Loading...
HomeMy WebLinkAboutDrainage Report10505 North College Avenue | Indianapolis, IN 46280 | .www.weihe.net | (317) 846-6611 | (800) 452-6408 | Fax: (317) 843-0546 Allan H. Weihe, P.E., L.S., - Founder STORMWATER TECHNICAL REPORT For: WATERFRONT OF WEST CLAY SECTION 5B 4455 W. 121st Street Carmel, Indiana Project #W16-0409 Detention and Storm Infrastructure Calculations Prepared For: Waterfront Homes 11731 Cold Creek Road Zionsville, IN 46077 317-714-2406 Prepared By: Brittany C. Hansen Checked By: Travis P. Gaither, P.E. Certified By: Travis P. Gaither, P.E. Date: 18 November 2019 Revised 23 December 2019 Revised 20 May 2020 Revised 30 June 2020 Revised 13 August 2020 Revised 26 August 2020 11/16/20 Stormwater Technical Report Prepared For: Waterfront of West Clay Section 5B Carmel, IN Project #W16-0409 TABLE OF CONTENTS 1. Project Narrative a. Overall Project Narrative b. Existing Conditions c. Proposed Conditions d. Location Maps 2. Northest Detention Calculations a. Exhibits b. Supporting Calculations c. ICPR Input/Results 3. Pipe Sizing Calculations a. Existing Conditions Map b. Storm Inlet Basin Map c. Supporting Calculations d. Hydraflow Calculations e. Gutter Spread/Inlet Capacity 4. Appendix a. Section 5A Report – May 10, 2016 b. Schneider – Master Drainage Plane – February 11, 2004 c. Paul I. Cripe, Inc. – Revised Drainage Plan – July 31, 2006 11/16/20 PROJECT NARRATIVE 11/16/20 Waterfront of West Clay Section 5B– Carmel, IN Weihe Engineers, Inc. 8/26/2020 Stormwater Technical Report Prepared For: Waterfront of West Clay Section 5B Carmel, IN Project #W16-0409 Project Narrative: Waterfront Homes is proposing to develop Section 5B in the “Waterfront of West Clay” subdivision on approximately 19+ acres of land in Carmel, Indiana. Section 5B will develop 27 single family residential lots. The overall development is located between 116th Street and 121st Street, approximately 0.6 miles east of US 421 (Michigan Road). Section 5B is north of Section 5A in the overall development. The proposed development is on a site at a Latitude of N 39° 57' 42" and Longitude W 86° 13' 58", falling within Carmel, Indiana. The site is generally located in the Southwest Quarter of Section 31, Township 18 North, Range 3 East, Clay Township, Hamilton County, Indiana. Please refer to Figure 1.1. Floodzone: Based upon a scaled interpretation of the Flood Insurance Map No.18057C0205G for Hamilton County, Indiana, dated November 19, 2017 Section 5A IS NOT located within a Special Flood Hazard Area. See Figure 1.2. Overall Stormwater Design: The Schneider Corporation prepared a master drainage report dated February 10, 2004 for this development, which was then called “The Lakes at Hamilton Place”. Paul I. Cripe, Inc. then revised the master drainage calculations on July 31, 2006 and the name of the development was changed to “Sanctuary at 116th Street”. CESO has also submitted revised master drainage calculations for review with the most current drainage report dated May 10, 2016 for Section 2B. The current master plan detention is provided by two large existing ponds, the East Pond and the West Pond. The two existing ponds will provide all the necessary detention for the overall site and are not interconnected. Each pond discharges through their own 12” RCP with both discharge pipe systems eventually draining into Long Branch Creek. The entire subject tract is part of the Long Branch Creek Watershed. 11/16/20 Waterfront of West Clay Section 5B– Carmel, IN Weihe Engineers, Inc. 8/26/2020 Existing Conditions: Currently the subject tract is covered with grass and some sporadic trees. The subject tract is adjoined by 121st Street to the north, existing Waterfront of West Clay Sections to the west, the existing East Pond and Waterfront of West Clay Section 5A to the south, and Long Branch Estates common area to the east. The pond in the adjacent Long Branch Estates has a normal pool level of 881.5. Refer to Figure 1.3. The subject tract consists of the following soil types: Brookston, Miami and Crosby. A soil map has been included with this report. 11/16/20 Waterfront of West Clay Section 5B– Carmel, IN Weihe Engineers, Inc. 8/26/2020 Proposed Conditions: A stub of approximately 150’ of Stone Lake Drive has been designed in the Section 5A plans. This street will be extended to through section 5B, wrapping back onto itself in a loop. The proposed improvements in Section 5B adhere to the revised master planned drainage basin of the East Pond from the Section 5A drainage report. The proposed Section 5B lies within the master planned drainage basin for the East Pond and the Direct East drainage basin. The proposed design of the northeast corner has changed from the master plan. The original masterplan indicated that the rear yards and common area in the northeast corner would be directly discharged without being detained. Section 5B is proposing a small dry detention basin to regulate the onsite runoff prior to discharging into the existing adjacent offsite pond in Long Branch Estates. The proposed dry basin is located behind lots 172-174. 4.28 acres of existing onsite land pass through the location where the dry basin is located. The dry basin drains 2.37 acres of proposed land. A 21.7 acre offsite drainage basin drains onto Section 5B through an existing 30” culvert under 121st Street. A proposed 30” pipe is proposed to route discharge from the existing culvert to the Long Branch Estates pond while bypassing the dry detention basin. An outlet control structure with a 10” orifice and a 12” pipe will regulate the release from the dry detention basin and connect to the proposed 30” pipe system. A comparison of existing from the 4.28 acre basin shown on Figure 2.1 to proposed flows outletting from the dry basin. Storm Event Existing Flow (cfs) Proposed Flow (cfs) Dry Basin Stage 2 yr, 24 hr 2.47 1.58 886.86 10 yr, 24 hr 5.84 2.74 887.51 100 yr, 24 hr 10.89 4.05 888.45 Storm Sewers: The proposed Section 5B storm sewer design has changed somewhat from the original master plan. The locations of curb inlets on Stone Lake Drive have slightly changed but still outlet to the East Pond. This change does not change the master detention basin for the East Pond. The changes to the master storm layout will also not adversely impact any existing storm sewer infrastructure. The frontage of lots 182-184 and 159-163 drain to storm inlets on Stone Lake Drive that were constructed with Section 5A. The frontage of lots 164-181 and lot 185 drain to new storm inlets on Stone Lake Drive. A small area in the side yards of lots 176 and 175 will drain into a beehive inlet that is part of the system draining into the East Pond. The rear of lots 159-164 drain into beehive inlets that were constructed with Section 2C. The rear of lots 165-168 drain into new beehive inlets. This storm sewer system will drain into the East Pond. The rear of lots 176-184 will drain directly into the East Pond. 11/16/20 Waterfront of West Clay Section 5B– Carmel, IN Weihe Engineers, Inc. 8/26/2020 The storm sewer system is designed to convey stormwater at a minimum velocity of 2.5 feet/second through reinforced concrete pipes. In accordance with the HERPIC manual, the 10 year design flow does not exceed the capacity of the proposed pipes. Refer to Section 3 for the pipe and inlet sizing calculations and Figure 3.2 for the Pipe Sizing Basin Map. Water Quality: Water quality for Section 5B of Waterfront of West Clay was provided and accounted for in the master plan for the development. 