HomeMy WebLinkAboutC600 Storm PnP885
890
895
900
905
910
915
885
890
895
900
905
910
915
E(A) E(A) E(A) E(A) E(A) E(A) E(A) E(A) E(A) E(A) E(A) E(A) E(A) E(A) E(A) E(A) E(A)
NP = 898.83
2 YR = 899.05
EXISTING POND
TOP OF BANK = 900.1
SPILLWAY=899.7
10 YR = 899.25
100 YR = 899.60
W
UD UD UD UD
165 166 167
179180 181
178
177
176
175
168 169 170
171
172
173
174STONE LAKEDRIVE185
W
W W W W W W W W
W WWW WWW
W WWWWWW WUDUDUDUD
UD
UDUD UDUD UDUDUDUD DRY POND
U
D
UD
UDUDUDUDUDUD
UDUDE N GI N E E R S317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil Engi neeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netWATERFRONT OF WEST CLAYSECTION FIVE "B"Know what'sbelow.
before you dig.Call
R
BENCHMARK INFORMATION
BM BOO 54 - A DNR DISK IS LOCATED 1.0 MILE NORTHEAST OF
ZIONSVILLE; 0.2 MILE EAST ALONG WEST 121ST STREET FROM ITS
JUNCTION WITH STATE ROAD 421, AT THE INTERSECTION OF
DAUGHERTY DRIVE AND WEST 121ST STREET, IN THE NORTHEAST 1/4
OF THE INTERSECTION, AT THE ENTRANCE TO THE EAGLE VILLAGE
SUBDIVISION; SET IN THE TOP OF A CONCRETE POST, LEVEL WITH
THE GROUND; A DEPARTMENT OF NATURAL RESOURCES BRASS
CONTROL STATION TABLET, STAMPED "BOO 54 1989".
ELEV.: 901.14 FEET (1929 DATUM)
ELEV.: 900.76 FEET (1988 DATUM)
THESE PLANS ARE BASED ON 1988 DATUM
STORM SEWER NOTES
1. THE CONTRACTOR SHALL ADHERE TO ALL TERMS AND CONDITIONS AS OUTLINED IN THE EPA OR APPLICABLE STATE GENERAL N.P.D.E.S. PERMIT FOR STORMWATER DISCHARGE
ASSOCIATED WITH CONSTRUCTION ACTIVITIES AND STORMWATER POLLUTION PREVENTION PLAN.
2. REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION METHODS. THE
SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF THE INDOT STANDARD
SPECIFICATIONS MAY ALSO BE APPLICABLE.
3. THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND LOCATION SERVICE AT LEAST 72 HOURS PRIOR TO ANY WORK AND SHALL CONTACT THE OWNER AND/OR
ENGINEER SHOULD UTILITIES APPEAR TO BE IN CONFLICT WITH THE PROPOSED IMPROVEMENTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL
EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.
4. THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS UTILITY
COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY OF THIS INFORMATION
IS NOT GUARANTEED.
5. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE LOCATION AND
PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THE EXPRESSED
RESPONSIBILITY OF THE CONTRACTOR.
6. THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY AND ALL FEES ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES.
7. ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER SAFETY.
8. ANY PART OF STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL.
8. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND ELEVATION OF EXISTING UTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS RELATED TO THEIR
WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/OR DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS.
9. CLEARANCE BETWEEN STORM / SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE, SHALL MAINTAIN 10' HORIZONTAL AND 18" VERTICAL.
10. CONTRACTOR TO INSTALL CONCRETE CRADLES AT PIPE CROSSING WHEN THE VERTICAL SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY
SEWERS, WATER MAINS AND STORM SEWERS IS 18" OR LESS.
11. SANITARY SEWER LINE IN PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE PVC.
12. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING
STRUCTURE AS NECESSARY TO RETURN IT TO IT'S CONDITION PRIOR TO CONSTRUCTION.
13. WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL
MOISTURE OF SOILS.
14. COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED AREAS.
15. ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVE TRAFFIC BEARING RING AND COVERS.
16. COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH PLUMBING DRAWINGS.
17. FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO STORM SEWER INSTALLATION.
18. ALL EXISTING MANHOLE AND CATCH BASIN GRATES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATIONS.
19. EXISTING PIPES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS.
20. ALL STORM PIPE CONNECTIONS AT STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT.
21. ALL STORM SEWER STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVE TRAFFIC BEARING RING AND COVERS RATED FOR H20 LOADING.
22. ALL STORM SEWER STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR CHANNEL FROM INVERT IN TO INVERT OUT.
23. NEW PIPES AND STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS PRIOR TO FINAL TURNOVER TO THE OWNER.
24. IF HDPE PIPE IS SPECIFIED USE DUAL WALLED, HANCOR HQ, ADS N-12 PIPE OR APPROVED EQUAL.
25. ALL FITTINGS AND ACCESSORIES INCLUDING BUT NOT LIMITED TO END CAPS, CLEANOUTS, REDUCERS, ETC., SHALL BE HDPE MATERIAL; IF SPECIFIED, COMPARABLE WITH
STORAGE PIPES.
26. PROVIDE BACKFILL WITH A MINIMUM OF 4" BEDDING MATERIAL OF #8 AGGREGATE COMPACTED IN 8" LIFTS TO 95% MAXIMUM DRY DENSITY.
