Loading...
HomeMy WebLinkAboutC800 Construction Details-C802DATE MARK REVISIONS BYCERTIFIED: S & A JOB NO. SHEET NO. DRAWN BY: CHECKED BY:THIS DRAWING IS NOT INTENDED TO BEREPRESENTED AS A RETRACEMENT ORORIGINAL BOUNDARY SURVEY, A ROUTESURVEY OR A SURVEYOR LOCATIONREPORT.S T O E P P E L W E R T HA L W A Y S O N7965 East 106th Street, Fishers, IN 46038-2505phone: 317.849.5935 fax: 317.849.5942STREET DETAILSC802 65840BKM-Sec 2-3-4SECTIONS 2, 3, & 4ADG JSL CLAY TOWNSHIP HAMILTON COUNTY, INDIANA03/20/2019DP I T E S G E E O TS R P RTE WL E D EHVADI R J .ADNINAI EEG NIRENOILA NSFEPROSTATE OF S File Name: S:\65840BKM-S3\DWG\C800 Construction Details.dwg - C802Modified / By: September 29, 2020 6:53:00 AM / dmetzPlotted / By: October 6, 2020 8:50:00 AM / Andre GuyonGRAMERCY WESTREVISED PER TAC COMMENTS ADG05/08/19 REVISED PER TAC COMMENTS ADG09/27/19 REVISED PER CLIENT COMMENTS DSM10/16/19 REVISED PER CITY OF CARMEL COMMENTS DSM12/12/19 REVISED PER CITY OF CARMEL COMMENTS DSM12/30/19 REVISED PER CLIENT COMMENTS DSM01/13/20 REVISED SWALE PER CARMEL COMMENTS DSM04/16/20 RAISED SITE 0.80 FT FOR DIRT BALANCE ADG09/24/20 TRANSVERSE CONTRACTION JOINTS TOP OF CURB CURB JOINT DETAIL MAX. 50' TRANSVERSE EXPANSION JOINTS PAVEMENT ***** ***** BOTTOM OF CURB WHEN BUILT IN CONJUCTION WITH CONCRETE PAVEMENT, EXPANSION AND CONTRACTION JOINTS SHALL BE PLACED AT THE SAME LOCATIONS AS IN THE PAVEMENT SLABS. THE CURB AND GUTTER SHALL BE TIED TO THE PAVEMENT BY 1/2" ROUND DEFORMED BARS AT ABOUT 3 FOOT INTERVALS. IF NO CONCRETE PAVEMENT IS BEING BUILT AT THE TIME THE CURB IS CONSTRUCTED, EXPANSION JOINTS SHALL BE PLACED AT THE ENDS OF ALL RETURNS AND AT INTERVALS NOT TO EXCEED 50 FEET. CONTRACTION JOINTS ON TANGENT SECTIONS SHALL BE INSTALLED AT 10 FOOT MAX. SPACING. CONTRACTION JOINTS ON RADII SHALL BE INSTALLED AT 5 FOOT MAX. SPACING. MAX. 50' ***** MINIMUM COVER FOR PIPE CROSSINGS OF CITY STREETS: THE MINIMUM COVER FROM THE TOP OF THE INSTALLED PAVEMENT TO THE TOP OF THE TINSTALLED PIPE SHALL BE THE PAVEMENT SECTION, THICKNESS (ALL BITUMINOUS AND AGGREGATE MATERIAL ABOVE THE SUBGRADE) PLUS 1'-0", BUT UNDER NO CIRCUMSTANCES SHALL THE COVER ALONG ANY PART OF THE PIPE FROM THE FINAL PAVEMENT ELEVATION TO THE TOP OF THE PIPE BE LESS THAN 2.5 FEET. NOTE: ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY. The Contractor shall be responsible for verifying that all state highways, city, and county permits have been obtained by the developer prior to start of construction. 12/04/20