11/16/20 LOCATION MAP Date: November 14, 2019FIGURE 1.1 WEIHE weihe.net Indianapolis, Indiana 46280 10505 N. College Avenue 317 | 846 - 6611 E N G I N E E R S PROJECT LOCATION WATERFRONT OF WEST CLAY SECTION 5B CARMEL, IN 11/16/20 FEMA MAP Date: November 14, 2019FIGURE 1.2 WEIHE weihe.net Indianapolis, Indiana 46280 10505 N. College Avenue 317 | 846 - 6611 E N G I N E E R S PROJECT LOCATION WATERFRONT OF WEST CLAY SECTION 5B CARMEL, IN 11/16/20 AERIAL MAP Date: November 14, 2019FIGURE 1.3 WEIHE weihe.net Indianapolis, Indiana 46280 10505 N. College Avenue 317 | 846 - 6611 E N G I N E E R S PROJECT LOCATION WATERFRONT OF WEST CLAY SECTION 5B CARMEL, IN 11/16/20 6 Custom Soil Resource Report Soil Map (Waterfront Sec 5B)4423570 4423630 4423690 4423750 4423810 44238704423570 4423630 4423690 4423750 4423810 4423870 4423930565210 565270 565330 565390 565450 565510 565570 565630 565690 565750 565210 565270 565330 565390 565450 565510 565570 565630 565690 565750 39° 57' 46'' N 86° 14' 12'' W39° 57' 46'' N86° 13' 47'' W39° 57' 34'' N 86° 14' 12'' W39° 57' 34'' N 86° 13' 47'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84 0 100 200 400 600 Feet 0 35 70 140 210 Meters Map Scale: 1:2,620 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. 11/16/20 MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Hamilton County, Indiana Survey Area Data: Version 20, Sep 16, 2019 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 1, 2018—Sep 30, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 7 11/16/20 Map Unit Legend (Waterfront Sec 5B) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Br Brookston silty clay loam, 0 to 2 percent slopes 4.3 12.0% CrA Crosby silt loam, fine-loamy subsoil, 0 to 2 percent slopes 8.2 23.0% MmC2 Miami silt loam, 6 to 12 percent slopes, eroded 4.1 11.4% MoC3 Miami clay loam, 6 to 12 percent slopes, severely eroded 1.1 3.2% Sh Shoals silt loam, 0 to 2 percent slopes, frequently flooded, brief duration 0.1 0.4% W Water 4.1 11.4% YbvA Brookston silty clay loam-Urban land complex, 0 to 2 percent slopes 1.9 5.4% YclA Crosby silt loam, fine-loamy subsoil-Urban land complex, 0 to 2 percent slopes 8.0 22.5% YmsC2 Miami silt loam-Urban land complex, 6 to 12 percent slopes, eroded 3.8 10.7% Totals for Area of Interest 35.7 100.0% Map Unit Descriptions (Waterfront Sec 5B) The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a Custom Soil Resource Report 8 11/16/20 1257+($67DETENTION &$/&8/$7,216 11/16/20 S89°29'45"E 200.01'NP = 898.832 YR = 899.05EXISTING PONDTOP OF BANK = 900.1SPILLWAY=899.710 YR = 899.25100 YR = 899.60WEXISTING PONDSTONE LAKEDRIVEW WW WWW WWWWW66 65646362615756 5554WWPRAIRIE FALCONDRIVENP = 898.832 YR = 899.05EXISTING PONDTOP OF BANK = 900.1SPILLWAY=899.7***10 YR = 899.25100 YR = 899.60525367 6869 70 7172156157158 **BLOCK "B" 159160 161162163164165 166 167 179180 181178177 176 175182183184168 169 170171172173174185EXISTING PONDNP = 898.83100 YR = 899.602YR =899.0510YR = 899.25TOP OF BANK = 900.1SPILLWAY = 899.7EX-NE4.28 AC.PR-NE2.37 AC.FIGURE 2.1 NORTHEAST BASIN MAP Date: August 26, 2020 WEIHE weihe.net Indianapolis, Indiana 46280 10505 N. College Avenue 317 | 846 - 6611 E N G I N E E R S WATERFRONT OF WEST CLAY SECTION 5B CARMEL, IN 11/16/20 Basin Type of Cover/ Percent Weighted Name AB C D Condition of Cover of Basin AB C D CN EX-NE 0% 40% 60% 0% Impervious 6% 98 98 98 98 98.0 0% 40% 60% 0% Woods-Grass Good Cond. 32% 32 58 72 79 66.4 0% 40% 60% 0% Open Space, Good Cond. 62% 39 6174 80 68.8 EX-NE 100% 69.8 PR-NE 0% 40% 60% 0% Impervious 20% 98 98 98 98 98.0 0% 40% 60% 0% Woods-Grass Good Cond. 29% 32 58 72 79 66.4 0% 40% 60% 0% Open Space, Good Cond. 51% 39 6174 80 68.8 PR-NE 100% 73.9 Weighted Curve Project: Waterfront of West Clay 5B Number Calculations Date: 8/13/2020 Prepared By: TPG Soil Group % Curve Number (CN) Job No.: W160409-5B Proposed Conditions Checked By: DAS 11/16/20 Shallow Conc Flow Travel Time: Channel Flow Travel Time: Farm Field 0.17Grass 0.03 Dense Grass 0.24Concrete 0.015 Shallow Conc Flow (Unpaved): Pavement 0.011 Rip-Rap 0.035 Shallow Conc Flow (Paved): 2 Yr, 24 Hr Rainfall= 2.93 Overland Flow Travel Time: Tc minimum= 5 Paved Gutter & Channel Flow Tc Basin Len S n T_t Len S n T_t Len S Pave/Un Vel T_t Len A Pw r S n Vel T_t (ft) % (min) (ft) % (min) (ft) % P or U (ft/s) (min) (ft) (sf) (ft) (ft) % (ft/s) (min) (min) EX-NE 68 1.00 0.24 14 0 968 1.80 U 2.16 7 3.00 0 22 PR-NE 100 1.50 0.24 17 0 577 2.60 U 2.60 4 3.00 0 20 Prepared By: TPG Time of Concentration Calculations Project: Waterfront of West Clay 5B Proposed Conditions Date: 8/13/2020 Job No.: W160409-5B Checked By: DAS Channel Flow Mannings Values (n) Overland Flow Channel Flow Overland Flow Overland Flow Shallow Conc. Flow 11/16/20 WATERFRONT OF WEST CLAY SECTION 5B ‐ W160409‐5B NE DETENTION CALCULATIONS ICPR INPUT REPORT ========================================================================================== ==== Basins ============================================================================== ==========================================================================================          Name: EX‐NE                    Node: EX LONG BRANCH         Status: Onsite         Group: BASE                     Type: SCS Unit Hydrograph CN         Unit Hydrograph: Uh484                    Peaking Factor: 484.0           Rainfall File:                     Storm Duration(hrs): 0.00     Rainfall Amount(in): 0.000                 Time of Conc(min): 22.00                Area(ac): 4.280                   Time Shift(hrs): 0.00            Curve Number: 69.80              Max Allowable Q(cfs): 999999.000                 DCIA(%): 0.00 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐          Name: PR‐NE                    Node: DRY BASIN NE           Status: Onsite         Group: BASE                     Type: SCS Unit Hydrograph CN         Unit Hydrograph: Uh484                    Peaking Factor: 484.0           Rainfall File:                     Storm Duration(hrs): 0.00     Rainfall Amount(in): 0.000                 Time of Conc(min): 20.00                Area(ac): 2.370                   Time Shift(hrs): 0.00            Curve Number: 73.90              Max Allowable Q(cfs): 999999.000                 DCIA(%): 0.00 ========================================================================================== ==== Nodes =============================================================================== ==========================================================================================       Name: DRY BASIN NE        Base Flow(cfs): 0.000          Init Stage(ft): 886.000      Group: BASE                                               Warn Stage(ft): 888.200       Type: Stage/Area       Stage(ft)        Area(ac) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐         886.000          0.0001         887.000          0.0425         888.000          0.0720         889.000          0.1053 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐       Name: EX LONG BRANCH      Base Flow(cfs): 0.000          Init Stage(ft): 881.500      Group: BASE                                               Warn Stage(ft): 881.500 11/16/20       Type: Time/Stage       Time(hrs)       Stage(ft) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐            0.00         881.500           99.00         881.500 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐       Name: PR LONG BRANCH      Base Flow(cfs): 0.000          Init Stage(ft): 883.000      Group: BASE                                               Warn Stage(ft): 883.000       Type: Time/Stage       Time(hrs)       Stage(ft) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐            0.00         883.000           99.00         883.000 ========================================================================================== ==== Drop Structures ===================================================================== ==========================================================================================          Name: DRY BASIN OCS       From Node: DRY BASIN NE       Length(ft): 24.00         Group: BASE                  To Node: PR LONG BRANCH          Count: 1                UPSTREAM       DOWNSTREAM                  Friction Equation: Automatic      Geometry: Circular       Circular                   Solution Algorithm: Most Restrictive      Span(in): 12.00          12.00                                    Flow: Both      Rise(in): 12.00          12.00                      Entrance Loss Coef: 0.500    Invert(ft): 883.800        883.700                        Exit Loss Coef: 0.000   Manning's N: 0.013000       0.013000                     Outlet Ctrl Spec: Use dc or tw  Top Clip(in): 0.000          0.000                         Inlet Ctrl Spec: Use dc  Bot Clip(in): 0.000          0.000                           Solution Incs: 10 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall *** Weir 1 of 2 for Drop Structure DRY BASIN OCS ***                                                                                   TABLE                   Count: 1                       Bottom Clip(in): 0.000                          Type: Vertical: Mavis            Top Clip(in): 0.000                          Flow: Both                     Weir Disc Coef: 3.200 11/16/20                Geometry: Circular              Orifice Disc Coef: 0.600                      Span(in): 10.00                        Invert(ft): 886.000                Rise(in): 10.00                  Control Elev(ft): 886.000 *** Weir 2 of 2 for Drop Structure DRY BASIN OCS ***                                                                                   TABLE                   Count: 1                       Bottom Clip(in): 0.000                          Type: Horizontal                 Top Clip(in): 0.000                          Flow: Both                     Weir Disc Coef: 3.200                      Geometry: Rectangular           Orifice Disc Coef: 0.600                Span(in): 24.00                        Invert(ft): 888.400                Rise(in): 24.00                  Control Elev(ft): 888.400 ========================================================================================== ==== Hydrology Simulations =============================================================== ==========================================================================================          Name: 002YR‐24HR      Filename: H:\2016\W160409\ENGINEERING\DESIGN\SITE DESIGN\DRAINAGE\POND MODELING\ICPR\002YR‐24HR.R32       Override Defaults: Yes     Storm Duration(hrs): 24.00           Rainfall File: Scsii‐24     Rainfall Amount(in): 2.93 Time(hrs)       Print Inc(min) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 24.000          5.00 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐          Name: 010YR‐24HR      Filename: H:\2016\W160409\ENGINEERING\DESIGN\SITE DESIGN\DRAINAGE\POND MODELING\ICPR\010YR‐24HR.R32       Override Defaults: Yes     Storm Duration(hrs): 24.00           Rainfall File: Scsii‐24     Rainfall Amount(in): 4.19 Time(hrs)       Print Inc(min) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 24.000          5.00 11/16/20 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐          Name: 100YR‐24HR      Filename: H:\2016\W160409\ENGINEERING\DESIGN\SITE DESIGN\DRAINAGE\POND MODELING\ICPR\100YR‐24HR.R32       Override Defaults: Yes     Storm Duration(hrs): 24.00           Rainfall File: Scsii‐24     Rainfall Amount(in): 5.82 Time(hrs)       Print Inc(min) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 24.000          5.00 ========================================================================================== ==== Routing Simulations ================================================================= ==========================================================================================          Name: 002YR‐24HR          Hydrology Sim: 002YR‐24HR      Filename: H:\2016\W160409\ENGINEERING\DESIGN\SITE DESIGN\DRAINAGE\POND MODELING\ICPR\002YR‐24HR.I32       Execute: Yes         Restart: No            Patch: No   Alternative: No         Max Delta Z(ft): 1.00                     Delta Z Factor: 0.00500     Time Step Optimizer: 10.000         Start Time(hrs): 0.000                     End Time(hrs): 30.00      Min Calc Time(sec): 0.5000               Max Calc Time(sec): 60.0000         Boundary Stages:                          Boundary Flows: Time(hrs)       Print Inc(min) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 30.000          5.000 Group           Run ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐ BASE            Yes ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐          Name: 010YR‐24HR          Hydrology Sim: 010YR‐24HR      Filename: H:\2016\W160409\ENGINEERING\DESIGN\SITE DESIGN\DRAINAGE\POND MODELING\ICPR\010YR‐24HR.I32 11/16/20       Execute: Yes         Restart: No            Patch: No   Alternative: No         Max Delta Z(ft): 1.00                     Delta Z Factor: 0.00500     Time Step Optimizer: 10.000         Start Time(hrs): 0.000                     End Time(hrs): 30.00      Min Calc Time(sec): 0.5000               Max Calc Time(sec): 60.0000         Boundary Stages:                          Boundary Flows: Time(hrs)       Print Inc(min) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 30.000          5.000 Group           Run ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐ BASE            Yes ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐          Name: 100YR‐24HR          Hydrology Sim: 100YR‐24HR      Filename: H:\2016\W160409\ENGINEERING\DESIGN\SITE DESIGN\DRAINAGE\POND MODELING\ICPR\100YR‐24HR.I32       Execute: Yes         Restart: No            Patch: No   Alternative: No         Max Delta Z(ft): 1.00                     Delta Z Factor: 0.00500     Time Step Optimizer: 10.000         Start Time(hrs): 0.000                     End Time(hrs): 30.00      Min Calc Time(sec): 0.5000               Max Calc Time(sec): 60.0000         Boundary Stages:                          Boundary Flows: Time(hrs)       Print Inc(min) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 30.000          5.000 Group           Run ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐ BASE            Yes 11/16/20 WATERFRONT OF WEST CLAY SECTION 5B ‐ W160409‐5B NE DETENTION CALCULATIONS ICPR BASIN REPORT      Simulation          Basin          Group  Time Max  Flow Max    Volume    Volume                                                     hrs       cfs        in       ft3 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐      002YR‐24HR          EX‐NE           BASE     12.17      2.47     0.665     10339      010YR‐24HR          EX‐NE           BASE     12.12      5.98     1.442     22398      100YR‐24HR          EX‐NE           BASE     12.12     11.30     2.640     41012      002YR‐24HR          PR‐NE           BASE     12.13      2.03     0.858      7381      010YR‐24HR          PR‐NE           BASE     12.09      4.27     1.728     14862      100YR‐24HR          PR‐NE           BASE     12.09      7.59     3.021     25986 11/16/20 WATERFRONT OF WEST CLAY SECTION 5B ‐ W160409‐5B NE DETENTION CALCULATIONS ICPR NODE REPORT                                      Max   Warning Max Delta  Max Surf       Max       Max            Name     Simulation     Stage     Stage     Stage      Area    Inflow   Outflow                                       ft        ft        ft       ft2       cfs       cfs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐    DRY BASIN NE     002YR‐24HR    886.86    888.20    