HomeMy WebLinkAboutC300 Erosion Control Plan-C300SAND
TRAPS
SAND
TRAPS
SAND
TRAP855853854853853
8
5
2 851849
8 52 852
85085085084984884784
5
851851852 852852853853847
847847
848849T.P.
T.P.
T.P.
T.P.R40R20X3R24
R30 R18
R30R20R24
R24R24X2R36R12X2R4 8R24_PINER18_PINER8X5_MAPLER6R8X4 R6X6R6X2R8R8X2R8X2R6CL
UST
E
R
R6CL
UST
E
R
R24MOHAWK WB LLC
*
*
**
**
12"x8"
TEE
TEMP. HYDRANT
TEMP. HYDRANT
8" VALVE 12" D.I.HYDRANT
HYDRANT
HYDRANT
8" VALVE
East City Center Drive
Kinzer AvenueEast Auman DriveEX. 10' ASPHALT PATH
EX
. 10' ASPHALT PATHEX. 5' SIDEWALKEX. 10' BIKE LANEEX. 5' SIDEWALKEX. 10' BIKE LANEEX. 5' SIDEWALKEX. 10' BIKE LANE64
65
67
68
69
Lot 90
70
71
72
73
74
EX. 4' MH #807
T.C.=849.59
8" S.D.R. 35 P.V.C S
INV.=841.92
EX. 4' MH #806
EX. MANHOLE #414A
T.C.=850.92
15" R.C.P. S
INV.=844.19
12" R.C.P. N
INV.=844.29
12" R.C.P. W
INV.=845.64
EX. CURB INLET #418
T.C.=851.00
12" R.C.P. S
INV.=846.81
EX. CURB INLET #417
T.C.=851.23
12" R.C.P. N
INV.=846.49
12" R.C.P. E
INV.=846.39
EX. CURB INLET #420
T.C.=849.53
12" R.C.P. E
INV.=845.56
EX. CURB INLET #419
T.C.=849.71
12" R.C.P. W
INV.=845.34
12" R.C.P. S
INV.=845.24
EX. CURB INLET #459
T.C.=849.02
12" R.C.P. SW
INV.=845.10
EX. MANHOLE #414
T.C.=848.72
15" R.C.P. N
INV.=843.50
15" R.C.P. S
INV.=843.40
12" R.C.P. W
INV.=843.80
EX. CURB INLET #416
T.C.=848.58
12" R.C.P. E
INV.=844.48
EX. CURB INLET #415
T.C.=848.63
12" R.C.P. W
INV.=844.00
12" R.C.P. E
INV.=843.90
EX. CURB INLET #458
T.C.=848.32
12" R.C.P. NE
INV.=844.35
12" R.C.P. W
INV.=844.25
EX. CURB INLET #456
T.C.=847.87
12" R.C.P. E
INV.=843.11
24" R.C.P. S
INV.=841.34
24" R.C.P. N
INV.=841.44
EX. CURB INLET #457
T.C.=847.83
24" R.C.P. S
INV.=841.97
EX. CURB INLET #426
T.C.=845.78
15" R.C.P. E
INV.=840.46
18" R.C.P. SE
INV.=840.36
EX. CURB INLET #413
T.C.=845.74
15" R.C.P. N
INV.=840.90
15" R.C.P. W
INV.=840.80
EX. MANHOLE #453
T.C.=844.67
24" R.C.P. N
INV.=839.80
27" R.C.P. S
INV.=839.70
12" R.C.P. E
INV.=839.80
EX. CURB INLET #454
T.C.=844.89
12" R.C.P. W
INV.=840.38
SF S
F
SFSFSFTEMP. SOIL
STOCKPILE
SF SF SF SFSFSF SF SFSF SF SF SF SF SF SF SFSFSFSF SFSFSFSF SFSF SFSF
SFSF SFSF SF SF SF SF SF SF SF
S
F
S
F
SFSFSF SF SF SFSFSFSFSFSFSFSFSF SFSFSFSF SFSF
SF SF SF SF
SF
SF
S
F
SFSF SFSFEARTHWORK CONTRACTOR
SHALL INSTALL 20' x 150'
MIN. STONE ACCESS DRIVE
PRIOR TO CONSTRUCTION
POSTING SIGN
LOCATION
CONCRETE
WASHOUT AREA
CONSTRUCTION
DUMPSTER
FUEL OIL TANK
(DOUBLE WALL)
PORT-O-LET
8
3
9
838835834833.65833.84
835.30835.00T.P.833.02832.38T.P.R18R1 2R12R4R4R4 R4R20
X3
T.P.R4R4T.P.
T.P.R4EX. SANITARY
MANHOLE
TC=834.32'
8" CLAY
INV.=829.72' N
6" CLAY
INV.=829.72' E
EX. SANITARY
MANHOLE
TC=833.15'
8" CLAY
INV.=828.66' N
INV.=828.66' S
EX. SANITARY
MANHOLE
INV.=827.71' N
INV.=827.71' S
EX. SANITARY
MANHOLE
TC=839.22'
10" CLAY
INV.=833.32' SW
INV.=833.32' N
6" CLAY
INV.=834.52' S
20'842MOHAWK WB LLC
GOLFVIEW DRIVE
SAND
TRAPS
fview Driv
e Kinzer AvenueEX. SANITARY
INV.=826.29' W
INV.=825.96' N
INV.= 824.24' E
APARTMENT BUILDINGEX. CURB INLET #44
T.C.=838.52
12" R.C.P. NE
INV.=836.17
EX. CURB INLET #461A
T.C.=838.42
12" R.C.P. NE
INV.=833.80
EX. END SECTION
21" R.C.P. SE
INV.=832.76 10SFSF SFSF SF SF SF SF SFSFSFSF SF SFSFSFSF SFSFSFSFSFSF
DATE MARK REVISIONS BYCERTIFIED: S & A JOB NO.
