Loading...
HomeMy WebLinkAbout2020_Keystone_Parkway_SMA_Resurfacing_-_Corrected DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE City of Carmel Project 20-04 2020 Keystone Parkway SMA Resurfacing CHANGE ORDER # 01 Additional construction signage was required to maintain safe traffic flow through the work zone. Additional description included in Change Order document. Contract Price prior to this Change Order $2,599,378.39 Contract Price will be increased/decreased by this Change Order $5,830.87 New Contract Price including this Change Order $2,605,209.26 Amount Adjusted Contract Cumulative% Change Price from Original Contract Original Contract $2,599,378.39 $2,599,378.39 N/A CO 01 $5,830.87 $2,605,209.26 0.22% • DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE CITY OF CARMEL 10: CONTRACT CHANGE ORDER NO.: 1 DATE: 10/13/2020 PROJECT NAME: 20-04 CITY REQ. NO.: CITY PO NO.: CITY PO DATE: 1. You are directed to make the following changes in this Contract: (Brief Description) SCHEDULED ADJUSTMENT ITEM AMOUNT (_+) OR(-) DAYS See Change Order Document Attached. I.I. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C.No.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 2,599,378.39 Contract Price will be increased/decreased by this Change Order $ 5,830.87 New Contract Price including this Change Order $ 2,605,209.26 Contract Time Prior to this Change Order Days Completion Date Net increased/decreased resulting from this Change Ordei 0 Days Current Contract Time including this Change Ord. Days Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved: Recommended Accepted: �DucuSigned by: American Structurepoint, Inc. Rieth-Riley Construction Co., Inc. icvAiGs fraivw1 ENGINEER CONTRACTOR James Brainard, Mayor • 9025 River Road 1751 W. Minnesota Street ,,;,u,;t fxolt, Address Address M"°r Ann Burke, Member Suite 200 (A) Ow C ae. LOrI Watson, Member Indianapolis, IN 46240 Indianapolis, IN 46221 City/State/Zip City/State/Zip Jeremy Kashman, PE. City Engineer ON C sl9red br Da.nA s=o MS „>.,,....... ....:. e+eea4lC�amri.rwm ATTEST: y: y,a,_._r.s.. x Y David A. Salo OU=Eo pee �.,N� Timothy P CDnartae,PE u-�r�v"f'.a �'�.- , au=Ene„eenn9 cH=Dawa 4 Salo Dalo 2020 10 13 Q 244704,Xt r—DoeuSigned by: Phone: 317-401-0263 Phone: 912-371-9523 I Cup hthavil 683AB9D7A9844C5 Site Wolfgang, Clerk Date: 10/13/2020 Date: 10/13/2020 Dale: 12/3/2020 Version 2016-08-31 AR-6 DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE • i I American Structurepoint, Inc. Change Order Details #20-04-2020 Keystone Parkway SMA Resurfacing Project Description Resurfacing Keystone Parkway Mainline,Shoulders,Gore Areas,and Ramps from 400 feet north of 98th Street to approximately 3400 feet north of 136th Street Prime Contractor Rieth-Riley Construction Co.,Inc Change Order 1 Status Pending Date Created 10/12/2020 Summary Additional Maintenance of Traffic Change Order Description Originally,the project was set up under the premise that the Contractor would be using more of a moving operation during the re-surface of Keystone Parkway.Actually,Rieth-Riley Construction utilized a 24/7 lane restriction through the length of the project to