Loading...
HomeMy WebLinkAboutPro-Build Truss layout 10-14-20Stick frame Stick frame Bearing at 12-06-12 MUS26 MUS26 MUS26 MUS26 HGUS26-2 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 MUS26 MUS26 6-05-00 TOP 6-04-10 TOP GE01 T03 T04 TG01 TG02 GE02 T09 GE03 M02 MG01 T12 GE04 GE05 GE06 V01 V02 V03 GE07 V04 V05 V06 V07 V08 PBE01 T01(5) T02(5) M01(2) T07(2) T10(2) T08(3) T11(6) T13(2) T14(7) T15(5) T16(2) T17(5) PB01(10) T05(3) T06(2) PB02(7) 73-03-00 16-05-00 37-10-00 11-02-00 48-11-00 13-02-00 22-11-00 9-05-00 21-11-00 11-03-02 13-04-04 11-04-06 IRC 2018 TPI 2014 20TLL - 10TDL - 10BDL Homes by McKenzie Frommeyer Residence 222 Bridgemont 1/4"=1' October 12, 2020 PH B20002988 CUSTOMER: LOCATION: MODEL: JOB #: DATE: DESIGNER: DESIGN INFORMATION: SCALE: 9028 Old SR 67 South Mooresville, IN 46158 (317) 834-5380 Truss Placement Guide 1) This layout is intended for the purpose of truss location and placement only. Refer to the building plans for actual building construction. 2) All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3) Trusses are spaced 24" on center unless otherwise noted. 4) Do not cut or modify trusses. 5) Refer to the individual truss design drawings for the location of member bracing, uplift and truss end reactions. 6) Installation of all temporary and permanent bracing is essential. See truss drawings, BCSI-B2 Summary Sheet and building designer requirements. 7) Non-bearing walls may not be shown on layout. Left end of truss, as shown on engineering drawing, is indicated by the triangle symbol