HomeMy WebLinkAboutEP102 - ROOF OWER & SYSTEMS PLANEF-1
ACCU-3
ACCU-1ACCU-2
HV-1
HA-16,18,20
LC-14,16LC-19,21
LC-18
LC-20,22
LC-23
LC-23 LC-23
LC-23
LC-23
WP
GFI
WP
GFI
WP
GFI
WP
GFI
WP
GFI
PF-1
LC-24
RH-1
LC-25
LC-23
WP
GFI
LC-23
WP
GFI
RTU-1 (ALTERNATE)
DP-9
SCALE:
ROOF POWER & SYSTEMS PLAN PLAN
3/32" = 1'-0"
1
N
0 24'16'8' CIRCLE DESIGN GROUPRTL BKS
ROOF
POWER &
SYSTEMS PLAN
EP102
A. SEE SHEET E-000 FOR ELECTRICAL SYMBOLS AND
ABBREVIATIONS.
B. WIRING SYSTEM SHALL BE CONDUIT AND CONDUCTOR.
MINIMUM WIRE SIZE SHALL BE #12 AWG. USE SOLID
CONDUCTOR #10 AWG AND SMALLER, USE STRANDED IN
LARGER SIZES.
C. ALL COVER PLATES FOR ELECTRICAL DEVICES SHALL BE OF A
COLOR TO MATCH THE AREA COLOR SCHEME AS DIRECTED BY
THE ARCHITECT.
D. FURNISH AND INSTALL ALL INTERCONNECT WIRING FOR
MECHANICAL AND PLUMBING EQUIPMENT FURNISHED BY
OTHERS
E. TELE/DATA, AV AND ALL LOW VOLTAGE SYSTEMS ARE ROUGH
IN ONLY. PROVIDE ROUGH IN AND CONDUIT/ RACEWAY.
F. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS,
ROOM AND AREA FINISHES, CEILING PLANS, DOOR SWINGS,
FIRE RATED PARTITIONS, CABINET AND CASEWORK DETAILS.
G. PROVIDE BRANCH CIRCUIT WIRING AS REQUIRED FOR ALL
EQUIPMENT FURNISHED BY OTHERS.
H. FINAL DETERMINATION OF FIRE AND/OR SMOKE STOPPING
REQUIREMENTS SHALL BE BASED ON LOCAL CODE
REQUIREMENTS. SEE COVER SHEET FOR ADDITIONAL
INFORMATION.
I. ALL WORK SHALL COMPLY WITH NATIONAL, STATE AND LOCAL
CODES AND ORDINANCES PERTAINING TO THE WORK IN THIS
PROJECT.
J. EXPOSED CONDUIT SHALL BE RUN PARALLEL TO AND AT
RIGHT ANGLES TO THE BUILDING LINES.
K. PROVIDE A TYPED UPDATED SCHEDULE TO BE INSTALLED IN
THE PANEL AND INCLUDED IN THE AS BUILT DRAWINGS.
L. RECEPTACLES SHALL BE A MAXIMUM OF +18" ABOVE
FINISHED FLOOR TO THE CENTER OF THE DEVICE. UNLESS
NOTED OTHERWISE.
M. REFER TO ELECTRICAL CONNECTION TO MECHANICAL
EQUIPMENT SCHEDULE FOR DISCONNECT SWITCH
REQUIREMENTS.
N. ALL EXTERIOR EQUIPMENT AND DEVICES SHALL BE
WEATHER PROOF AND RAIN TIGHT.
O. ALL DEVICES AND EQUIPMENT MARKED "EX." ARE EXISTING
TO REMAIN. PROTECT DURING CONSTRUCTION.
P. FOR DEVICES MARKED WITH " N# " SQUARE CALLOUTS
REFER TO ELECTRICAL CONNECTION TO TENANT
EQUIPMENT SCHEDULE.
Q. ELECTRICAL CONNECTION TO HV-1 I BASE BID.
ELECTRICAL CONNECTION TO RTU-1 IS ALTERNATE. IF
ALTERNATE IS ACCEPTED PROVIDE DUCT SMOKE
DETECTORS AS REQUIRED.
GENERAL SHEET NOTES
P:\2018\18183 Lakeside ATAPCO Braunability CSO\Tenant\Dwgs\Elec\EP102.dwg, 6/18/2020 5:58:37 PM, rlamb11/04/20