH EARTH OR GRANULAR MATERIAL CONTAINING STONES OR ROCKS NOT LARGER THAN 4 INCHES. BACKFILL UNDER WALKS, PARKING AREAS, DRIVEWAYS AND STREETS SHALL BE GRANULAR MATERIAL ONLY THOROUGHLY COMPACTED BY APPROVED METHODS. TRENCHES PARALLEL TO AND WITHIN 5 FEET OF PAVED ROADWAYS SHALL ALSO BE CONSTRUCTED WITH COMPACTED GRANULAR MATERIALS. 3.G.2. HDPE BACKFILLING: FOR DEPTH OF AT LEAST 12 INCHES ABOVE THE TOP OF THE PIPE, BACKFILL WITH GRANULAR MATERIAL. COMPACT THIS BACKFILL THOROUGHLY TAKING CARE NOT TO DISTURB THE PIPE. FOR THE REMAINING TRENCH DEPTH, BACKFILL WITH EARTH OR GRANULAR MATERIAL CONTAINING STONES OR ROCKS NOT LARGER THAN 4 INCHES. BACKFILL UNDER WALKS, PARKING AREAS, DRIVEWAYS AND STREETS SHALL BE GRANULAR MATERIAL ONLY THOROUGHLY COMPACTED BY APPROVED METHODS. TRENCHES PARALLEL TO AND WITHIN 5 FEET OF PAVED ROADWAYS SHALL ALSO BE CONSTRUCTED WITH COMPACTED GRANULAR MATERIALS. 3.H. SUBDRAINS: ALL SUBDRAINS ON SITE SHALL BE OF THE SIZE AS SHOWN AND SHALL BE PLACED AS SHOWN ON THE PLANS. THEY SHALL BE CONSTRUCTED TO THE GRADES AS SHOWN ON THE PLANS. 3.I. UTILITIES: IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO VERIFY ALL EXISTING UTILITIES AND CONDITIONS PERTAINING TO HIS PHASE OF THE WORK. IT SHALL ALSO, BE THE CONTRACTORS RESPONSIBILITY TO CONTACT THE OWNERS OF THE VARIOUS UTILITIES BEFORE WORK IS STARTED. THE CONTRACTOR SHALL NOTIFY IN WRITING THE OWNERS OR THE ENGINEER OF ANY CHANGES, ERRORS OR OMISSIONS FOUND ON THESE PLANS OR IN THE FIELD BEFORE WORK IS STARTED OR RESUMED. WATER LINE SPECIFICATIONS 1. SCOPE OF WORK 1.A. THE WORK REQUIRED UNDER THIS SECTION INCLUDES ALL COLD WATER DISTRIBUTION LINES, VALVES, METER PITS, HYDRANTS, AND RELATED ITEMS INCLUDING EXCAVATING AND BACKFILLING NECESSARY TO COMPLETE THE WORK SHOWN ON THE DRAWINGS. THE END OF WATER SERVICE LINES SHALL BE TIGHTLY PLUGGED OR CAPPED AT THE TERMINAL POINTS PENDING THE CONNECTING TO ALL SUCH LINES OF THE BUILDING PIPING AS SPECIFIED IN THE PLUMBING SPECIFICATIONS AND ARCHITECTURAL DRAWINGS. 2. MATERIALS 2.A. DUCTILE IRON (D.I.) PIPE: DUCTILE IRON PIPE SHALL BE CLASS 350 AND MEET AWWA C-150 AND C-151 SPECIFICATIONS. JOINTS SHALL MEET AWWA C-111 SPECIFICATIONS. PIPE SHALL BE CEMENT LINED PER AWWA C-104 AND SHALL BE COATED OUTSIDE WITH A BITUMINOUS COATING. D.I. FITTINGS SHALL BE CEMENT LINED AND MEET AWWA C-110 SPECIFICATIONS (350 PSI). COMPACT D.I. FITTINGS SHALL BE CEMENT LINED AND MEET AWWA C-153 SPECIFICATIONS (CLASS 53, 350 PSI) 2.B. POLYVINYL CHLORIDE (PVC) PIPE: PVC PIPE SHALL HAVE THE SAME OUTSIDE DIAMETER AS DUCTILE IRON PIPE, HAVE A MINIMUM WALL THICKNESS OF DR-18 FOR PRESSURE CLASS 150 AND MEET AWWA C900 SPECIFICATIONS. JOINTS SHALL BE SLIP-ON TYPE WITH INTEGRAL BELL AND SPIGOT. 2.C. POLYETHYLENE (HDPE) PIPE: HDPE PIPE SHALL MEET AWWA C901 AND C906 SPECIFICATIONS. PIPE (3"-24") SHALL HAVE A MINIMUM WALL THICKNESS OF SRD 11. HDPE FITTINGS SHALL HAVE SAME DR AS PIPE BEING INSTALLED. 2.D. COPPER TUBING: SHALL BE SEAMLESS, ANNEALED COPPER TUBING COMPLYING WITH FEDERAL SPECIFICATION WW-T799. FITTINGS SHALL BE WROUGHT COPPER OR CAST BRONZE WITH SOLDER JOINTS. SOLDER SHALL BE OF A COMPOSITION RECOMMENDED BY THE MANUFACTURER OF THE FITTINGS. 2.E. FIRE HYDRANTS: SHALL COMPLY WITH AWWA SPECIFICATION C-502 AND SHALL MEET LOCAL STANDARDS AND REQUIREMENTS, PARTICULARLY AS TO NOZZLE DIAMETERS AND THREADS, DIRECTION OF OPENING AND DIMENSIONS OF OPERATING AND CAP NUTS. FIRE HYDRANTS SHALL HAVE ONE PUMPER AND TWO HOSE NOZZLES. A VALVE OPENING NOT LESS THAN 5 INCHES AND A 6 INCH INLET CONNECTION. THE LENGTH OF THE HYDRANT BARREL SHALL BE DETERMINED BY THE SPECIFIED DEPTH OF COVER OVER THE PIPE. 2.F. VALVES: ALL VALVES AND STOPS SHALL HAVE ENDS SUITED OR ADAPTERS SHALL BE PROVIDED FOR THE PROPER INSTALLATION IN THE LINES IN WHICH THEY ARE LOCATED. VALVES SHALL MEET LOCAL STANDARDS OR IN THE ABSENCE OF SUCH STANDARDS, THE FOLLOWING REQUIREMENTS. 2.F.1. VALVES IN CAST IRON PIPE SHALL BE IRON BODY, BRONZE MOUNTED, DISC GATE VALVES CONFORMING TO AWWA SPECIFICATION C-500. THEY SHALL OPEN IN THE SAME DIRECTION AS THOSE USED IN THE LOCAL WATERWORKS SYSTEM. VALVE STEMS SHALL TERMINATE IN 2 INCH WRENCH NUTS. FURNISH TWO (2) KEYS. 2.F.2. VALVES IN COPPER PIPE SHALL BE STANDARD BRASS BODY, ROUND-WAY, GROUND-KEY STOPS, WITH T HEADS. FURNISH TWO (2) KEYS. 2.G. VALVE BOXES: SHALL MEET LOCAL STANDARDS OR IN THE ABSENCE OF SUCH, SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS: 2.G.1. FOR IRON BODY VALVES, BOXES SHALL BE APPROVED STANDARD BUFFALO-TYPE CAST IRON, ADJUSTABLE SHAFT BOXES, HAVING A MINIMUM SHAFT DIAMETER OF 5-1/4 INCHES. 2.G.2. FOR BRASS BODY VALVES (STOPS) BOXES SHALL BE APPROVED STANDARD CAST IRON EXTENSION SERVICE BOXES, HAVING A MINIMUM DIAMETER OF 2-1/2 INCHES AND HAVING LID HELD IN PLACE BY A BRASS OR BRONZE BOLT. THE CASTINGS SHALL BE COATED WITH TWO COATS OF COAL-TAR PITCH VARNISH. FURNISH TWO (2) KEYS FOR BOLT IN LIDS. 3. APPLICATION: 3.A. PERMITS AND CODES: THE INTENT OF THIS SECTION OF THE SPECIFICATIONS IS THAT THE CONTRACTOR'S BID ON THE WORK COVERED HEREIN SHALL BE BASED UPON THE DRAWINGS AND SPECIFICATIONS BUT THAT THE WORK SHALL COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS. CONTRACTOR SHALL FURNISH ALL NECESSARY BONDS TO GET PERMITS FOR CUTS AND CONNECTIONS. 3.B. EXISTING IMPROVEMENTS: MAINTAIN IN OPERATING CONDITION ALL ACTIVE UTILITIES AND SEWERS AND OTHER PIPE SYSTEM THAT MAY BE ENCOUNTERED. 3.C. TRENCHING: LAY ALL PIPE IN OPEN TRENCHES, EXCEPT WHEN LOCAL AUTHORITY GIVES WRITTEN PERMISSION FOR TUNNELING. PROVIDE SEPARATE TRENCH FOR THE WATER LINE AT LEAST 10 FEET HORIZONTALLY FROM ANY SANITARY SEWER. IN LOCATIONS WHERE SEPARATE TRENCHES FOR SEWER AND WATER LINES ARE IMPRACTICABLE, LAY THE WATER PIPE ON A SOLID SHELF AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER. 3.D. WIDTH OF TRENCH: EXCAVATE TRENCHES 12 INCHES EACH SIDE OF THE PIPE FOR PROPER INSTALLATION OF PIPE. 3.E. SHEETING AND BRACING: SHEET AND BRACE TRENCHES AS NECESSARY TO PROTECT WORKMEN AND ADJACENT STRUCTURES. ALL TRENCHING SHALL COMPLY WITH THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION STANDARDS. 3.F. WATER REMOVAL: KEEP TRENCHES FREE FROM WATER WHILE CONSTRUCTION THEREIN IS IN PROGRESS. UNDER NO CIRCUMSTANCES LAY PIPE OR APPURTENANCES IN STANDING WATER. CONDUCT THE DISCHARGE FROM TRENCH DEWATERING TO DRAINS, OR NATURAL DRAINAGE CHANNELS. 3.G. GRADING TRENCH BOTTOMS: THE BOTTOM QUADRANT OF THE PIPE SHALL BE FULLY AND UNIFORMLY SUPPORTED. THE FULL LOAD SHALL REST ON THE BARREL OF THE PIPE. THE TRENCH MAY BE EXCAVATED TO A DEPTH OF 4 INCHES OR MORE BELOW FINAL GRADE WITH SAND, CRUSHED STONE OR GRAVEL BACKFILL TO BRING IT BACK TO PIPE LAYING GRADE. FOR A DEPTH OF AT LEAST 12 INCHES ABOVE THE TOP OF THE PIPE BACKFILL WITH EARTH OR GRANULAR MATERIAL FREE FROM LARGE STONES, ROOTS OR FROZEN CLOGS. TAMP THIS BACKFILL THOROUGHLY TAKING CARE NOT TO DISTURB THE PIPE. BACKFILL UNDER WALKS, PARKING AREAS DRIVEWAYS AND STREETS WITH GRANULAR MATERIAL ONLY AND TAMP THOROUGHLY, BY APPROVED METHODS. TRENCHES PARALLEL TO AND WITHIN 10 FEET OF PAVED ROADWAYS SHALL ALSO BE CONSTRUCTED WITH COMPACTED GRANULAR MATERIAL. 3.H. TESTS: BEFORE JOINTS ARE COVERED, FILL THE PIPING WITH WATER, OPENING HYDRANTS OR OTHER OUTLETS TO EXPEL AIR. TEST THE PIPING FOR LEAKAGE AS REQUIRED BY THE LOCAL UTILITY. INSPECT ALL JOINTS FOR LEAKAGE AND REMEDY ANY LEAKS. UPON COMPLETION OF THE WATER LINES, FLUSH OUT THE SYSTEM UNTIL THE WATER RUNS CLEAR. AS SOON AS THE SYSTEM HAS BEEN FLUSHED OUT, IT SHALL BE STERILIZED IN ACCORDANCE WITH THE REQUIREMENTS OF THE LOCAL UTILITY. 3.I. IF A HORIZONTAL DISTANCE OF 10 FEET CANNOT BE MAINTAINED BETWEEN THE WATER LINE AND THE SANITARY SEWER LINE, THE SEWER MUST BE CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON OR PVC PIPE WITH MECHANICAL JOINTS WITHIN 10' OF EITHER SIDE THE WATER LINE. 3.J. UTILITIES: IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO VERIFY ALL EXISTING UTILITIES AND CONDITIONS PERTAINING TO HIS PHASE OF THE WORK. IT SHALL ALSO BE THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE OWNERS OF THE VARIOUS UTILITIES BEFORE WORK IS STARTED. THE CONTRACTOR SHALL NOTIFY IN WRITING THE OWNERS OR THE ENGINEER OF ANY CHANGES, ERRORS OR OMISSIONS FOUND ON THESE PLANS OR IN THE FIELD BEFORE WORK IS STARTED OR RESUMED. 3.K. NEW WATER LINE CONSTRUCTION: CONTRACTOR TO RECORD DIMENSION OF EACH WATER STUB AND VALVES FROM NEAREST FIRE HYDRANT MEASURED ALONG WATER MAIN. THE LOCATIONS OF HYDRANTS AND WATER VALVES, ALONG WITH ANY OTHER CONSTRUCTION CHANGES ARE TO BE INCORPORATED ON THE ORIGINAL CONSTRUCTION DRAWINGS AND "RECORD DRAWING" PRINTS SHALL BE SUBMITTED TO THE LOCAL UTILITY AS SOON AFTER COMPLETION OF CONSTRUCTION AS POSSIBLE. NOTE: THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. PAVEMENT MARKING SPECIFICATIONS 1. SUMMARY 1.A. SECTION INCLUDES: 1.A.1. PAINTING AND MARKING OF PAVEMENTS. 1.B. REFERENCES 1.B.1. THE PUBLICATIONS LISTED BELOW FORM A PART OF THIS SPECIFICATION TO THE EXTENT REFERENCED. PUBLICATIONS ARE REFERENCED WITHIN THE TEXT BY THE BASIC DESIGNATION ONLY. 1.B.2. AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION (AASHTO): 1.B.2.a. AASHTO M247 - GLASS BEADS USED IN TRAFFIC PAINTS 1.B.2.b. AASHTO M248 - READY-MIXED WHITE AND YELLOW TRAFFIC PAINTS 1.B.3. ASTM INTERNATIONAL (ASTM): 1.B.3.a. ASTM D4414 - STANDARD PRACTICE FOR MEASUREMENT OF WET FILM THICKNESS BY NOTCHED GAUGES. 1.B.4. FEDERAL SPECIFICATIONS (FS): 1.B.4.a. FS A-A-2886 - PAINT, TRAFFIC, SOLVENT BASED (SUPERSEDES FS TT-P-85 AND FS TT-P-115, TYPE I) 1.B.4.b. FS TT-B-1325 - BEADS (GLASS SPHERES) RETRO-REFLECTIVE 1.B.4.c. FS TT-P-1952 - PAINT, TRAFFIC AND AIRFIELD MARKING, WATERBORNE 1.C. PROJECT CONDITIONS 1.C.1. MAINTAIN ACCESS FOR VEHICULAR AND PEDESTRIAN TRAFFIC AS REQUIRED FOR OTHER CONSTRUCTION ACTIVITIES. UTILIZE FLAGMEN, BARRICADES, WARNING SIGNS, AND WARNING LIGHTS AS REQUIRED. 