Loading...
HomeMy WebLinkAboutTruss layoutStick frame porch roof 10-01-02 TOP 12-01-02 TOP 12-01-02 TOP HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HGUS26-2 HGUS26-2 HGUS26-2 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 MUS26 2x4 ledger GE01 GE02 TG01 TG02 MG01 GE03 GE04 TG03 TG04 T07 T08 T09 J02 TG05 T10 CG01 J03 J04 V01 V02 V03 V04 V05 V06 V07 V08 V09 V10 V11 V12 V13 GE05 V14 V15 V16 V17 V18 PB02 T01(15) T03(6) T02(5) T05(16) T05(2) T06(2) M01(15) T04(9) PB01(10) 6-08-00 79-11-00 14-05-00 18-09-00 16-01-00 54-11-00 31-08-00 22-00-00 8-08-00 18-07-00 7-00-08 14-01-08 IRC 2018 TPI 2014 20TLL - 10TDL - 10BDL Homes by McKenzie Inc Hackney 220 Bridgemont 1/4"=1' November 19, 2020 PH B20003442 CUSTOMER: LOCATION: MODEL: JOB #: DATE: DESIGNER: DESIGN INFORMATION: SCALE: 9028 Old SR 67 South Mooresville, IN 46158 (317) 834-5380 Truss Placement Guide 1) This layout is intended for the purpose of truss location and placement only. Refer to the building plans for actual building construction. 2) All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3) Trusses are spaced 24" on center unless otherwise noted. 4) Do not cut or modify trusses. 5) Refer to the individual truss design drawings for the location of member bracing, uplift and truss end reactions. 6) Installation of all temporary and permanent bracing is essential. See truss drawings, BCSI-B2 Summary Sheet and building designer requirements. 7) Non-bearing walls may not be shown on layout. Left end of truss, as shown on engineering drawing, is indicated by the triangle symbol