ALB24 Second Floor System
Products PlotIDLengthProduct Plies Net Qty G40' 40' 0"14" TJI 210 joist 1 2 G38' 38' 0"14" TJI 210 joist 1 13 G20' 20' 0"14" TJI 210 joist 1 1 G18' 18' 0"14" TJI 210 joist 1 3 G16' 16' 0"14" TJI 210 joist 1 11 G14' 14' 0"14" TJI 210 joist 1 8 G4' 4' 0" 14" TJI 210 joist 1 4 GBk1 2' 0" 14" TJI 210 joist 1 3 S22' 22' 0"14" TJI 360 joist 1 5 TS1-2 8' 0" 1 3/4" x 14" 1.55E TimberStrand LSL 2 2 TS2 6' 0" 1 3/4" x 14" 1.55E TimberStrand LSL 1 1 RM1 16' 0"1 1/8" x 14" TJ Rim Board 1 12 Total Lengths Length Product 958' 0"14" TJI 210 joist 110' 0"14" TJI 360 joist 22' 0" 1 3/4" x 14" 1.55E TimberStrand LSL 192' 0"1 1/8" x 14" TJ Rim Board LEVEL NOTES Current Date: 11/4/2020 File Name: 2021-0003dh drees alb-24.jvl Level Name: 2nd-Floor Framing Building Code - Design Methodology: IBC 2018 Members with Design Overridden: TJ-Pro Rating (Weighted Average): 48 Minimum Level TJ - Pro Rating & Joist: TJ-Pro rating = 40, joist = G38'(i16163) Maximum Level TJ - Pro Rating & Joist: TJ-Pro rating = 61, joist = G14'(i16296) FLOOR Floor Container: FC2 Use/Occupancy: ResidentialLivingAreas Floor Area Loading is: 40.0 lb/ft² Live Load & 10.0 lb/ft² Dead Load Maximum Allowed Deflection: L/480 Live Load & L/240 Total Load TJ-Pro Rating Information: Weighted Average: 48 Directly Applied Ceiling: Gypsum 1/2" Decking Attachment: Glue and Nail Decking Material: 23/32"x48"x96" Weyerhaeuser Edge Gold Panel (0/24) T&G SF Perpendicular Partition: No Strapping at max 8' o.c.: None Blocking at max 8' o.c.: No Poured Flooring: No Start Spacing 19.2" O.C. Start Spacing 19.2" O.C. Framing Connector Summary PlotIDQty Manuf Product Design Method Face Nails Top Nails Member Nails Skew Backer Blks Filler Web Stiff H1 4 Simpson IUS2.37/14 Designed 12- 10dx1.5 - 2- Strong-Grip - No No No H2 4 Simpson IUS2.06/14 Designed 12- 10dx1.5 - 2- Strong-Grip - No No No B4 A3 A3 A3 A3 A3 A3 A3 A3 A3 CS CS CS CS B3W B3W B3W BBO35 BBO6TS1-2 BBO27 TS2BBO19Tub Shower Toilet Tub Toilet BBO17 BBO16 Toilet CS 10' 0 1/2" 6' 4" 14' 0" 15' 7" 17' 8" 10' 2"3' 10 1/2"12' 10 1/16" Tub G20' RM1RM1RM1RM1 RM1RM1RM1RM1 RM1 RM1 RM1 RM1 RM1 RM1 9 5/8" 1' 7 3/16" 9 5/8" 9 5/8" 1' 7 3/16" 9 5/8" GBk1 RM1 RM1 S22'G16' S22' G40' G18' G14'G16'G4' H2 G38' H1 37' 3 1/16"13' 2"19' 9"Deviation from plan. Flush beam inserted for better floor performance. No dimension given in plan set, so guessed on location. Beam dropped per plan, but some past layouts had the beam flush at top. Let me know if I need to revise. Mechanical Chase Kitchen Island Hatch Legend TJI 110 TJI 210 TJI 230 TJI 360 TJI 560 Joists by Series Architectural Drawings Prepared By: Structural Drawings Prepared By:84 LumberMike T. LeeDrees HomesALB-24 Buchanan URev By Date Comments Drawn By:DHChecked By: Release Date:11-4-20Job # 2021-0003DH Sheet 2 of 2 A complete Javelin ® framing plan requires the Trus Joist Installation Guide See the Trus Joist Installation Guide for Product Trademark Information SYMBOL LEGEND Bearing Length Requirements Point Load (Operator Added) Line Load (Operator Added) Area Load (Operator Added) Beam by Others Detail Callout Label (See Framer's Pocket Guide) Non-Load Bearing Wall Joist Under Wall Above BBO A10'UWALack of proper bracing during construction can result in serious accidents. Observe the following guidelines: WARNING NOTES: WARNING Joists are unstable until braced laterally Bracing Includes: Blocking Hangers Sheathing Rim Board Strut Lines Rim Joist DO NOT stack building materials on unsheathed joists. Stack only over beams or walls. DO NOT walk on joists that are lying flat. DO NOT walk on joists until braced. INJURY MAY RESULT. Weyerhaeuser, Microllam, Parallam, TimberStrand, TJI, TJ, and Trus Joist are registered trademarks of Weyerhaeuser NR. ©2014 Weyerhaeuser NR Company. All rights reserved. 1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI ® joists must be completely installed and properly nailed. 2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also be accomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay. 3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist. Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker or one layer of unnailed sheathing. 5. Ends of cantilevers require safety bracing on both the top and bottom flanges. 6. The flanges must remain straight within 1/2" from true alignment. 4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system.Second Floor System Scale: 1/4" = 1'0"These placement plans have been developed for the specificationof products based on project information provided. This service is solelyintended for product application assurance; and, is not intended tocircumvent the need for a design professional as determined by thebuilding code. The designer of record and/or builder/framer is responsibleto assure these drawings are compatible with the overall project.11/25/20