1.D. QUALITY ASSURANCE 1.D.1. USE TRAINED AND EXPERIENCED PERSONNEL IN APPLYING THE PRODUCTS AND OPERATING THE EQUIPMENT REQUIRED FOR PROPERLY PERFORMED WORK. 2. PRODUCTS 2.A. MATERIALS 2.A.1. PAINT SHALL BE WATERBORNE OR SOLVENT BORNE, COLORS AS SHOWN OR SPECIFIED HEREIN. PAVEMENT MARKING PAINTS SHALL COMPLY WITH APPLICABLE STATE AND LOCAL LAWS ENACTED TO ENSURE COMPLIANCE WITH FEDERAL CLEAN AIR STANDARDS. PAINT MATERIALS SHALL CONFORM TO THE RESTRICTIONS OF THE LOCAL AIR POLLUTION CONTROL DISTRICT. 2.A.2. WATERBORNE PAINT: PAINTS SHALL CONFORM TO FS TT-P-1952. 2.A.3. SOLVENT BORNE PAINT: PAINT SHALL CONFORM TO FS A-A-2886 OR AASHTO M248. PAINT SHALL BE NON_BLEEDING, QUICK_DRYING, AND ALKYD PETROLEUM BASE PAINT SUITABLE FOR TRAFFIC_BEARING SURFACE AND BE MIXED IN ACCORDANCE WITH MANUFACTURE'S INSTRUCTIONS BEFORE APPLICATION FOR COLORS WHITE, YELLOW, BLUE, AND RED. 2.A.4. GLASS BEADS: AASHTO M 247, TYPE 1 OR FS TT-B-1325, TYPE 1, GRADATION A. 3. EXECUTION 3.A. EXAMINATION 3.A.1. EXAMINE THE WORK AREA AND CORRECT CONDITIONS DETRIMENTAL TO TIMELY AND PROPER COMPLETION OF THE WORK. DO NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS ARE CORRECTED. 3.B. PREPARATION 3.B.1. SWEEP AND CLEAN SURFACE TO ELIMINATE LOOSE MATERIAL AND DUST. 3.B.2. WHERE EXISTING PAVEMENT MARKINGS ARE INDICATED ON CONSTRUCTION DRAWINGS TO BE REMOVED OR WOULD INTERFERE WITH ADHESION OF NEW PAINT, A MOTORIZED ABRASIVE DEVICE SHALL BE USED TO REMOVE THE MARKINGS. EQUIPMENT EMPLOYED SHALL NOT DAMAGE EXISTING PAVING OR CREATE SURFACES HAZARDOUS TO VEHICLE OR PEDESTRIAN TRAFFIC. WITHIN PUBLIC RIGHTS-OF-WAY, APPROPRIATE GOVERNING AUTHORITY SHALL APPROVE METHOD OF MARKING REMOVAL. 3.B.3. NEW PAVEMENT SURFACES SHALL BE ALLOWED TO CURE FOR NOT LESS THAN 30 DAYS BEFORE APPLICATION OF MARKING MATERIALS. 3.C. APPLICATION 3.C.1. APPLY TWO COATS OF SAME COLOR OF PAINT AS SPECIFIED BELOW, AT MANUFACTURER'S RECOMMENDED RATE, WITHOUT ADDITION OF THINNER, WITH MAXIMUM OF 100 SQUARE FEET PER GALLON OR AS REQUIRED TO PROVIDE A MINIMUM WET FILM THICKNESS OF 15 MILS AND DRY FILM THICKNESS OF 7 ½ MILS PER COAT. PAINT SHALL BE APPLIED FOR A TOTAL DRY FILM THICKNESS OF 15 MILS. APPLY WITH MECHANICAL EQUIPMENT TO PRODUCE UNIFORM STRAIGHT EDGES. AT SIDEWALK CURBS AND CROSSWALKS, USE STRAIGHTEDGE TO ENSURE UNIFORM, CLEAN, AND STRAIGHT STRIPE. 3.C.2. INSTALL PAVEMENT MARKINGS ACCORDING TO MANUFACTURER'S RECOMMENDED PROCEDURES FOR THE SPECIFIED MATERIAL. 3.C.3. FOLLOWING ITEMS SHALL BE PAINTED WITH COLORS NOTED BELOW: 3.C.3.a. PEDESTRIAN CROSSWALKS: WHITE 3.C.3.b. EXTERIOR SIDEWALK CURBS AND GUARD POSTS: YELLOW 3.C.3.c. FIRE LANES: RED OR PER LOCAL CODE 3.C.3.d. LANE STRIPING WHERE SEPARATING TRAFFIC MOVING IN OPPOSITE DIRECTIONS: YELLOW 3.C.3.e. LANE STRIPING WHERE SEPARATING TRAFFIC MOVING IN THE SAME DIRECTION: WHITE 3.C.3.f. ADA SYMBOLS: BLUE OR PER LOCAL CODE 3.C.3.g. ADA PARKING SPACE MARKINGS AS SHOWN ON THE DRAWINGS. 3.C.3.h. PARKING STALL STRIPING: WHITE, UNLESS OTHERWISE NOTED ON CONSTRUCTION DRAWINGS 3.C.4. APPLY GLASS BEADS AT PEDESTRIAN CROSSWALK STRIPING AND AT LANE STRIPING AND ARROWS AT DRIVEWAYS CONNECTING TO PUBLIC STREETS. BROADCAST GLASS BEADS UNIFORMLY INTO WET MARKINGS AT A RATE OF 6 LB/GAL. 3.D. FIELD QUALITY CONTROL 3.D.1. INSPECTION: AFTER THE PAINT HAS THOROUGHLY DRIED, VISUALLY INSPECT THE ENTIRE APPLICATION AND TOUCH UP AS REQUIRED TO PROVIDE CLEAN, STRAIGHT LINES AND SURFACES THROUGHOUT. 3.D.2. TESTING: TESTING OF WET FILM THICKNESS SHALL BE PERFORMED A MINIMUM OF TWO TIMES ON EACH PARKING ROW (INCLUDING STRIPED ISLANDS) AND PEDESTRIAN CROSS WALKS, AND A MINIMUM OF ONE TEST ON EACH LANE/ALIGNMENT STRIPING. AT LEAST ONE TEST SHALL BE PERFORMED AFTER REFILLING PAINT STRIPING MACHINE, CHANGING OPERATORS OF STRIPING MACHINE, AND CHANGING PAINT TYPES, BRANDS, ETC. THIS SHALL BE PERFORMED IN ADDITION TO THE TESTING STATED ABOVE. THESE TESTS SHALL BE PERFORMED ON EACH COAT APPLIED. TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ASTM D4414. 3.E. CLEANING 3.E.1. WASTE MATERIALS SHALL BE REMOVED AT THE END OF EACH WORKDAY. UPON COMPLETION OF THE WORK, ALL CONTAINERS AND DEBRIS SHALL BE REMOVED FROM THE SITE. PAINT SPOTS UPON ADJACENT SURFACES SHALL BE CAREFULLY REMOVED BY APPROVED PROCEDURES THAT WILL NOT DAMAGE THE SURFACES AND THE ENTIRE JOB LEFT CLEAN AND ACCEPTABLE. REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 -NOTE- PAVING IN THE RIGHT-OF-WAY TO CONFORM TO THE CITY SPECIFICATIONS. ALL CURBS MUST CONFORM TO CITY'S CURBING SPECIFICATIONS. ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED. 3. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR. 4. THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY AND ALL FEES ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES. 5. ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER SAFETY. 6. ANY PART OF SANITARY OR STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL. 7. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND ELEVATION OF EXISTING UTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS RELATED TO THEIR WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/OR DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL CLEARANCE BETWEEN STORM / SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE. SANITARY SEWER LINE IN PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE PVC. 9. CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWERS, WATER MAINS AND STORM SEWERS IS 18" OR LESS. 10. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 11. WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. 12. COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED AREAS. 13. ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVE TRAFFIC BEARING RING AND COVERS. 14. PROVIDE THRUST BLOCKS FOR ALL WATER LINE BENDS AND TEES, INCLUDING TAP CONNECTION. 15. CONTRACTOR SHALL COORDINATE WITH WATER COMPANY FOR DOMESTIC AND FIRE SERVICE. CONNECT TO BUILDING DOMESTIC AND FIRE LINE. COORDINATE WITH PLUMBING DRAWINGS. 16. COORDINATE LOCATION OF ELECTRICAL AND COMMUNICATION LINES WITH LOCAL UTILITIES. 17. COORDINATE LOCATION OF REQUIRED CONDUITS FOR ELECTRIC SERVICE, LIGHT POLES, COMMUNICATION SERVICE AND IRRIGATION SYSTEM. 18. COORDINATE LOCATION AND SIZE OF GAS SERVICE CONNECTION AND INSTALLATION OF SERVICE LINE AND METER WITH GAS COMPANY. 19. COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH PLUMBING DRAWINGS. 20. FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO DOMESTIC/FIRE LINE INSTALLATION AND STORM SEWER / SANITARY SEWER INSTALLATION. 21. SANITARY SEWER LATERAL, WATER SERVICE, & ELECTRICAL/COMMUNICATION CONDUITS SHALL BE GRANULAR BACKFILL FOR ENTIRE RUN. 22. ALL EXISTING MANHOLE AND CATCH BASIN GRATES, WATER OR GAS VALVES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATIONS. UTILITY PLAN NOTES SANITARY SEWER NOTES CONNECT PROPOSED 6" SANITARY SEWER LATERAL TO EXISTING SANITARY SEWER LATERAL. COORDINATE CONNECTION WITH MEP. PROVIDE CLEANOUTS AS REQUIRED/SHOWN. VERIFY INVERTS ON EXISTING LINE AND COORDINATE CONDITIONS WITH MEP. ADJUST AS REQUIRED. ALL EXISTING CONNECTIONS MUST BE TELEVISED PRIOR TO CONNECTING. CARMEL UTILITY INSPECTOR MUST BE ON SITE TO WITNESS THE TELEVISING AND CONNECTIONS. CONTACT JASON STEWART PRIOR TO PROCEEDING AT 317-518-5842 EXISTING 6" SANITARY SEWER LATERAL. PROPOSED SANITARY LATERAL CLEANOUT TYPE 1 (IN LANDSCAPE AREAS WITHIN 3' OF BUILDING). REFER TO DETAIL ON SHEET [C801]. WATER SERVICE NOTES: COORDINATE AND CONNECT 6" FIRE LINE TO EXISTING WATER MAIN WITH A WET TAP. CONTACT CARMEL UTILITIES BEFOREHAND (STEVE COOK 317-733-2849) COORDINATE CONNECTION OF DOMESTIC SERVICE LINE AND FIRE SERVICE LINE WITH PLUMBING DRAWINGS. COORDINATE LOCATION AND CONNECTION OF DOMESTIC METER WITH LOCAL SERVICE PROVIDER. 1 1/2" WATER METER SET W/ BACKFLOW PREVENTION INSIDE THE BUILDING REQUIRED. EXISTING FIRE HYDRANT. PROPOSED POST INDICATOR VALVE (PIV). PROPOSED FIRE DEPARTMENT CONNECTION 5" STORZ/2.5" SIAMESE. PROPOSED WATER VALVE. PROPOSED 6" PVC FIRE SERVICE LINE. PROPOSED 2" PE DOMESTIC SERVICE LINE PROPOSED PRIVATE FIRE HYDRANT ASSEMBLY. MUST BE RED IN COLOR FROM THE FACTORY. PROVIDE BOLLARD PROTECTION. ELECTRIC NOTES: COORDINATE AND CONNECT BUILDING ELECTRICAL LINE FROM SERVICE DROP LOCATION TO TRANSFORMER. COORDINATE CONNECTION WITH POWER COMPANY AND ELECTRICAL DRAWINGS. ADJUST AS REQUIRED. 2-4" EC CONDUITS TO BE INSTALLED WITH PULL STRINGS. COORDINATE WITH UTILITY PROVIDER IF A NEW TRANSFORMER IS REQUIRED. BUILDING ELECTRICAL LINE POINT OF CONNECTION. COORDINATE CONNECTION WITH POWER COMPANY AND ELECTRICAL DRAWINGS. ADJUST AS REQUIRED. COMMUNICATION NOTES: COORDINATE AND CONNECT BUILDING COMMUNICATION SERVICE LINE(S) TO CONNECTION POINT AS SHOWN. ADJUST AS REQUIRED. PROVIDE (3)-4" PVC CONDUIT TO BE INSTALLED WITH PULL STRINGS. GAS SERVICE NOTES: CONNECT PROPOSED GAS SERVICE TO EXISTING GAS LINE. REFER TO PLUMBING DRAWINGS AND COORDINATE WITH SERVICE PROVIDER. PROPOSED GAS METER LOCATION. REFER TO PLUMBING DRAWINGS AND COORDINATE WITH SERVICE PROVIDER. W4 W2 W3 SS3 SS2 W1 E1 E2 C1 G1 SS1 W5 W6 W7 W8 W9 C800 UTILITY PLAN ELECTRICAL RISER GUY ANCHOR ELECTRIC JUNCTION BOX ORNAMENTAL LIGHT GENERATOR STREET LIGHT ELECTRIC MANHOLE ELECTRIC OUTLET UTILITY POLE UTILITY POLE W/ TRANSFORMER TRANSFORMER COMMUNICATIONS JUNCTION BOX COMMUNICATIONS MANHOLE COMMUNICATIONS PEDESTAL RIGHT OF WAY LINE FENCE GUARD RAIL BOUNDARY LINE CISTERN DRINKING FOUNTAIN FIRE DEPT HOOKUP FIRE HYDRANT POST INDICATOR VALVE CHILLED WATER MANHOLE WATER MANHOLE SPRINKLER CONTROL BOX SPRINKLER CONTROL VALVE SPRINKLER SPIGOT WELL HEAD WATER METER WATER VALVE GAS METER GAS VALVE ELECTRIC METER LIQUID PROPANE GAS TANK MONITORING WELL TRAFFIC SIGNAL POLE TRAFFIC SIGNAL BOLLARD FLAG POLE PARKING METER POST SIGN PARKING WHEEL STOP DOWN SPOUT ACCESSIBLE SPACE GATE POST COMMUNICATIONS RISER STORM CLEANOUT BEEHIVE INLET CURB INLET FLOOR DRAIN ROUND INLET SQUARE INLET STORM MANHOLE SANITARY SEWER CLEANOUT LIFT STATION SANITARY SEWER MANHOLE SANITARY STUB MARKER SEPTIC TANK PARKING LOT LIGHT (1 HEAD) PARKING LOT LIGHT (3 HEAD) PARKING LOT LIGHT (4 HEAD) PARKING LOT LIGHT (2 HEAD) HEAVY DUTY ASPHALT CONCRETE PAVEMENT DISTRIBUTION BOX ROW RIGHT OF WAY ESMT EASEMENT D.