HomeMy WebLinkAboutS100.0 - First Floor MasterWIC.MATCH LINERIGHT
SIDE
LEFT
SIDE
K-3322-RAGABRIELLETOILETSVITREOUS CHINA
K-3322-RAGABRIELLETOILETSVITREOUS CHINA
K-3322-RAGABRIELLETOILETSVITREOUS CHINAK-3322-RAGABRIELLETOILETSVITREOUS CHINA
POOL 24' X 24'
FIRST FLOOR SQ. FT.
5,163 S.F. FINISHED LIVING
557 S.F. COVERED TERRACE
326 S.F. FRONT PORCH
986 S.F. OUTDOOR ENTERTAINING
1,675 S.F. GARAGE & CART
LAUNDRY
BUTLER'S
PANTRY
GEAR
KITCHEN
4 - BAY
GARAGE
TRASH
STORAGE
/ BIKES
GATHERING
DINING
FOYER
COVERED
TERRACE
OFFICE
GUEST
SUITE
KING
KING
WIC.
HIS
HER'S
MASTER
SUITE
LUGGAGE
8' X 8'
SPAMATCH LINERIGHT
SIDE
LEFT
SIDE
OUTDOOR
ENTERTAINING
GRILLE
PORCH
WIC.
1
A-7.0
1
A-7.0
1
A-7.1
1
A-7.1
HALL
COVERED
PORCH
153 S.F. GRILLE PORCH
1
A-7.2
1
A-7.2
FOOD
PANTRY
STOR.
PDR.
2020-0710
10-20-2020
Project No:
Sheet Title
REVISIONS
Date:
Sheet No.1806 Burning Tree LaneCarmel, IN 46032"FANCHER RESIDENCE"A New Residence for the:GARY NANCE DESIGN720 3rd Avenue South West Carmel, IN 46032317.605.2196 Pgnance@garynancedesign.com garynancedesign.comThese design concepts are the property of Gary Nance Designand may not be used without approval from Gary Nance DesignA R C H I T E C T S+A S S O C I A T E S2520 Durbin DriveCarmel , Indiana 46032317-733-8525hsark@sarkassociates.com1. THESE DRAWINGS INDICATE THE "GENERAL SCOPE" OF THE PROJECT IN TERMS OF
THE ARCHITECTURAL ELEMENTS AND THE TYPE OF STRUCTURAL SYSTEM. AS
SCOPE DOCUMENTS, THESE DRAWINGS DO NOT NECESSARILY INDICATE OR
DESCRIBE ALL WORK REQUIRED FOR FULL PERFORMANCE AND COMPLETION OF THE
REQUIREMENTS FOR CONSTRUCTION. AS SCOPE DOCUMENTS ALL STRUCTURAL
ITEMS SHOWN ARE CONCEPTUAL AND HAVE NOT BEEN DESIGNED OR ENGINEERED
BY SARK & ASSOCIATES. THE STRUCTURAL SYSTEM IN IT'S ENTIRETY ARE THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE TRADE SUB-CONTRACTORS
SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND
COMPLETION OF THE WORK.
2. ALL WORK ON THIS PROJECT MUST COMPLY WITH ALL CURRENT LOCAL, STATE, &
NATIONAL CODES APPLICABLE.
3. VERIFY ALL EXISTING CONDITIONS PRIOR TO THE START OF CONSTRUCTION AND
NOTIFY THE ARCHITECT IMMEDIATELY OF ANY CONFLICTS PRIOR TO PROCEEDING
WITH THE WORK.
4. G.C. SHALL VERIFY ALL SOIL CONDITIONS AND ASSURE THAT THE SOIL BEARING
CAPACITY IS ADEQUATE FOR ALL NEW FOOTING LOADING REQUIREMENTS.
SPECIAL GENERAL CONDITIONS
FIRST FLOOR - MASTER PLAN
SCALE: 1/8" = 1'-0"
FLOOR PLAN -
MASTER PLAN
A-4.0
166'-8"89'-0"54'-0" 14'-0"2'-4"18'-8"8'-0" 27'-0" 18'-8" 60'-4" 15'-4" 8'-8" 12'-8" 16'-0"89'-0"5'-8" 1'-4"2'-0" 17'-0" 16'-0" 9'-0" 16'-0"166'-8"
16'-0" 10'-0" 7'-0" 37'-8" 42'-4" 19'-0" 7'-0" 5'-8"9'-4"8'-0"23'-0"6'-0"14'-0"3'-0"9'-6"13'-0" 12'-6"14'-0"8'-0" U:\02-RESIDENTIAL L-Z\Nance, G\2020-0616_Fancher\01-CDs\2020-0710_Fancher_FF Plan.dwg, 10/20/2020 7:19:36 PM,_DWG To PDF.pc312/08/20