Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Walk-Path Estimate
ESTIMATE OF PROBABLE COSTS PROJECT: TANNER REPLAT DATE: December 3, 2020 LOCATION: CARMEL ITEM: SUMMARY JOB #: W200416 DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL STRIPPING - TOPSOIL 100 CYDS $3.25 $325.00 EARTHMOVING 100 CYDS $4.25 $425.00 FINISH GRADING 600 SYDS $1.80 $1,080.00 SEEDING 550 SYDS $0.50 $275.00 SILT FENCING 300 LF $1.50 $450.00 5' CONC. WALK 140 LF $15.00 $2,100.00 10' ASPHALT WALKING PATH 140 LF $30.00 $4,200.00 CONTINGENCIES (15%)$1,328.25 T O T A L $10,183.25 NOTES: THIS ESTIMATE PREPARED TO REFLECT THE INSTALLATION COST OF 10' MULTI-PURPOSE PATH AND SIDEWALK INSTALLATION ONLY. ESTIMATE PREPARED FROM PRIMARY PLAT DATED OCTOBER 14, 2020, REVISED DECEMBER 3, 2020 Weihe Engineers 10505 N. College Avenue Indianapolis, IN 46280 317-846-6611