accommodate the surface milling and HMA paving operations working concurrently in the same direction This lane restriction required additional signage at the entryiexit ramps to aid the travelling public in navigating the work zone.The City of Carmel requested this additional signage to aid traffic Clow The following additional signage was utilized... YIELD signs were deployed at each Exit ramp.There are 5 Exits in each direction equaling a total of 10 Yield signs deployed EXIT OPEN signs were deployed at each Exit ramp.There are 5 Exits in each direction equaling a total of 10 EXIT OPEN signs deployed. ONE LANE ROAD AHEAD signs were requested for each Entrance ramp as well as additional locations along the mainline.There are 5 Entrance ramps in each direction equaling 10 signs plus 2 additional signs deployed along the mainline.This is a total of 12 ONE LANE ROAD AHEAD signs A new pay item for Maintaining Traffic,Additional is being created to cover the cost of this additional construction signage. Awarded Project Amount $2,599,378.39 Authorized Project Amount $2,599,378 39 • Change Order Amount $5,830 87 Revised Project Amount $2,605,209.26 Change Order Details: 10/13/2020 #20-04-2020 Keystone Parkway SMA Resurfacing Project Page 1 of 2 Ii f I i i DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE I I New Items It i s �i.ii 3 l'.• ,II} ;f•; I?r.V l i is.. - 1:..i1` fi,, - ::71.'1:i 1 Wig:: Section:1-Description • 0021 801-06775 LS 1000 $5,830.870 $5,830.87 MAINTAINING TRAFFIC I' Reason:Additional Construction Signage I item Total:$5,830.87 uoe,k.r.ar T�wnr P-;: ...E a dV!erI MtI..gww. •,4 inn. Timothy P.Conarroe,PE ors..^,si�,.�,:n � .su4..cu.T.�e•r.t<..•�a-ac 10/13/2020 arzn•v.1311 uswm Project Engineer Date oiaxeny signed M Meld a seen DN Cs US.Esdeelosnee nley can, David A. Salo OtPoeT-Rdoy Conclusion, DU=Engneexing,CN.DaUtl A Rain Data:2O20.I0,a 11.0235-04'00' 10/13/2020 Contractor Date • Owner Date Change Order Details: 10/13/2020 #20-04-2020 Keystone Parkway SMA Resurfacing Project Page 2 of 2 •II I ! DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE j RIETH-RILEY CONSTRUCTION ' I EXTRA WORK AGREEMENT DATE: 9/23/20 Work Performed: Additional Signage&MOT CONTRACT: 3200838120-04 PROJECT: Keystone Parkway FORCE ACCOUNT/EXTRA WORK FOR: No MOT plans orsigna9e provisions.Street Department and City of Carmel requested additional signage,above and beyond,normal MOT resurfacing. LABOR 109.05(b)(1) HOURS EMPLOYEE Regular Overtime ' Doubletime TOTAL RATE EXTENSION CARPENTER 0.00 $28.86 $0.00 CARPENTER FOREMAN 0.00 $30.86 $0.00 COMBINATION 0.00 $32.01 $0.00 FINISHER - 0.00 $27.60 $0.00 FOREMAN 0.00 $39.48 $0.00 LABORER(INITIAL SET_UPS) 32.00 32.00 $26.60 $851.20 MECHANIC 0.00 $39.48 $0.00 I, OPERATOR(103) 0.00 $38.48 $0.00 OPERATOR(841) 0.00 $35.25 $0.00 OPERATOR OILER(103) 0.00 $32.51 $0.00 CIA TECH 0.00 $26.60 $0.00 SUPERINTENDENT/PROJECT MANAGER 0.00 $48.48 $0.00 TEAMSTER 0.00 $31.41 $0.00 TOTAL LABOR $851.20 (2) FICA 7.50 % x LINE(2) $63.84 (3) • FRINGES EMPLOYEE HOURS RATE EXTENSION CARPENTER 0,00 X $24.81 = $0.00 CARPENTER FOREMAN 0.00 x $24.81 = $0,00 COMBINATION 0.00 X $16.54 = $0.00 FINISHER 0.00 x $16.38 = $0.00 FOREMAN 0.00 X $19.71 = $0.00 LABORER(INITIAL SET_UPS) 32.00 X $16.38 = $524.16 MECHANIC 0-00 X $19.71 = $0.00 OPERATOR(103) 0.00 X $19.71 = $0.00 OPERATOR(841) 0.00 x $23.21 = $0.00 OPERATOR OILER(103) 0.00 X $19.71 = $0,00 • QA TECH 0.00 X $16.38 = $0.00 SUPERINTENDENT/PROJECT MAN 0.00 X $19.71 = $0.00 TEAMSTER 0.00 x $16.54 = $0.00 ' TOTAL FRINGES $524.16 (4) WORKERS COMPENSATION 4.70 % X LINE(2) $40.01 (5) BODILY INJURY!PROPERTY DAMAGE INSURANCE 0.00 % X LINE(2) $0.00 (6) STATE UNEMPLOYMENT 3.85 % X LINE(2) $32.77 (7) FEDERAL UNEMPLOYMENT 0.40 % x LINE(2) $3.40 (a) , TRAVEL ALLOWANCE OR SUBSISTENCE(NOTE#3) $0.00 (9) TOTAL LINES 2,3,4,5,6.7.8&9 $1,515.38(Io) 20% x LINE(10) $303.08(11) • GRAND TOTAL LABOR LINES(10)+(11) $1,818.46(12) i Page 1of2 DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE MATERIAL 109.05(b)(31 Rechasetl u Manufactured Description Quantity Unit Unit Pnce Extension P $ F $ • $ • $ $ - $ i 5 - $ - MATERIALS PURCHASED $0.00 (18) MATERIALS MANUFACTURED $0.00 (19} TOTAL: LINE(18}•(19) $0.00 (20) 12% nLINE(20) $0.00 (21) GRAND TOTAL FOR MATERIALS:LINE(20)*(21} $0.00 (22) EQUIPMENT 109.051I)(41 Equipment N CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE HOURS EXTENSION P22-168 Foreman Truck $29.34 32.00 $938.80 $0.00 $0.00 $0.00 50_00 _ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0-00 $0.00 $0.00 $0.00 $0.00 $0.00 Trucking-Straight Time $0.00 $0.005 , Trucking-Over Time $0.00 $0.00 Trucking-Double Time $0.00 $0.30 TOTAL EQUIPMENT $938.88 (23) i 1 TOTAL TRUCKING $0.00 (24) FUEL.LUBRICANTS ANI3 TRANSPORTATION COSTS $15.50 (25i TOTAL LINES(23)t(24)t(25) $954.38 (26) 52% X LINE(26) $114.53 (27) GRAND TOTAL FOR EQUIPMENT:LINES(26)*(27) $1,088.91 (28) SUBCONTRACTORS 109.05(b)(6) DESCRIPTION AMOUNT Indiana Sign&Barricade(RI24163) $840.00 Indiana Sign&Barricade(RI24319) $1,143.00 Indiana Sign&Barricade(RI24666) $872.00 • TOTAL SUBCONTRACT $2,655-00 (29) 10% x LINE(30)$3.000.00 OR LESS $285.50 (31) • 7% x LINE(30)OVER S3,000.00 $0.00 (32) • ORAL,GRAM/TOTAL FOR SUBCONTRACTORS:LINES{30).(31)L(32) $2,920.50 (33) • • TOTAL OF WORK COMPLETED FOR THE WEEK • TOTAL LINES(12).(17).(22).(28)E(33) $5,807.87 (34) 0.36 %BONO RATE BASED UdONLINE(34) $20.91 (35) 10%x LINE(35) $2.09 136) TOTAL EXTRA WORK LINES:(34)•(35)•(38) $5,830.87 {37) UNITS UNIT PRICE $0.00 Page 2 of 2 i � • DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE Indiana Sign &Barricade, Inc. INVOICE 5240 E. 25th Street Indianapolis, IN 46218 Invoice Number: RI24163 INDIANA Phone No.: 317.377.8000 Invoice Date: 7/13/2020 SIGN1BARRIEADE Fax No.: 317.377.8008 Page: 1 Home Page:www.indianasb.com E-Mail:AR@indianasb.com Bill Ship To: Rieth Riley Indianapolis To: Rieth Riley Indianapolis PO Box 276 1751 W Minnesota St, Indianapolis, IN Indianapolis, IN 46206 Light Sales payableindy@rieth-riley.corn Ticket 34151 P.O. Number • Customer ID CU00065 P.O. Date 5/12/2020 ShipVia Our Order No. R004362 Terms Net 30 Days Due Dale 8/12/2020 'Email all pay estimates, lien waivers, and payment remittances to AR@indianasb.com • Item/Description Quantity Unit Price Total Price LIGHTAC 24.00 35.00 840.00 • Light A(Flasher) EA • • • • • • • Tax