Loading...
HomeMy WebLinkAboutALB 19 Second Floor SystemFP Supply310 S Kitley AveIndianapolis, IN  46219;      317-357-8011These placement plans have been prepared with the specifications of TrussJoist products based on project information provided. This service is solely intendedfor product application assurance; and, is not intended to circumvent the needfor a design professional as determined by the building codes. The designerof record and/or builder/framer is responsible to assure these drawings arecompatible with the overall project. These documents are not intended to replacethe building plan (which should be used to determine bearing placement).Please insure measurements of the foundation match those provided at the timeof design.  Builder is responsible to place load bearing members in load path.Architectural Drawings Prepared By: Drees HomesStructural Drawings Prepared By:84 Lumber CompanyMike T LeeDrees IndyALB-19Rev.aBy DateGL 10/5/2020CommentsAdded HVAC Holes Per AirtronDrawn By:GLChecked By: Date:10/1/2020Monticello U 2020-1084GLa Sheet 2 of 2 Second Floor System Not to Scale Confirm this layout with Drees Homes. Make sure all discrepencies are corrected before installing this floor system. All Dimensions are Approximate and Must Be Field Verified. TJI 210 TJI 360 TJI 560 Joists by Series Kitchen Island Mechanical Chase Hatch Legend Framing Connector Summary PlotID Qty Manuf Product Design Method Skew Backer Blks Filler Web Stiff H1 2 Simpson HHUS410 Designed - No No No H2 3 Simpson HUS1.81/10 Designed - No No No H3 1 Simpson IUS2.06/11.88 Designed - No No Yes H4 29 Simpson IUS2.06/11.88 Designed - No No No H6 12 Simpson IUS2.37/11.88 Designed - No No No H7 5 User IUS2.37/11.88 User Defined - Not Required No Not Required Products PlotID Length Product Plies Net Qty F38' 38' 0" 11 7/8" TJI 210 joist 1 5 F18' 18' 0" 11 7/8" TJI 210 joist 1 17 F14' 14' 0" 11 7/8" TJI 210 joist 1 2 F10' 10' 0" 11 7/8" TJI 210 joist 1 5 F4' 4' 0" 11 7/8" TJI 210 joist 1 14 R24' 24' 0" 11 7/8" TJI 360 joist 1 7 R22' 22' 0" 11 7/8" TJI 360 joist 1 5 R20' 20' 0" 11 7/8" TJI 360 joist 1 17 R18' 18' 0" 11 7/8" TJI 360 joist 1 4 M1-2 20' 0" 1 3/4" x 20" 2.0E Microllam LVL 2 2 M2-2 20' 0" 1 3/4" x 11 7/8" 2.0E Microllam LVL 2 4 TS1 22' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 1 TS2-2 20' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2 TS3-2 16' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2 TS4-3 14' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 3 3 TS5-2 12' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2 TS6 8' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 1 TS8-3 6' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 3 3 TS7-2 6' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2 STRm1 16' 0" 1 1/8" x 11 7/8" TJ Rim Board 1 12 Accessories PlotID Length Product Plies Net Qty 9 1/8" 7/8" x 2 5/16" Web Stiffeners 1 10 9 1/8" 3/4" x 2 5/16" Web Stiffeners 1 2 23/32"x4'x8' OSB Sheathing (48/24) 1 62 Blocking PlotID Length Product Plies Net Qty FBk1 2' 0" 11 7/8" TJI 210 joist 1 1 FBk1 1' 6" 11 7/8" TJI 210 joist 1 33 FBk2 1' 6" 11 7/8" TJI 210 joist 1 1 FBk1 1' 0" 11 7/8" TJI 210 joist 1 2 FBk2 1' 0" 11 7/8" TJI 210 joist 1 1 FBk3 1' 0" 11 7/8" TJI 210 joist 1 2 FBk3 6" 11 7/8" TJI 210 joist 1 1  LEVEL NOTES  Current Date:  10/5/2020  File Name:  2020-1084GLa Drees Indy, ALB-19.jvl  Level Name:  Second Floor System  Building Code - Design Methodology:  IBC 2006  Members with Design Overridden:  TJ-Pro Rating (Weighted Average):  45     Minimum Level TJ - Pro Rating & Joist:  TJ-Pro rating = 37, joist = F38'(i35986)     Maximum Level TJ - Pro Rating & Joist:  TJ-Pro rating = 70, joist = F10'(i35916)  FLOOR  Floor Container:  FC8  Use/Occupancy:  ResidentialLivingAreas  Floor Area Loading is:  40.0 lb/ft² Live Load & 10.0 lb/ft² Dead Load  Maximum Allowed Deflection:  L/480 Live Load & L/240 Total Load  TJ-Pro Rating Information:      Weighted Average:  45      Directly Applied Ceiling:  Varies      Decking Attachment:  Glue and Nail      Decking Material:  23/32"x4'x8' OSB Sheathing (48/24)      Perpendicular Partition:  No      Strapping at max 8' o.c.:  None      Blocking at max 8' o.c.:  No      Poured Flooring:  No 11-7/8" TJI 19.2" oc spacing 11-7/8" TJI 19.2" oc spacing 11-7/8" TJI 19.2" oc spacing CS A3 A3 A3 A3 A3 A3 A3 CS A3 E1B4 B4 E1 B1 B4 B1 B4 A3 B1 E1 TS4-3 Dropped LVL BeamM1-2 Dropped 2x header TS5-2TS8-3 M2-2 TS7-2M2-2 TS2-2 TS6Dropped Steel Beam Dropped BBO 7' 5 1/2" 13' 2"Shower Toilet Toilet Toilet Shower 7' 5 1/2"15' 10 1/2"18' 5" 15' 10 1/2"22' 3 1/2" R20' F38' R20' STRm1 STRm1 STRm1 STRm1STRm11' 7 3/16"9 9/16" 1' 7 3/16" 1' 0 1/2" STRm18" Round Hole FBk2Dropped LVL Beam STRm113' 8 1/2" 6' 6"11' 0" 16' 8"1' 7 3/16" 9 5/8" 1' 7 3/16"9 9/16"1' 7 3/16"Dropped 2x HeaderR18' BBO16CS STRm1TS1F4' F4' F4' F4' F4' F4' F4' F4' F4' F4' F4' F4' F4' F4'STRm1STRm1STRm1 STRm1FBk1FBk11' 9 1/16"10' 6 1/2" H2H2 H1 20' 3"19' 3" 37' 3 1/2"Dropped 2x Header F14' F14'2' 0" 2' 0" 10' 0" 12' 6" STRm1 Tub H4 H4 H4 H4 H4 FBk1FBk1H4 H4 H4 H4 H4 7 3/16" 2' 11 11/16"8' 7"2' 4 1/4" Shower F18'FBk3F18'8"1' 7 3/16"11 3/16"F18'FBk1F18'4"1' 7 3/16"1' 3 3/16" VO10 H7H7H2H7H7H7H3 H4 H4 H4 H4 H4 H6 H4 H4 H4 H4 FBk1TS3-2 F10' H1 R20'R20'R18' F18'F18' F10'F38'R24' R22'H6H4H4 H4 H6INSUFFICIENT PRODUCT SUBSTITUTION Specified: 2 py 1-3/4" x 18" Microllam LVL Required: 2 ply 1-3/4" x 20" Microllam LVL The product(s) specified on the architectural or structural plans for this beam / joist was found to be insufficient. Supports girder truss above. Tub location unverified, please confirm prior to construction 11/09/20