Loading...
HomeMy WebLinkAboutGN010.0 General NotesWaterman Kitchen Remodel Project GN010.0 General Notes · Structural – increase opening between Kitchen and Great Room. Remove ~50” of wall. Add 2-2x4’s at each end of expanded wall opening. Install new 2-2x8 support beams approximately 14’ in length. Structural Engineer Report included. · Mechanical – run new Wardflex 15A gas line (to match existing gas supply lines in house) from gas supply manifold in basement to new stub-out and shut-off valve to provide gas service to new gas range. · Plumbing – water supply lines and drain of new island to use existing island water supply lines and drain. · Electrical – summary below o Add two additional can lights (same model as existing) to existing 4 can light circuit o Relocate existing pendant lights to new location above new island o Relocate two existing 110v GFCI outlets on island o Relocate existing 110v outlet (servicing the Great Room) from wall being removed to section of wall remaining o New combination microwave/wall oven to use existing 220v outlet (no change) o Relocate phone and cable TV jacks from wall being removed to adjacent wall o Delete 110v outlet on wall being removed. o Relocate dedicated 110v/20A microwave electric outlet from wall being removed to supply power to new gas range 11/10/20