Loading...
HomeMy WebLinkAboutC300 Erosion Control Plan-C301T.P. TV.P. MM M MM MM TV.P.Golfview DriveAPARTMENT BUILDINGAPARTMENT BUILDINGELECTRIC BOX APARTMENT BUILDING SAND TRAP 848 84985085185184784884 3 842 84684784 7 847847 847847 84784884884884884984984 9 8498 3 5 8 3 1 8 3 2 8 3 3 8 3 4 8 3 6 8 3 7 8 3 8 8 3 9 8 2 5 8 3 0 8 2 4 8 2 6 8 2 7 8 2 8 8 2 9 8 3 1 8 2 2 82 3 836840838835834840849 T.P. T.P. T.P. 20' Gas Line Easement Record 264, Pg. 354 Amended by Record 301, Pg. 645 (NOT TO BE VACATED) 20' 20' 20'20'20' Gas Line Easement Record 264, Pg. 354 Amended by Record 301, Pg. 645 MOHAWK WB LLC MOHAWK WB LLC MOHAWK WB LLC AUMANS ADDITION * * * * * * * * * * * * * ** 8 2 0 821 8 1 7 8 1 8 819 8 4 0 8 4 1 8 4 2 8" TEE 8" TEE8" TEE 22.5° BEND 11.25° BEND 8" VALVE 8" VALVE 8" VALVE 8" VALVE 8" VALVE 8" VALVE TEMP. HYDRANT TEMP. HYDRANT TEMP. HYDRANT 8" VALVE 8" D.I.8" D.I.8" D.I.8" D.I. HYDRANT HYDRANT 8" VALVE TEMP. HYDRANT 11.25° BEND 8" TEE 8" D.I. 8" VALVE 84 0 83 7 83 8 83 9 841 842 83 5 8 3 2 83 3 83 4 83 6 83 0 828 829 83 1 826 827 825 8 24 822 823820821 817818 819 8 4 2 842843844APARTMENT BUILDINGAP A R T M E N T BU I L DI NG PVMT PVMT PVMT PVMT Gol fvie w Drive Kinzer AvenueKinzer AvenueE. Auman Dr.East Auman Drive74 75 76 77 78 79 80 EX. 5' SIDEWAL K EX . 5 ' SIDEW A L K EX. 5' S IDEWALK EX . 5 ' SIDEWA L K EX. SANITARY MANHOLE TC=833.41' INV.=826.41' S 10" CLAY INV.=826.29' W INV.=825.96' N INV.= 824.24' E N.P.= 10 YEAR ELEV.= 2 YEAR ELEV.= 100 YEAR ELEV.= BOTTOM ELEV.= EX. WET POND WITH NATIVE BANKS 833.00 835.63 837.14 839.57 817.00 EX. 4' MH #805 T.C.=845.97 8" S.D.R. 26 P.V.C N INV.=833.92 8" S.D.R. 26 P.V.C E INV.=833.72 EX. 4' MH #810 T.C.=845.42 8" S.D.R. 35 P.V.C SE INV.=837.87 EX. 4' MH #806 T.C.=844.42 8" S.D.R. 35 P.V.C N INV.=836.88 8" S.D.R. 26 P.V.C S INV.=835.25 8" S.D.R. 35 P.V.C E INV.=836.88 EX. TEMP. C.O. #1 TO BE REPLACED WITH MANHOLE T.C.=844.14 8" S.D.R. 35 P.V.C. N INV.=832.60 EX. CURB INLET #44 T.C.=838.52 12" R.C.P. NE INV.=836.17 EX. CURB INLET #467 T.C.=845.17 12" R.C.P. N INV.=839.25 EX. YARD INLET #481 T.C.=844.61 15" R.C.P. N INV.=839.00 EX. YARD INLET #435A T.C.=843.96 36" R.C.P. E INV.=838.49 27" R.C.P. N INV.=838.49 EX. CURB INLET #445 T.C.=843.85 15" R.C.P. N INV.=838.65 15" R.C.P. SW INV.=838.75 EX. CURB INLET #444 T.C.=843.61 12" R.C.P. N INV.=840.33 EX. CURB INLET #468 T.C.=843.48 15" R.C.P. S INV.=838.96 15" R.C.P. NE INV.=838.86 EX. CURB INLET #441 T.C.=843.53 18" R.C.P. NE INV.=838.37 15" R.C.P. S INV.=838.47 EX. CURB INLET #431B T.C.=842.75 15" R.C.P. NE INV.=838.15 12" R.C.P. W INV.=838.25 EX. YARD INLET #469 T.C.=842.59 15" R.C.P. N INV.=839.19 EX. CURB INLET #439 T.C.=842.10 12" R.C.P. NE INV.=837.84 EX. YARD INLET #466 T.C.=841.98 12" R.C.P. S INV.=838.75 12" R.C.P. E INV.=838.65 EX. CURB INLET #438 T.C.=841.94 12" R.C.P. S INV.=835.50 EX. CURB INLET #461A T.C.=838.42 12" R.C.P. NE INV.=833.80 EX. END SECTION 48" R.C.P. N INV.=832.93 EX. OUTLET CONTROL #401 T.C.=839.34 15" R.C.P. E INV.=831.32 EX. END SECTION 12" R.C.P. E INV.=833.10 EX. END SECTION 21" R.C.P. SE INV.=832.76 EX. END SECTION 12" R.C.P. N INV.=833.06 10' BIKE LANESFSFSFSF SFSF SFSF SF SF SF SF SF SF SF SFSFSFSF SF SFSFSF SF SF SF SFSF SF SFSFSFSFSFSFSFSFSF SF SFSFSF SF SFS F S F S F S F SFSFSFSFSF DATE MARK REVISIONS BYCERTIFIED: S & A JOB NO. SHEET NO. DRAWN BY: CHECKED BY:THIS DRAWING IS NOT INTENDED TO BEREPRESENTED AS A RETRACEMENT ORORIGINAL BOUNDARY SURVEY, A ROUTESURVEY OR A SURVEYOR LOCATIONREPORT.S T O E P P E L W E R T HA L W A Y S O N7965 East 106th Street, Fishers, IN 46038-2505phone: 317.849.5935 fax: 317.849.5942INITIAL STORM WATER POLL. & PREV.PLANC301 1" = 50 FT LEGEND Denotes Silt Fence Denotes Construction Limits Temporary "Coconut Fiber Mat" or Below Grade " Drop Inlet Protection Basket" Temporary "Drop Inlet Protection Basket", "Sediment Control Devices" SF SF SF 65840BKM-Sec 2-3-4SECTIONS 2, 3, & 4ADG JSL CLAY TOWNSHIP HAMILTON COUNTY, INDIANA03/20/2019DP I T E S G E E O TS R P RTE WLE D EHVADI R J .ADNINAI EEG NIRENOILA NSFEPROSTATE OF S File Name: S:\65840BKM-S3\DWG\C300 Erosion Control Plan.dwg - C301Modified / By: September 29, 2020 8:57:03 AM / dmetzPlotted / By: October 6, 2020 8:58:25 AM / Andre GuyonGRAMERCY WESTREVISED PER TAC COMMENTS ADG05/08/19 REVISED PER TAC COMMENTS ADG09/27/19 REVISED PER CLIENT COMMENTS DSM10/16/19 REVISED PER CITY OF CARMEL COMMENTS DSM12/12/19 REVISED PER CITY OF CARMEL COMMENTS DSM12/30/19 REVISED PER CLIENT COMMENTS DSM01/13/20 REVISED SWALE PER CARMEL COMMENTS DSM04/16/20 RAISED SITE 0.80 FT FOR DIRT BALANCE ADG09/24/20 FOR EROSION CONTROL ONLY. THIS SHEET TO BE USED PERSON ONSITE RESPONSIBLE FOR EROSION CONTROL: TIM BERRY PHONE: (317) 564-7301 9.) GENERAL CONSTRUCTION SEQUENCE 1. The contractor shall schedule a Pre-construction meeting with the City of Carmel prior to any constructing on the site being started. The contractor and/or developer shall notify IDEM and the City of Carmel 48 hours prior to start of construction. 