0.0050      1590      1.97      1.58    DRY BASIN NE     010YR‐24HR    887.51    888.20    0.0050      2507      4.22      2.74    DRY BASIN NE     100YR‐24HR    888.45    888.20    0.0050      3793      7.52      4.05  EX LONG BRANCH     002YR‐24HR    881.50    881.50    0.0000         0      2.47      0.00  EX LONG BRANCH     010YR‐24HR    881.50    881.50    0.0000         0      5.84      0.00  EX LONG BRANCH     100YR‐24HR    881.50    881.50    0.0000         0     10.89      0.00  PR LONG BRANCH     002YR‐24HR    883.00    883.00    0.0000         0      1.58      0.00  PR LONG BRANCH     010YR‐24HR    883.00    883.00    0.0000         0      2.74      0.00  PR LONG BRANCH     100YR‐24HR    883.00    883.00    0.0000         0      4.05      0.00 11/16/20 SECTION A-A SECTION B-B A A BB DRY BASIN OUTLET STR. #82 NOT TO SCALE DETAIL EXHIBIT WEIHE weihe.net Indianapolis, Indiana 46280 10505 N. College Avenue 317 | 846 - 6611E N G I N E E R S 11/16/20 SPILLWAY DETAIL NOT TO SCALE WEIHE weihe.net Indianapolis, Indiana 46280 10505 N. College Avenue 317 | 846 - 6611E N G I N E E R S DETAIL EXHIBIT 11/16/20 PIPE SIZING CALCULATIONS 11/16/20 STONE LAKE DRIVEW WWWW WW W WWW66 656463 6261595857 565554WWPRAIRIE FALCONDRIVENP = 898.832 YR = 899.05EXISTING PONDTOP OF BANK = 900.1SPILLWAY=899.7*** 10 YR = 899.25100 YR = 899.6052536768697172156157158 **EXISTING PONDNP = 898.83100 YR = 899.602YR =899.0510YR = 899.25TOP OF BANK = 900.1SPILLWAY = 899.7FIGURE 3.1 EXISTING CONDITIONS EXHIBIT Date: November 14, 2019 WEIHE weihe.net Indianapolis, Indiana 46280 10505 N. College Avenue 317 | 846 - 6611 E N G I N E E R S WATERFRONT OF WEST CLAY SECTION 5B CARMEL, IN 11/16/20 S89°29'45"E 200.01'NP = 898.832 YR = 899.05EXISTING PONDTOP OF BANK = 900.1SPILLWAY=899.710 YR = 899.25100 YR = 899.60STONE LAKEDRIVEW WW WW W W W WW W66 656463 62615857565554W WPRAIRIE FALC ONDRIVENP = 898.832 YR = 899.05EXISTING PONDTOP OF BANK = 900.1SPILLWAY=899.7*** 10 YR = 899.25100 YR = 899.60525367 68 69 70 7172156 157158 **BLOCK "B"271.77 AC.300.44 AC.310.37 AC.159160 161162163164165 166 167179180 181178177176175182183184168 169 17017117217317418530072.27 AC. 30031.17 AC.30040.47 AC.30050.89 AC.30061.51 AC.30080.07 AC.390.67 AC.400.67 AC.410.51 AC.331.01 AC.33A0.57 AC.350.36 AC.360.87 AC.30020.61 AC.EXISTING PONDNP = 898.83100 YR = 899.602YR =899.0510YR = 899.25TOP OF BANK = 900.1SPILLWAY = 899.730100.83 AC.30110.51 AC.380.04 AC.430.58 AC.75 1.14 AC.FIGURE 3.2 STORM INLET BASIN MAP Date: August 26, 2020 WEIHE weihe.net Indianapolis, Indiana 46280 10505 N. College Avenue 317 | 846 - 6611 E N G I N E E R S WATERFRONT OF WEST CLAY SECTION 5B CARMEL, IN 11/16/20 Project: Date: Job No.: Checked By: Prepared By: Typical Driveway (Ld, Wd) 29 16 Street Width, B-B (Wst) 30 Sidewalk Width (Wsw) 5 Walking Path Width (Wwp) 10 Str. # Total Pad Number Street Sidewalk Walking Total Impervious Total Pervious Composite Drainage Area, of Length Length Path Length Area Area "c" Value Area, At Apad Driveways Lst Lsw Lwp Aimp Aper (acre) (sq. ft.) (ft) (ft) (ft) (acre) (acre) Cw 43 0.58 11416 0 0 0 0 0.26 0.32 0.49 39 0.67 6336 0 0 0 0 0.15 0.52 0.34 40 0.67 10911 4 364 376 0 0.46 0.21 0.65 41 0.51 10670 3 364 340 0 0.44 0.07 0.76 33 1.01 18000 6 419 460 0 0.67 0.34 0.63 33A 0.57 0 0 419 0 0 0.14 0.43 0.36 35 0.36 0 0 424 0 0 0.15 0.21 0.46 36 0.87 9463 6 424 475 0 0.48 0.39 0.56 38 0.04 777 0.25 0 0 0 0.02 0.01 0.58 75 1.14 0 0 845 0 854 0.49 0.66 0.48 TPG BCH Composite "c" Value Calculations Waterfront Sec 5B 8/13/2020 W16-0409 11/16/20 Shallow Conc Flow Travel Time: Channel Flow Travel Time: Short Grass 0.15 Grass 0.03 Dense Grass 0.24 Concrete 0.015 Shallow Conc Flow (Unpaved): Pavement 0.011 Rip‐Rap 0.035 Shallow Conc Flow (Paved): 2 Yr, 24 Hr Rainfall= 2.66 Overland Flow Travel Time: Tc minimum= 5 Paved Gutter & Channel Flow Tc Basin Len S n T_t Len S n T_t Len S Pave/Un Vel T_t Len A Pw r S n Vel T_t (ft) % (min) (ft) % (min) (ft) % P or U (ft/s) (min) (ft) (sf) (ft) (ft) % (ft/s) (min) (min) 43 76 1.20 0.24 15 0 190 1.00 U 1.61 2 0 17.4 39 67 1.80 0.24 12 0 92 1.00 U 1.61 1 0 12.8 40 71 1.20 0.24 15 0 191 0.90 P 1.93 2 0 16.2 41 80 1.10 0.24 17 0 182 0.90 P 1.93 2 0 18.2 33 80 2.4 0.24 12 0 367 0.6 P 1.57 4 0 16.1 33A 100 1.1 0.24 20 0 106 0.6 P 1.57 1 0 21.0 35 30 3.20 0.24 5 0 205 0.63 P 1.61 2 0 7.1 36 80 2.70 0.24 12 0 281 0.63 P 1.61 3 0 14.5 38 51 1.70 0.24 10 0 0 0.00 P 0.00 0 0 9.7 75 100 0.60 0.24 25 0 543 1.60 U 2.04 4 0 29.8 Channel Flow Overland Flow Channel Flow Mannings Values (n) Overland Flow Overland Flow Shallow Conc. Flow Waterfront Sec 5B 8/13/2020 W16-0409 TPG BCH Time of Concentration Calculations Prepared By: Checked By: Job No.: Date: Project: 11/16/20 11/16/20 11/16/20 11/16/20 Project: Date: Job No.: Checked By: Prepared By: Min. Travel Lane Required =10ft Street Width =30ft Total Flow, %Net Flow, Longitudinal Cross Slope, Manning's Depth at Gutter Spread, Min. Clear Travel Q Flow Flow Qnet Slope, S Sx Coefficient, Casting, D GS Lane Width Str. # (cfs)Direction (%) (cfs) (%) (%) N (ft) (ft) (ft) Left 60 1.15 0.90 2.08 0.013 0.15 7.03 Right 40 0.77 0.60 2.08 0.013 0.14 6.51 Left 35 0.57 0.60 2.08 0.013 0.12 5.82 Right 65 1.06 0.90 2.08 0.013 0.14 6.81 Left 20 0.56 0.60 2.08 0.013 0.12 5.79 Right 80 2.25 0.60 2.08 0.013 0.20 9.74 Left 75 0.61 0.60 2.08 0.013 0.12 5.96 Right 25 0.20 0.60 2.08 0.013 0.08 3.95 Left 25 0.60 0.68 2.08 0.013 0.12 5.80 Right 75 0.63 0.88 2.08 0.013 0.12 5.63 Left 70 0.63 0.88 2.08 0.013 0.12 5.63 Right 30 0.60 0.68 2.08 0.013 0.12 5.80 Gutter Spread Calculations Waterfront Sec. 5B 3/13/2020 W16-0409 TPG BCH 40 1.92 12.2 41 1.63 33 2.81 10.3 33A 0.81 35 0.95 14.4 36 2.25 11/16/20 Project: Date: Job No.: Checked By: Prepared By: Single Double Weir Flow (d<0.3') 1.4 2.8 Orifice Flow (d>0.4') 4.6 9.2 0.7 1.4 Gutter Spread 3.45 4.6 0.1 Min. Travel Lane Required = 10 ft 2.00 Street Width = 30 ft Flow, Depth Depth Street Cross Gutter Spread, Gutter Spread, Clear Travel Q # of Weir, d Orifice, d Slope, Sx GS (weir) GS (orifice) Lane Width Inlet Type Str. # (cfs) Inlets (ft) (ft) (%) (ft) (ft) (ft) (single/double) 40 1.92 2 0.27 0.08 2.08 10.10 0.97 DOUBLE INLET 41 1.63 2 0.24 0.06 2.08 8.77 0.00 DOUBLE INLET 33 2.81 2 0.35 0.17 2.08 13.83 5.29 DOUBLE INLET 33A 0.81 1 0.18 0.06 2.08 5.99 0.00 SINGLE INLET 35 0.95 1 0.20 0.08 2.08 6.98 0.90 SINGLE INLET 36 2.25 2 0.30 0.11 2.08 11.54 2.39 DOUBLE INLET Curb Inlet Capacity Calculations Waterfront Sec. 5B W16-0409 TPG BCH 3/13/2020 P, 50% Clogged (ft) = A, 50% Clogged (ft2) = Weir Perimeter, P (ft) = Open Area, A (ft2) = Neenah R‐3501‐TR or TL 11.5 10.2 11.1 Casting Length, Cl (ft) = Casting Depth, Cd (ft) = 11/16/20 APPENDIX Section 5A Report May 10, 2016 11/16/20 10505 North College Avenue | Indianapolis, IN 46280 | .www.weihe.net | (317) 846-6611 | (800) 452-6408 | Fax: (317) 843-0546 Allan H. Weihe, P.E., L.S., - Founder STORMWATER TECHNICAL REPORT For: WATERFRONT OF WEST CLAY SECTION 5A 4455 W. 121st Street Carmel, Indiana Project #W16-0409 Revised Detention and Storm Infrastructure Calculations Prepared For: Waterfront Homes 12080 Abney Run Drive Zionsville, IN 46077 317-714-2406 Prepared By: Travis P. Gaither, P.E. Checked By: Alvin E. Skoog, Jr., P.E. Certified By: Travis P. Gaither, P.E. Date: 19 April 2017 Revised: 7 May 2018 25 July 2018 11/16/20 Stormwater Technical Report Prepared For: Waterfront of West Clay Section 5A Carmel, IN Project #W16-0409 TABLE OF CONTENTS 1. Project Narrative a. Overall Project Narrative b. Existing Conditions c. Proposed Conditions d. Location Maps 2. Revised Detention Calculations a. ICPR Routing Schematic b. ICPR Input Report c. ICPR Results Report d. Emergency Overflow Calculations e. Emergency