Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ALB13 First Floor System
FP Supply310 S Kitley AveIndianapolis, IN 46219; 317-357-8011These placement plans have been prepared with the specifications of TrussJoist products based on project information provided. This service is solely intendedfor product application assurance; and, is not intended to circumvent the needfor a design professional as determined by the building codes. The designerof record and/or builder/framer is responsible to assure these drawings arecompatible with the overall project. These documents are not intended to replacethe building plan (which should be used to determine bearing placement).Please insure measurements of the foundation match those provided at the timeof design. Builder is responsible to place load bearing members in load path.Architectural Drawings Prepared By: Drees HomesStructural Drawings Prepared By:84 Lumber CompanyMike T LeeDrees IndyALB-13Rev.aBy Date GL 10/11/2020CommentsAdded HVAC Hole per AirtronDrawn By:GLChecked By: Date:10/6/2020Monticello E 2020-1100GLa Sheet 1 of 2 First Floor System Not to Scale Confirm this layout with Drees Homes. Make sure all discrepencies are corrected before installing this floor system. All Dimensions are Approximate and Must Be Field Verified. TJI 210 TJI 360 TJI 560 Joists by Series Kitchen Island Mechanical Chase Hatch Legend 11-7/8" TJI 19.2" oc spacingFraming Connector Summary PlotID Qty Manuf Product Design Method Face Nails Top Nails Member Nails Skew Backer Blks Filler Web Stiff H1 7 Simpson HUS1.81/10 Designed 30- 10dx1.5 - 10- 10d - No No No H2 6 Simpson IUS2.06/9.5 Designed 8- 10dx1.5 - 2- 10dx1.5 - No No Yes H4 4 Simpson IUS2.06/11.88 Designed 10- 10dx1.5 - 2- Strong-Grip - No No No Products PlotID Length Product Plies Net Qty F28' 28' 0" 11 7/8" TJI 210 joist 1 3 F18' 18' 0" 11 7/8" TJI 210 joist 1 10 F12' 12' 0" 11 7/8" TJI 210 joist 1 1 F8' 8' 0" 11 7/8" TJI 210 joist 1 4 F4' 4' 0" 11 7/8" TJI 210 joist 1 3 X40' 40' 0" 11 7/8" TJI 560 joist 1 6 X36' 36' 0" 11 7/8" TJI 560 joist 1 3 X22' 22' 0" 11 7/8" TJI 560 joist 1 3 X20' 20' 0" 11 7/8" TJI 560 joist 1 29 X18' 18' 0" 11 7/8" TJI 560 joist 1 2 M1-2 20' 0" 1 3/4" x 11 7/8" 2.0E Microllam LVL 2 2 TS1-3 22' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 3 3 TS2-2 20' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 4 TS3 8' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 1 TS4 6' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 2 TS5 4' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 2 STRm1 16' 0" 1 1/8" x 11 7/8" TJ Rim Board 1 16 Accessories PlotID Length Product Plies Net Qty 9 1/8" 3/4" x 2 5/16" Web Stiffeners 1 12 23/32"x4'x8' OSB Sheathing (48/24) 1 66 Blocking PlotID Length Product Plies Net Qty FBk1 1' 6" 11 7/8" TJI 210 joist 1 3 FBk2 1' 6" 11 7/8" TJI 210 joist 1 5 FBk3 1' 6" 11 7/8" TJI 210 joist 1 1 FBk1 1' 0" 11 7/8" TJI 210 joist 1 1 FBk2 1' 0" 11 7/8" TJI 210 joist 1 3 FBk3 6" 11 7/8" TJI 210 joist 1 1 XBk1 1' 6" 11 7/8" TJI 560 joist 1 12 XBk2 1' 6" 11 7/8" TJI 560 joist 1 1 XBk2 1' 0" 11 7/8" TJI 560 joist 1 1 XBk3 1' 0" 11 7/8" TJI 560 joist 1 2 XBk3 6" 11 7/8" TJI 560 joist 1 2 STBk1-2 1' 0" 1 1/8" x 11 7/8" TJ Rim Board 2 2 LEVEL NOTES Current Date: 10/11/2020 File Name: 2020-1100GLa Drees Indy ALB-13.jvl Level Name: First FLoor System Building Code - Design Methodology: IBC 2006 Members with Design Overridden: TJ-Pro Rating (Weighted Average): 40 Minimum Level TJ - Pro Rating & Joist: TJ-Pro rating = 35, joist = F18'(i46592) Maximum Level TJ - Pro Rating & Joist: TJ-Pro rating = 67, joist = F8'(i46716) FLOOR Floor Container: FC10 Use/Occupancy: ResidentialLivingAreas Floor Area Loading is: 40.0 lb/ft² Live Load & 10.0 lb/ft² Dead Load Operator Added Additional Loads Maximum Allowed Deflection: L/480 Live Load & L/240 Total Load TJ-Pro Rating Information: Weighted Average: 40 Directly Applied Ceiling: None Decking Attachment: Glue and Nail Decking Material: 23/32"x4'x8' OSB Sheathing (48/24) Perpendicular Partition: No Strapping at max 8' o.c.: None Blocking at max 8' o.c.: No Poured Flooring: No A3 A3 A3 A3 A3 A3 A3 A3 CS B1 A3 CS CS CS B1 B1 A3 CS B1 B4 B1 B4 B1 B1 B1 B4 B1 CS Steel BeamSteel Beam M1-2 TS2-2 TS5 F12' F28' F18' X36' X36' X20' X20' X20' X20' X20' X20' X20' X20' X20' X20' STRm1 STRm1 STRm1 STRm1 STRm1STRm1STRm1 STRm1STRm1STRm1F18' F18' F18' F18' F28' F28' F18' F18' X36' TS1-3 17' 10" Toilet STRm1 TS5TS3 3' 7" 3' 10 1/2"19' 2" STRm1 20' 2" F18'STRm1 2' 0" 14' 0"STRm11' 7 3/16" 9 9/16" 1' 7 3/16" 1' 1 3/16" 8" 1' 7 3/16"9 5/8"1' 7 3/16" 1' 6 1/2" STRm1STRm11' 0" 8"Hole 8" Round Hole F18' F18' B1 CS CS B1 16' 11" CS FBk3FBk2 FBk1 FBk123' 5" X20' X20' X20'STBk1-2 11' 7 1/2" 12' 3 1/2" 14' 8" 7' 5 1/2"B1 H157' 2" X20' X20' X20' X20' X20' X20' X20' X20' X20' X20' X20' 12' 1 1/2" 2' 0"TS2-2STRm1 TS4F4' F4' F4' TS46' 0" 5' 0"H2 H2 H2 STRm1 STRm1 34' 2" 14' 0"21' 1"4' 6" 12' 7" 4' 6 1/2" Shower 1' 4 5/8"5 9/16"1' 4 3/16"9"1' 7 3/16" 10 3/16"H2 H1 H1H1 H1H1H1 X40' X40' X40' X18' X40' X18' X40' X40'XBk1X22'XBk2XBk1 XBk1X22'XBk3 X22' 8"Hole 8" Holes 8" Holes 6" Holes H2 7" Holes H2 6" Holes 6" Holes X20'F8'F8'H4 H4 4.4" bearing required. 5-1/2" bearing required. HVAC holes are as close to the steel beam as allowed. Elevator Shaft 12/03/20