&U.E. DRAINAGE AND UTILITY EASEMENT FFE FINISH FLOOR ELEVATION CMP CORRUGATED METAL PIPE RCP REINFORCED CONCRETE PIPE PVC POLYVINYL CHLORIDE PIPE VCP VITRIFIED CLAY PIPE HDPE HIGH DENSITY POLYETHYLENE PIPE DIP DUCTILE IRON PIPE SSD SUB SURFACE DRAIN PIPE STM STORM SAN SANITARY STR STRUCTURE CO CLEANOUT STANDARD DUTY ASPHALT PAVEMENT UTILITY PLAN LEGEND UTILITIES ABBREVIATIONS OTHER LINE TYPES FLOW LINE SANITARY SEWER MAIN STORM SEWER MAIN UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS AERIAL COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN G G G W W E(A) E(A) E E E C C C C(A) C(A) OHU OHU FM FM FO(A) FO(A) AERIAL FIBER OPTIC CABLE FO FO UNDERGROUND FIBER OPTIC SAN SAN SANITARY SEWER LATERAL STM STM ROOF DRAIN SUB SURFACE DRAIN G2 E3 REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS W S N E ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 W10 COMMUNICATIONS JUNCTION BOX COMMUNICATIONS MANHOLE COMMUNICATIONS PEDESTAL RIGHT OF WAY LINE FENCE GUARD RAIL BOUNDARY LINE FIRE DEPT HOOKUP FIRE HYDRANT POST INDICATOR VALVE WATER METER WATER VALVE GAS METER GAS VALVE ELECTRIC METER LIQUID PROPANE GAS TANK MONITORING WELL TRAFFIC SIGNAL POLE TRAFFIC SIGNAL BOLLARD POST SIGN PARKING WHEEL STOP DOWN SPOUT ACCESSIBLE SPACE GATE POST COMMUNICATIONS RISER STORM CLEANOUT BEEHIVE INLET CURB INLET FLOOR DRAIN ROUND INLET SQUARE INLET STORM MANHOLE SANITARY SEWER CLEANOUT LIFT STATION SANITARY SEWER MANHOLE SANITARY STUB MARKER PARKING LOT LIGHT (1 HEAD) ROW RIGHT OF WAY ESMT EASEMENT D.&U.E. DRAINAGE AND UTILITY EASEMENT FFE FINISH FLOOR ELEVATION TOC TOP OF CASTING CMP CORRUGATED METAL PIPE RCP REINFORCED CONCRETE PIPE PVC POLYVINYL CHLORIDE PIPE VCP VITRIFIED CLAY PIPE HDPE HIGH DENSITY POLYETHYLENE PIPE DIP DUCTILE IRON PIPE SSD SUB SURFACE DRAIN PIPE STM STORM SAN SANITARY STR STRUCTURE CO CLEANOUT DRAINAGE PLAN LEGEND UTILITIES ABBREVIATIONS OTHER LINE TYPES FLOW LINE INDEX CONTOUR INTERMEDIATE CONTOUR SANITARY SEWER MAIN STORM SEWER MAIN UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS AERIAL COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN G G G W W E(A) E(A) E E E C C C C(A) C(A) OHU OHU FM FM FO(A) FO(A) AERIAL FIBER OPTIC CABLE FO FO UNDERGROUND FIBER OPTIC EMERGENCY FLOOD ROUTE SAN SAN SANITARY SEWER LATERAL STM STM ROOF DRAIN SUB SURFACE DRAIN FLOW DIRECTION AND SLOPE D D LIMITS OF DISTURBANCE GENERAL NOTES THE SITE DOES NOT LIE IN A SPECIAL FLOOD HAZARD AREA AS ESTABLISHED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY - NATIONAL FLOOD INSURANCE PROGRAM, WHEN PLOTTED BY SCALE ON FLOOD INSURANCE RATE MAP #18057C0209 G, DATED NOVEMBER 19, 2014. BENCHMARK DATA BM G 54 - ISHC BRONZE DISK ON A CONCRETE POST PROJECTING 1.5 FT. OUT OF THE GROUND ALONG U.S. 31, 1.4 MILES NORTH OF I-465, 0.4 MILES SOUTH OF 116TH STREET, 100 FT. WEST OF CENTERLINE OF SOUTH BOUND LANE OF U.S. 31, AND 2 FT. EAST OF R/W FENCE. BM G 55 - ISHC BRONZE DISK ON A CONCRETE POST PROJECTING 1.5 FT. OUT OF THE GROUND ALONG U.S. 31, 2.6 MILES NORTH OF I-465, 0.7 MILES SOUTH OF 131ST STREET, 83 FT. WEST OF CENTERLINE OF SOUTH BOUND LANE OF U.S. 31. BM Y 42 - CGS DISK IN CONCRETE SLAB ON THE EAST SIDE OF THE MONON TRAIL 218 FT. SOUTH OF 111TH STREET. PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS W S N E ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 ELECTRICAL RISER GUY ANCHOR ELECTRIC JUNCTION BOX ORNAMENTAL LIGHT GENERATOR STREET LIGHT ELECTRIC MANHOLE ELECTRIC OUTLET UTILITY POLE UTILITY POLE W/ TRANSFORMER TRANSFORMER COMMUNICATIONS JUNCTION BOX COMMUNICATIONS MANHOLE COMMUNICATIONS PEDESTAL RIGHT OF WAY LINE FENCE GUARD RAIL BOUNDARY LINE FIRE DEPT HOOKUP FIRE HYDRANT POST INDICATOR VALVE WATER METER WATER VALVE GAS METER GAS VALVE ELECTRIC METER LIQUID PROPANE GAS TANK MONITORING WELL TRAFFIC SIGNAL POLE TRAFFIC SIGNAL BOLLARD POST SIGN PARKING WHEEL STOP DOWN SPOUT ACCESSIBLE SPACE GATE POST COMMUNICATIONS RISER STORM CLEANOUT BEEHIVE INLET CURB INLET FLOOR DRAIN ROUND INLET SQUARE INLET STORM MANHOLE SANITARY SEWER CLEANOUT LIFT STATION SANITARY SEWER MANHOLE SANITARY STUB MARKER PARKING LOT LIGHT (1 HEAD) ROW RIGHT OF WAY ESMT EASEMENT D.&U.E. DRAINAGE AND UTILITY EASEMENT FFE FINISH FLOOR ELEVATION TOC TOP OF CASTING CMP CORRUGATED METAL PIPE RCP REINFORCED CONCRETE PIPE PVC POLYVINYL CHLORIDE PIPE VCP VITRIFIED CLAY PIPE HDPE HIGH DENSITY POLYETHYLENE PIPE DIP DUCTILE IRON PIPE SSD SUB SURFACE DRAIN PIPE STM STORM SAN SANITARY STR STRUCTURE CO CLEANOUT DRAINAGE PLAN LEGEND UTILITIES ABBREVIATIONS OTHER LINE TYPES FLOW LINE INDEX CONTOUR INTERMEDIATE CONTOUR SANITARY SEWER MAIN STORM SEWER MAIN UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS AERIAL COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN G G G W W E(A) E(A) E E E C C C C(A) C(A) OHU OHU FM FM FO(A) FO(A) AERIAL FIBER OPTIC CABLE FO FO UNDERGROUND FIBER OPTIC EMERGENCY FLOOD ROUTE SAN SAN SANITARY SEWER LATERAL STM STM ROOF DRAIN SUB SURFACE DRAIN FLOW DIRECTION AND SLOPE D D LIMITS OF DISTURBANCE 100 YEAR CLOGGED INLET PONDING LIMITS GENERAL NOTES THE SITE DOES NOT LIE IN A SPECIAL FLOOD HAZARD AREA AS ESTABLISHED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY - NATIONAL FLOOD INSURANCE PROGRAM, WHEN PLOTTED BY SCALE ON FLOOD INSURANCE RATE MAP #18057C0209 G, DATED NOVEMBER 19, 2014. BENCHMARK DATA BM G 54 - ISHC BRONZE DISK ON A CONCRETE POST PROJECTING 1.5 FT. OUT OF THE GROUND ALONG U.S. 31, 1.4 MILES NORTH OF I-465, 0.4 MILES SOUTH OF 116TH STREET, 100 FT. WEST OF CENTERLINE OF SOUTH BOUND LANE OF U.S. 31, AND 2 FT. EAST OF R/W FENCE. BM G 55 - ISHC BRONZE DISK ON A CONCRETE POST PROJECTING 1.5 FT. OUT OF THE GROUND ALONG U.S. 31, 2.6 MILES NORTH OF I-465, 0.7 MILES SOUTH OF 131ST STREET, 83 FT. WEST OF CENTERLINE OF SOUTH BOUND LANE OF U.S. 31. BM Y 42 - CGS DISK IN CONCRETE SLAB ON THE EAST SIDE OF THE MONON TRAIL 218 FT. SOUTH OF 111TH STREET. M.F.P.G. = 828.90 M.L.A.G. = 828.85 APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 ROOF DRAIN @ 0.5% CLEANOUT TOC=829.50 INV=828.00 CLEANOUT TOC=828.80 INV=826.42 CLEANOUT TOC=828.50 YARD INLET TOC=827.21 (6")INV=826.60 5 4 1 1 1 1 7 8 9 2 3 10 11 12 13 DRAINAGE PLAN NOTES DOWNSPOUTS TO CONNECT TO PROPOSED ROOF DRAIN. COORDINATE WITH ARCHITECTURAL PLANS. TRENCH DRAIN CONNECT TRENCH DRAIN TO PROPOSED STRUCTURE WATER QUALITY UNIT CONTROL STRUCTURE DIVERSION STRUCTURE 12' WIDE EMERGENCY OVERFLOW. EXTEND EXISTING CULVERT PIPE UNDERNEATH THE NEW SIDEWALK. PIPE TO FOLLOW THE SLOPE OF THE EXISTING GRADE TO PRESERVE POSITIVE DRAINAGE. CONNECT TO STRUCTURE 900. RECONNECT 6" OUTLET FROM THE DRAIN TO STRUCTURE 304. NATIVE PLANTINGS WITHIN BASIN. REFER TO SPECS ON SHEET C601. SIGN FOR NATIVE PLANTINGS. DETAIL ON SHEET C601. CONNECT STRUCTURE 900 TO EXISTING 15" PIPE WITH 12' OF 15" PIPE. STONE LEVEL SPREADER WITH UNDER DRAIN. REFER TO DETAIL ON SHEET C601 C600 DRAINAGE PLAN W190582-C600 drainage plan 1 2 3 4 5 6 ELECTRICAL RISER GUY ANCHOR ELECTRIC JUNCTION BOX ORNAMENTAL LIGHT GENERATOR STREET LIGHT ELECTRIC MANHOLE ELECTRIC OUTLET UTILITY POLE UTILITY POLE W/ TRANSFORMER TRANSFORMER COMMUNICATIONS JUNCTION BOX COMMUNICATIONS MANHOLE COMMUNICATIONS PEDESTAL RIGHT OF WAY LINE FENCE GUARD RAIL BOUNDARY LINE FIRE DEPT HOOKUP FIRE HYDRANT POST INDICATOR VALVE CHILLED WATER MANHOLE WATER MANHOLE SPRINKLER CONTROL BOX SPRINKLER CONTROL VALVE SPRINKLER SPIGOT WELL HEAD WATER METER WATER VALVE GAS METER GAS VALVE ELECTRIC METER LIQUID PROPANE GAS TANK MONITORING WELL TRAFFIC SIGNAL POLE TRAFFIC SIGNAL BOLLARD POST SIGN PARKING WHEEL STOP DOWN SPOUT ACCESSIBLE SPACE GATE POST COMMUNICATIONS RISER STORM CLEANOUT BEEHIVE INLET CURB INLET FLOOR DRAIN ROUND INLET SQUARE INLET STORM MANHOLE SANITARY SEWER CLEANOUT LIFT STATION SANITARY SEWER MANHOLE SANITARY STUB MARKER SEPTIC TANK PARKING LOT LIGHT (1 HEAD) PARKING LOT LIGHT (3 HEAD) PARKING LOT LIGHT (2 HEAD) DISTRIBUTION BOX ROW RIGHT OF WAY ESMT EASEMENT D.&U.E. DRAINAGE AND UTILITY EASEMENT FFE FINISH FLOOR ELEVATION CMP CORRUGATED METAL PIPE RCP REINFORCED CONCRETE PIPE PVC POLYVINYL CHLORIDE PIPE VCP VITRIFIED CLAY PIPE HDPE HIGH DENSITY POLYETHYLENE PIPE DIP DUCTILE IRON PIPE SSD SUB SURFACE DRAIN PIPE STM STORM SAN SANITARY STR STRUCTURE CO CLEANOUT NATIVE PLANTINGS AREA AREAS DRAINAGE PLAN LEGEND UTILITIES ABBREVIATIONS OTHER LINE TYPES FLOW LINE INDEX CONTOUR INTERMEDIATE CONTOUR SANITARY SEWER MAIN STORM SEWER MAIN UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS AERIAL COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN G G G W W E(A) E(A) E E E C C C C(A) C(A) OHU OHU FM FM FO(A) FO(A) AERIAL FIBER OPTIC CABLE FO FO UNDERGROUND FIBER OPTIC EMERGENCY FLOOD ROUTE SAN SAN SANITARY SEWER LATERAL STM STM ROOF DRAIN SUB SURFACE DRAIN FLOW DIRECTION AND SLOPE GENERAL DRAINAGE NOTES 1. THE CONTRACTOR SHALL ADHERE TO ALL TERMS AND CONDITIONS AS OUTLINED IN THE EPA OR APPLICABLE STATE GENERAL N.P.D.E.S. PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES AND STORMWATER POLLUTION PREVENTION PLAN. 2. REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION METHODS. THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE. 3. THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND LOCATION SERVICE AT LEAST 72 HOURS PRIOR TO ANY WORK AND SHALL CONTACT THE OWNER AND/OR ENGINEER SHOULD UTILITIES APPEAR TO BE IN CONFLICT WITH THE PROPOSED IMPROVEMENTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 4. THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED. 5. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR. 6. THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY AND ALL FEES ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES. 7. ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER SAFETY. 8. ANY PART OF STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL. 9. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND ELEVATION OF EXISTING UTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS RELATED TO THEIR WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/OR DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS. 10. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL CLEARANCE BETWEEN STORM / SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE. SANITARY SEWER LINE IN PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE PVC. 11. CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWERS, WATER MAINS AND STORM SEWERS IS 18" OR LESS. 12. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 13. WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. 14. COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED AREAS. 15. ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVE TRAFFIC BEARING RING AND COVERS. 16. COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH PLUMBING DRAWINGS. 17. FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO STORM SEWER INSTALLATION. 18. ALL EXISTING MANHOLE AND CATCH BASIN GRATES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATIONS. 19. EXISTING PIPES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS. 20. ALL STORM PIPE CONNECTIONS AT STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT. 21. ALL STORM SEWER STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVE TRAFFIC BEARING RING AND COVERS. 22. ALL STORM SEWER STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR CHANNEL FROM INVERT IN TO INVERT OUT. 23. NEW PIPES AND STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS PRIOR TO FINAL TURNOVER TO THE OWNER. 24. ALL HDPE PIPE SHALL BE DUAL WALLED, HANCOR HQ, ADS N-12 PIPE OR APPROVED EQUAL. 25. ALL FITTINGS AND ACCESSORIES INCLUDING BUT NOT LIMITED TO END CAPS, CLEANOUTS, REDUCERS, ETC., SHALL BE OF HDPE MATERIAL COMPARABLE WITH STORAGE PIPES. 26. PROVIDE BACKFILL WITH A MINIMUM OF 4" BEDDING MATERIAL OF #8 AGGREGATE COMPACTED IN 8" LIFTS TO 95% MAXIMUM DRY DENSITY. 27. VERIFY EXISTING STORM INVERT ELEVATIONS PRIOR TO STARTING NEW STORM SEWER CONNECTION. 28. THE PROPOSED STORM SEWER ON THIS SITE SHALL BE PRIVATE. 29. CONTRACTOR TO CONNECT BACK ANY FIELD TILES FOUND DURING EXCAVATION AND MAINTAIN POSITIVE DRAINAGE. REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS W S N E ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 CARMEL REQUIREMENTS 1. NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 2. DECORATIVE SIGNS, SPRINKLER SYSTEMS, TREES, LANDSCAPING MOUNDS, FENCES, LIGHT POLES OR OTHER SUCH AMENITIES ARE NOT PERMITTED WITHIN THE RIGHT-0F-WAY. 3. M.F.P.G. = MINIMUM FLOOD PROTECTION GRADE M.F.P.G. OF ALL STRUCTURES FRONTING A POND OR OPEN DITCH SHALL BE NO LESS THAN 2 FEET ABOVE ANY ADJACENT 100-YEAR LOCAL OR REGIONAL FLOOD ELEVATIONS, WHICHEVER IS GREATER, FOR ALL WINDOWS, DOORS, PIPE ENTRANCES, WINDOW WELLS, AND ANY OTHER STRUCTURE MEMBER WHERE FLOOD WATERS CAN ENTER A BUILDING. 4. M.L.A.G. = LOWEST ADJACENT GRADE IS THE ELEVATION OF THE LOWEST GRADE ADJACENT TO A STRUCTURE WHEN THE SOIL MEETS THE FOUNDATION AROUND THE OUTSIDE OF THE STRUCTURE. (INCLUDING STRUCTURAL MEMBERS SUCH AS BASEMENT WALKOUT, PATIOS, DECKS, PORCHES, SUPPORT POST, OR PIERS, AND RIM OF THE WINDOW WELL. 7 8 9 10 11 12 13 W W W W E E E E E E E E E E DRY POND GENERAL GRADING NOTES 1. CONTRACTOR SHALL REFER TO THE STORMWATER POLLUTION PREVENTION PLAN AND DETAILS FOR CONSTRUCTION SCHEDULING AND EROSION CONTROL MEASURES TO BE INSTALLED PRIOR TO EARTHMOVING ACTIVITIES. 2. REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION METHODS. THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE. 3. TOPSOIL SHALL BE STRIPPED FROM ALL AREAS TO RECEIVE PAVING AND FROM WITHIN THE LIMITS OF PROPOSED BUILDINGS AND STRUCTURES. TOPSOIL SHALL BE STRIPPED TO THE DEPTH AS NOTED IN THE GEOTECHNICAL REPORT. 4. AFTER STRIPPING TOPSOIL, PROOFROLL AREAS TO BE FILLED WITH A MEDIUM WEIGHT ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UNSUITABLE MATERIAL. RECOMMENDATIONS FOR DRYING, AMENDING AND/OR REMOVAL OF ANY UNSUITABLE MATERIAL WITHIN THE PROPOSED PAVED AND/OR BUILDING AREAS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION BY THE OWNER'S GEOTECHNICAL TESTING REPRESENTATIVE. 5. TOPSOIL SHALL BE PLACED IN MOUNDING AREAS, NONSTRUCTURAL FILL AND/OR PLANTING AREAS TO A MINIMUM DEPTH OF 6". EXCESS TOPSOIL SHALL BE REMOVED FROM THE SITE. 6. WHEN PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO GEOTECHNICAL REPORT AND/OR CONSULT WITH OWNER'S GEOTECHNICAL TESTING REPRESENTATIVE FOR RECOMMENDATIONS. 7. FILL MATERIAL SHALL CONSIST OF EARTH OBTAINED FROM CUT AREAS, BORROW PITS OR OTHER APPROVED SOURCES. EARTH SHALL BE FREE FROM ORGANIC MATTER AND OTHER DELETERIOUS SUBSTANCES AND LARGE ROCKS. THE FILL MATERIAL SHALL BE PLACED IN LAYERS NOT TO EXCEED SIX INCHES FOLLOWING COMPACTION, PROPER MOISTURE CONTENT OF FILL MATERIAL WILL BE SUCH TO ACHIEVE SPECIFIED COMPACTION DENSITY. ALL FILL BENEATH PAVED AREAS, FLOOR SLABS AND FUTURE BUILDINGS SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY PER ASTM D-1557. FIELD COMPACTING TEST SHALL BE RUN ON EACH LIFT, IN FILL SECTIONS, AND THE REQUIRED COMPACTION ON EACH LIFT SHALL BE IN ACCORDANCE WITH INDOT SECTION 211. 8. MAXIMUM LAWN SLOPE IS 3:1. 9. THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED. 10. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR. 11. ALL SPOT ELEVATIONS ARE TO FINISHED GRADE. 12. COMPACTED "B" BORROW BACK FILL REQ'D. OVER ALL UTILITIES IN PAVED AREAS. 13. ALL GRADES AT BOUNDARY SHALL MEET EXISTING. CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE. BUTT JOINTS SHALL BE PROVIDED AT TRANSITIONAL AREAS BETWEEN PROPOSED AND EXISTING PAVEMENT. 14. ANY PART OF SANITARY OR STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL. 15. ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER SAFETY. 16. THE CONTRACTOR SHALL CONFIRM ALL EARTHWORK QUANTITIES PRIOR TO THE START OF CONSTRUCTION. IF AN EXCESS OR SHORTAGE OF EARTH IS ENCOUNTERED, THE CONTRACTOR SHALL CONFIRM WITH THE OWNER AND ENGINEER THE REQUIREMENTS FOR STOCKPILING, REMOVAL OR IMPORTING OF EARTH. 17. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING IN ALL AREAS AFTER INSTALLATION. CONTRACTOR TO TEST FOR AND CORRECT ANY PONDING CONDITIONS. ANY AREAS THAT HOLD WATER MORE THAN 1/8" DEEP SHALL BE CUT OUT AND CORRECTED TO POSITIVE DRAINAGE AT NO COST TO THE OWNER/ DEVELOPER OR ENGINEER. 18. ADA ACCESSIBLE PARKING SPACES, RAMPS, AND ROUTES SHALL BE IN ACCORDANCE WITH THE LATEST ADA STANDARDS FOR ACCESSIBLE DESIGN. 19. VERTICAL CURVES, WITH A MINIMUM LENGTH OF 50', SHALL BE USED WHERE POSSIBLE BETWEEN VERTICAL CHANGES IN DIRECTION (SLOPE) TO ALLOW FOR POSITIVE DRAINAGE AND SMOOTH TRANSITIONS. 20. CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWER FACILITIES, WATER MAIN, AND STORM SEWERS IS 18" OR LESS. 21. ALL DISTURBED AREA SHALL BE STABILIZED IN ACCORDANCE TO THE STORM WATER POLLUTION PREVENTION PLAN AND LANDSCAPE PLAN. GENERAL NOTES THE SITE DOES NOT LIE IN A SPECIAL FLOOD HAZARD AREA AS ESTABLISHED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY - NATIONAL FLOOD INSURANCE PROGRAM, WHEN PLOTTED BY SCALE ON FLOOD INSURANCE RATE MAP #18057C0209 G, DATED NOVEMBER 19, 2014. BENCHMARK DATA EXISTING AREAS PERVIOUS = 0.65 AC. IMPERVIOUS = 3.72 AC. PROPOSED AREAS PERVIOUS = 0.53 AC. IMPERVIOUS = 3.84 AC. POND DETENTION SUMMARY PEAK DISCHARGE (CFS) RETURN PERIOD 10 YR. 100 YR. 0.03 0.03 ALLOWABLE ACTUAL 0.09 0.07 NET SITE ACREAGE (MINUS ROW) DETENTION VOLUME REQUIRED DETENTION VOLUME PROVIDED 3.84 ACRES 4229 CF 4487 CF C300 W190582-C300 grad ELECTRICAL RISER GUY ANCHOR ELECTRIC JUNCTION BOX ORNAMENTAL LIGHT GENERATOR STREET LIGHT ELECTRIC MANHOLE ELECTRIC OUTLET UTILITY POLE UTILITY POLE W/ TRANSFORMER TRANSFORMER COMMUNICATIONS JUNCTION BOX COMMUNICATIONS MANHOLE COMMUNICATIONS PEDESTAL RIGHT OF WAY LINE FENCE GUARD RAIL BOUNDARY LINE CISTERN DRINKING FOUNTAIN FIRE DEPT HOOKUP FIRE HYDRANT POST INDICATOR VALVE CHILLED WATER MANHOLE WATER MANHOLE SPRINKLER CONTROL BOX SPRINKLER CONTROL VALVE SPRINKLER SPIGOT WELL HEAD WATER METER WATER VALVE GAS METER GAS VALVE ELECTRIC METER LIQUID PROPANE GAS TANK MONITORING WELL TRAFFIC SIGNAL POLE TRAFFIC SIGNAL BOLLARD FLAG POLE PARKING METER POST SIGN PARKING WHEEL STOP DOWN SPOUT ACCESSIBLE SPACE GATE POST COMMUNICATIONS RISER STORM CLEANOUT BEEHIVE INLET CURB INLET FLOOR DRAIN ROUND INLET SQUARE INLET STORM MANHOLE SANITARY SEWER CLEANOUT LIFT STATION SANITARY SEWER MANHOLE SANITARY STUB MARKER SEPTIC TANK PARKING LOT LIGHT (1 HEAD) PARKING LOT LIGHT (3 HEAD) PARKING LOT LIGHT (4 HEAD) PARKING LOT LIGHT (2 HEAD) DISTRIBUTION BOX ROW RIGHT OF WAY ESMT EASEMENT D.&U.E. DRAINAGE AND UTILITY EASEMENT FFE FINISH FLOOR ELEVATION TC TOP OF CURB GUT GUTTER CMP CORRUGATED METAL PIPE RCP REINFORCED CONCRETE PIPE PVC POLYVINYL CHLORIDE PIPE VCP VITRIFIED CLAY PIPE HDPE HIGH DENSITY POLYETHYLENE PIPE DIP DUCTILE IRON PIPE SSD SUB SURFACE DRAIN PIPE STM STORM SAN SANITARY STR STRUCTURE CO CLEANOUT GRADING PLAN LEGEND UTILITIES ABBREVIATIONS OTHER LINE TYPES EXISTING SPOT ELEVATION CURB & GUTTER ELEVATION PAVEMENT SPOT ELEVATION GROUND SPOT ELEVATION FLOW LINE INDEX CONTOUR INTERMEDIATE CONTOUR SANITARY SEWER MAIN STORM SEWER MAIN UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS AERIAL COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN G G G W W E(A) E(A) E E E C C C C(A) C(A) OHU OHU FM FM FO(A) FO(A) AERIAL FIBER OPTIC CABLE FO FO UNDERGROUND FIBER OPTIC EMERGENCY FLOOD ROUTE SAN SAN SANITARY SEWER LATERAL STM STM ROOF DRAIN SUB SURFACE DRAIN CARMEL REQUIREMENTS 1. NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 2. DECORATIVE SIGNS, SPRINKLER SYSTEMS, TREES, LANDSCAPING MOUNDS, FENCES, LIGHT POLES OR OTHER SUCH AMENITIES ARE NOT PERMITTED WITHIN THE RIGHT-0F-WAY. 3. M.F.P.G. = MINIMUM FLOOD PROTECTION GRADE M.F.P.G. OF ALL STRUCTURES FRONTING A POND OR OPEN DITCH SHALL BE NO LESS THAN 2 FEET ABOVE ANY ADJACENT 100-YEAR LOCAL OR REGIONAL FLOOD ELEVATIONS, WHICHEVER IS GREATER, FOR ALL WINDOWS, DOORS, PIPE ENTRANCES, WINDOW WELLS, AND ANY OTHER STRUCTURE MEMBER WHERE FLOOD WATERS CAN ENTER A BUILDING. 