Overland Spillway Detail 3. Pipe Sizing Calculations a. Existing Conditions Map b. Storm Inlet Basin Map c. Supporting Calculations d. Hydraflow Calculations e. Gutter Spread/Inlet Capacity f. Flood Routing Calculations 4. Appendix a. CESO – Section 2B Report – May 10, 2016 11/16/20 PROJECT NARRATIVE 11/16/20 Waterfront of West Clay Section 5A– Carmel, IN Weihe Engineers, Inc. 5/7/2018 Stormwater Technical Report Prepared For: Waterfront of West Clay Section 5A Carmel, IN Project #W16-0409 Project Narrative: Waterfront Homes is proposing to develop Section 5A in the “Waterfront of West Clay” subdivision on approximately 12+ acres of land in Carmel, Indiana. Section 5A will develop 13 single family residential lots. The overall development is located between 116th Street and 121st Street, approximately 0.6 miles east of US 421 (Michigan Road). Section 5A is east of Section 2C in the overall development. The proposed development is on a site at a Latitude of N 39° 57' 37" and Longitude W 86° 14' 01", falling within Carmel, Indiana. The site is generally located in the Southwest Quarter of Section 31, Township 18 North, Range 3 East, Clay Township, Hamilton County, Indiana. Please refer to Figure 1.1. Floodzone: Based upon a scaled interpretation of the Flood Insurance Map No.18057C0205G for Hamilton County, Indiana, dated November 19, 2017 Section 5A IS located within a Special Flood Hazard Area inundated by 100-year flood-Base Flood Elevation or Floodway Area in Zone AE. Zone AE for Long Branch Creek is adjacent to the overall site along the eastern boundary. See Figure 1.2. Overall Stormwater Design: The Schneider Corporation prepared a master drainage report dated February 10, 2004 for this development, which was then called “The Lakes at Hamilton Place”. Paul I. Cripe, Inc. then revised the master drainage calculations on July 31, 2006 and the name of the development was changed to “Sanctuary at 116th Street”. CESO has also submitted revised master drainage calculations for review with the most current drainage report dated May 10, 2016 for Section 2B. The current master plan detention is provided by two large existing ponds, the East Pond and the West Pond. The two existing ponds will provide all the necessary detention for the overall site and are not interconnected. Each pond discharges through their own 12” RCP with both discharge pipe systems eventually draining into Long Branch Creek. The entire subject tract is part of the Long Branch Creek Watershed. 11/16/20 Waterfront of West Clay Section 5A– Carmel, IN Weihe Engineers, Inc. 5/7/2018 Existing Conditions: Currently the subject tract is covered with grass and some sporadic trees. The subject tract is adjoined by future Waterfront of West Clay Sections to the north, existing Waterfront of West Clay Sections to the west, the existing West Pond to the south, and Long Branch Estates common area to the east. Refer to Figure 1.3. The subject tract consists of the following soil types: Brookston, Miami and Crosby. A soil map has been included with this report. 11/16/20 Waterfront of West Clay Section 5A– Carmel, IN Weihe Engineers, Inc. 5/7/2018 Proposed Conditions: The proposed Section 5A lies entirely within the master planned drainage basin for the East Pond. Section 5A does not require much infrastructure to be built to service the proposed lots. A stub of approximately 175’ of Prairie Falcon Drive has been designed in the Section 2C plans. This street will be extended to the end of the cul-de-sac with Stone Lake Drive providing a stub to the north of approximately 150’. The proposed improvements in Section 5A adheres to the approved master planned drainage basin of the East Pond from previous reports. Revised detention calculations have been included in Section 2 of this report. The CESO Section 2B revised drainage calculations contained two ICPR detention models, one was called “Schneider Original Master Plan Model-Cripe Revised” and the second was called “Schneider Original Master Plan Model-Cripe Revised and Updated”. It was noticed in each calculation that both pond outlets were regulated with a rating curve and operating table. This created inaccurate calculations because the elevations set for the rating curves to turn on were higher than the 100-year elevations for each pond, resulting in no discharge leaving the pond because the rating curve never turned on. Therefore, Weihe Engineers has recreated the ponds in ICPR with the existing outlets to create more accurate release rates and staging elevations for each pond. Please note that the direct discharge basins indicated in the overall master planned design are not included in the revised detention model as Section 5A is not included in these areas and these areas don’t impact the ponds. Pond Normal Pool Elev. Revised Pond Staging Revised Release Rates (cfs) 2-YR 10-YR 100-YR 2-YR 10-YR 100-YR East 898.83 899.05 899.25 899.60 1.93 3.56 4.20 West 898.88 899.16 899.48 899.98 2.66 3.66 4.49 Based on the results, it has been determined that the emergency overland spillway for each pond needs to be raised from the existing spillway elevation. The existing spillway elevation for the East Pond is currently 899.3 and is proposed to be raised to 899.7. The existing spillway elevation for the West Pond is 899.4 and needs to be raised to 900.0. Weihe Engineers propose that the emergency overland spillway for the east pond be relocated from the northeast corner of the pond to the east side of the pond during spillway reconstruction. Revised emergency overflow spillway calculations and a detail can be found in Section 2 of this report. Storm Sewers: The proposed Section 5A storm sewer design has changed somewhat from the original master plan. There is a storm change on Prairie Falcon Drive which now drains to the end of the cul-de-sac. This change will require revisions to the master storm layout, but does not change the master detention basin for the East Pond. The changes to the master storm layout will also not adversely impact any existing storm sewer infrastructure. 11/16/20 Waterfront of West Clay Section 5A– Carmel, IN Weihe Engineers, Inc. 5/7/2018 Future storm sewers north of Section 5A (Section 5) still need further design when those lots are designed and developed to convey runoff into the East Pond. The rear of lots 98-109 will drain directly into the East Pond. The rear lot of lot 110 will drain into a proposed inlet to be constructed with Section 2C. The frontage lots 98-109 will drain onto Prairie Falcon Drive, all but lot 98 and part of lot 99 will drain to the east to a new storm inlet at the end of the cul-de-sac. This storm system will discharge into the East Pond. The frontage of Lots 98, 110 and part of lot 99 will drain to the west and tie into the storm system designed in Section 2C. The remaining frontage of Lots 109 and 110 will drain onto Stone Lake Drive and tie into new storm inlets just north of these lots. These inlets will also drain lots to the north in a future section. This storm system will extend the outlet an upstream storm sewer system designed in Section 2C to the East Pond. The storm sewer system is designed to convey stormwater at a minimum velocity of 2.5 feet/second through reinforced concrete pipes. In accordance with the HERPIC manual, the 10 year design flow does not exceed the capacity of the proposed pipes. Refer to Section 3 for the pipe and inlet sizing calculations and Figure 3.2 for the Pipe Sizing Basin Map. Water Quality: Water quality for Section 5A of Waterfront of West Clay was provided and accounted for in the master plan for the development. 