HomeMy WebLinkAboutC800 Construction Details-C802DATE MARK REVISIONS BYCERTIFIED: S & A JOB NO.
SHEET NO.
DRAWN BY: CHECKED BY:THIS DRAWING IS NOT INTENDED TO BEREPRESENTED AS A RETRACEMENT ORORIGINAL BOUNDARY SURVEY, A ROUTESURVEY OR A SURVEYOR LOCATIONREPORT.S T O E P P E L W E R T HA L W A Y S O N7965 East 106th Street, Fishers, IN 46038-2505phone: 317.849.5935 fax: 317.849.5942STREET DETAILSC802
65840BKM-Sec 2-3-4SECTIONS 2, 3, & 4ADG JSL CLAY TOWNSHIP HAMILTON COUNTY, INDIANA03/20/2019DP
I
T
E
S
G
E
E
O
TS R
P
RTE WL
E
D EHVADI R
J .ADNINAI EEG NIRENOILA NSFEPROSTATE OF
S
File Name: S:\65840BKM-S3\DWG\C800 Construction Details.dwg - C802Modified / By: September 29, 2020 6:53:00 AM / dmetzPlotted / By: October 6, 2020 8:50:00 AM / Andre GuyonGRAMERCY WESTREVISED PER TAC COMMENTS ADG05/08/19 REVISED PER TAC COMMENTS ADG09/27/19 REVISED PER CLIENT COMMENTS DSM10/16/19 REVISED PER CITY OF CARMEL COMMENTS DSM12/12/19 REVISED PER CITY OF CARMEL COMMENTS DSM12/30/19 REVISED PER CLIENT COMMENTS DSM01/13/20 REVISED SWALE PER CARMEL COMMENTS DSM04/16/20 RAISED SITE 0.80 FT FOR DIRT BALANCE ADG09/24/20 TRANSVERSE CONTRACTION JOINTS
TOP OF CURB
CURB JOINT DETAIL
MAX. 50'
TRANSVERSE EXPANSION JOINTS
PAVEMENT
*****
*****
BOTTOM OF CURB
WHEN BUILT IN CONJUCTION WITH CONCRETE PAVEMENT, EXPANSION AND
CONTRACTION JOINTS SHALL BE PLACED AT THE SAME LOCATIONS AS IN THE
PAVEMENT SLABS. THE CURB AND GUTTER SHALL BE TIED TO THE PAVEMENT BY
1/2" ROUND DEFORMED BARS AT ABOUT 3 FOOT INTERVALS. IF NO CONCRETE
PAVEMENT IS BEING BUILT AT THE TIME THE CURB IS CONSTRUCTED, EXPANSION
JOINTS SHALL BE PLACED AT THE ENDS OF ALL RETURNS AND AT INTERVALS NOT
TO EXCEED 50 FEET. CONTRACTION JOINTS ON TANGENT SECTIONS SHALL BE
INSTALLED AT 10 FOOT MAX. SPACING. CONTRACTION JOINTS ON RADII SHALL BE
INSTALLED AT 5 FOOT MAX. SPACING.
MAX. 50' *****
MINIMUM COVER FOR PIPE CROSSINGS OF CITY STREETS:
THE MINIMUM COVER FROM THE TOP OF THE INSTALLED PAVEMENT TO THE
TOP OF THE TINSTALLED PIPE SHALL BE THE PAVEMENT SECTION, THICKNESS
(ALL BITUMINOUS AND AGGREGATE MATERIAL ABOVE THE SUBGRADE) PLUS
1'-0", BUT UNDER NO CIRCUMSTANCES SHALL THE COVER ALONG ANY PART
OF THE PIPE FROM THE FINAL PAVEMENT ELEVATION TO THE TOP OF THE PIPE
BE LESS THAN 2.5 FEET.
NOTE:
ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY
SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF
ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF
ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW
THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF
NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN
STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE
DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND
PROPOSED CITY RIGHT-OF-WAY.
The Contractor shall be responsible for verifying that all
state highways, city, and county permits have been obtained
by the developer prior to start of construction.