27. VERIFY EXISTING STORM INVERT ELEVATIONS PRIOR TO STARTING NEW STORM SEWER CONNECTION.
28. SEE SHEET C601 FOR STORM SEWER DETAILS
CITY OF CARMEL COVER AND
BACKFILL POLICY; 9-8-06
WATER AND SEWER UNDER PAVEMENT, SIDEWALK, PAVED AREAS
AND WITHIN RIGHT-OF-WAY
BEDDING, HAUNCHING, INITIAL BACKFILL
BEDDING, HAUNCHING AND INITIAL BACKFILL REQUIREMENTS AND
COMPACTION FOR WATER MAINS, WATER SERVICE LATERALS, SANITARY
MAINS AND SANITARY SERVICE LATERALS SHALL BE IN ACCORDANCE WITH
THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER
THE INSTALLATION.
FINAL BACKFILL
FINAL BACKFILL FOR WATER MAINS, WATER SERVICE LATERALS, SANITARY
MAINS AND SANITARY SERVICE LATERALS UNDER AND WITHIN 5-FEET OF
PAVEMENT OR SIDEWALK OR OTHER PAVED AREAS AND FOR ALL
INSTALLATIONS WITHIN CITY RIGHT-OF-WAY SHALL BE B-BORROW FOR
STRUCTURE BACKFILL MEETING THE MATERIAL REQUIREMENTS OF THE
INDOT. THE MATERIAL SHALL BE APPROVED BY THE CITY OF CARMEL
DEPARTMENT OF ENGINEERING AT TIME OF INSTALLATION. FINAL BACKFILL
SHALL BE COMPACTED IN 6-INCH MAXIMUM LIFTS TO NOT LESS THAN 95%
STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL
PLACED. THE BACKFILL FOR THE TOP 6-INCHES OF THE EXCAVATION BELOW
THE START OF THE AGGREGATE SUB-BASE OF THE PAVEMENT SHALL BE NO.
53 STONE MEETING THE MATERIAL REQUIREMENT OF THE INDOT AND SHALL
BE COMPACTED TO NOT LESS THAN 95% STANDARD PROCTOR DENSITY. IF
THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER
THE INSTALLATION HAS A MORE STRINGENT BACKFILL REQUIREMENT, THE
MORE STRINGENT REQUIREMENT SHALL GOVERN.
MINIMUM COVER FOR PIPE CROSSINGS WITHIN CITY RIGHT-OF-WAY
FOR INSTALLATION OF STORM MAINS, WATER MAINS, SANITARY MAINS,
WATER SERVICE LATERALS, SANITARY SERVICE LATERALS UNDER CITY
STREETS, REGARDLESS OF JURISDICTION OF THE UTILITY, THE MINIMUM
COVER FROM THE TOP OF THE INSTALLED PAVEMENT TO THE TOP OF THE
INSTALLED PIPE SHALL BE THE PAVEMENT SECTION THICKNESS (ALL
BITUMINOUS AND AGGREGATE MATERIAL ABOVE THE SUBGRADE) PLUS 1-0",
BUT UNDER NO CIRCUMSTANCES SHALL THE COVER ALONG ANY PART OF
THE PIPE FROM THE FINAL PAVEMENT ELEVATION TO THE TOP OF THE PIPE
BE LESS THAN 2.5-FEET. IF THE STANDARD PRACTICE OF THE UTILITY THAT
HAS JURISDICTION OVER THE INSTALLATION HAS A MORE STRINGENT
COVER REQUIREMENT, THE MORE STRINGENT REQUIREMENT SHALL
GOVERN.
COVER HEIGHTS FOR REINFORCED CONCRETE PIPE STORM SEWER THAT
ARE LESS THAN THOSE REQUIRED WILL BE EVALUATED ON A CASE BY CASE
CONDITION AND APPROVED ONLY WITH WRITTEN PERMISSION BY THE CITY
ENGINEER.FINISHED GRADE
EXISTING GRADE
PROFILE LEGEND
HYDRAULIC GRADE LINE
GRANULAR BACKFILL (SEE
DETAIL 10-31 ON SHEET C601)
ADDITIONAL NOTE:
THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN
SPECIFIED AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL
APPROVED CONSTRUCTION PLANS. DEVIATIONS FROM THE APPROVED
DESIGN SHALL ONLY BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR
DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE PRIOR FIELD
APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL
IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN
EXPLANATION OF ANY SUCH DEVIATION SHALL BE INCLUDED AS A
REQUIREMENT ON AS-BUILT/RECORD DRAWINGS SUBMITTED FOR RELEASE
OF PERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED
AS GENERATING VELOCITIES OF 2.5 FPS OR LESS OR 10 FPS OR GREATER
(AT FULL FLOW CAPACITY) SHALL REQUIRE AS-BUILT CERTIFICATION AT THE
TIME OF CONSTRUCTION, PRIOR TO BACKFILLING THE PIPE. THE
CONTRACTOR IS INSTRUCTED TO AS-BUILT EACH SECTION OF STORM PIPE
AS IT IS BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN
PLANS AND AS APPROVED BY THE CITY OF CARMEL.
W
S
N
E
C600STORM PLAN AND PROFILE11/16/20