11/16/20 LOCATION MAP Date: May 7, 2018FIGURE 1.1 WEIHE weihe.net Indianapolis, Indiana 46280 10505 N. College Avenue 317 | 846 - 6611 E N G I N E E R S PROJECT LOCATION WATERFRONT OF WEST CLAY SECTION 5A CARMEL, IN 11/16/20 FEMA MAP Date: May 7, 2018FIGURE 1.2 WEIHE weihe.net Indianapolis, Indiana 46280 10505 N. College Avenue 317 | 846 - 6611 E N G I N E E R S PROJECT LOCATION WATERFRONT OF WEST CLAY SECTION 5A CARMEL, IN 11/16/20 AERIAL MAP Date: May 7, 2018FIGURE 1.3 WEIHE weihe.net Indianapolis, Indiana 46280 10505 N. College Avenue 317 | 846 - 6611 E N G I N E E R S PROJECT LOCATION WATERFRONT OF WEST CLAY SECTION 5A CARMEL, IN 11/16/20 Soil Map—Hamilton County, IndianaNatural ResourcesConservation ServiceWeb Soil SurveyNational Cooperative Soil Survey8/9/2017Page 1 of 34423500 4423550 4423600 4423650 4423700 44237504423500 4423550 4423600 4423650 4423700 4423750565210 565260 565310 565360 565410 565460 565510 565560 565610 565660565210 565260 565310 565360 565410 565460 565510 565560 565610 56566039° 57' 41'' N86° 14' 11'' W39° 57' 41'' N86° 13' 52'' W39° 57' 31'' N 86° 14' 11'' W39° 57' 31'' N86° 13' 52'' W NMap projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS840 100 200 400 600Feet0 30 60 120 180MetersMap Scale: 1:2,130 if printed on A landscape (11" x 8.5") sheet.Soil Map may not be valid at this scale.11/16/20 MAP LEGEND MAP INFORMATIONArea of Interest (AOI)Area of Interest (AOI)SoilsSoil Map Unit PolygonsSoil Map Unit LinesSoil Map Unit PointsSpecial Point FeaturesBlowoutBorrow PitClay SpotClosed DepressionGravel PitGravelly SpotLandfillLava FlowMarsh or swampMine or QuarryMiscellaneous WaterPerennial WaterRock OutcropSaline SpotSandy SpotSeverely Eroded SpotSinkholeSlide or SlipSodic SpotSpoil AreaStony SpotVery Stony SpotWet SpotOtherSpecial Line FeaturesWater FeaturesStreams and CanalsTransportationRailsInterstate HighwaysUS RoutesMajor RoadsLocal RoadsBackgroundAerial PhotographyThe soil surveys that comprise your AOI were mapped at1:15,800.Warning: Soil Map may not be valid at this scale.Enlargement of maps beyond the scale of mapping can causemisunderstanding of the detail of mapping and accuracy of soilline placement. The maps do not show the small areas ofcontrasting soils that could have been shown at a more detailedscale.Please rely on the bar scale on each map sheet for mapmeasurements.Source of Map: Natural Resources Conservation ServiceWeb Soil Survey URL:Coordinate System: Web Mercator (EPSG:3857)Maps from the Web Soil Survey are based on the Web Mercatorprojection, which preserves direction and shape but distortsdistance and area. A projection that preserves area, such as theAlbers equal-area conic projection, should be used if moreaccurate calculations of distance or area are required.This product is generated from the USDA-NRCS certified data asof the version date(s) listed below.Soil Survey Area: Hamilton County, IndianaSurvey Area Data: Version 17, Sep 14, 2016Soil map units are labeled (as space allows) for map scales1:50,000 or larger.Date(s) aerial images were photographed: Jun 27, 2014—Aug28, 2014The orthophoto or other base map on which the soil lines werecompiled and digitized probably differs from the backgroundimagery displayed on these maps. As a result, some minorshifting of map unit boundaries may be evident.Soil Map—Hamilton County, IndianaNatural ResourcesConservation ServiceWeb Soil SurveyNational Cooperative Soil Survey8/9/2017Page 2 of 311/16/20 Map Unit Legend Hamilton County, Indiana (IN057) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CrA Crosby silt loam, fine-loamy subsoil, 0 to 2 percent slopes 4.1 22.4% MmC2 Miami silt loam, 6 to 12 percent slopes, eroded 6.4 34.7% W Water 7.9 42.9% Totals for Area of Interest 18.4 100.0% Soil Map—Hamilton County, Indiana Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/9/2017 Page 3 of 3 11/16/20 REVISED DETENTION CALCULATIONS 11/16/20 WATERFRONT OF WEST CLAY - W160409 REVISED DETENTION CALCULATIONS ICPR BASIN REPORT A:POND WEST U:POND WEST ,v D:OUT WEST W:EX WEST WEIR ,v T:OUT WEST A:POND EAST U:POND EAST U:OFFSITE E POND "- D:OUT EAST W:EX EAST WEIR ,v T:OUT EAST 11/16/20 WATERFRONT OF WEST CLAY - W160409 REVISED DETENTION CALCULATIONS ICPR INPUT REPORT ========================================================================================== ==== Basins ============================================================================== ========================================================================================== Name: OFFSITE E POND Node: POND EAST Status: Offsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh484 Peaking Factor: 484.0 Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): 0.000 Time of Conc(min): 20.00 Area(ac): 3.164 Time Shift(hrs): 0.00 Curve Number: 70.00 Max Allowable Q(cfs): 999999.000 DCIA(%): 0.00 ------------------------------------------------------------------------------------------ ---------- Name: POND EAST Node: POND EAST Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh484 Peaking Factor: 484.0 Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): 0.000 Time of Conc(min): 27.00 Area(ac): 61.686 Time Shift(hrs): 0.00 Curve Number: 77.00 Max Allowable Q(cfs): 999999.000 DCIA(%): 0.00 ------------------------------------------------------------------------------------------ ---------- Name: POND WEST Node: POND WEST Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh484 Peaking Factor: 484.0 Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): 0.000 Time of Conc(min): 25.00 Area(ac): 52.161 Time Shift(hrs): 0.00 Curve Number: 77.00 Max Allowable Q(cfs): 999999.000 DCIA(%): 0.00 ========================================================================================== ==== Nodes =============================================================================== ========================================================================================== Name: OUT EAST Base Flow(cfs): 0.000 Init Stage(ft): 881.500 Group: BASE Warn Stage(ft): 881.500 Type: Time/Stage Time(hrs) Stage(ft) --------------- --------------- 0.00 881.500 99.00 881.500 11/16/20 ------------------------------------------------------------------------------------------ Name: OUT WEST Base Flow(cfs): 0.000 Init Stage(ft): 874.360 Group: BASE Warn Stage(ft): 874.360 Type: Time/Stage Time(hrs) Stage(ft) --------------- --------------- 0.00 874.360 99.00 874.360 ------------------------------------------------------------------------------------------ Name: POND EAST Base Flow(cfs): 0.000 Init Stage(ft): 898.830 Group: BASE Warn Stage(ft): 899.300 Type: Stage/Area Stage(ft) Area(ac) --------------- --------------- 898.000 16.8440 899.000 17.5280 900.000 18.2260 901.000 18.9240 901.570 19.0000 ------------------------------------------------------------------------------------------ Name: POND WEST Base Flow(cfs): 0.000 Init Stage(ft): 898.880 Group: BASE Warn Stage(ft): 899.400 Type: Stage/Area Stage(ft) Area(ac) --------------- --------------- 898.000 8.8010 899.000 9.2570 900.000 9.7180 901.000 10.1820 901.950 10.2000 ========================================================================================== ==== Drop Structures ===================================================================== ========================================================================================== Name: OUT EAST From Node: POND EAST Length(ft): 430.00 Group: BASE To Node: OUT EAST Count: 1 UPSTREAM DOWNSTREAM Friction Equation: Automatic Geometry: Circular Circular Solution Algorithm: Most Restrictive Span(in): 12.00 12.00 Flow: Both Rise(in): 12.00 12.00 Entrance Loss Coef: 0.500 Invert(ft): 897.660 881.500 Exit Loss Coef: 1.000 Manning's N: 0.013000 0.013000 Outlet Ctrl Spec: Use dc or tw Top Clip(in): 0.000 0.000 Inlet