Tax B a Base Tax Amount Total: 840.00 • IN-STATE 840.00 0.00 • • DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE • i Indiana Sign& Barricade, Inc. INVOICE i 5240 E. 25th Street i Indianapolis, IN 46218 Invoice Number: R124319 I INDIANA Phone No.: 317.377.8000 Invoice Date: 7/31/2020 SIGNtBARRICALl Fax No.: 317.377.8008 Page: 1 INIMINP' Home Page: www.indianasb.com E-Mail: AR@indianasb.com Bill Ship To: Rieth Riley Indianapolis To: Rieth Riley Indianapolis PO Box 276 Keystone Parkway Pavement Markings Indianapolis, IN 46206 Ticket 34196,229, 239, 289 payableindy@rieth-riley.com . P.O. Number 3200838 : Customer ID CU00065 P.O. Date 7/21/2020 ShipVia Our Order No. 20088R1 • Terms Net 30 Days i Due Date 8/30/2020 • *Email all pay estimates, lien waivers, and payment remittances to AR@indianasb.com Item!Description Quantity Unit Price Total Price SA-VAR 165.00 3.00 495.00 Yield EA Shipping Details . Date Transaction Quantity Net Qty Rented Unit Price Rent/Period From Thru No.of Periods Price • 07/14/20 Delivery 5 5 3.00 per Day 15.00 07/14/20 07/16/20 3 45.00 07/17/20 Delivery 5 10 3.00 per Day 30.00 07/17/20 07/31/20 15 450.00 i • SA-VAR 120.00 3.00 360.00 • Exit R Arrow EA • Shipping Details Date Transaction Quantity Net Qty Rented Unit Price Rent/Period From Thru No.of Periods Price 07/20/20 Delivery 10 10 3.00 per Day 30.00 07/20/20 07/31/20 12 360.00 • SA-OLRA 96.00 3.00 288.00 One Lane Road Ahead EA • Shipping Details Date Transaction Quantity Net Qty Rented Unit Price Rent/Period From Thru No.of Periods Price 07/24/20 Delivery 12 12 3,00 per Day 36-00 07/24/20 07/31/20 8 288.00 Tax Tax Base Tax Amount Total: 1,143.00 IN-STATE 1,143 00 0.00 DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE INVOICE Indiana Sign& Barricade, Inc. 5240 E. 25th Street Invoice Number: RI24666 IN D I A N A Indianapolis, IN 46218 Invoice Date: 9/3/2020 5IGY88ARRICADE Phone No.: 317.377.8000 Page: 1 Home Page: www.indianasb.com E-Mail:AR@indianasb.com Bill Ship To: Rieth Riley Indianapolis To: Rieth Riley Indianapolis PO Box 276 Keystone Parkway Pavement Markings Indianapolis, IN 46206 Ticket 34196, 229, 239,289„ 656 payableindy@rieth-riley.com P.O. Number 3200838 Customer ID CU00065 P.O. Date 7/21/2020 ShipVia Our Order No. 20088R1 Terms Net 30 Days Due Date 10/3/2020 "Email all pay estimates, lien waivers, and payment remittances to AR@indianasb.com Item/Description Quantity Unit Price Total Price SA-VAR 70.00 3.00 210.00 Yield EA Shipping Details Date Transaction Quantity Net Qty Rented Unit Price Rent/Period From Thru No.of Periods Price Bal.Carry 08/01120 Forward 10 3.00 per Day 0.00 08/01/20 08/07/20 7 0.00 � I SA-VAR 70.00 3.00 210.00 Exit R Arrow EA Shipping Details Date Transaction Quantity Net City Rented Unit Price Rent/Period From Thru No.of Periods Price Bal.Carry 08101/20 Forward 10 3.00 per Day 0.00 08/01/20 081137120 7 0,00 • SA-OLRA 84.00 3.00 252.00 • One Lane Road Ahead EA • • Shipping Details • Date Transaction Quantity Net Qty Rented Unit Price Rent/Period From Thru No.of Periods Price Bal.Carry 08/01/20 Forward 12 3.00 per Day D_00 08/01/20 08/07/20 7 0 00 Revised August Rental • • Total: 672.00 f i