HomeMy WebLinkAbout31LV - Truss Placement12-01-02 TOP
8-06-00 TOP
8-06-00 TOP
8-06-00 TOP
8-06-00 TOP
8-06-00 TOP
8-06-00 TOP
12-01-02 TOP
12-01-02 TOP
11-01-02 TOP
10-01-02 TOP
10-01-02 TOP
10-01-02 TOP
10-01-02 TOP
10-01-02 TOP
Stick frame dormer atop deck
Stick frame shed roof
10-01-02 TOP
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
Stick frame cricket
Pad out gable end in the field
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
8-06-00 TOP
HTU26
HGUS26-2
GE01
T02
MG01
GE02
GE03
TG01
T07
TG02
TG03
GE04
GE05
TG04
T09
GE06
GE07
GE08
V01
V02
V03
V04
V05
V06
V07
V08
V09
V10
V11
V12
GE09
V13
V14
V15
V16
V17
V18
V19
V20
V21
V22
V23
PBE01
PBE01
PBE02
PBE03
T01(11)
T03(3)
T04(5)
T05(6)
T06(2)
T08(10)
M01(2)
T10(4)
M02(5)
PB01(26)
PB02(4)
PB03(5)
22-07-00 2-04-00 6-05-00 9-00-00 12-07-00
66-11-00 2-04-00 3-08-00
21-08-00 2-03-00 16-01-00 12-11-00
20-04-00 52-07-00
7-06-12
8-00
22-09-12 18-00-04 12-01-00
21-08-00
IRC 2018
TPI 2014 20TLL - 10TDL - 10BDL
Wedgewood Building Company
Hogan Residence - Bellamy
31 Laura Vista
1/4"=1'
November 25, 2020
PH
B20003465
CUSTOMER:
LOCATION:
MODEL:
JOB #:
DATE:
DESIGNER: DESIGN INFORMATION: SCALE:
9028 Old SR 67 South
Mooresville, IN 46158
(317) 834-5380
Truss Placement Guide
1) This layout is intended for the purpose of truss location
and placement only. Refer to the building plans for actual
building construction.
2) All dimensions shown 00-00-00 are in feet-inches-sixteenths.
3) Trusses are spaced 24" on center unless otherwise noted.
4) Do not cut or modify trusses.
5) Refer to the individual truss design drawings for the location
of member bracing, uplift and truss end reactions.
6) Installation of all temporary and permanent bracing is
essential. See truss drawings, BCSI-B2 Summary Sheet
and building designer requirements.
7) Non-bearing walls may not be shown on layout.
Left end of truss, as shown on engineering
drawing, is indicated by the triangle symbol