HomeMy WebLinkAboutUtilities_Change_Order_11-13-2020 (2) DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE
November 2, 2020
Doug,
The attached Change Order for$90,604 is to add additional sewer lining work to the original contract
that was for$644,370.This project is being funded via a loan from the Indiana Finance Authority(IFA).
The budgeted $ amount was for$1,100,000.We received very good pricing and would therefore like to
do more work under the existing contract.The IFA has approved the Change Order but it also requires
our BPW to sign it.
The additional work is for items that we have unit prices for,and it does not exceed 20%of the original
contract.
I would like to have this on the next available BPW meeting for approval.Thank you.
fin/ohn 14u4ff
Director of Utilities
DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE
A-,-:;:77-.)./ ri !)y. _44.. ___.-
ii a r ►e1 Utilities 0
CHANGE ORDER
Change Order No. 1 , .,.i_..e,,
Date: 10/13/2020
Contract Date: April 2020 �,;;,:.
Name of Project: 2019 CIPP Sewer Lining ' s`�,',..w''
Owner: City of Carmel
Contractor: SAK Construction LLC.
The following changes are hereby made to the Agreement:
Description of Change in Work: See Attached Description of Changes
Justification:
Original Contract Price: $644,370.00
Previous Changes to Contract Price: $0
Current Contract Price adjusted by previous
Change Order(s): $644,370.00
The Contract Price due to this Change
Order will be increased by: $90,604.40
The new Contract Price including this
Change Order will be: $734,974.40
Change to Contract Time:
The Contract Time will be adjusted by 90 calendar days.
(Date)
Requested by: City of Carmel 10/13/20
(Owner) (Date)
.� =�,,.> J �-
-Zo Recommended bq �" �. /.
(Consulting Engineer) (Date)
Accepted by: SAK Construction LLC
(Contractor)
CI
Chris Vogt- Project Manager 10/13/2020
(Name and Title) (Date)
2019 CIPP Lining A-25 CITY OF CARMEL
Change Order Form
DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE
ä 'meI UtilitiesJi
,, s,
Approved By
Owner:
City of Carmel, Indiana
Board of Public Works
DocuSlOned by:
By: 3asio 1JraitnarL
ertnina&gard Member
By:�Daeu8igned by:
(Ari (Mot
L I iiDi .:atTbn Board member
r—DoeuSIgned by:
By: ktni huk,Wit, _
_a6F DVPHc4Buebtird Member
Date: 12/2/2020
One Copy—Owner
One Copy—Contractor
One Copy—Engineer
•
2019 CIPP Lining A-25 CITY OF CARMEL
Change Order Form
DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE
10/13/2020
CIPP Change order
PCO Description Cost
1 Prevailing wage rate increase from 2019 to 2020 $1,946.90
2 Heavy Sewer Cleaning $12,375.00
3 Inside M.H. Drop $3,740.00
4 Additional CIPP Lining $116,453.00
5 Added Lining Lateral Cut outs -47@$80 $3,760.00
6 Added Lining Mobilazation $7,000.00
7 Under Run From Original Contract -$54,670.50
8
9
10
11
12
Total Change order amount
$90,604.40
DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE
riS A „" 636.38 .100
8651fax
8641 Hoff Road
O'Fa:lun,MO 6336E
Pipeline Infrastructure.Solved." www.sakcon.com
Date: 4-28-2020
Jones& Henry Engineers, Ltd.
1980 E 116th St
Carmel, IN 46032
Attn: Tom Schreiber
RE: City of Carmel 2019 Sewer Lining Project
SAK Construction bid the above referenced on September 4th, 2019 using the 2019
Davis Bacon Wages. Due to the delay in contracts and notice proceed, the sewer lining
project will be constructed in 2020 under increased wages. Summary below:
2019 Wage Fringe Total
Utility Laborer $ 24.27 $ 15.70 $ 39.97
2020 _ Wage Fringe Total
Utility Laborer $ 25.10 $ 16.17 $ 41.27
_ 1
Increase per Hour $ 1.30
Estimated Hours 1,600
Total Job Footage 21,000
Increase Per LF $ 0.10
SAK is requesting an increase to the contract price for CIPP line items 2a, 2b, and 2C.
If you would like to discuss in further detail, please call me at 636-248-8884
SAK Construction LLC
Signed:
Chris Vogt, Project Manager
DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE
Description Unit Unit Cost QTY Total Cost
Prevailing wage rate increase from 2019 to 2020 LF $0.10 19,469 $1,946.90
DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE
Description Unit Unit Cost Hours Total Cost
Heavy Cleaning (more than 3 passes) HR $495.00 25 $12,375.00
DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE
636.3a5.100 tel
SAK _
6.3a5.11 fax
86
864 I la ff Rum!
.�" O'Faaun,MO 63366
Pipeline infrastructure.Solved.'" www.sakcon.com
Date: 6-8-2020
Jones & Henry Engineers, Ltd.
