HomeMy WebLinkAboutMW07051B.AnchorUpgrade.StructuralOpinionLetter.09.30.20.pdf 3740 Davinci Ct, Suite 100 • Peachtree Corners, GA 30092 • 770.368.1399 • www.fg-inc.net September 30, 2020 Mark Norville First Group Engineering, Inc. 5925 Lakeside Boulevard Indianapolis, IN 46278 Re: MW07051B, T-Mobile Anchor Upgrade – Building Rooftop Structural Opinion Letter T-MOBILE SITE NO / NAME : MW07051B / Meridian Mark SITE ADDRESS : 11590 North Meridian Street Carmel, IN 46032 COUNTY : Marion LATITUDE, LONGITUDE : 39.955091° N, 86.160650° W FORESITE GROUP JOB NO : 1147.002 Dear Mr. Norville: We have reviewed the referenced site for the purpose of stating our structural opinion on the capacity of the existing building rooftop to support the final T-Mobile equipment loading. The following information was provided to us or obtained for this letter: • The existing Pipe Mount information was obtained from: - The Structural Analysis prepared by GPD Group, Inc., dated June 14, 2017. - The site photos provided by T-Mobile subcontractors. • The existing and proposed antenna loading information was obtained from the Anchor Upgrade Construction Drawings prepared by First Group Engineering, dated September 15, 2020. APPLICABLE STANDARDS & CODES 2018 International Building Code Based on a comparison, the proposed effective weight for the final loading is within tolerances of the allowable design loading. We conclude the final T-Mobile loading will not have an impact on the structural integrity of the building structure. If any questions arise from your review, please call us at your earliest convenience. Sincerely, FORESITE GROUP LLC Justin Diaz, P.E. Project Manager Mr. Mark Norville MW07051B, Indiana September 30, 2020 Structural Opinion Letter 2 of 2 EQUIPMENT LOADING Table 1 – Existing T-Mobile Loading TO BE REMOVED before Final T-Mobile Loading Equipment Quantity Delta SSC Cabinet 1 Nokia COVP 1 Nokia ESMB RRH 1 Nokia FSFM RRH 1 Nokia FBBC RRH 2 Table 2 – Final T-Mobile Loading Summary (Proposed equipment are highlighted in bold type) Equipment Quantity Delta LB3 Battery Support Cabinet 1 Delta HPL3 Site Support Cabinet 1 Nokia ASIA Radio* 1 Nokia ASIK Radio* 2 Nokia ASIB Radio* 1 Nokia FSMF Radio* 1 Nokia ABIA Radio* 3 Nokia ABIL Radio* 4 Nokia ABIC Radio* 3 Nokia AMIA Radio* 2 SFC4 Diplexers* 6 Commscope HCS 2.0 COVP 2 *Equipment installed in Delta HPL3 cabinet as specified in Construction Drawings. WEIGHT COMPARISON The total weight of the equipment loading in approximately 2,590 lbs. The total distributed load from the platform to the rooftop supporting structure is 18.8 psf. Per current code, the allowable design live load for the roof is assumed to be 20 psf. We conclude that the existing building rooftop is adequate to support the existing and proposed T-Mobile equipment platform Loading. CONCLUSIONS & RECOMMENDATIONS Based on a comparison, the proposed effective weight for the final loading is within tolerances of the allowable design loading. We conclude the final T-Mobile loading will not have an impact on the structural integrity of the building structure.