4. M.L.A.G. = LOWEST ADJACENT GRADE IS THE ELEVATION OF THE LOWEST GRADE ADJACENT TO A STRUCTURE WHEN THE SOIL MEETS THE FOUNDATION AROUND THE OUTSIDE OF THE STRUCTURE. (INCLUDING STRUCTURAL MEMBERS SUCH AS BASEMENT WALKOUT, PATIOS, DECKS, PORCHES, SUPPORT POST, OR PIERS, AND RIM OF THE WINDOW WELL. FLOW DIRECTION AND SLOPE GRADING PLAN REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS W S N E ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 BM G 54 - ISHC BRONZE DISK ON A CONCRETE POST PROJECTING 1.5 FT. OUT OF THE GROUND ALONG U.S. 31, 1.4 MILES NORTH OF I-465, 0.4 MILES SOUTH OF 116TH STREET, 100 FT. WEST OF CENTERLINE OF SOUTH BOUND LANE OF U.S. 31, AND 2 FT. EAST OF R/W FENCE. BM G 55 - ISHC BRONZE DISK ON A CONCRETE POST PROJECTING 1.5 FT. OUT OF THE GROUND ALONG U.S. 31, 2.6 MILES NORTH OF I-465, 0.7 MILES SOUTH OF 131ST STREET, 83 FT. WEST OF CENTERLINE OF SOUTH BOUND LANE OF U.S. 31. BM Y 42 - CGS DISK IN CONCRETE SLAB ON THE EAST SIDE OF THE MONON TRAIL 218 FT. SOUTH OF 111TH STREET. M.F.P.G. = 828.90 M.L.A.G. = 828.85 D D CONSTRUCTION LIMITS THE FOLLOWING IS A SUMMARY OF RELEASE RATES FOR THE PORTION OF THE DEVELOPMENT THAT IS REQUIRED TO CREATE DETENTION, WHICH IS THE INCREASED HARD SURFACE DUE TO THE PROPOSED BUILDING BEING LARGER THAN THE EXISTING BUILDING. THE ALLOWABLE RELEASE RATES ARE BASED ON THIS ACREAGE, WHICH IS 0.30 ACRES OF NEW HARD SURFACE. RETURN PERIOD PEAK DISCHARGE (CFS) 10 YR. 100 YR. 10.45 15.79 THE FOLLOWING IS A SUMMARY OF RELEASE RATES FOR THE REST OF THE SITE, WHICH ARE EXISTING AND PROPOSED WHICH FLOW SOUTH AND WEST TO THE EXISTING STORM SEWER AT THAT POINT. THE RUNOFF WHICH ENTER THE PROPOSED DRY BASIN HAVE BEEN GIVEN A SEPARATE OUTLET ORIFICE AND THOSE FLOWS ARE INCLUDED IN THE NUMBER BELOW. 3500 P.S.I. P.C. CONCRETE 3" 12" X 6" 12" X 9" 10" DIA. 18" 1" 18"R 7" 11" 4" (TYP.) NOTE: ALL STRIPES TO BE PAINTED WHITE. MINIMUM = 3" SPECIAL = 4" (NO SCALE) RESERVED PARKING 1" RAD. ALL CORNERS 12" 18" 4" 8" 2.0% MAX. SLOPE CLASS "A" CONCRETE 18" SCORE PAVEMENT 6" 6" 1/8"RAD. 2" 2" (NO SCALE) TYPICAL SIDEWALK SECTION 5.0' (MIN.) 4" CLASS "A" CONCRETE 1/2" PREFORMED JOINT FILLER TRANSVERSE JOINT TRANSVERSE JOINT 1/2" PREFORMED JOINT FILLER (NO SCALE) (NO SCALE) PARKING BARRIER (NO SCALE) VARIES (SEE PLANS) 1" RAD. R7-8 R7-8P 5° 20° PRECAST CONC. PARKING BARRIER WITH 2-#3 REBARS USE 4000 PSI CONC. BEVELED EDGE #5 REBAR 1'-6" WITH 3/4" HOLE CAST FACE OF CURB OR EDGE OF ASPHALT 30" 6.0' 7 5/8" 0.5' HEIGHT OF SYMBOL: MINIMUM = 28" SPECIAL = 41" WIDTH OF SYMBOL: MINIMUM = 24" SPECIAL = 36" NOTE: BLUE BACKGROUND AND WHITE BORDER ARE OPTIONAL VAN ACCESSIBLE 12" NOTE: WHERE PARKING SPACES THAT ARE RESERVED FOR PERSONS WITH DISABILITIES ARE DESIGNATED TO ACCOMMODATE WHEELCHAIR VANS, A VAN ACCESSIBLE (R7-8P) PLAQUE SHALL BE MOUNTED BELOW THE R7-8 SIGN. THE R7-8SIGN SHALL HAVE A GREEN LEGEND AND BORDER AND A WHITE WHEELCHAIR SYMBOL ON A BLUE SQUARE ALL ON A WHITE BACKGROUND. THE R7-8P PLAQUE SHALL HAVE A GREEN LEGEND AND BORDER ON A WHITE BACKGROUND. 6" RESERVED PARKING VAN ACCESSIBLE 3" 3" (R7-8P) (R7-8) 8' MIN. VAN 9' (5' MIN. CAR) 9' ACCESSIBLE PARKING SPACES NOTE: ALL PAINT TO BE BLUE NON-SKID SURFACE APPLICATION OF CILICA SAND OR GLASS BEAD BY METHOD OF MIXTURE AND OR BROADCASTING. PROPOSED ADA SIGNS ON 3" DIAMETER POST (SEE SIGN DETAILS) 18' (NO SCALE) PREPARED SUBGRADE COMPACTED PER INDOT STANDARD SPECIFICATIONS PREPARED SUBGRADE COMPACTED PER INDOT STANDARD SPECIFICATIONS PREPARED SUBGRADE COMPACTED PER INDOT STANDARD SPECIFICATIONS. MAY REQUIRE TREATMENT BEFORE PAVING. PREPARED SUBGRADE COMPACTED PER INDOT STANDARD SPECIFICATIONS. MAY REQUIRE TREATMENT BEFORE PAVING. MIN. 4" COMPACTED #53 STONE BASE MIN. 4" COMPACTED #53 STONE BASE 6'-0" (MAX.) BETWEEN TRANSVERSE JOINTS 48.0' (MAX.) BETWEEN EXPANSION JOINTS REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 H6 H6 H6 H6 H6 H7 H7 A3 C200 SITE PLAN W190582-C200 site SITE PLAN GENERAL NOTES 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION. 2. ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE SCOPE OF WORK SECTION ARE ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTORS. 3. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS FOR EXCAVATIONS; FINAL RULE 29 CFR PART 1926, SUBPART "P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET IN DEPTH. IN ADDITION, EXCAVATION EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN OF A TRENCH SAFETY SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER. 4. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR TO MAINTAIN QUALITY CONTROL THROUGHOUT THIS PROJECT. 5. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL STANDARDS. 6. BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE RECORD SURVEYS AND PLATS FOR EXACT INFORMATION. 7. THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT. 8. ALL DIMENSIONS ARE BASED ON FACE OF CURB OR BACK OF ROLL CURB OR FACE OF BUILDING. 9. SEE ARCHITECTURAL PLANS FOR DETAILS OF BUILDING, BUILDING DIMENSIONS AND SIGNAGE SPECIFICATIONS. DO NOT STAKE BUILDING FROM THESE PLANS. 10. COORDINATE CONSTRUCTION ACTIVITIES WITH ADJOINING WORK IF APPLICABLE. VERIFY EXTENT OF ADJOINING WORK AND COORDINATE AS REQUIRED. 11. FIELD VERIFY EXISTING CURBS AND TAPER PROPOSED VERTICAL CURBS TO MATCH WITHIN A MIN. OF THREE (3) FEET. 12. ± DIMENSIONS INDICATE FIELD DIMENSION ADJUSTMENT AREA BASED ON ACTUAL FIELD LAYOUT COORDINATES. 13. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO START OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 14. PROVIDE SMOOTH TRANSITION FROM NEWLY PAVED AREAS TO EXISTING AREAS AS NECESSARY. ALL AREAS WHERE PROPOSED PAVEMENT MEETS EXISTING PAVEMENT, THE EXISTING EDGE OF PAVEMENT SHALL BE FREE OF ALL LOOSE DEBRIS. THE EDGE OF EXISTING ASPHALT PAVEMENT SHALL BE PROPERLY SEALED WITH A TACK COAT MATERIAL IN ALL AREAS WHERE NEW ASPHALT PAVEMENT IS INDICATED TO JOIN EXISTING. 15. RESURFACE OR RECONSTRUCT AT LEAST TO ORIGINAL CONDITIONS ALL AREAS WHERE THE EXISTING PAVEMENT OR LAWNS ARE DAMAGED DURING CONSTRUCTION FROM TRAFFIC BY CONTRACTORS, SUBCONTRACTORS, OR SUPPLIERS AFTER CONSTRUCTION WORK IS COMPLETE. 16. THE CONTRACTOR SHALL PROTECT AND NOT DESTROY THE PROPERTY CORNER MONUMENTS DURING CONSTRUCTION. 17. REFER TO ARCHITECTURAL PLANS FOR BUILDING ACCESSORY DETAILS. 18. REFER TO SHEET C201 FOR SITE PLAN DETAILS UNLESS OTHERWISE NOTED. SITE DATA SITE AREA = 4.37± AC BUILDING AREA = 20,121± SF PER FLOOR PERCENT IMPERVIOUS = 87% ZONING = I-1 FRONT YARD BSL REQUIRED = 0' FT MIN. 10' MAX. REAR YARD BSL REQUIRED = 0' FT SIDE YARD BSL REQUIRED = 0' FT PARKING REQUIRED: PARKING REQUIREMENT: 1 PER EMPLOYEE PARKING DIMENSIONS = 9' x 18' BIKE PARKING REQUIRED = 4 SPACES PARKING PROVIDED: 10 - STANDARD SPACES 1 - ADA SPACES 11 - TOTAL SPACES SITE PLAN NOTES PAVEMENT STANDARD DUTY ASPHALT PAVING STANDARD DUTY CONCRETE MATCH EXISTING PAVEMENT HARDSCAPE INTEGRAL WALK AND CURB CONCRETE PARKING BARRIER CONCRETE SIDEWALK ACCESSIBLE RAMP PAVEMENT FLUSH WITH SIDEWALK CONCRETE CURB WITH VARIABLE HEIGHT RETAINING WALL. REFER TO C300 FOR GRADES. TAPER CURB WITHIN 3' AT THE END OF THE CURB RUN BUILDING ACCESSORIES DUMPSTER ENCLOSURE (INSIDE THE BUILDING) CANOPY (CANTILEVERED OVER THE DRIVE) CONCRETE CURB OF VARYING HEIGHT LOCATED ALONG THE FACADE FOR VEHICLE PROTECTION. REFER TO C300 FOR GRADES. ENTRY GATE TO MAINTAIN A 20' CLEAR ZONE MIN. ACCESS PANEL BOLLARDS ACCESSORIES CONNECT EXISTING FENCE TO BUILDING PROVIDE NEW FENCE FROM THE SECURITY GATE SOUTH ALONG THE DRIVE AND CONNECT TO THE OLD FENCE. COORDINATE LIMITS WITH OWNER REP. FIRE HYDRANT WITH BOLLARD PROTECTION SIGNAGE & MARKINGS ACCESSIBLE PARKING SPACE & SIGN ON BUILDING 4" PAINTED WHITE SOLID LINES (TYP) 4" PAINTED WHITE SOLID LINE ISLAND H1 H2 H3 H4 H5 B1 B2 A1 S1 S2 S3 P1 P2 P3 ELECTRICAL RISER GUY ANCHOR ELECTRIC JUNCTION BOX ORNAMENTAL LIGHT GENERATOR STREET LIGHT ELECTRIC MANHOLE ELECTRIC OUTLET UTILITY POLE UTILITY POLE W/ TRANSFORMER TRANSFORMER COMMUNICATIONS JUNCTION BOX COMMUNICATIONS MANHOLE COMMUNICATIONS PEDESTAL RIGHT OF WAY LINE FENCE GUARD RAIL BUILDING SETBACK LINE BOUNDARY LINE CISTERN DRINKING FOUNTAIN FIRE DEPT HOOKUP FIRE HYDRANT POST INDICATOR VALVE CHILLED WATER MANHOLE WATER MANHOLE SPRINKLER CONTROL BOX SPRINKLER CONTROL VALVE SPRINKLER SPIGOT WELL HEAD WATER METER WATER VALVE GAS METER GAS VALVE ELECTRIC METER LIQUID PROPANE GAS TANK MONITORING WELL TRAFFIC SIGNAL POLE TRAFFIC SIGNAL BOLLARD FLAG POLE PARKING METER POST SIGN PARKING WHEEL STOP DOWN SPOUT ACCESSIBLE SPACE GATE POST COMMUNICATIONS RISER STORM CLEANOUT BEEHIVE INLET CURB INLET FLOOR DRAIN ROUND INLET SQUARE INLET STORM MANHOLE SANITARY SEWER CLEANOUT LIFT STATION SANITARY SEWER MANHOLE SANITARY STUB MARKER SEPTIC TANK PARKING LOT LIGHT (1 HEAD) PARKING LOT LIGHT (3 HEAD) PARKING LOT LIGHT (4 HEAD) PARKING LOT LIGHT (2 HEAD) STANDARD DUTY ASPHALT CONCRETE PAVEMENT DISTRIBUTION BOX ROW RIGHT OF WAY BSL BUILDING SETBACK LINE ESMT EASEMENT D.&U.E. DRAINAGE AND UTILITY EASEMENT FFE FINISH FLOOR ELEVATION 12 PARKING COUNT EXISTING ASPHALT PAVEMENT SITE PLAN LEGEND UTILITIES ABBREVIATIONS OTHER LINE TYPES SECTION LINE REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS W S N E ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 B3 B4 B5 B6 H6 H7 A2 A3 5. PLACE GEOTEXTILE FABRIC OR AGGREGATE BEDDING MATERIAL (FOR STABILIZATION AND FILTRATION) ON THE COMPACTED AND SMOOTHED FOUNDATION. 6. INSTALL RIPRAP TO THE LINES AND ELEVATIONS SHOWN IN THE CONSTRUCTION PLANS. BLEND RIPRAP SMOOTHLY TO SURROUNDING GRADE. IF THE CHANNEL IS WELL DEFINED, EXTEND THE APRON ACROSS THE CHANNEL BOTTOM AND UP THE CHANNEL BANKS TO AN ELEVATION OF SIX INCHES ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 7. IF GEOTEXTILE FABRIC TEARS WHEN PLACING RIPRAP, REPAIR IMMEDIATELY BY LAYING AND STAPLING A PIECE OF FABRIC OVER DAMAGED AREA, OVERLAPPING THE UNDAMAGED AREAS BY AT LEAST 12 INCHES. 