HomeMy WebLinkAboutP1-100-PLUMBING-FLOOR-PLAN---FOUNDATION-AND-GROUND-FLOOR-Rev.0Z
�
K
m
�
�
a
_
U
W
�
m
a
m
0
rn
�
K
�
�
�
g o
a a
o �
i
z
3
4
�
�
I 1
I
�
FDG-� �
WHVD-i,i
\/
� ��
I U p
ORD I � LL �- 6"SPUP
m�
GPi I I f. I 15
� FDV � � CW
OPEN TO ABOVE II
S v
I SP-1 -" S
WCO
� t vz• SPo � r
4" DS ,
� CO �
� �4 � � FD-2
coo
11/2"NG ,� eo�,
oRo
cPi
FLOOR ELEVATION
834 8
'—"". .__'��I��
oSGi
WHVD-1
�
3
0
� � SS VS �
� vs ss —. � Wco I Wco —� �� vs ss ��
SS VS
_ „� _ �� _ � wco wco � � �s �s �
n GROUND FLOOR PLAN I uNORTH
3/32" = 1'-0"
A P,
,
� ' ��
O i __
i �"
13
GCO
12 � r-0 8" 6AN 8" 6/
NVERT
83�.95' 4,• v 11
� �J. �'�. II
�� �
RELEA5E0 FOR CONSTRUCTION
Suhjec��o compliance with allregula�ions
04 S�a�e antl Local Codes
City of Carmel
,
�{�n„� i,.�a�'
\
onrE: 03/19/20
INVERT 832 9]'
U2" SPD
SS
-0 a os
FCO
INVERT 835.50'
I�
FD2
4" DS
55
aP
SAN � 6"
� C
ST INVERT 835.50'
/
d
SAN�6" SAN—
FCO
a• os
�
INVERT 031.00'
GCO
�
S$
n FOUNDATION PLAN %�NORTH
Usisz,.=,,_o,.
� SS SS �
aP ap a
� 6" SAN � 6" SAN ' SAN�" S/
\� FCO
^�-6" ST 6" ST�
SANINVERT835.50'� A��
Fco sr
4" DS �
[
55
7
� B,1 Ai.
DSC-1
I" I
SS
� INVERT835.50' -�
55
ss 4., ps J ss
�"�
O DRAWING NOTES
1 PIPING RUN IN TRUSS SPACE ABOVE.
HOLD AS HIGH AS POSSIBLE.
2 DSC-1 LOCATED ABOVE GARAGE
PODIUM DECK.
3 PROVIDE ORDINARY HAZARD GP-1
SPRINKLER SYSTEM IN GROUND FLOOR
STORAGE.
4 PIPING BELOW FLOOR.
5 PROVIDE BALL VALVE ON COLD WATER
RISER.
6 PROVIDE CONNECTION TO PIPING
PROVIDED UNDER GAR4GE PACKAGE.
7 PIPING PROVIDED UNDER GARAGE
PACKAGE.
8 HOT AND COLD WATER SUPPLIES FROM
FIRST FLOOR.
9 PIPINGABOVECEILINGANDABOVE
CEILWG INSULATION.
10 STUB AND CAP COLD WATER FOR
FUTURE USE.
11 PROVIDE CAPPED PIPING FOR FUTURE.
12 PROVIDE CONNECTION TO PIPWG
PROVIDED BY CIVIL CONTRACTOR.
13 PIPING BELOW FLOOR.
14 WATER SUPPLY FROM FIRST FLOOR.
15 COORDINATE FOR EXPANSION OF 3" AT
EXPANSION JOINT.
16 UP TO UNIT ABOVE.
17 INDICATES AREAS OF GAS METERS
PROVIDED BY VECTREN.
18 PROVIDE CONNECTION TO OUTLET OF
EACH METERAND EXTEND INDIVIDUAL
SUPPLY TO EACH UNIT.
19 PIPING RUN ABOVE FINISHED CEILING,
COORDINATE LOCATION WITH OTHER
sPRwK�ER TRADES.
suPP�v ro ZO RISE TO MECHANICAL CLOSET ABOVE
cRouNo AND DROP TO UNITS ON GROUND
FLOOR
FLOOR.
` � 6F�P 21 RISER TO MECHANICAL CLOSETS
ABOVE.
22 RISERS TO SERVE MECHANICAL UNITS
�� rs ON FIRST THRU THIRD FLOOR.
�23 PIPING RUN AT UNDERSIDE OF
Fs STRUCTURE ABOVE.
24 PROVIDE 1-1/2" NG FROM METER TO
SHELLED SPACE. TERMINATE AT
SHELLED SPACE WITH VALVED STUB.
25 2" GAS TO SERVE TANKLESS WATER
HEATERSLOCATED ON GROUNDTHRU
THIRD FLOORS.
26 SUPPLY DOMESTIC HOT WATER TO MB-1
(MOPBASIN). WSTALLTHERMOSTATIC
CONTROL VALVE ON SUPPLY PER
DETAIL 1-P1-001.
27 3/4" COLD WATER SUPPLIED FROM FIRST
FLOOR MECHANICAL CLOSET.
28 WH1 (WATER HEATER) MOUNTED IN
LOCATION AS DIRECTED BY OWNER.
PROVIDE COLD WATER SUPPLY TO ET1
AND HEATER AND HOT WATER SUPPLY
� TO DWIFAUCET.EXTENDT&P
DISCHARGE TO WHDP7 FOR INDIRECT
DISCHARGE. PROVIDE ISOLATION
VALVES ON COLD AND HOT WATER
SUPPLIES.
INVERT 835.50'
SS
6" SP �
I CSS � F�
INVERT 829AP
s
�
4
% �
\� 3
�U
1 2
NORTH
KEY PLAN �
G
��_
WOOLPERT
axwirec.une�eNmxeexix��ceosrnru�
76351nterective Way
Suite 100
Indianapolis, IN
46278
317.299.7500
FAX: 377.291.5805
novo�::
�;< .
�r"o ,•G„�.
IVo. Pc11tlOG2[% ;�
- P
uli�Tc(i' . n.
F
��
D
C
4�
�
��
�
W
�
�
O
W
�
W
�
�
J •�
W �
a--�
� V �
� v . �
� O a
O � N
� � ❑
� w` � ��
� W � `o m
�a
� � � O C
L � d
U � � ��
�
m - U
0 Issuances:
Proi. No.: 074904
Date: 10/24/18
A Sheet Name:
PLUMBING FLOOR
PLAN-FOUNDATION
AND GROUND FLOOR
P1-100