2. Following the required pre-construction meeting the contractor shall construct the “posting information center” on the Northeast side of the proposed construction entrance. The location of the posting information center is shown on Sheet C300 & C302. The posting information center is the location where a copy of the approved IDEM Rule 5 Permit, Approved SWPP Plan, signed O&M Manual and Maintenance Logs are to be located. The contractor shall proceed to construct the construction entrance after all posting requirements have been met. 3. Immediately following the installation of the construction entrance, the contractor shall construct the maintenance and refueling area. Please refer to the maintenance and refueling area detail on Sheet C307. 4. After the maintenance and refueling area is constructed, the contractor shall construct the concrete washout area per the specifications on Sheet C307. Concrete washout shall not be required if concrete truck is equipped with self-contained chute system, similar to system provided by Enviroguard, or approved equal. 5. Prior to any earth moving the contractor shall install all silt fence as shown on Sheet C300 - C305. The details and specifications for silt fence installation are located on Sheet C307. 6. The contractor shall protect all existing inlets with drop inlet protection baskets and fiber mats as shown on Sheet C300 - C303. The details and specifications for the drop inlet baskets and fiber mats on Sheet C307. 7. When the “existing” site/construction limits are completely stabilized, the contractor shall start stripping the existing top soil within the construction limits. 9. The contractor shall proceed to grade the site. The material to grade the site shall be excavated per the proposed cut & fills as shown on Sheet C200 - C202, & C204. 10. The Contractor shall install the proposed erosion control blanket in all swales as shown on Sheet C304 & C305. The details and specifications for the erosion control blanket can be found on Sheet C308. 11. Contractor shall excavate around the existing sanitary manholes #805 & #807 and expose the proposed connection point for the gravity sanitary sewer for this project. 12. The proposed storm sewer and sanitary sewer shall be installed concurrently with each other when crossings are encountered. 13. Contractor shall install water main. The trench area shall be seeded and mulched immediately following the installation of the water main. 14. The contractor shall prepare the sub-grade for the proposed road system. If lime stabilization is the method chosen, dust shall be kept to a minimum. Dust shall be removed from the construction vehicles prior to leaving the site. 15. Contractor shall install all concrete roll curb. 16. Contractor shall install all asphalt pavement. 17. Contractor shall have all other appropriate utilities installed. It is ultimately the responsibility of the contractor to ensure that the trench area is seeded and mulched immediately following the installation of each utility. 18. The contractor shall permanent seed all areas between the back of curb and the constructed pads and all other areas that are illustrated on Sheets C304 & C305. The seed mixture and rate can be found on Sheet C304 & C305. 19. The contractor shall schedule a site inspection with the City of Carmel to ensure that the site is stabilized. After the inspector approves the site conditions the contractor shall remove all temporary erosion control practices. 20. The post-construction erosion control practices then become the responsibility of the developer of this project. 21. The developer of this project shall continue to monitor this site for good house keeping on the post-construction BMP's until a NOT is filed with IDEM. 12/04/20