8. CONSTRUCT A SMALL PLUNGE POOL WITHIN THE OUTLET APRON. (RIPRAP APRONS MUST BE LEVEL WITH OR SLIGHTLY LOWER THAN THE RECEIVING CHANNEL AND SHOULD NOT PRODUCE AN OVERFALL OR RESTRICT FLOW OF THE WATER CONVEYANCE STRUCTURE.) MAINTENANCE _ INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS. _ INSPECT FOR STONE DISPLACEMENT; REPLACE STONES ENSURING PLACEMENT AT FINISHED GRADE. _ CHECK FOR EROSION OR SCOURING AROUND SIDES OF THE APRON; REPAIR IMMEDIATELY. _ CHECK FOR PIPING OR UNDERCUTTING; REPAIR IMMEDIATELY. REFERENCE IN CHAPTER 7 PAGE 121 IN THE INDIANA STORM WATER QUALITY MANUAL AT=1.5' X D50 15" OR LESS, 1.2' X D50 15" OR LARGER STONE. PIPE SIZE (D50) C106 STORMWATER POLLUTION PREVENTION PLAN DETAILS W190582-C103 swppp det (NO SCALE) AVERAGE RIPRAP DIAMETER APRON WIDTH APRON LENGTH 8 IN. 12 IN. 18 IN. 24 IN. 30 IN. 36 IN. 14 IN. 12 IN. 10 IN. 8 IN. 5 IN. 3 IN. 2 TO 3 FEET 3 TO 4 FEET 4 TO 6 FEET 6 TO 8 FEET 8 TO 10 FEET 10 TO 12 FEET 16 TO 32 FEET 14 TO 28 FEET 12 TO 22 FEET 8 TO 18 FEET 6 TO 12 FEET 5 TO 7 FEET SIDE AL= FEET DITCH BED PLAN AL= FEET RIP-RAP DIA. DIA. DIA. (NO SCALE) EROSION CONTROL Products Guaranteed SOLUTIONS 14649 HIGHWAY 41 NORTH EVANSVILLE, IN 47725 800-720-2040 www.nagreen.com (NO SCALE) GENERAL STAPLE RECOMMENDATIONS STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN EROSION CONTROL BLANKETS. STAPLE PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL. AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO THE BLANKETS, STAPLE PATTERN "C" SHOULD BE UTILIZED. CHANNEL LININGS REQUIRED A 2.0' MINIMUM OVERLAP AT LONGITUDINAL JOINTS. SIDESLOPES SHALL REQUIRE A 6" MINIMUM OVERLAP. WHERE OVERLAPS OCCUR, THE UPSTREAM BLANKET SHALL OVERLAP THE DOWNSTREAM. IF OTHER THAN NORTH AMERICAN GREEN EROSION CONTROL BLANKETS ARE INSTALLED FOLLOW THE INSTALLATION DIRECTIONS RECOMMENDED BY THAT PRODUCTS COMPANY. CHANNEL LININGS UTILIZE STAPLE PATTERN "C" WITH ADDITIONAL STAPLES ON SIDE SLOPES. 1 1/2 STAPLE PER SQ. YD. 2 STAPLE PER SQ. YD. ADDITIONAL STAPLES AS REQUIRED SLOPE GRADIENT CHANNEL LINING SLOPE LENGTH IN FEET 300 275 250 225 200 175 150 125 100 75 50 25 1 STAPLE PER SQ. YD. TABLE 1. SIZING FOR FLOW DISSIPATERS AT CULVERT PIPE OUTLETS REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 2-WOOD POST/STAKES WRAPPED WITH SILT FENCE AND ROTATED AT LEAST TWO FULL TURNS TO PROVIDE A SECURE CONNECTION WOOD OR METAL STAKES TO SECURE THE STRAW BALES (TWO PER BALE) 10 MIL. PLASTIC LINING STRAW BALE (TYP) SECTION LINE STRAW BALE (TYP) BINDING WIRE WOOD OR METAL STAKES (TYP) - 2 PER NATIVE MATERIAL (OPTIONAL) BALE POLYETHYLENE LINING 10 MIL. EXTENDING OVER BALES TYPE "ABOVE GRADE (NO SCALE) W/ STRAW BALES" 4" WOOD OR METAL STAKES TO SECURE THE STRAW BALES (TWO PER BALE) POLYETHYLENE LINING 10 MIL. EXTENDING OVER BALES METAL PINS OR STAPLES TO SECURE THE POLYETHYLENE LINING TO THE STRAW BALES METAL PINS OR STAPLES TO SECURE THE POLYETHYLENE LINING TO THE STRAW BALES CONCRETE WASHOUT WOOD POST 3"x3"x8' BLACK LETTER 6" HEIGHT 3/8" TREATED PLYWOOD 48"x24" PAINTED WHITE 0.5" LAG SCREWS INSTALLATION 1. UTILIZE AND FOLLOW THE DESIGN IN THE STORM WATER POLLUTION PREVENTION PLAN TO INSTALL THE SYSTEM. 2. DEPENDENT UPON THE TYPE OF SYSTEM, EITHER EXCAVATE THE PIT OR INSTALL THE CONTAINMENT SYSTEM. 3. A BASE SHALL BE CONSTRUCTED AND PREPARED THAT IS FREE OF ROCKS AND OTHER DEBRIS THAT MAY CAUSE TEARS OR PUNCTURES IN THE POLYETHYLENE LINING. 4. INSTALL THE POLYETHYLENE LINING. FOR EXCAVATED SYSTEMS, THE LINING SHOULD EXTEND OVER THE ENTIRE EXCAVATION. THE LINING FOR BERMED SYSTEMS SHOULD BE INSTALLED OVER THE POOLING AREA WITH ENOUGH MATERIAL TO EXTEND THE LINING OVER THE BERM OR CONTAINMENT SYSTEM. THE LINING SHOULD BE SECURED WITH PINS, STAPLES, OR OTHER FASTENERS. 5. PLACE FLAGS, SAFETY FENCING, OR EQUIVALENT TO PROVIDE A BARRIER TO CONSTRUCTION EQUIPMENT AND OTHER TRAFFIC. 6. PLACE A NON-COLLAPSING, NON-WATER HOLDING COVER OVER THE WASHOUT FACILITY PRIOR TO A PREDICTED RAINFALL EVENT TO PREVENT ACCUMULATION OF WATER AND POSSIBLE OVERFLOW OF THE SYSTEM (OPTIONAL). 7. INSTALL SIGNAGE THAT IDENTIFIES CONCRETE WASHOUT AREAS. 8. POST SIGNS DIRECTING CONTRACTORS AND SUPPLIERS TO DESIGNATED LOCATIONS. 9. WHERE NECESSARY, PROVIDE STABLE INGRESS AND EGRESS APPROACH PAD FOR CONCRETE WASHOUT SYSTEMS. 10. USE A 10 MIL. POLYETHYLENE LINED DUMPSTER AS AN ALTERNATE. C105 STORMWATER POLLUTION PREVENTION PLAN DETAILS W190582-C103 swppp det 3' 3' PLAN 1. ACTUAL LAYOUT DETERMINED IN FIELD. 2. THE CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30FT. OF THE TEMP. CONCRETE WASHOUT FACILITY. SECTION CONCRETE WASHOUT 8" 8" 8"X4" TRENCH TO BE BACKFILLED AND COMPACTED POSTS: STEEL T OR U TYPE, OR 2"X2" HARD WOOD POST FENCE: WOVEN WIRE, 14-1/2 GA., 6" MAX. MESH OPENING FABRIC: IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION. LOAD SLOPE LESS THAN 2% 2 TO 5% 5 TO 10% 10 TO 20% MORE THAN 20% MAX. DISTANCE ABOVE FENCE 100 FT. 75 FT. 50 FT. 25 FT. 15 FT. WITHOUT WIRE SUPPORT WITH WIRE SUPPORT (NO SCALE) FLOW FINISH GRADE UNDISTURBED GROUND FLOW FINISH GRADE UNDISTURBED GROUND NOTES: 1. THE SWPPP INFORMATION SIGN MUST BE LOCATED NEAR THE CONSTRUCTION EXIT OF THE SITE, SUCH THAT IT IS ACCESSIBLE AND VIEWABLE BY THE GENERAL PUBLIC, BUT NOT OBSTRUCTING VIEWS AS TO CAUSE A SAFETY HAZARD. 2. ALL POSTED DOCUMENTS MUST BE MAINTAINED IN A CLEARLY READABLE CONDITION AT ALL TIMES THROUGHOUT CONSTRUCTION AND UNTIL THE NOTICE-OF-TERMINATION (NOT) IS FILED FOR THE PERMIT. 3. CONTRACTOR SHALL POST OTHER STORM WATER AND/OR EROSION AND SEDIMENT CONTROL RELATED PERMITS ON THE SIGN AS REQUIRED BY THE GOVERNING AGENCY. 4. SIGN SHALL BE LOCATED OUTSIDE OF PUBLIC RIGHT-OF-WAY AND EASEMENTS UNLESS APPROVED BY THE GOVERNING AGENCY. 5. CONTRACTOR IS RESPONSIBLE FOR ENSURING STABILITY OF THE SWPPP INFORMATION SIGN. SWPPP INFORMATION SIGN COPY OF NOI COPY OF IDEM NOTICE OF SUFFICIENCY SWPPP INFORMATION DETAILED DESCRIPTION OF THE LOCATION OF THE SWPPP DOCUMENTATION (BINDER AND SITE MAPS) ON THE SITE. SIGN TO BE CONSTRUCTED OF A RIGID MATERIAL, SUCH AS PLYWOOD OR OUTDOOR SIGN BOARD. SIGN MUST BE CONSTRUCTED IN A MANNER TO PROTECT DOCUMENTS FROM DAMAGE DUE TO WEATHER (WIND, SUN, MOISTURE, ETC.). "SWPPP INFORMATION" MUST BE DISPLAYED PROMINENTLY ACROSS THE TOP OF THE SIGN, AS SHOWN IN THE DETAIL. 3" MIN. 3" MIN. COPY OF DRAINAGE APPROVAL LETTER COPY OF CONSTRUCTION SITE NOTICE AS APPLICABLE COPY OF CONSTRUCTION SITE NOTICE AS APPLICABLE COPY OF CONSTRUCTION SITE NOTICE AS APPLICABLE (NO SCALE) ALTERNATE CONTRACTOR MAY USE A LINED (10 MIL. POLYETHYLENE) DUMPSTER FOR CONCRETE WASHOUT. NOTE: DUMPSTER IS TO BE USED FOR CONCRETE WASHOUT ONLY. NO CONSTRUCTION WASTE OR DEBRIS SHALL BE ALLOWED TO PREVENT TEARING OF THE LINER. SHEET 1 OF 1 DRAWN CHECKED QA MFG APPROVED SIZE DWG NO SCALE REV REPLACEABLE SEDIMENT BAGS WITH GEOTEXTILE FILTER FABRIC LIFT HANDLES STAINLESS STEEL CLAMPING BAND REAR CURB GUARD FLAP WITH MAGNETIC TIE-DOWNS ALL PRODUCTS MANUFACTURED BY INLET & PIPE PROTECTION, INC DISTRIBUTED BY ADS WWW.INLETFILTERS.COM (866) 287-8655 PH (630) 355-3477 FX INFO@INLETFILTERS.COM INSTALLATION: 1. 2. REMOVE GRATE DROP FLEXSTORM INLET FILTER ONTO LOAD BEARING LIP OF CASTING OR CONCRETE STRUCTURE 3. REPLACE GRATE STANDARD 2" OVERFLOW AREA 11 GAUGE STEEL SUSPENSION SYSTEM IPP TEMPORARY SEED TABLE 1. TEMPORARY SEEDING SPECIFICATIONS AUG. 1 - SEPT. 1 GERMAN MILLET WHEAT OR RYE 150 LBS. 1 TO 1½ INCHES SEPT. 15 - OCT. 30 SPRING OATS 100 LBS. 1 INCH MARCH 1 - APRIL 15 ANNUAL RYEGRASS 40 LBS. ¼ INCH MARCH 1 - MAY 1 40 LBS. 1 TO 2 INCHES MAY 1 - JUNE 1 SUDANGRASS 35 LBS. MAY 1 - JULY 30 BUCKWHEAT 60 LBS. APRIL 15 - JUNE 1 CORN (BROADCAST) 300 LBS. MAY 11 - AUG. 10 SORGHUM 35 LBS. MAY 1 - JULY 15 1 TO 2 INCHES 1 TO 2 INCHES 1 TO 2 INCHES 1 TO 2 INCHES 1. PERENNIAL SPECIES MAY BE USED AS A TEMPORARY COVER, ESPECIALLY IF THE AREA TO BE SEEDED WILL REMAIN IDLE FOR MORE THAN ONE YEAR. 2. SEEDING DONE OUTSIDE THE OPTIMUM SEEDING DATES INCREASES THE CHANCES OF SEEDING FAILURE. DATES MAY BE EXTENDED OR SHORTENED BASED ON THE LOCATION OF THE PROJECT SITE WITHIN THE STATE. NOTES 1. MULCH ALONE IS AN ACCEPTABLE TEMPORARY COVER AND MAY BE USED IN LIEU OF TEMPORARY SEEDING, PROVIDED THAT IT IS APPROPRIATELY ANCHORED. 2. A HIGH POTENTIAL FOR FERTILIZER, SEED, AND MULCH TO WASH EXISTS ON STEEP BANKS, AND CUTS, IN CHANNELS AND AREAS OF CONCENTRATED FLOW. SEEDBED PREPARATION 1. TEST SOIL TO DETERMINE PH AND NUTRIENT LEVELS. 2. APPLY SOIL AMENDMENTS AS RECOMMENDED BY THE SOIL TEST. IF TESTING IS NOT DONE, APPLY 400 TO 600 POUNDS PER ACRE OF 12-12-12 ANALYSIS FERTILIZER, OR EQUIVALENT. 3. WORK THE SOIL AMENDMENTS INTO THE UPPER TWO TO FOUR INCHES OF THE SOIL WITH A DISK OR RAKE OPERATED ACROSS THE SLOPE. SEEDING 1. SELECT A SEED SPECIES OR AN APPROPRIATE SEED MIXTURE AND APPLICATION RATE FROM TABLE 1. 2. APPLY SEED UNIFORMLY WITH A DRILL OR CULTIPACKER SEEDER OR BY BROADCASTING. PLANT OR COVER SEED TO THE DEPTH SHOWN IN TABLE 1. NOTES 1. IF DRILLING OR BROADCASTING THE SEED, ENSURE GOOD SEED-TO-SOIL CONTACT BY FIRMING THE SEEDBED WITH A ROLLER OR CULTIPACKER AFTER COMPLETING SEEDING OPERATIONS. 2. DAILY SEEDING WHEN THE SOIL IS MOIST IS USUALLY MOST EFFECTIVE. 3. IF SEEDING IS DONE WITH A HYDROSEEDER, FERTILIZER AND MULCH CAN BE APPLIED WITH THE SEED IN A SLURRY MIXTURE. 3. APPLY MULCH AND ANCHOR IT IN PLACE. MAINTENANCE 1. INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS. 2. CHECK FOR EROSION OR MOVEMENT OF MULCH AND REPAIR IMMEDIATELY. 3. MONITOR FOR EROSION DAMAGE AND ADEQUATE COVER (80 PERCENT DENSITY); RESEED, FERTILIZE, AND APPLY 4. MULCH WHERE NECESSARY. 4. IF NITROGEN DEFICIENCY IS APPARENT, TOP-DRESS FALL SEEDED WHEAT OR RYE SEEDING WITH 50 POUNDS PER ACRE OF NITROGEN IN FEBRUARY OR MARCH. REFERENCE IN CHAPTER 7 PAGES 31-33 IN THE INDIANA STORM WATER QUALITY MANUAL TEMPORARY SEED TABLE 1. TEMPORARY SEEDING SPECIFICATIONS SEED SPECIES1 RATE PER ACRE PLANTING DEPTH OPTIMUM DATES2 MAINTENANCE 1. INSPECT DAILY AND AFTER EACH STORM EVENT FOR LEAKS, SPILLS, TRACKING OF SOIL BY EQUIPMENT, AND THE POLYETHYLENE LINING FOR FAILURE. 2. ONCE CONCRETE WASTES HARDEN, REMOVE AND DISPOSE OF THE MATERIAL. EXCESS CONCRETE SHOULD BE REMOVED WHEN THE WASHOUT SYSTEM REACHES 50 PERCENT OF THE DESIGN CAPACITY AND SHOULD NOT BE USED UNTIL PROPERLY CLEANED OUT. 3. PLASTIC LINER SHOULD BE REPLACED AFTER EVERY CLEANING, THE REMOVAL OF MATERIAL USUALLY DAMAGES IT. 4. REPAIR OR ENLARGE AS NECESSARY TO MAINTAIN CAPACITY FOR CONCRETE WASTE. 