Loading...
HomeMy WebLinkAbout31LV - Truss Placement12-01-02 TOP 8-06-00 TOP 8-06-00 TOP 8-06-00 TOP 8-06-00 TOP 8-06-00 TOP 8-06-00 TOP 12-01-02 TOP 12-01-02 TOP 11-01-02 TOP 10-01-02 TOP 10-01-02 TOP 10-01-02 TOP 10-01-02 TOP 10-01-02 TOP Stick frame dormer atop deck Stick frame shed roof 10-01-02 TOP HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 Stick frame cricket Pad out gable end in the field HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 8-06-00 TOP HTU26 HGUS26-2 GE01 T02 MG01 GE02 GE03 TG01 T07 TG02 TG03 GE04 GE05 TG04 T09 GE06 GE07 GE08 V01 V02 V03 V04 V05 V06 V07 V08 V09 V10 V11 V12 GE09 V13 V14 V15 V16 V17 V18 V19 V20 V21 V22 V23 PBE01 PBE01 PBE02 PBE03 T01(11) T03(3) T04(5) T05(6) T06(2) T08(10) M01(2) T10(4) M02(5) PB01(26) PB02(4) PB03(5) 22-07-00 2-04-00 6-05-00 9-00-00 12-07-00 66-11-00 2-04-00 3-08-00 21-08-00 2-03-00 16-01-00 12-11-00 20-04-00 52-07-00 7-06-12 8-00 22-09-12 18-00-04 12-01-00 21-08-00 IRC 2018 TPI 2014 20TLL - 10TDL - 10BDL Wedgewood Building Company Hogan Residence - Bellamy 31 Laura Vista 1/4"=1' November 25, 2020 PH B20003465 CUSTOMER: LOCATION: MODEL: JOB #: DATE: DESIGNER: DESIGN INFORMATION: SCALE: 9028 Old SR 67 South Mooresville, IN 46158 (317) 834-5380 Truss Placement Guide 1) This layout is intended for the purpose of truss location and placement only. Refer to the building plans for actual building construction. 2) All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3) Trusses are spaced 24" on center unless otherwise noted. 4) Do not cut or modify trusses. 5) Refer to the individual truss design drawings for the location of member bracing, uplift and truss end reactions. 6) Installation of all temporary and permanent bracing is essential. See truss drawings, BCSI-B2 Summary Sheet and building designer requirements. 7) Non-bearing walls may not be shown on layout. Left end of truss, as shown on engineering drawing, is indicated by the triangle symbol