HomeMy WebLinkAboutPro-Build Truss layout 10-14-20Stick frame
Stick frame
Bearing at 12-06-12
MUS26
MUS26
MUS26
MUS26
HGUS26-2
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
MUS26
MUS26
6-05-00 TOP
6-04-10 TOP
GE01
T03
T04
TG01
TG02
GE02
T09
GE03
M02
MG01
T12
GE04
GE05 GE06
V01
V02
V03
GE07
V04
V05
V06
V07
V08
PBE01
T01(5)
T02(5)
M01(2)
T07(2)
T10(2) T08(3)
T11(6)
T13(2)
T14(7)
T15(5)
T16(2)
T17(5)
PB01(10)
T05(3)
T06(2)
PB02(7)
73-03-00
16-05-00 37-10-00
11-02-00 48-11-00 13-02-00
22-11-00 9-05-00 21-11-00
11-03-02
13-04-04 11-04-06
IRC 2018
TPI 2014 20TLL - 10TDL - 10BDL
Homes by McKenzie
Frommeyer Residence
222 Bridgemont
1/4"=1'
October 12, 2020
PH
B20002988
CUSTOMER:
LOCATION:
MODEL:
JOB #:
DATE:
DESIGNER: DESIGN INFORMATION: SCALE:
9028 Old SR 67 South
Mooresville, IN 46158
(317) 834-5380
Truss Placement Guide
1) This layout is intended for the purpose of truss location
and placement only. Refer to the building plans for actual
building construction.
2) All dimensions shown 00-00-00 are in feet-inches-sixteenths.
3) Trusses are spaced 24" on center unless otherwise noted.
4) Do not cut or modify trusses.
5) Refer to the individual truss design drawings for the location
of member bracing, uplift and truss end reactions.
6) Installation of all temporary and permanent bracing is
essential. See truss drawings, BCSI-B2 Summary Sheet
and building designer requirements.
7) Non-bearing walls may not be shown on layout.
Left end of truss, as shown on engineering
drawing, is indicated by the triangle symbol