5. IF LIQUIDS DO NOT EVAPORATE IT MAY BE NECESSARY TO VACUUM OR REMOVE THE LIQUIDS AND DISPOSE OF THEM IN AN ACCEPTABLE METHOD. 6. WHEN CONCRETE WASHOUT SYSTEMS ARE NO LONGER REQUIRED THEY SHALL BE CLOSED AND HOLES, DEPRESSIONS AND OTHER DISTURBANCES ASSOCIATED WITH THE SYSTEM SHOULD BE BACKFILLED, GRADED, AND STABILIZED. REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 INSTALLATION 1. REMOVE ALL VEGETATION AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA. 2. GRADE THE FOUNDATION AND CROWN FOR POSITIVE DRAINAGE. 3. INSTALL A CULVERT PIPE UNDER THE PAD IF NEEDED TO MAINTAIN PROPER PUBLIC ROAD DRAINAGE. 4. IF WET CONDITIONS ARE ANTICIPATED, PLACE GEOTEXTILE FABRIC ON THE GRADED FOUNDATION TO IMPROVE STABILITY. 5. PLACE AGGREGATE (INDOT CA NO. 2) TO THE DIMENSIONS AND GRADE SHOWN IN THE CONSTRUCTION PLANS, LEAVING THE SURFACE SMOOTH AND SLOPED FOR DRAINAGE. 6. TOP-DRESS THE DRIVE WITH WASHED AGGREGATE (INDOT CA NO.2). 7. WHERE POSSIBLE, DIVERT ALL STORM WATER RUNOFF AND DRAINAGE FROM THE TEMPORARY CONSTRUCTION INGRESS/EGRESS PAD TO A SEDIMENT TRAP OR BASIN. MAINTENANCE _ INSPECT DAILY. _ RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. _ TOP-DRESS WITH CLEAN AGGREGATE AS NEEDED. _ IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS. _ FLUSHING SHOULD ONLY BE USED IF THE WATER FROM THE CONSTRUCTION DRIVE CAN BE CONVEYED INTO A SEDIMENT TRAP OR BASIN. REFERENCED IN CHAPTER 7 PAGE 22 AND 23 IN INDIANA STORM WATER QUALITY MANUAL. WIDTH: (A) - 20' MINIMUM OR FULL WIDTH OF ENTRANCE/EXIT DRIVE, WHICHEVER IS GREATER. TEMPORARY CONSTRUCTION INGRESS/EGRESS PAD SMALL SITES - LESS THAN TWO ACRES (NO SCALE) GEOTEXTILE FABRIC UNDERLINER #2 STONE AGGREGATE PUBLIC ROAD #2 STONE AGGREGATE (OPTIONAL) 2"-3"(MIN.) (OPTIONAL) 150' (MIN.) 6" (MIN.) 5 4 1 1 1 1 7 8 9 2 3 10 11 12 13 CONTACT PERSON FOR EROSION CONTROL & SEDIMENT PRACTICES WEIHE ENGINEERS, INC. 10505 N. COLLEGE AVE. INDIANAPOLIS, IN 46268 TELEPHONE: (317) 846-6611 FAX: (317) 843-0546 EMAIL: PARKERF@WEIHE.NET CONTACT PERSON: FRED PARKER, CPESC -WARNING- THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES ONLY. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. -NOTE- THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED AFTER SOIL STRIPPING AND PAD BUILDING HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR MEASURES REQUIRED UNTIL PROPERTY TURNED OVER FOR DEVELOPMENT. COORDINATE WITH SOIL CONSERVATION DISTRICT REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS. DISTURBED ACREAGE =1.20± AC. LAND DESCRIPTION C103 STORMWATER POLLUTION PREVENTION PLAN PHASE II W190582-C101 swppp2 SWPPP PHASE 2 LEGEND - INLET PROTECTION - USE SUBSURFACE INLET PROTECTION WITH OVERFLOW CAPABILITY - PERMANENT/TEMPORARY SEEDING USE PLANTING CHART - THE DRY POND BASIN BOTTOM TO BE PLANTED WITH NATIVE SEED MIX THEN TOPPED WITH AN EROSION BLANKET - EROSION CONTROL BLANKET - USE S150BN BIO-NET AS SUPPLIED BY NORTH AMERICAN GREEN OR APPROVED EQUAL - LIMITS OF DISTURBANCE (CONSTRUCTION LIMITS) IP D LINE TYPES UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS AERIAL COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN RIGHT OF WAY LINE CHAIN LINK FENCE BOARD FENCE WROUGHT IRON FENCE GUARD RAIL HAND RAIL SILT FENCE BUILDING SETBACK LINE BOUNDARY LINE FLOW LINE G G G W W E(A) E(A) E E E C C C C(A) C(A) OHU OHU FM FM SF SF FO(A) FO(A) AERIAL FIBER OPTIC CABLE SECTION LINE FARM FENCE FO FO UNDERGROUND FIBER OPTIC INDEX CONTOUR INTERMEDIATE CONTOUR SANITARY SEWER STORM SEWER EROSION CONTROL NOTES 1. ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR LOCATION OF LANDSCAPE BEDS. 2. INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT FENCE TO FOLLOW CONTOUR. 3. THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN THE STREET. EROSION CONTROL SPECIFICATIONS 1. THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS. 2. TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS. 3. PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND FINISHED GRADE. 4. PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION. 5. ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS. 6. IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED. 7. DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. 8. THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER. 9. IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY. 10. FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS. 11. PORTABLE TOILETS MUST BE ANCHORED. REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS W S N E ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 PROJECT BM HARRISON MONUMENT AT THE EAST QUARTER CORNER OF SECTION 36, TOWNSHIP18 NORTH, RANGE 03 EAST PER HAMILTON COUNTY SURVEYOR'S OFFICE CORNER NUMBER 18033606. LOCATED IN THE SOUTHBOUND LANE OF RANGELINE ROAD APPROXIMATELY 190 FEET NORTH OF THE INTERSECTION OF EXECUTIVE DRIVE AND RANGELINE ROAD. ELEV.844.55 (NAVD 88) SITE TBM CUT 'X' ON THE SOUTH BONNET BOLT OF A FIRE HYDRANT LOCATED APPROXIMATELY 22 FEET NORTHWEST OF THE NORTHWEST CORNER OF THE SURVEYED REAL ESTATE ON THE SOUTH SIDE OF CARMEL DRIVE. ELEV.831.54 (NAVD 88) BENCHMARK INFORMATION APPROXIMATELY 4.3 ACRES LOCATED AT 147 AND 155 WEST CARMEL DRIVE - PART OF SOUTHEAST 1 4, SECTION 36, TOWNSHIP 18 NORTH, RANGE 3 EAST, CLAY TOWNSHIP, HAMILTON COUNTY, INDIANA DRAINAGE PLAN NOTES DOWNSPOUTS TO CONNECT TO PROPOSED ROOF DRAIN. COORDINATE WITH ARCHITECTURAL PLANS. TRENCH DRAIN CONNECT TRENCH DRAIN TO PROPOSED STRUCTURE WATER QUALITY UNIT CONTROL STRUCTURE DIVERSION STRUCTURE 12' WIDE EMERGENCY OVERFLOW. EXTEND EXISTING CULVERT PIPE UNDERNEATH THE NEW SIDEWALK. PIPE TO FOLLOW THE SLOPE OF THE EXISTING GRADE TO PRESERVE POSITIVE DRAINAGE. CONNECT TO STRUCTURE 900. RECONNECT 6" OUTLET FROM THE DRAIN TO STRUCTURE 304. NATIVE PLANTINGS WITHIN BASIN. REFER TO SPECS ON SHEET C601. SIGN FOR NATIVE PLANTINGS. DETAIL ON SHEET C601. CONNECT STRUCTURE 900 TO EXISTING 15" PIPE WITH 12" OF 15" PIPE. STONE LEVEL SPREADER WITH UNDER DRAIN. REFER TO DETAIL ON SHEET C601 1 2 3 4 5 6 7 8 9 10 11 12 13 C D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D STM STM STM STM STM STM STM STM STM STM STM STM STM ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS DRY POND 9 13 17 16 14 14 6 6 20 20 7 7 7 7 7 8 9 22 22 10 15 7 17 2 2 SD SD SD SD SD SD SD SD SD SD SD SD SD SD IP SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF IP IP IP IP 1 3 19 SF SF SF SF SF SF SF 4 4 4 5 5 5 7 21 10 9 11 12 15 15 18 4 4 22 23 2 2 10 10 13 10 16 21 24 25 26 25 26 2 SF SF 4 22 22 25 25 GENERAL NOTES 1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY WITH THE OWNER DURING BIDDING AND DURING CONSTRUCTION ACTIVITIES ALL ITEMS TO BE REMOVED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ANY MATERIALS AND/OR STRUCTURES NOT LOCATED ON THIS SURVEY FOR THE INSTALLATION OF THE NEW WORK. 2. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL EXISTING UTILITIES PERTAINING TO THEIR PHASE OF WORK, AND TO VERIFY WHICH UTILITIES WILL BE REMOVED BY UTILITY COMPANY. ANY AND ALL UTILITIES NOT REMOVED BY THE UTILITY COMPANY SHALL BE REMOVED BY THE CONTRACTOR. 3. UTILITIES ARE SHOWN TO BE APPROXIMATE AND SHALL BE RELOCATED AND/OR CAPPED AND ABANDONED BEFORE CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER. 4. ALL DEMOLITION MATERIAL AND SALVAGEABLE MATERIAL IS THE PROPERTY OF THE DEMOLITION CONTRACTOR AND SHALL BE PROPERLY DISPOSED OF OFF THE SITE. 5. SLABS ON GRADE MUST BE REMOVED COMPLETELY AND TAKEN OFF THE SITE. 6. ALL UTILITIES MUST REMAIN ACTIVE FOR AREA TENANTS THAT ARE REMAINING. NO UTILITY SERVICE SHALL BE INTERRUPTED DURING THE CONSTRUCTION PROCESS. 7. BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE RECORD SURVEYS AND PLATS FOR EXACT INFORMATION. 8. ANY EXISTING TREE(S) THAT MAY REQUIRE REMOVAL BUT ARE NOT SHOWN ON THE PLAN AS BEING REMOVED MAY BE DONE SO, AS LONG AS THE TREE(S) ARE RELOCATED TO AN APPROVED ALTERNATIVE LOCATION ON SITE. 9. IF THERE ARE ANY QUESTIONS CONCERNING THIS DEMOLITION PLAN, PLEASE CONTACT THE ENGINEER BEFORE CONTINUING WORK. 10. CONTRACTOR TO CONNECT BACK ANY FIELD TILES FOUND DURING EXCAVATION AND MAINTAIN POSITIVE DRAINAGE. SITE PREPARATION / SWPPP PHASE 1 NOTES INSTALL PERMIT POSTING AREA. 4" PVC TUBE WITH END CAPS ATTACHED TO PROJECT CONSTRUCTION SIGN TO CONTAIN APPROVED CONSTRUCTION DRAWINGS AND PERMITS FOR INSPECTORS. USE EXISTING DRIVE AS CONSTRUCTION ENTRANCE. REFER TO DETAIL ON SHEET C105 IF THE ENTIRE ASPHALT DRIVE IS REMOVED DURING CONSTRUCTION. INSTALL CONCRETE WASHOUT. REFER TO DETAIL ON SHEET C105 INSTALL SILT FENCE. REFER TO DETAIL ON SHEET C105 INSTALL SILT WORM OR EQUAL. REFER TO DETAIL ON SHEET C106 LIMITS OF PROPOSED BUILDING REMOVE STORM SEWER LINE(S) AND APPURTENANCES AS SHOWN. COORDINATE WITH SHEET C600 FOR NEW LOCATION(S). DISCONNECT AND RELOCATE SANITARY SEWER LINE(S) AND APPURTENANCES AS SHOWN. COORDINATE WITH SHEET C800, ARCHITECTURAL DRAWINGS AND SERVICE PROVIDER FOR NEW LOCATION(S). DISCONNECT AND RELOCATE WATER SERVICE LINE(S) AND APPURTENANCES AS SHOWN. COORDINATE WITH SHEET C800, ARCHITECTURAL DRAWINGS AND SERVICE PROVIDER FOR NEW LOCATION(S). DISCONNECT AND RELOCATE ELECTRIC SERVICE LINE(S) AND APPURTENANCES AS SHOWN. COORDINATE WITH SHEET C800, ARCHITECTURAL DRAWINGS AND SERVICE PROVIDER FOR NEW LOCATION(S). DISCONNECT AND RELOCATE TELEPHONE SERVICE LINE(S) AND APPURTENANCES AS SHOWN. COORDINATE WITH SHEET C800, ARCHITECTURAL DRAWINGS AND SERVICE PROVIDER FOR NEW LOCATION(S). DISCONNECT AND RELOCATE CABLE SERVICE LINE(S) AND APPURTENANCES AS SHOWN. COORDINATE WITH SHEET C800, ARCHITECTURAL DRAWINGS AND SERVICE PROVIDER FOR NEW LOCATION(S). DISCONNECT AND RELOCATE GAS SERVICE LINE(S) AND APPURTENANCES AS SHOWN. COORDINATE WITH SHEET C800, ARCHITECTURAL DRAWINGS AND SERVICE PROVIDER FOR NEW LOCATION(S). CONTACT CHAD MILLER WITH VECTREN TO HAVE THE SERVICE LINE AND METER RETIRED OR RELOCATED PRIOR TO THE EXISTING BUILDING BEING DEMOLISHED. REMOVE BUILDING AND APPURTENANCES FROM EXISTING BUILDING LOCATION. REMOVE EXISTING CONCRETE STOOPS TO NEAREST JOINT (IF APPLICABLE) SAWCUT AND REMOVE EXISTING PAVEMENT FULL DEPTH. REMOVE EXISTING LANDSCAPING AND VEGETATION REMOVE EXISTING SIGN STAGING AREA. PROVIDE CONSTRUCTION DUMPSTER, FUELING AREA, AND PORT-O-LET AS NEEDED. REMOVE EXISTING BOLLARDS REMOVE AND RELOCATE EXISTING WHEEL STOPS REMOVE EXISTING FENCE REMOVE EXISTING GATE RAISE STRUCTURE TO THE NEW PAVEMENT GRADE. REFER TO SHEET C300 FOR NEW ELEVATIONS. SAWCUT AND REMOVE PAVEMENT FOR NEW WATER TAP AND STORM SEWER. REMOVE END SECTIONS. 