Loading...
HomeMy WebLinkAboutALB24 S200.2 Second Floor Subfloor Plan1 1 END JOISTEND JOIST1 2 1 1 2 22 1 @ 19.2" O.C.14" I-JOISTS@ 19.2" O.C. 14" I-JOISTS @ 19.2" O.C.14" I-JOISTS47'-3"39'-3"17'-4 1/2"2'-10" 3'-10 1/2" 13'-2" 1'-0" 1'-0"47'-3" 10'-2"6'-4" 10'-4" 20'-5" 2'-0" 37'-3"TO DRAIN C.L. 2'-0 1/2"@ 19.2" O.C.14" I-JOISTS@ 19.2" O.C.14" I-JOISTS12'-2"11'-10"51'-5"51'-5"1" 1 TO DRAIN C.L. 5'-9 1/2" TO DRAIN C.L. 8'-6 1/2" TO DRAIN C.L. 15'-1 1/2" TO DRAIN C.L. 17'-10"TO DRAIN C.L.4'-11"TO DRAIN C.L.8'-5"TO DRAIN C.L.18'-10 1/2"TO DRAIN C.L.19'-3"TO DRAIN C.L.8'-3 1/2"TO DRAIN C.L.1'-9 1/8"2'-3 1/2" 3ADD'L JOIST (UNDER WALL ABOVE)ADD'L JOIST(UNDER WALL ABOVE)ADD'L JOIST(UNDER WALL ABOVE)14'-0" 15'-7" 4'-10" 12'-10" RESIDENCE FOR:Sheet InformationHouse Name: Series: Plan No.: Job Number: Drawing Date: Coord Name: Coord Phone: Drawing Scale: 1/8" = 1'0" Contract Drawn By: ( ) The Drees Company. All Rights Reserved. Space for Architect Seal 900 East 96th Street, Suite 100, Indianapolis, IN 46240 Phone: [317] 347-7300 Born on Date: CDs Drawn By: Copyright © AMANKELDI 3558 MARSDALE COURT ALBANY PLACE ALB-0024-00 10/15/2020 MPH 3.02 Elevation "U" Second Floor Subfloor Plan 859-578-4290 the BUCHANAN EWT 08/27/2010 SSP 2010 2019 Key Notes: 1 2 3 4 5 6 -- 7 8 9 10 General Notes: -- -- -- -- -- -- 1. REFER TO SHEET 0N.1 FOR GENERAL NOTES. 2. FLOOR JOISTS TO BE 14" TJI 210 SERIES, OR EQUAL, @ 19.2" O.C., UNLESS OTHERWISE NOTED. 3. JOISTS ARE NOT TO BE PLACE DIRECTLY OVER INTERIOR PARALLEL WALL. (TO PREVENT UNEVEN FLOOR DEFLECTION FROM OCCURRING) 4. ADD'L JOISTS MAY BE LOCATED UP TO 2" AWAY FROM THE PARTITION WALL ABOVE IN CASES WHERE MECHANICAL PENETRATIONS BEAM BELOW -SEE SHEET 2.01S FOR MORE INFO BEARING WALL BELOW HVAC CHASE 11/25/20