HomeMy WebLinkAboutS0-1-1 - STRUCTURAL ABBREVIATIONS AND LEGEND284554 46 145556 48 32 1681624324048566471523313947556361422303846546251321293745536141220283644526031119273543515921018263442505857 49 41 33 25 179 1DETAIL NUMBERING EXAMPLETHE NUMBER OF THE MODULE WHICH OCCURSIN THE LOWER LEFT CORNER OF A SINGLEMODULE OR SEVERAL MODULES GROUPEDTOGETHER WILL DEFINE THE FINAL DETAILNUMBER AS SHOWN IN THE ILLUSTRATIONTO THE LEFT. ALTHOUGH THE MODULENUMBERS OCCUR IN CONSECUTIVE ORDER,NOT ALL NUMBERS ARE NECESSARILY USEDON EACH SHEET.DETAIL MODULE LAYOUTDETAILS ARE NUMBERED ACCORDING TO THEIRLOCATION ON EACH SHEET AND ARE NOTNUMBERED CONSECUTIVELY. EACH MAINTAINSTHE NUMBER ASSOCIATED WITH IT.THIS SYTEM CAN BE APPLIED TO ANY DRAWINGTHAT CONTAINS MULTIPLE VIEWS. THE VIEWS ARENUMBERED ACCORDING TO THE MODULE SYSTEMSHOWN ILLISTRATED TO THE LEFT.EACH DETAIL MAY OCCUPY ONE OR MORE WHOLEMODULES. THE DETAIL MODULE IS USED TOESTABLISH THE IDENTIFYING LABEL FOR EACH DETAIL,NOT TO LIMIT THE SIZE OF THE DETAILS.MODULAR LAYOUT / DETAIL NUMBERING SYSTEM646159GENERAL REFERENCE SYMBOLSSTRUCTURAL ABBREVIATIONSALL ABBREVIATIONS, SYMBOLS, AND LEGENDS SHOWN ON THIS DRAWING ARE NOT NECESSARILY USEDSTRUCTURAL NOTESSECOND LEVEL+10'-0"BUILDING SECTIONWALL SECTION NUMBERDIRECTION OF VIEWSHEET WHERE DRAWNWALL SECTIONWALL SECTION NUMBERNORTH ARROW REFERENCESTRUE NORTH90°NEW GRIDIDENTIFICATIONEXISTING GRIDIDENTIFICATIONLAYOUT GRID LINESBASIC DRAWING TITLESHEET WHERE DRAWNDIRECTION OF VIEWLEVEL LINEREVISION NUMBER AND EXTENTDETAIL REFERENCESECTION DETAIL REFERENCEEXTERIOR ELEVATIONA1022112INTERIOR ELEVATION REFERENCEROOM NAME AND NUMBERELEVATION NUMBER ANDDIRECTIONSHEET WHERE DRAWNSHEET WHERE DRAWNELEVATION NUMBER ANDDIRECTION OF VIEWSHEET WHERE DRAWN,HYPHEN INDICATES DETAILON SAME SHEET.DETAIL NUMBERSHEET WHERE DRAWNELEVATION NUMBER ANDDIRECTIONAX.X.XXWINDOW AND LOUVER TYPE MARKSEE CORRESPONDING NUMBER ON SCHEDULESEE ASSEMBLY TYPE FOR DETAILS.NAME OF LEVELINDICATES HEIGHT ABOVE PROJECT DATUMREVISION NUMBER - SEE REVISION HISTORY ON THE TITLE BLOCK OF EACH SHEETEXTENT OF CURRENT REVISIONSHEET KEYNOTE MARKMATCH LINE REFERENCESDRAWING TITLE SYMBOLSA502SEE CORRESPONDING NUMBERED KEYNOTE ON SHEET WHERE REFERENCE OCCURS REFER TO THE SHEET WHERE CONTINUATION IS FOUNDAB1SCALE:1A101SIMA1011SIM1A101SIMA1011SIM1MATCH LINEW-X1View Name1/8" = 1'-0"REFERENCE KEYNOTE MARK088000.A03THE FIRST SIX DIGITSREPRESENT THE SPECIFICATION SECTIONEXAMPLE 1:THE CHARACTERSFOLLOWING THE PERIODREPRESENT PARTICULARITEMS OF THE SPECIFIED SYSTEMNORTH PROJECT NORTHOR ORBASIC DRAWING TITLE WITH LINESCALE:1View Name1/8" = 1'-0"DRAWING TITLE WHEN ONLY ONE PLAN EXISTS ON THE DRAWINGSCALE:View Name1/8" = 1'-0"SHEET A2.1.1SHEET A2.1.2SHEET A2.1.1ORREFER TO THE SHEETS EITHER SIDE OF THE MATCH LINERoom Name101M-X061600 5/8" PLYWOODEXAMPLE 2:THE TEXT IS THE PRODUCT DESCRIPTIONSHEET NUMBERPROJECT NUMBERDRAWING TITLESEALS AND SIGNATURESISSUED FOR REVDATE44 EAST MIFFLIN STREETSUITE 500MADISON, WI 53703608.251.1177www.smithgroupjjr.comSCALEWEST PARK:THE CORE3030 W. 116TH STREETCARMEL, IN 46032OWNER:500 PARK BOULEVARDSUITE 800ITASCA, IL 60143630.221.1212www.williams-architects.com65% REVIEW04/20/202090% CONSTRUCTION DOCUMENTS 06/01/2020100% CONSTRUCTION DOCUMENTS 06/19/2020ISSUED FOR BID 07/14/2020As indicatedSTRUCTURALABBREVIATIONS ANDLEGENDS0.1.111640.000SSC SLIP CRITICALSCHED SCHEDULESECT SECTIONSEOR STRUCTURAL ENGINEER OF RECORDSHT SHEET(ING)SIM SIMILARSOG SLAB ON GRADESP SPACE(D, ING)SPEC(S) SPECIFICATION(S)SQ SQUARESQ FT SQUARE FOOTSQ IN SQUARE INCHSST STAINLESS STEELST STREETSTAG STAGGEREDSTD STANDARDSTIFF STIFFENERSTIR STIRRUPSTL STEELSTRUCT STRUCTURALSYMM SYMMETRICALTT TREADT&B TOP AND BOTTOMTC TOP OF CURBTD TRENCH DRAINTEMP TEMPORARYTHK THICK(NESS)THRU THROUGHTOC TOP OF CONCRETETODP TOP OF DRILLED PIERTODPC TOP OF DRILLED PIER CAPTOF TOP OF FOOTINGTOFP TOP OF FORMED PIERTOPC TOP OF PILE CAPTOS TOP OF STEELTOW TOP OF WALLTYP TYPICALUUON UNLESS OTHERWISE NOTEDVVB VAPOR BARRIERVCJ VERTICAL CONTROL JOINTVERT VERTICALVIF VERIFY IN FIELDVRFY VERIFYWW WIDEW/ WITHW/ O WITH OUTWCJ WALL VERTICAL CONSTRUCTION JOINTWCLJ WALL VERTICAL CONTROL JOINTWTRPRF WATERPROOFINGWWF WELDED WIRE FABRICGGA GAGEGALV GALVANIZEDGALVI GALVANIZED IRONGALVS GALVANIZED STEELGB GRADE BEAMGND GROUNDGR GRAD(E, ING)GVL GRAVELHH HIGHHORIZ HORIZONTALHP HIGH POINTHVAC HEATING-VENTILATION-AIR CONDITIONINGIID INSIDE DIAMETERIN INCHINCL INCLUD(E, ING)INFO INFORMATIONINV EL INVERT ELEVATIONJJT JOINTKKPL KICK PLATELL LONGLB POUNDLG LENGTHLLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLP LOW POINTLVR LOUVERMMAS MASONRYMATL MATERIALMAX MAXIMUMMB MACHINE BOLTMDO MEDIUM DENSITY OVERLAYMECH MECHANICALMEMB MEMBRANEMFR MANUFACTURERMIN MINIMUMMISC MISCELLANEOUSMO MASONRY OPENINGNNA NOT APPLICABLENAT NATURALNIC NOT IN CONTRACTNO NUMBERNOM NOMINALNTS NOT TO SCALEOO TO O OUT TO OUTOA OVERALLOC ON CENTEROD OUTSIDE DIAMETEROFOI OWNER FURNISHED-OWNER INSTALLEDOH OPPOSITE HANDOPNG OPENINGOPP OPPOSITEPPC PIECEPERP PERPENDICULARPJTN PROJECTIONPL PLATEPOT POINT OF TANGENCYPP PANEL POINTPRCST PRECASTPT POINTPVMT PAVEMENTQQTY QUANTITYRR RISERRAD RADIUSRD ROOF DRAINREF REFERENCEREINF REINFORCE(D, ING, MENT)REQD REQUIREDREV REVISIONAAB ANCHOR BOLTABV ABOVEACI AMERICAN CONCRETE INSTITUTEADD ADDENDUMADDL ADDITIONALAESS ARCHITECTURALLY EXPOSED STRUCTURALSTEELAISC AMERICAN INSTITUTE OF STEEL CONSTRUCTIONALT ALTERNATEAR ANCHOR RODARCH ARCHITECT(URAL)ASCE AMERICAN SOCIETY OF CIVIL ENGINEERSASTM AMERICAN SOCIETY FOR TESTING MATERIALSAWS AMERICAN WELDING SOCIETYBB TO B BACK TO BACKBASE PL BASE PLATEBC BOTTOM CHORDBENT PL BENT PLATEBET BETWEENBLDG BUILDINGBO BOTTOM OFBOD BOTTOM OF METAL DECKBOF BOTTOM OF FOOTINGBOS BOTTOM OF STEELBOT BOTTOMBRG BEARINGBRKT BRACKETBULL BULLETINCCHAM CHAMFERCHKD PL CHECKERED PLATECJ CONTROL JOINTCL CENTER LINECLR CLEARCMU CONCRETE MASONRY UNITCOL COLUMNCONC CONCRETECOND CONDITIONCONN CONNECTIONCONSTR CONSTRUCTIONCONSTR JT CONSTRUCTION JTCONT CONTINUOUSCONTR CONTRACTORCOORD COORDINAT(E, ION)DD DEEP, DEPTHDBA DEFORMED BAR ANCHORDEG DEGREEDEMO DEMOLISHDET DETAILDIA DIAMETERDIAG DIAGONALDIM DIMENSIONDIM PT DIMENSION POINTDIST DISTANCEDN DOWNDO DITTODP DRILLED PIERDPC DRILLED PIER CAPDR DRAINDT DRAIN TILEDWG(S) DRAWING(S)DWL DOWELEEA EACHEF EACH FACEEL ELEVATIONELEC ELECTRICALELEV ELEVATOREMBED EMBEDMENTENGR ENGINEEREOD EDGE OF DECKEOS EDGE OF SLABEQ EQUALEQ SP EQUALLY SPACEDEQPT EQUIPMENTEQUIV EQUIVALENTEW EACH WAYEXP EXPANSIONEXP JT EXPANSION JOINTEXST EXISTINGEXT EXTERIORFFD FLOOR DRAINFDN FOUNDATIONFIN FINISHFIN FL FINISH FLOORFIN GR FINISH GRADEFT FOOT, FEETFTG FOOTINGFUT FUTUREA. THE FOLLOWING NOTES APPLY TO ALL STRUCTURALDRAWINGS. FOR GENERAL NOTES APPLICABLE TO EACHDISCIPLINES, REFER TO THE FRONT OF THE EACHDISCIPLINES DRAWINGS AS LISTED IN THE PROJECTINDEX OF DRAWINGS.B. ALL PARTS OF THE WORK - INCLUDING