15" PIPES TO BE EXTENDED. REFER TO SHEET C600. C102 STORMWATER POLLUTION PREVENTION PLAN PHASE I W190582-C100 swppp1 SWPPP PHASE 1 LEGEND - INLET PROTECTION - USE SUBSURFACE INLET PROTECTION WITH OVERFLOW CAPABILITY - STAGING AREA - POSTING AREA - 4" PVC TUBE WITH END CAPS ATTACHED TO PROJECT CONSTRUCTION SIGN TO CONTAIN APPROVED CONSTRUCTION DRAWINGS AND PERMITS FOR INSPECTORS. - SILT WORM OR EQUAL - CONCRETE WASHOUT - SILT FENCE - LIMITS OF DISTURBANCE SD IP SF 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 D EROSION CONTROL NOTES 1. ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR LOCATION OF LANDSCAPE BEDS. 2. INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT FENCE TO FOLLOW CONTOUR. 3. THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN THE STREET. CONTACT PERSON FOR EROSION CONTROL & SEDIMENT PRACTICES EROSION CONTROL SPECIFICATIONS 1. THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS. 2. TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS. 3. PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND FINISHED GRADE. 4. PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION. 5. ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS. 6. IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED. 7. DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. 8. THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER. 9. IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY. 10. FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS. 11. PORTABLE TOILETS MUST BE ANCHORED. WEIHE ENGINEERS, INC. 10505 N. COLLEGE AVE. INDIANAPOLIS, IN 46268 TELEPHONE: (317) 846-6611 FAX: (317) 843-0546 EMAIL: PARKERF@WEIHE.NET CONTACT PERSON: FRED PARKER, CPESC LINE TYPES UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS AERIAL COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN RIGHT OF WAY LINE CHAIN LINK FENCE BOARD FENCE WROUGHT IRON FENCE GUARD RAIL HAND RAIL SILT FENCE BUILDING SETBACK LINE BOUNDARY LINE FLOW LINE G G G W W E(A) E(A) E E E C C C C(A) C(A) OHU OHU FM FM SF SF FO(A) FO(A) AERIAL FIBER OPTIC CABLE SECTION LINE FARM FENCE FO FO UNDERGROUND FIBER OPTIC INDEX CONTOUR INTERMEDIATE CONTOUR SANITARY SEWER STORM SEWER REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS W S N E ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 PROJECT BM HARRISON MONUMENT AT THE EAST QUARTER CORNER OF SECTION 36, TOWNSHIP18 NORTH, RANGE 03 EAST PER HAMILTON COUNTY SURVEYOR'S OFFICE CORNER NUMBER 18033606. LOCATED IN THE SOUTHBOUND LANE OF RANGELINE ROAD APPROXIMATELY 190 FEET NORTH OF THE INTERSECTION OF EXECUTIVE DRIVE AND RANGELINE ROAD. ELEV.844.55 (NAVD 88) SITE TBM CUT 'X' ON THE SOUTH BONNET BOLT OF A FIRE HYDRANT LOCATED APPROXIMATELY 22 FEET NORTHWEST OF THE NORTHWEST CORNER OF THE SURVEYED REAL ESTATE ON THE SOUTH SIDE OF CARMEL DRIVE. ELEV.831.54 (NAVD 88) BENCHMARK INFORMATION 21 22 23 DEMO ASPHALT EXISTING CONCRETE EXISTING ASPHALT EXISTING AREAS TOTAL SITE = 4.37 AC. DISTURBED = 1.20 AC. PERVIOUS = 0.65 AC. IMPERVIOUS = 3.72 AC. 24 25 26 ENTRANCE NOTE CONTRACTOR TO KEEP THE EXISTING DRIVE OPEN DURING CONSTRUCTION TO ALLOW EMERGENCY EQUIPMENT AND ACCESS TO BACK UNITS. DEMO ASPHALT EXISTING CONCRETE EXISTING ASPHALT STONE * SITE DISCHARGE POINT EXISTING AREAS TOTAL SITE = 4.37 AC. DISTURBED = 1.20 AC. PERVIOUS = 0.65 AC. IMPERVIOUS = 3.72 AC. C C C C C C C C100 EXISTING CONDITIONS W190582-C100 existing conditions REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 W S N E EXISTING AREAS TOTAL SITE = 4.37 AC. DISTURBED = 1.20 AC. PERVIOUS = 0.65 AC. IMPERVIOUS = 3.72 AC. PROJECT BM HARRISON MONUMENT AT THE EAST QUARTER CORNER OF SECTION 36, TOWNSHIP18 NORTH, RANGE 03 EAST PER HAMILTON COUNTY SURVEYOR'S OFFICE CORNER NUMBER 18033606. LOCATED IN THE SOUTHBOUND LANE OF RANGELINE ROAD APPROXIMATELY 190 FEET NORTH OF THE INTERSECTION OF EXECUTIVE DRIVE AND RANGELINE ROAD. ELEV.844.55 (NAVD 88) SITE TBM CUT 'X' ON THE SOUTH BONNET BOLT OF A FIRE HYDRANT LOCATED APPROXIMATELY 22 FEET NORTHWEST OF THE NORTHWEST CORNER OF THE SURVEYED REAL ESTATE ON THE SOUTH SIDE OF CARMEL DRIVE. ELEV.831.54 (NAVD 88) BENCHMARK INFORMATION DEMO ASPHALT EXISTING CONCRETE EXISTING ASPHALT STONE * SITE DISCHARGE POINT STORM SEWERS AND POSITIVE DRAINAGE PRESERVED. 11. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER THAT ALL LANDSCAPE REQUIREMENTS ARE MET AND CONFORM TO APPLICABLE LOCAL STANDARDS. 12. THE SITE DOES NOT LIE IN A SPECIAL FLOOD HAZARD AREA AS ESTABLISHED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY - NATIONAL FLOOD INSURANCE PROGRAM, WHEN PLOTTED BY SCALE ON FLOOD INSURANCE RATE MAP #18057C0209 G, DATED NOVEMBER 19, 2014. 13. BEARINGS, DIMENSIONS AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE RECORD SURVEYS & PLAT FOR EXACT INFORMATION. 14. THIS SITE DOES NOT CONTAIN ANY WETLANDS AT SHOWN ON THE U.S. DEPARTMENT OF THE INTERIOR FISH AND WILDLIFE SERVICE; NATIONAL WETLANDS INVENTORY MAP. GENERAL NOTES W S N E CITY OF CARMEL PLANNING ONE CIVIC SQUARE CARMEL, IN 46032 ANGIE CONN / ALEXIA LOPEZ TEL: 317/571-2417 CITY OF CARMEL ENGINEERING ONE CIVIC SQUARE CARMEL, IN 46032 JOHN THOMAS / ALEX JORDAN TEL: 317/571-2441 CITY OF CARMEL BLDG SERVICES ONE CIVIC SQUARE CARMEL, IN 46032 JIM BLANCHARD TEL: 317/571-2444 CITY OF CARMEL FIRE DEPARTMENT TWO CIVIC SQUARE CARMEL, INDIANA 46032 CHRIS ELLISON TEL: 317/571-2600 CARMEL CITY UTILITIES 30 W MAIN ST, SUITE 220 CARMEL, INDIANA 46032 JOHN DUFFY TEL: 317/571-2648 HAMILTON COUNTY SURVEYOR ONE HAMILTON COUNTY SQUARE SUITE 188 NOBLESVILLE, INDIANA 46060 TEL: 317/776-8495 HAMILTON COUNTY HIGHWAY DEPT 1700 SOUTH 10TH STREET NOBLESVILLE, INDIANA 46060 TEL: 317/773-7770 HAMILTON COUNTY HEALTH DEPARTMENT 18030 FOUNDATION DR. SUITE A NOBLESVILLE, INDIANA 46060 JASON LEMASTER TEL: 317/776-8500 CLAY TOWNSHIP REGIONAL WASTE DISTRICT 10701 NORTH COLLEGE AVENUE, SUITE A INDIANAPOLIS, IN 46280-1098 RYAN HARTMAN TEL: 317/844-9200 DUKE ENERGY 100 SOUTH MILL CREEK RD. NOBLESVILLE, INDIANA 46060 TEL: 317/776-5352 COMCAST 9750 E. 150th STREET SUITE 1600 NOBLESVILLE, INDIANA 46060 TEL: 317/776-4495 VECTREN GAS P.O. BOX 1700 NOBLESVILLE, INDIANA, 46060 TEL: 317/776-5573 AT&T 5858 NORTH COLLEGE INDIANAPOLIS, INDIANA 46220 TEL: 317/252-5168 OPERATING AUTHORITIES PLANS PREPARED BY WEIHE ENGINEERS, INC. 10505 N. COLLEGE AVE. INDIANAPOLIS, INDIANA 46280 TELEPHONE: (317) 846-6611 FAX: (317) 843-0546 CONTACT PERSON: SCOTT RUCKER, P.E. EMAIL: RUCKERS@WEIHE.NET REVISIONS AND ISSUES Part of Section 36, Township 18 North, Range 3 East, Hamilton County, Indiana W19.0582 PREPARED FOR: 147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANA PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: SSR DESIGNED BY: DWG NAME: PROJECT NO.: W19.0582 DATE BY 06.08.2020 SSR DATE: SSR Know what'sbelow. Call before you dig. R APPROVAL PENDING NOT FOR CONSTRUCTION CARMEL SELF STORAGE ISSUED FOR CITY REVIEW 01.13.2020 BJS ISSUED FOR TAC REVISIONS 05.12.2020 BJS ENGINEERS 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Surveying | Civil Engineering Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net Build with confidence. SM STEVEN SCOTT RUCKER, PE No. 11300279 06/08/2020 TAC REVISIONS 03.30.2020 BJS ISSUED FOR TAC REVISIONS 06.08.2020 CARMEL DR. CITY CENTER DR. MAIN ST. RANGELINE RD. RANGELINE RD. GUILFORD RD. MAIN ST. 116th ST. CITY CENTER DR. PENNSYLVANIA ST. US 31 US 31 OLD MERIDIAN ST. KEYSTONE AVE. KEYSTONE AVE. CARMEL DR. 116th ST. 116th ST. CARMEL DR. RANGELINE RD. RANGELINE RD. SHEET INDEX Sheet Number Sheet Title C001 TITLE SHEET 1 & 2 ALTA NSPS LAND TITLE SURVEY C100 EXISTING CONDITIONS C101 EXISTING CONDITIONS C102 STORMWATER POLLUTION PREVENTION PLAN PHASE I C103 STORMWATER POLLUTION PREVENTION PLAN PHASE II C104 STORMWATER POLLUTION PREVENTION PLAN SPECS C105 STORMWATER POLLUTION PREVENTION PLAN DETAILS C106 STORMWATER POLLUTION PREVENTION PLAN DETAILS C200 SITE PLAN C201 SITE PLAN DETAILS C300 GRADING PLAN C600 DRAINAGE PLAN C601 DRAINAGE DETAILS C602 DRAINAGE DETAILS C603 OVERFLOW ROUTING PLAN C604 OVERFLOW ROUTING PLAN C800 UTILITY PLAN C801 UTILITY PLAN DETAILS C900 SPECIFICATIONS C901 SPECIFICATIONS C902 SPECIFICATIONS L100 LANDSCAPE PLAN L200 LANDSCAPE PLAN DETAILS CITY OF CARMEL STANDARD NOTES 1. NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT 2. THESE PLANS COMPLY WITH ALL ADA REQUIREMENTS. 3. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPER TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 4. ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND BRIDGES ACROSS THE FRONTAGE OF THIS DEVELOPMENT ARE INDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES AS NECESSARY OR AS REQUEST BY THE CITY TO ACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES, MULTI-USE PATH, AND ANY OTHER REQUIRED IMPROVEMENTS TO THE PROPERTY OR THE ROADWAY. THE COST TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES WILL BE BORNE BY THE DEVELOPER. 5. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 6. ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT -OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY. DESIGN DATA EXISTING ZONING: I-1 ZONING OVERLAY: RANGELINE OVERLAY (RL-OL) TOTAL ACREAGE: 4.37 ACRES NET ACREAGE: 4.37 ACRES LIMITS OF DISTURBANCE: 1.20 ACRES BUILDING COVER RATIO: 11% BUILDING SQUARE FOOTAGE: 20,121 SQUARE FEET IMPERVIOUS COVER RATIO: 87% (MAXIMUM ALLOWED - 90%) SETBACKS: 0' FRONT, 0' BACK