SHEET NO.
DRAWN BY: CHECKED BY:THIS DRAWING IS NOT INTENDED TO BEREPRESENTED AS A RETRACEMENT ORORIGINAL BOUNDARY SURVEY, A ROUTESURVEY OR A SURVEYOR LOCATIONREPORT.S T O E P P E L W E R T HA L W A Y S O N7965 East 106th Street, Fishers, IN 46038-2505phone: 317.849.5935 fax: 317.849.5942INITIAL STORM WATER POLL. & PREV. PLANC300
1" = 50 FT
LEGEND
Denotes Silt Fence
Denotes Construction Limits
Temporary "Coconut Fiber Mat" or
Below Grade " Drop Inlet Protection Basket"
Temporary "Drop Inlet Protection Basket", "Sediment
Control Devices"
SF SF SF
65840BKM-Sec 2-3-4SECTIONS 2, 3, & 4ADG JSL CLAY TOWNSHIP HAMILTON COUNTY, INDIANA03/20/2019DP
I
T
E
S
G
E
E
O
TS R
P
RTE WLE
D EHVADI R
J .ADNINAI EEG NIRENOILA NSFEPROSTATE OF
S
File Name: S:\65840BKM-S3\DWG\C300 Erosion Control Plan.dwg - C300Modified / By: September 29, 2020 8:57:03 AM / dmetzPlotted / By: October 6, 2020 8:58:15 AM / Andre GuyonGRAMERCY WESTREVISED PER TAC COMMENTS ADG05/08/19 REVISED PER TAC COMMENTS ADG09/27/19 REVISED PER CLIENT COMMENTS DSM10/16/19 REVISED PER CITY OF CARMEL COMMENTS DSM12/12/19 REVISED PER CITY OF CARMEL COMMENTS DSM12/30/19 REVISED PER CLIENT COMMENTS DSM01/13/20 REVISED SWALE PER CARMEL COMMENTS DSM04/16/20 RAISED SITE 0.80 FT FOR DIRT BALANCE ADG09/24/20 FOR EROSION CONTROL ONLY.
THIS SHEET TO BE USED
PERSON ONSITE RESPONSIBLE FOR EROSION CONTROL:
TIM BERRY
PHONE: (317) 564-7301
9.) GENERAL CONSTRUCTION SEQUENCE
1. The contractor shall schedule a Pre-construction meeting with the City of Carmel prior to any constructing on
the site being started. The contractor and/or developer shall notify IDEM and the City of Carmel 48 hours
prior to start of construction.
2. Following the required pre-construction meeting the contractor shall construct the “posting information
center” on the Northeast side of the proposed construction entrance. The location of the posting information
center is shown on Sheet C300 & C302. The posting information center is the location where a copy of the
approved IDEM Rule 5 Permit, Approved SWPP Plan, signed O&M Manual and Maintenance Logs are to be
located. The contractor shall proceed to construct the construction entrance after all posting requirements
have been met.
3. Immediately following the installation of the construction entrance, the contractor shall construct the
maintenance and refueling area. Please refer to the maintenance and refueling area detail on Sheet C307.
4. After the maintenance and refueling area is constructed, the contractor shall construct the concrete washout
area per the specifications on Sheet C307. Concrete washout shall not be required if concrete truck is
equipped with self-contained chute system, similar to system provided by Enviroguard, or approved equal.
5. Prior to any earth moving the contractor shall install all silt fence as shown on Sheet C300 - C305. The
details and specifications for silt fence installation are located on Sheet C307.
6. The contractor shall protect all existing inlets with drop inlet protection baskets and fiber mats as shown on
Sheet C300 - C303. The details and specifications for the drop inlet baskets and fiber mats on Sheet C307.
7. When the “existing” site/construction limits are completely stabilized, the contractor shall start stripping the
existing top soil within the construction limits.
9. The contractor shall proceed to grade the site. The material to grade the site shall be excavated per the
proposed cut & fills as shown on Sheet C200 - C202, & C204.
10. The Contractor shall install the proposed erosion control blanket in all swales as shown on Sheet C304 &
C305. The details and specifications for the erosion control blanket can be found on Sheet C308.
11. Contractor shall excavate around the existing sanitary manholes #805 & #807 and expose the proposed
connection point for the gravity sanitary sewer for this project.
12. The proposed storm sewer and sanitary sewer shall be installed concurrently with each other when crossings
are encountered.
13. Contractor shall install water main. The trench area shall be seeded and mulched immediately following the
installation of the water main.
14. The contractor shall prepare the sub-grade for the proposed road system. If lime stabilization is the method
chosen, dust shall be kept to a minimum. Dust shall be removed from the construction vehicles prior to
leaving the site.
15. Contractor shall install all concrete roll curb.
16. Contractor shall install all asphalt pavement.
17. Contractor shall have all other appropriate utilities installed. It is ultimately the responsibility of the
contractor to ensure that the trench area is seeded and mulched immediately following the installation of each
utility.
18. The contractor shall permanent seed all areas between the back of curb and the constructed pads and all other
areas that are illustrated on Sheets C304 & C305. The seed mixture and rate can be found on Sheet C304 &
C305.
19. The contractor shall schedule a site inspection with the City of Carmel to ensure that the site is stabilized.
After the inspector approves the site conditions the contractor shall remove all temporary erosion control
practices.
20. The post-construction erosion control practices then become the responsibility of the developer of this
project.
21. The developer of this project shall continue to monitor this site for good house keeping on the
post-construction BMP's until a NOT is filed with IDEM.
12/04/20