Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S101 - 31LV
DN HB HB 21' - 8" 2' - 3" 16' - 1" 12' - 11" 52' - 11" 3 1/2" 7' - 8 1/2" 3 1/2" 13' - 4" 3 1/2" 1' - 8 1/2" 3 1/2" 16' - 1" 3 1/2" 12' - 4" 3 1/2" 5' - 4 1/2" 7' - 6 1/2" 10' - 2 1/2" 2' - 1 1/2"3 1/2" 19' - 4" 3 1/2" 19' - 4 1/2" 1' - 6" 10' - 0" 1' - 6"3 1/2"27' - 5 1/2" 3 1/2" 3 1/2" 4' - 4" 3 1/2" 4' - 10 1/4" 5' - 1 3/4"5 1/2" 32' - 5 1/2" 10' - 0"10' - 11" 10"66' - 11"3 1/2"10' - 2"3 1/2"3' - 3"3 1/2"4' - 0" 3 1/2" 3' - 6 1/2"7"3' - 6" 3 1/2" 2' - 1" 3 1/2"12' - 1 1/2"3 1/2" 25' - 4" 3 1/2" 3 1/2"3' - 8 1/2" 3 1/2" 18' - 0" 3 1/2"3 1/2"21' - 8"3 1/2"5' - 0" 3 1/2" 6' - 6 1/2" 3 1/2" 3' - 8" 5 1/2"5' - 10"3' - 8 1/4"6' - 9 1/2" 3' - 9" 1' - 8 1/2" 7' - 6 1/4"1' - 9 3/4"12' - 9"10' - 11" 5 1/2"20' - 9 1/2" 10' - 10" 10" 9' - 8"3' - 5 1/2"3' - 4" 3' - 4" 8' - 2 1/2" 34' - 3" 52' - 7"20' - 4" 4' - 1 3/4" 10' - 9 3/4" 6' - 8 1/2" 5' - 9" 3 1/2" 1' - 8" 3 1/2" 4' - 3 1/2" 7' - 2" 3' - 1 1/2" 7" 3' - 7" 6' - 1" 3' - 7" 7" 3 1/2" 4' - 0" 3 1/2" 5' - 8 1/2" 3 1/2" 5' - 8" 1' - 6 1/2" 15' - 9 1/2" 3 1/2" 11' - 0" 3 1/2" 6' - 3" 3 1/2" 4' - 2" 3 1/2" 2' - 0 1/2" 1' - 11 1/2" 11' - 0" 3 1/2" 2' - 4" 6' - 5" 9' - 0" 12' - 7" 6' - 6" 3 1/2" 3' - 2 1/2" 3' - 2 1/2" 4' - 7 1/2" 4' - 4 1/2" 3 1/2" 12' - 0" 3 1/2" 6' - 3 1/2" 6' - 3 1/2" 22' - 7" 30' - 4" 52' - 11" 6' - 6 1/2" 4' - 2" 1' - 6 1/2" 8' - 5 1/2" 7' - 4" 5 1/2" 6' - 3" 3 1/2" 6' - 0" 3 1/2"16' - 7"14' - 5 1/2" 35' - 10 1/2" 1' - 6 3/4" 17' - 2 1/4" 12' - 6" 2' - 2" 3' - 0" 12' - 1" R.O. 12' - 8"9 1/2" 3 1/2" 4' - 8" 3 1/2" 2' - 0" 3' - 9" W.I.C. MASTER BATH FLEX ROOM 2-CAR GARAGE BATH 2 LAUNDRY MASTER BEDROOM DINING PANTRY 1- CAR GARAGE GREAT ROOM FOYER KITCHEN 18" H. SEAT EQ 7' - 0" 7' - 0" EQ 11' - 3 1/2" 11' - 3 1/2" 17' - 9" 6' - 3 1/2" 6' - 3 1/2" 1' - 11" 15' - 9 1/2" 8"DW OPNG.9' FIN.72' - 11"OPTIONAL 1x8 X 1x8 WOOD BOX BEAMS W/REVEAL AT BOTTOM FACE (5 EACH) SEE DETAIL ON SHEET A-2.10 BULKHEAD @ 9'-6" TO BOTTOM 1' - 1"3' - 0"3' - 3"3 1/2"6' - 3 1/2" 3 1/2"3 1/2"3' - 1 1/2" 3 1/2"3 1/2" 244DH3060 244DH3060 244DH3060 2020 FX3020 FX3020 FX 3050 DH 3050 DH 4046 GW 2020 FX 2020 FX 2020 FX244DH2860244DH2860244DH2860 4076 FX 244DH3060244DH3060 244DH3060 244DH2446 CW145244DH3060 16070 OVHD.8070 OVHD. 286824682‐16682868 28682‐2068 2868 28682‐20682868 2868 2‐2068 2868 3/0‐C/ODWO9'-0" BH 9'-0" BH 9'-0" BHZERO THRESHOLD 13' - 4" 3' - 6 1/4" 3 1/2" 3' - 6 1/4"1' - 0"LANAI 7 1/8" 9'-6" BULKHEAD5' - 10"5' - 0" BEAM BEAM 10" SQ. COL. 10" SQ. COL. TRAY CLG. LINE 9'-1 1/8" CLG. HT. 10'-1 1/8" CLG. HT. 10'-1 1/8" CLG. HT. 10'-1 1/8" CLG. HT.10'-1 1/8" CLG. HT. 12'-1 1/8" CLG. HT. 10'-1 1/8" CLG. HT. 10'-1 1/8" CLG. HT. 10'-1 1/8" CLG. HT. COVERED PORCH LVL BEAM 12" DIA. COL. w/SQ. BASE/CAP. 8'-6" WALL HEIGHT ABOVE MAIN FLOOR 8'-6" WALL HEIGHT ABOVE MAIN FLOOR 10'-1 1/8" H. WALL 12'-1 1/8" H. WALL 12'-1 1/8" H. WALL12'-1 1/8" H. WALLFACE OF TRIM FLUSH TO COLUMN FACE 28682 x10 DROP FLOOR FRAMING FOR MUD PAN BULLNOSE DW CORNERS IN GREAT ROOM 3' - 10 1/2" SOAP NICHE 7'-0" HDR./36" H SILL w/1 SHELF 1 1/2"3 1/2" 22' - 0" 3 1/2"DOWN 16R/15T@10" R.C.3' - 6" 2' - 10" 6' - 0"2880 FP1x4 BATTENS OVER SEAM ON THE BEAD BOARD. LAYOUT TO CENTER ON WINDOWS. 1 1/2" 6'-3" H. BULKHEAD ABOVE REFG. 42" NOVUS D.V.F.P. R.O. 48" W x 34 7/8" H x 19-5/8"D ON 5 1/2" TALL PLATFORM 6" 9' - 0 1/2" 12' - 11 1/2" 1x4 BATTENS OVER SEAM ON THE BEAD BOARD. LAYOUT TO CENTER ON WINDOWS. TOILET C.L. TOILET C.L.3 1/2"3' - 4 1/2"75' - 1 1/2"42" FIREPLACEPROVIDE 2X12 WOOD BLOCKING IN WALLS FOR FUTURE GRAB BARS @ 30" A.F.F. TO CENTER PROVIDE VERTICAL BLOCKING POCKET OFFICE 2' - 3" 8' - 7" 6' - 10 1/2" 11'-1 1/8" CLG. HT.9'-0" BH15' - 5 1/2" 2868 2868 9' - 4"23' - 8"1' - 4"EQ EQ 2' - 0" 9' - 4" 2' - 0"2' - 0" 14' - 0" 2' - 0"3/0‐8/0 5' - 0"4076 FX4076 FX 4026 FX4026 FX4026 FX 4' - 11"1' - 0 1/2"33' - 0"42" VILLAWOOD F.P. R.O. 48" W x 39 3/4" H x 21-1/2"D ON 12" TALL PLATFORM 6' - 4"21' - 8" 2' - 3"2' - 4"4 1/2" 4 1/2" 2 6 1x8 WOOD TRIM 1x6 WOOD TRIM 1x8 WOOD TRIM 2x BLOCKING @ 16" O.C. 2x NAILER BLOCKING @ 16" O.C. BETWEEN TRUSSES 7"7 1/4"1/2" GWB DBL 11 7/8" JST 9 1/2" JOIST TAPER SHOWER BASE TO DRAIN ON CENTER. HANGER PER PLAN 1ST FLOOR ROUGH FRAMING NOTES: 1. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL CUSTOMER:PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:Copyright © 2020 Wedgewood Building Co. LLC. Approved For Construction Owner Signature:_________________________ Date:_________ Owner Signature:_________________________ Date:_________ Architect Signature:_______________________ Date:_________ Wedgewood Building Co., LLC32 First Street NECarmel, IN 46032317.669.6300www.wedgewoodbc.com11/17/2020 2:46:43 PM A6The Hogan ResidenceLot #31 - Laura Vista2670 Rix Court, Carmel, IN, 460331ST FLOOR ROUGH FRAMING PLAN ABL 1/4" = 1'-0"1 1ST FLOOR ROUGH FRAMING 1 1/2" = 1'-0"2 1x8 BOX BEAM 1 1/2" = 1'-0"4 DROPPED FLOOR SHOWER DETAIL Rev.No. Date Description12/02/20