Loading...
HomeMy WebLinkAboutCD502 STORMWATER POLLUTION PREVENTION DETAILS2" x 2" x 36" WOOD STAKES AT 10'-0" O.C. (MIN.) FLOW FLOW FLOW 12" DIA. TUBE 2'-0" OVERLAP MIN. PLAN VIEW - FLOW 45 TO 90° TO TUBE PLAN VIEW - FLOW LESS THAN 45° TO TUBE SECTION VIEW REPAIR DETAIL - TEAR GREATER THAN 12 INCHES 12" DIA. TUBE 2'-0" OVERLAP MIN. 2" x 2" x 36" WOOD STAKES AT 10'-0" O.C. (MIN.)4'-0" (MIN.) HOOK4'-0" (MIN.) HOOK FLOW BACK-GROUT W/ TUBE FILLER MATERIAL 2" x 2" x 36" WOOD STAKES AT 10'-0" O.C. (MIN.) 12" DIA. TUBE DRIVE STAKE 12" MIN. EXISTING SEDIMENT CONTROL TUBE NARROW TEAR LONGER THAN 12"NEW FABRIC WRAPPED AROUND TUBE AND TIED AT DOWNSTREAM SIDE. EXTEND NEW FABRIC A MINIMUM OF 12" PAST EACH END OF TEAR PLASTIC TIES OR STITCHING INSTALLATION AND MAINTENANCE REQUIREMENTS: 1.SECURE SEDIMENT CONTROL TUBE FIRMLY IN PLACE WITH STAKES. WHEN SEDIMENT CONTROL TUBE IS USED ON A PAVED SURFACE CONCRETE BLOCKS SHALL BE USED TO SECURE SEDIMENT CONTROL TUBE IN PLACE OF STAKING. 2.ACCUMULATED SEDIMENT SHALL BE REMOVED FROM BEHIND THE SEDIMENT CONTROL TUBE WHEN IT HAS REACHED A HEIGHT EQUAL TO HALF OF THE TUBE HEIGHT. 3.MAINTAIN AND REPLACE DAMAGED OR DEGRADED SEDIMENT CONTROL TUBE THROUGHOUT CONSTRUCTION. SMALL HOLES OR NARROW RIPS LESS THAN 12" LONG MAY BE STITCHED CLOSED USING PLASTIC ZIP TIES. LARGER RIPS SHALL BE FIXED PER THE REPAIR DETAIL. HEAVILY DAMAGED SECTIONS SHALL BE REPLACED ENTIRELY. MAINTAIN 2' MINIMUM OVERLAP AT EACH END. STORMWATER POLLUTION PREVENTION DETAILS 11640 CD502 SEALS AND SIGNATURES KEY PLAN DRAWING TITLE PROJECT NUMBER SCALE DRAWING NUMBER DATEREVISSUED FOR 500 PARK BOULEVARD SUITE 800 ITASCA, IL 60143 630.221.1212 www.williams-architects.com WEST PARK: THE CORE 2700 W. 116TH STREET CARMEL, IN 46032 Owner: 44 EAST MIFFLIN STREET SUITE 500 MADISON, WI 53703 608.251.1177 www.smithgroup.com ISSUED FOR CONSTRUCTION 09/10/2020 NOT TO SCALE TEMPORARY SEDIMENT FOREBAY1 NOT TO SCALE STONE CHECK DAM2 NOT TO SCALE SEDIMENT CONTROL TUBE3 PER CITY STORMWATER RVW 09/21/2020