HomeMy WebLinkAboutC300 Erosion Control Plan-C308DATE MARK REVISIONS BYCERTIFIED: S & A JOB NO.
SHEET NO.
DRAWN BY: CHECKED BY:THIS DRAWING IS NOT INTENDED TO BEREPRESENTED AS A RETRACEMENT ORORIGINAL BOUNDARY SURVEY, A ROUTESURVEY OR A SURVEYOR LOCATIONREPORT.S T O E P P E L W E R T HA L W A Y S O N7965 East 106th Street, Fishers, IN 46038-2505phone: 317.849.5935 fax: 317.849.5942STORM WATER POLL. & PREV. PLAN SPECSC308
FOR EROSION CONTROL ONLY.
THIS SHEET TO BE USED
PERSON ONSITE RESPONSIBLE FOR EROSION CONTROL:
TIM BERRY
PHONE: (317) 564-7301
65840BKM-Sec 2-3-4SECTIONS 2, 3, & 4ADG JSL CLAY TOWNSHIP HAMILTON COUNTY, INDIANA03/20/2019DP
I
T
E
S
G
E
E
O
TS R
P
RTE WLE
D EHVADI R
J .ADNINAI EEG NIRENOILA NSFEPROSTATE OF
S
File Name: S:\65840BKM-S3\DWG\C300 Erosion Control Plan.dwg - C308Modified / By: September 29, 2020 8:57:03 AM / dmetzPlotted / By: October 6, 2020 9:00:28 AM / Andre GuyonGRAMERCY WESTREVISED PER TAC COMMENTS ADG05/08/19 REVISED PER TAC COMMENTS ADG09/27/19 REVISED PER CLIENT COMMENTS DSM10/16/19 REVISED PER CITY OF CARMEL COMMENTS DSM12/12/19 REVISED PER CITY OF CARMEL COMMENTS DSM12/30/19 REVISED PER CLIENT COMMENTS DSM01/13/20 REVISED SWALE PER CARMEL COMMENTS DSM04/16/20 RAISED SITE 0.80 FT FOR DIRT BALANCE ADG09/24/20 1-1/2'1-1/2'
1 STAPLE
PER SQ. YD. PER SQ. YD.
1-1/2 STAPLES
PER SQ. YD.
2 STAPLES
PER SQ. YD.
3.5 STAPLES
FT.
150
200
250
100
50
25
75
225
275
A B C D
A
A
B
B
175
125
C
C C
C
B B
D
4:1 3:1 2:1 1:1 LOW MED/HIGH
FLOW
CHANNEL CHANNEL
FLOW
AND
SHORELINESLOPE GRADIENT SLOPE LENGTHSTAPLE PATTERNS APPLY TO ALL NORTH AMERICAN
GREEN EROSION CONTROL BLANKETS. STAPLE
PATTERNS WILL VARY DEPENDING UPON SLOPE
LENGTH, SLOPE GRADE, SOIL TYPE AND AVERAGE
ANNUAL RAINFALL.
20"
2'
4'4'
3'
2'
4'
3'
3'
6' 6'
3'
3'
STAPLE PATTERN GUIDE
EROSION CONTROL BLANKET
(TO BE USED WHEN PUMPING DIRTY WATER)
DEWATERING FILTER BAG DETAIL
ANY DISCHARGE OF CONTAMINATED WATER DUE TO DEWATERING
SHALL OUTLET THROUGH EXISTING VEGETATION OR FILTER BAGS
THAT WILL NOT ADVERSELY IMPACT STORM WATER QUALITY.
12/04/20