1980 E 116th St
Carmel, IN 46032
Attn: Tom Schreiber
RE: City of Carmel 2019 Sewer Lining Project
SAK Construction subcontracted the sewer main cleaning scope to David Mason and
Associates. During the first week of cleaning, multiple lines required
tuberculation/calcium removal in preparation for the CIPP liner. Spec Section 01010-
2.01 B states bid item includes light cleaning, up to three passes. SAK is requesting an
hourly rate line item added to the contract for$495.00 per hour. This line item is owner
directed and verified prior to heavy cleaning.
item No. Description Unit Unit Cost
2E Heavy Cleaninpjmore than 3 passes) HR $ 450.00
SAK Construction Overhead (10%) HR $ 45.00
TOTAL $ 495.00
Backup documentation attached
If you would like to discuss in further detail, please call me at 636-248-8884
SAK Construction LLC
Signed: (ifi Vogt _ _ p
Chris Vogt, Project Manager
DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE
& DAVID MASON
+ A SSO CI A TES 314.534.1030
SERVICES PROPOSAL
SAIt Construction
Carmel IN
Heavy Cleaning
June 5,2020
SCOPE OF SERVICES
David Mason+Associates, is pleased to submit for your consideration our quote on the above referenced
project. DMA will use the proposed price below for all Heavy Cleaning with approval from the engineer. Heavy
Cleaning will consist of tuberculation/calcium removal with the chain knocker or root saw,also when 3 or more
passes with the jetter/vactor is required to complete the cleaning of the sewer line for CIPP insertion.
Inclusions:Equipment, crew to complete the project.
EXCLUSIONS
Access to manholes, Bypass over pumping, permits (other than water), Bond (if required add 1.5%),Traffic
control (other than cones).
COMPENSATION
$450.00 per hour
ADDITIONAL SERVICES
Any additional services requested can be completed at an agreed upon hourly rate.
SCHEDULE
Will be completed at the mutually agreed upon schedule.
SUBCONTRACTORS
N/A
David Mason+Associates,thanks you for this opportunity to submit our proposal for the above described
project. If you require clarification or have any questions, please do not hesitate to contact Spencer Mason at
314-409-2275.
Sincerely,
Matt Mortimer-Lead Estimator
DAVID MASON+ASSOCIATES
t Louis Chicago I Philadelphia • davidmason.com
DocJSign Envelope ID:A7F9746E-7D86-4267-AAA4-0745A105ADCE
Description Unit Unit Cost OTY Total Cost
8"dia x 8 VET Refiner Inside Drop EA $1,760.00 1 $1,760.00
10"dia x 12 VFT Refiner Inside Drop EA $1,980.00 1 $1,980.00
$3,740.00
DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE
O000000ooa'
OoC L 0000p Qp00pH
64 4'1 QI 00 CD CD NI: CO CD CD EN; M 00 O.I
75 h M INN- COIN CO. N CD
6 CA E� �
I- >. C) ' 69 (f� 69 2i
o4') O OOO CD
..,J
ON41CnapOp0CDO
pOpt!) Cb co POM0CNCO�7JNCr�
C It) 66AA 664469 6N96969
dUl
pp
•
SO'SOO0000
C CD (U Ni r- I` r r-- at
7 i 'O CO
CS
0 •
U -
Joo O O O OHO 0 0 0
,• 4
c OPt1 to COO — NMNCif
Q Nt
• !CD CD 0 0 OY 00 0"0
• ;0000 Oo
C ' - ppOOOO +15N pppp CD
Cu O � MCM') CO cJ
C7 , O M
▪ '
al
r
• J J J J W W > > LJJ
C
o
U 0.
C 2 C 0
g c .0 C
OCavm
a) cci c c om as
C 'c 'c cF- c d
J 1 m eC R C
J
N CL 5
41 CD p CC U
OC NV." jU- F- O- W
0 —
ooc _'c
18a L . r
fl V U U c c C v 1-60ooa � 6r2 UU
0 T N on V tt7 Cif h CO CO
DocuSign Envelope ID:A7F9746E-7DB6-4267-AAA4-0745A105ADCE
ACKNOWLEDGEMENT
STATE OF INDIANA )
COUNTY OF .1- IOn ) SS:
Before me, a Notary Public in and for said County and State, personally appeared James
Brainard, Mary Ann Burke, and Lori Watson, by me known to be the Members of the City of Carmel
Board of Public Works and Safety,and Sue Wolfgang, Clerk of the City of Cannel, who acknowledged
the execution of the foregoing "Agreement" on behalf of the City of Carmel, Indiana.
Witness my hand and Notarial Seal this day of DUCE btt^ , 2020.
Jennifer I Stites
Notary Public Seal State of Indiana r C�
Hamilton County [
Commission Number NP0723135
My Commission Expires 10/22/2027 NOT PU IC
J S
My Commission Expires: Printed Name
My County of Residence: 14 6.41')
Date: ( o� J)-] ]
Docusign Envelope ID:A7F9746E-7DI36-4267-AAA4-0745A105ADCE
Approved and Adopted this 2nd day of December , 20 20
CITY OF CARMEL, INDIANA
By and through its Board of Public Works and Safety
BY:
c-DocuSigned by:
jaiNit,s braitA,arL
aNiVilliegiard Presiding Officer
Date:
-DocuSIgned by:
Atdrii burid. _ - -
'-6E37CA.nn C068E
Mary urke, Member
Date: 12/3/2020
DocuSIgned by:
Lori S. Watson, Member
Date: 12/3/2020
ATTEST:
DocuS y:
/Iggnned b
1. Ste-wbli y,,.t
7 B
Su683Ae Wo tkang,o Clerk
Date: