Loading...
HomeMy WebLinkAboutLEG28 S100.2 First Floor FramingKey Notes General Notes 1. REFER TO SHEET 0N.1 FOR GENERAL NOTES. 2. ALL SECOND FLOOR CEILINGS TO BE 8'1" ABOVE SUBFLOOR UNLESS OTHERWISE NOTED. 3. FRAME TOP OF ALL WINDOWS @ 1'0-1/4" BELOW TOP PLATE UNLESS OTHERWISE NOTED. 4. ALL DROPPED INTERIOR HEADERS TO BE DROPPED 1'-0" FROM CEILING UNLESS OTHERWISE NOTED. First Floor Framing Plan Elevation "A" RESIDENCE FOR:Sheet InformationHouse Name: Series: Plan No.: Job Number: Copyright © 2015, (2019) The Drees Company. All Rights Reserved. ALI 7237 DELMONT DRIVE LEGACY Drawing Date: Coord Name: Coord Phone: LEG-0028-00 09/09/20 MELISSA PINGEL-HYATT 859-578-4290 the SHELBURN 900 EAST 96TH STREET, SUITE 100, INDIANAPOLIS, IN 46240 PHONE: [317] 347-7300 Drawing Scale: 1/8" = 1'-0" 2.02F 42" HIGH WALL 5 6 7 8 9 10 1 2 3 4 15 16 17 18 19 20 11 12 13 14 RE: DETAIL C/7.01 FOR STAIR FRAMING -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 2 19'-7 1/2" 16'-1"12'-4 1/2" 4'-1 1/2" DNGAMEROOM 4'-7 1/4" 4'-6 3/4" 20'-2 1/2" 4040 SLIDER 17'-8"14'-2" 10'-0 1/2" 4 SLOPE TO 8'1"7'1" HIGH WALL7'1" HIGH WALL5'-2"3'-9 1/2"5 1/2"2'4"2'4"5'-0" 3'-6"WIC BATH 8 1/2" 11'-0 1/2" 4040 SLIDER 8'-2"5'-0" 5 1/2"5'-2" 3'-0" 4'-0" 11/24/20