Ctrl Spec: Use dc Bot Clip(in): 0.000 0.000 Solution Incs: 10 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall 11/16/20 Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall *** Weir 1 of 1 for Drop Structure OUT EAST *** TABLE Count: 1 Bottom Clip(in): 0.000 Type: Horizontal Top Clip(in): 0.000 Flow: Both Weir Disc Coef: 3.200 Geometry: Rectangular Orifice Disc Coef: 0.600 Span(in): 18.00 Invert(ft): 898.830 Rise(in): 18.00 Control Elev(ft): 898.830 ------------------------------------------------------------------------------------------ ---------- Name: OUT WEST From Node: POND WEST Length(ft): 134.00 Group: BASE To Node: OUT WEST Count: 1 UPSTREAM DOWNSTREAM Friction Equation: Automatic Geometry: Circular Circular Solution Algorithm: Most Restrictive Span(in): 12.00 12.00 Flow: Both Rise(in): 12.00 12.00 Entrance Loss Coef: 0.500 Invert(ft): 897.860 889.830 Exit Loss Coef: 0.000 Manning's N: 0.013000 0.013000 Outlet Ctrl Spec: Use dc or tw Top Clip(in): 0.000 0.000 Inlet Ctrl Spec: Use dc Bot Clip(in): 0.000 0.000 Solution Incs: 10 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall *** Weir 1 of 1 for Drop Structure OUT WEST *** TABLE Count: 1 Bottom Clip(in): 0.000 Type: Horizontal Top Clip(in): 0.000 Flow: Both Weir Disc Coef: 3.200 Geometry: Rectangular Orifice Disc Coef: 0.600 Span(in): 18.00 Invert(ft): 898.880 Rise(in): 18.00 Control Elev(ft): 898.880 ========================================================================================== ==== Weirs =============================================================================== ========================================================================================== Name: EX EAST WEIR From Node: POND EAST 11/16/20 Group: BASE To Node: OUT EAST Flow: None Count: 1 Type: Vertical: Fread Geometry: Trapezoidal Bottom Width(ft): 18.00 Left Side Slope(h/v): 20.00 Right Side Slope(h/v): 20.00 Invert(ft): 899.300 Control Elevation(ft): 899.300 Struct Opening Dim(ft): 9999.00 TABLE Bottom Clip(ft): 0.000 Top Clip(ft): 0.000 Weir Discharge Coef: 3.200 Orifice Discharge Coef: 0.600 ------------------------------------------------------------------------------------------ ---------- Name: EX WEST WEIR From Node: POND WEST Group: BASE To Node: OUT WEST Flow: None Count: 1 Type: Vertical: Fread Geometry: Trapezoidal Bottom Width(ft): 20.00 Left Side Slope(h/v): 100.00 Right Side Slope(h/v): 100.00 Invert(ft): 899.400 Control Elevation(ft): 899.400 Struct Opening Dim(ft): 9999.00 TABLE Bottom Clip(ft): 0.000 Top Clip(ft): 0.000 Weir Discharge Coef: 3.200 Orifice Discharge Coef: 0.600 ========================================================================================== ==== Hydrology Simulations =============================================================== ========================================================================================== Name: 002YR-24HR Filename: C:\USERS\GAITHERT\DESKTOP\WORK\SANCTUARY\ICPR\002YR-24HR.R32 Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scsii-24 Rainfall Amount(in): 2.93 Time(hrs) Print Inc(min) --------------- --------------- 24.000 5.00 ------------------------------------------------------------------------------------------ ---------- Name: 010YR-24HR Filename: C:\USERS\GAITHERT\DESKTOP\WORK\SANCTUARY\ICPR\010YR-24HR.R32 Override Defaults: Yes 11/16/20 Storm Duration(hrs): 24.00 Rainfall File: Scsii-24 Rainfall Amount(in): 4.19 Time(hrs) Print Inc(min) --------------- --------------- 24.000 5.00 ------------------------------------------------------------------------------------------ ---------- Name: 100YR-24HR Filename: C:\USERS\GAITHERT\DESKTOP\WORK\SANCTUARY\ICPR\100YR-24HR.R32 Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scsii-24 Rainfall Amount(in): 5.82 Time(hrs) Print Inc(min) --------------- --------------- 24.000 5.00 ========================================================================================== ==== Routing Simulations ================================================================= ========================================================================================== Name: 002YR-24HR Hydrology Sim: 002YR-24HR Filename: C:\USERS\GAITHERT\DESKTOP\WORK\SANCTUARY\ICPR\002YR-24HR.I32 Execute: Yes Restart: No Patch: No Alternative: No Max Delta Z(ft): 1.00 Delta Z Factor: 0.00500 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 End Time(hrs): 30.00 Min Calc Time(sec): 0.5000 Max Calc Time(sec): 60.0000 Boundary Stages: Boundary Flows: Time(hrs) Print Inc(min) --------------- --------------- 30.000 5.000 Group Run --------------- ----- BASE Yes ------------------------------------------------------------------------------------------ ---------- Name: 010YR-24HR Hydrology Sim: 010YR-24HR Filename: C:\USERS\GAITHERT\DESKTOP\WORK\SANCTUARY\ICPR\010YR-24HR.I32 Execute: Yes Restart: No Patch: No Alternative: No Max Delta Z(ft): 1.00 Delta Z Factor: 0.00500 Time Step Optimizer: 10.000 11/16/20 Start Time(hrs): 0.000 End Time(hrs): 30.00 Min Calc Time(sec): 0.5000 Max Calc Time(sec): 60.0000 Boundary Stages: Boundary Flows: Time(hrs) Print Inc(min) --------------- --------------- 30.000 5.000 Group Run --------------- ----- BASE Yes ------------------------------------------------------------------------------------------ ---------- Name: 100YR-24HR Hydrology Sim: 100YR-24HR Filename: C:\USERS\GAITHERT\DESKTOP\WORK\SANCTUARY\ICPR\100YR-24HR.I32 Execute: Yes Restart: No Patch: No Alternative: No Max Delta Z(ft): 1.00 Delta Z Factor: 0.00500 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 End Time(hrs): 30.00 Min Calc Time(sec): 0.5000 Max Calc Time(sec): 60.0000 Boundary Stages: Boundary Flows: Time(hrs) Print Inc(min) --------------- --------------- 30.000 5.000 Group Run --------------- ----- BASE Yes 11/16/20 WATERFRONT OF WEST CLAY - W160409 REVISED DETENTION CALCULATIONS ICPR BASIN REPORT Simulation Basin Group Time Max Flow Max Volume Volume hrs cfs in ft3 -------------------------------------------------------------------------------------- 002YR-24HR OFFSITE E POND BASE 12.13 2.01 0.675 7751 010YR-24HR OFFSITE E POND BASE 12.13 4.72 1.456 16723 100YR-24HR OFFSITE E POND BASE 12.09 8.87 2.660 30546 002YR-24HR POND EAST BASE 12.18 54.75 1.021 228724 010YR-24HR POND EAST BASE 12.18 108.59 1.959 438661 100YR-24HR POND EAST BASE 12.18 184.74 3.318 742956 002YR-24HR POND WEST BASE 12.17 48.42 1.021 193406 010YR-24HR POND WEST BASE 12.17 95.65 1.959 370927 100YR-24HR POND WEST BASE 12.17 162.32 3.318 628235 11/16/20 WATERFRONT OF WEST CLAY - W160409 REVISED DETENTION CALCULATIONS ICPR NODE REPORT Max Warning Max Delta Max Surf Max Max Name Simulation Stage Stage Stage Area Inflow Outflow ft ft ft ft2 cfs cfs ------------------------------------------------------------------------------------------ OUT EAST 002YR-24HR 881.50 881.50 0.0000 0 1.93 0.00 OUT EAST 010YR-24HR 881.50 881.50 0.0000 0 3.56 0.00 OUT EAST 100YR-24HR 881.50 881.50 0.0000 0 4.20 0.00 OUT WEST 002YR-24HR 874.36 874.36 0.0000 0 2.66 0.00 OUT WEST 010YR-24HR 874.36 874.36 0.0000 0 3.66 0.00 OUT WEST 100YR-24HR 874.36 874.36 0.0000 0 4.49 0.00 POND EAST 002YR-24HR 899.05 899.30 0.0030 764926 55.93 1.93 POND EAST 010YR-24HR 899.25 899.30 0.0030 771055 112.01 3.56 POND EAST 100YR-24HR 899.60 899.30 0.0031 781829 191.60 4.20 POND WEST 002YR-24HR 899.16 899.40 0.0050 406481 48.30 2.66 POND WEST 010YR-24HR 899.48 899.40 0.0049 412841 95.54 3.66 POND WEST 100YR-24HR 899.98 899.40 0.0050 422893 161.95 4.49 11/16/20 WATERFRONT OF WEST CLAY - W160409 REVISED DETENTION CALCULATIONS ICPR LINK REPORT Max Max Max Max Name Simulation Flow Delta Q US Stage DS Stage cfs cfs ft ft ----------------------------------------------------------------------- EX EAST WEIR 