MATERIALS,METHODS, ASSEMBLIES, ETC. - MUST COMPLY WITH THEMINIMUM REQUIREMENTS OF THE GOVERNINGREGULATIONS OF ALL FEDERAL, STATE, DISTRICT ANDLOCAL AUTHORITIES HAVING JURISDICTION OVER THEPROJECT AS WELL AS THOSE GREATER REQUIREMENTSINDICATED BY THE CONTRACT DOCUMENTS. NO PART OFTHE CONTRACT DOCUMENTS MAY BE CONSTRUED TOREQUIRE OR PERMIT WORK CONTRARY TO A GOVERNINGREGULATION.C. THE STRUCTURAL DRAWINGS ARE PART OF A LARGERSET OF DRAWINGS WHICH, WHEN COMPLETE, CONSISTSOF ALL DRAWINGS LISTED BY THE INDEX OF DRAWINGS.THE WORK DESCRIBED BY THE DRAWINGS OF ANY ONEDISCIPLINE MAY BE AFFECTED BY THE WORK DESCRIBEDON DRAWINGS OF ANOTHER DISCIPLINE AND MAYREQUIRE REFERENCE TO THE DRAWINGS OF ANOTHERDISCIPLINE. PARTIAL SETS OF DRAWINGS AREINCOMPLETE AND SHOULD NOT BE DISTRIBUTED ORUTILIZED.D. REVIEW AND COORDINATE THE WORK OF ALLSUB-CONTRACTORS, TRADES AND SUPPLIERS WITH THEREQUIREMENTS OF THE CONTRACT DOCUMENTS BEFORECOMMENCING CONSTRUCTION, AND TO ASSURE THAT ALLPARTIES ARE AWARE OF ALL REQUIREMENTS,REGARDLESS OF WHERE THE REQUIREMENTS OCCUR INTHE CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THEWORK OF THAT PARTY.E. IDENTIFY AND NOTIFY THE ARCHITECT/ ENGINEER OF ANYCONFLICTS BETWEEN THE WORK OF DIFFERENT PARTIESAT THE EARLIEST POSSIBLE DATE SO AS TO ALLOWREASONABLE AND ADEQUATE TIME FOR THE CONFLICTTO BE RESOLVED WITHOUT DELAYING THE WORK. ALLDEVIATIONS FROM THAT WHICH IS REQUIRED BY THECONTRACT DOCUMENTS MUST BE APPROVED INADVANCE BY THE ARCHITECT/ ENGINEER.F. REFER TO DRAWINGS FROM OTHER DISCIPLINES FORDETAILED DESIGN OF THE OTHER SITE AND BUILDINGSYSTEMS, OF WHICH PORTIONS MAY BE SHOWN ON THESTRUCTURAL DRAWINGS.G. EXCEPT WHERE DIRECTED TO PLACE ITEMS OF WORK ATTHE APPROXIMATE LOCATION SHOWN, DO NOT SCALEDRAWINGS FOR DIMENSIONAL INFORMATION. ALLELEMENTS OF THE DRAWINGS MAY NOT BE DRAWN TOEXACT SCALE. ALL DIMENSIONS REQUIRED ARE SHOWNOR MAY BE DERIVED FROM THOSE SHOWN ON THE FLOORPLANS, DETAIL PLANS, ELEVATIONS, SECTIONS, DETAILS,SCHEDULES AND SPECIFICATIONS.H. THE PURPOSE OF THE SYMBOLS INDICATED ON THISSHEET IS TO ILLUSTRATE AND DEFINE THE TYPICALGRAPHIC SYMBOLS WHICH MAY OCCUR ON THESTRUCTURAL DRAWINGS. ADDITIONAL SYMBOLS NOTSHOWN OR DEFINED ON THIS SHEET MAY BE USED ONTHE STRUCTURAL DRAWINGS AND ARE TYPICALLYDEFINED ON OTHER SHEETS.