002YR-24HR 0.00 0.000 0.00 0.00 EX EAST WEIR 010YR-24HR 0.00 0.000 0.00 0.00 EX EAST WEIR 100YR-24HR 0.00 0.000 0.00 0.00 EX WEST WEIR 002YR-24HR 0.00 0.000 0.00 0.00 EX WEST WEIR 010YR-24HR 0.00 0.000 0.00 0.00 EX WEST WEIR 100YR-24HR 0.00 0.000 0.00 0.00 OUT EAST 002YR-24HR 1.93 0.022 899.05 881.50 OUT EAST 010YR-24HR 3.56 0.033 899.25 881.50 OUT EAST 100YR-24HR 4.20 0.046 899.60 881.50 OUT WEST 002YR-24HR 2.66 0.043 899.16 874.36 OUT WEST 010YR-24HR 3.66 0.064 899.48 874.36 OUT WEST 100YR-24HR 4.49 0.069 899.98 874.36 11/16/20 Weir Location Depth, d (ft) Bottom Width, b (ft) n Slope, S (ft/ft) Side Slope, y (H:V) Area, A (ft 2) Wetted Perimeter, Pw (ft) Hydraulic Radius, R (ft) Velocity, V (ft/s) Max. Discharge, Q (cfs) 1.25*MaxPond Inflow (cfs) CapacityCheckEAST POND 0.40 282.0 0.030 0.0200 4 113.44 285.30 0.40 3.80 240.21 239.50 OKWEST POND 1.00 61.0 0.030 0.0200 4 65.00 69.25 0.94 6.73 205.39 202.44 OKEmergency OverflowWeir CalculationsProject:Date:Job No.:Checked By:Prepared By:Waterfront of West Clay5/7/2018W16-0409AESTPG11/16/20 WEIHE weihe.net Indianapolis, Indiana 46280 10505 N. College Avenue 317 | 846 - 6611E N G I N E E R S DETAIL EXHIBIT 11/16/20 PIPE SIZING CALCULATIONS 11/16/20 51 52 53 67 68 BLOCK "D"BLOCK "C"EXISTING POND NP = 898.83 100 YR = 899.60 2YR =899.05 10YR = 899.25 TOP OF BANK = 900.1 SPILLWAY = 899.7 EXISTING POND NP = 898.83 100 YR = 899.60 2YR =899.05 10YR = 899.25 TOP OF BANK = 900.1 SPILLWAY = 899.7 FIGURE 3.1EXISTING CONDITIONS EXHIBITDate: May 7, 2018WEIHEweihe.netIndianapolis, Indiana 4628010505 N. College Avenue317 | 846 - 6611 E N G I N E E R SWATERFRONT OF WEST CLAYSECTION 5ACARMEL, IN11/16/20 121st STREETONLYWEST ROAD FM FM FMFMFM FM FM FM FM FM FM FM FM FM FMFM FM FM FM FM FM FME(A)E(A)E(A) E(A) E(A) E(A)E(A) E(A) E(A) E(A) E(A) E(A) E(A)E(A)E(A) E(A)E(A) E(A)E(A) E(A)E(A)80797877T(U)T(U) T(U) T(U) T(U) T(U) T(U)T(U) T(U)T(U)T(U) T(U) T(U) T(U)T(U)T(U) T(U)T(U) T(U)T(U) T(U) T(U) T(U) T(U) T(U)T(U)T(U)T(U)T(U) T(U)T(U) T(U) T(U)T(U)T(U) T(U)T(U)T(U)159160 161162 163164165 166 167 179180 18117818218318416849505152536768 69 70 71 72156157158 **BLOCK "B"BLOCK "D" BLOCK "A" BLOCK "C"EXISTING PONDNP = 898.83100 YR = 899.602YR =899.0510YR = 899.25TOP OF BANK = 900.1SPILLWAY = 899.7271.77 AC.300.44 AC.310.37 AC.66 6564 6362 616059585756 5554***30072.84 AC.30031.17 AC.30040.47 AC.30050.89 AC.30061.51 AC.30080.07 AC.391.21 AC.400.83 AC.410.63 AC.30020.61 AC. EXISTING PONDNP = 898.83100 YR = 899.602YR =899.0510YR = 899.25TOP OF BANK = 900.1SPILLWAY = 899.730100.83 AC.30110.51 AC.FIGURE 3.2 STORM INLET BASIN MAPDate: July 25, 2018WEIHEweihe.netIndianapolis, Indiana 4628010505 N. College Avenue317 | 846 - 6611 E N G I N E E R SWATERFRONT OF WEST CLAYSECTION 5ACARMEL, IN11/16/20 Project: Date: Job No.: Checked By: Prepared By: Typical Driveway (Ld, Wd) 29 16 Street Width, B-B (Wst) 30 Sidewalk Width (Wsw) 5 Walking Path Width (Wwp) 8 Str. # Total Pad Number Street Sidewalk Walking Total Impervious Total Pervious Composite Drainage Area, of Length Length Path Length Area Area "c" Value Area, At Apad Driveways Lst Lsw Lwp Aimp Aper (acre) (sq. ft.) (ft) (ft) (ft) (acre) (acre) Cw 27 1.77 27600 10 826 0 1.17 0.60 0.63 31 0.37 3000 1 308 264 0 0.22 0.15 0.58 30 0.44 7720 2 262 242 0 0.32 0.12 0.67 3004 0.47 9725 0 0 0 0 0.22 0.25 0.51 3005 0.89 13100 0 0 0 0 0.30 0.58 0.42 3006 1.51 20010 6 585 0 0.85 0.66 0.57 3007 2.84 18880 0 0 0 0 0.43 2.40 0.30 3008 0.07 1400 0 0 0 0 0.03 0.04 0.48 3010 0.83 12520 4 323 349 0 0.48 0.35 0.61 3011 0.51 5640 2 323 297 0 0.30 0.21 0.63 AES TPG Composite "c" Value Calculations Sanctuary Sect 5A 7/25/2018 W16-0409 11/16/20 Shallow Conc Flow Travel Time:Channel Flow Travel Time:Short Grass 0.15Grass 0.03Dense Grass 0.24Concrete 0.015Shallow Conc Flow (Unpaved):Pavement 0.011 Rip‐Rap 0.035Shallow Conc Flow (Paved):2 Yr, 24 Hr Rainfall=2.66Overland Flow Travel Time:Tc minimum= 5Paved Gutter & Channel FlowTcBasin Len S n T_t Len S n T_t Len S Pave/Un Vel T_t Len APwr S n Vel T_t(ft)% (min)(ft)% (min)(ft)% P or U (ft/s)(min)(ft)(sf)(ft)(ft)% (ft/s)(min)(min)2776 1.70 0.24 13 0 4290.60 P 1.575 0 18.031 70 1.00 0.24 16 0 141 1.10 p 2.13 1 0 16.630 74 1.00 0.24 16 0 146 1.10 P 2.13 1 0 17.43004 80 1.00 0.24 17 0 112 1.00 U 1.61 1 0 18.43005 80 1.00 0.24 17 0 156 1.30 U 1.84 1 0 18.73006 81 1.00 0.24 17 0 315 0.70 P 1.70 3 0 20.5300776 1.00 0.24 17 0 3391.10 U 1.69 3 0 19.93008 61 1.00 0.24 14 0 0 0.00 P 0.00 0 0 13.93010 80 1.00 0.24 17 0 178 1.18 P 2.21 1 0 18.63011 72 1.00 0.24 16 0 168 1.18 P 2.21 1 0 17.1Channel Flow Overland Flow Channel FlowMannings Values (n)Overland Flow Overland Flow Shallow Conc. Flow Sanctuary Sect 5A7/25/2018W16-0409AESTPGTime of ConcentrationCalculationsPrepared By:Checked By:Job No.:Date:Project:11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 Project:Date:Job No.:Checked By:Prepared By:Min. Travel Lane Required = 10 ftStreet Width = 30 ftTotal Flow, % Net Flow, Longitudinal Cross Slope, Manning's Depth at Gutter Spread, Min. Clear TravelQ Flow Flow Qnet Slope, S Sx Coefficient, Casting, D GS Lane WidthStr. # (cfs) Direction (%) (cfs) (%) (%) N (ft) (ft) (ft)Left 60 0.79 1.10 2.08 0.013 0.12 5.86Right 40 0.52 0.77 2.08 0.013 0.11 5.38Left 30 0.29 0.77 2.08 0.013 0.09 4.32Right 70 0.68 1.10 2.08 0.013 0.12 5.55Left 50 1.05 0.68 2.08 0.013 0.15 7.15Right 50 1.05 0.88 2.08 0.013 0.14 6.81Left 50 0.70 0.88 2.08 0.013 0.12 5.84Right 50 0.70 0.68 2.08 0.013 0.13 6.133010 2.1012.73011 1.39AESTPG30 1.3114.631 0.97Gutter Spread Calculations Sanctuary Sect 5A7/25/2018W16-040911/16/20 Project:Date:Job No.:Checked By:Prepared By:SingleDouble Weir Flow (d<0.3')1.42.8 Orifice Flow (d>0.4')4.69.20.71.4 Gutter Spread3.454.60.1 Min. Travel Lane Required = 10 ft2.00 Street Width = 30 ftFlow, Depth Depth Street Cross Gutter Spread, Gutter Spread, Clear TravelQ # of Weir, d Orifice, d Slope, Sx GS (weir) GS (orifice) Lane Width Inlet TypeStr. # (cfs) Inlets (ft) (ft) (%) (ft) (ft) (ft) (single/double)30 1.31 1 0.25 0.15 2.08 9.31 4.23 SINGLE INLET31 0.97 1 0.21 0.08 2.08 7.11 1.05 SINGLE INLET3010 2.10 2 0.29 0.09 2.08 10.90 1.72 DOUBLE INLET3011 1.39 2 0.22 0.04 2.08 7.60 0.00 DOUBLE INLET11.513.6Casting Length, Cl (ft) = Casting Depth, Cd (ft) = P, 50% Clogged (ft) = A, 50% Clogged (ft 2) = Weir Perimeter, P (ft) = Open Area, A (ft 2) = Neenah R‐3501‐TR or TL Sanctuary Sect 5AW16-0409AESTPG7/25/2018Curb InletCapacity Calculations11/16/20 Project: Date: Job No: Checked By: AES Prepared By: TPG Basin Q, (CFS) Area (Ac.) C-Value Tc (Min.) Intensity 3006 5.11 1.51 0.57 20.5 5.93 Duration Intensity 3005 2.31 0.89 0.42 18.7 6.19 5 9.12 3004 1.50 0.47 0.51 18.4 6.24 10 7.78 FUT 5.24 2.91 0.30 19.9 6.01 15 6.77 20 5.99 27 7.03 1.77 0.63 18.0 6.30 30 4.84 30 1.96 0.51 0.60 17.4 6.40 31 1.44 0.41 0.54 16.6 6.52 Rational Method Flow Calculations Waterfront Sect 5A August 7, 2017 W16-0409 City of Carmel IDF Curve 100-Year Flow 11/16/20 Project: Date: Job No: Checked By: AES Prepared By: TPG Cd = 0.8 for broad crested weir Inlet Peak Q, (CFS)Drainage Area (Ac.) Total 100-yr flow Total Area Weir Elevation Width of Weir Normal Depth Max Overflow Ponding Elevation 904.3 SY 109/136 1.77 7.03 1.77 903.20 5.00 0.5 903.7 FY 103/10527 3004 1.50 30 1.96 31 1.44 7.03 903.90 5.00 0.4 Waterfront Sect 5A August 7, 2017 W16-0409 D = (3/2)*((Q)/(Cd*SQRT(2*g)*W)))^(2/3) Flood Routing Calculations 100-Year Normal Depth 0.41 1.50 0.47 0.47 0.51 4.90 1.39 SY 110/111905.50 5.00 0.2 905.7 11/16/20 APPENDIX Schneider - Master Drainage Plan February 11, 2004 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 APPENDIX Paul I. Cripe, Inc. - Revised Drainage Plan July 31, 2006 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20 11/16/20