Loading...
HomeMy WebLinkAbout42230009 - GR2 53 - Truss DetailsDE DANSCO ENGINEERING, LLC P.O. Box 3400 Apollo Beach, FL 33572 Telephone (813) 645-0166 Facsimile (813) 645-9698 The truss drawing(s) attached have been prepared by Dansco Engineering, LLC under my direct supervision and control based on the parameters provided by Stark Truss Inc. Job: 2006030-12T 18 truss design(s) 79125-W1 12/03/2020 Samuel A. Greenberg, P.E. Indiana Reg. #19700485 Note: Gable end frames with stud lengths exceeding 4’ require permanent bracing. On structural gables, where studs may be made from two or more boards as they cross diagonals, the 4’ length is the distance from the top chord to bottom chord. The seal on these drawings indicate acceptance of professional engineering responsibility solely for the truss components shown. The suitability and use of this component for any particular building is the responsibility of the building designer, per ANSI/TPI 1-2014 Chapter 2. Warning !—Verify design parameters and read notes before use. These designs are based only upon parameters shown, and are for individual building components to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component is responsibility of building designer – not truss designer or truss engineer. Bracing shown is for lateral support of individual web members only. Additional temporary bracing to ensure stability during construction is the responsibility of the erector. Additional permanent bracing of the overall structure is the responsibility of the building designer. For general guidance regarding fabrication, quality control, storage, delivery, erection and bracing, consult ANSI/TPI 1 National Design Standard for Metal Plate Connected Wood Truss Construction and BCSI 1-03 Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses from Truss Plate Institute, 583 D’Onofrio Drive, Madison, WI 53719 DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Œ ª¤ª¤ªº¤Œ ª¤ª¤ª¤Ł Ø Œ º Łº Œ Ø º Œ Ł Ø ˝º ˝ ˝ ˝ ˝ ˝ ˝ ˝ ˝ ŁŁ ŁØØ˝‰¿·» ª Ø —·¿‹» ””›»‹› ł¨ ˙¯ˆ –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝º–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ º · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi ·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› Ł ł· ¿¤ –fi•ƒªº ł º ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ Ø Ł »¤‰»‹ ªŁŁ ł ºªŒŁ ł ªØº ł ªº ł ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› º Œ Ø Ł ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ŒØªŁ æØ ØŁªŁæØ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ¤‹»fi•–fił ‹– –fi †»fił˛ ‹– ¤‹»fi•–fił ‹– Ł ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ł ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ fi«›› ‹– » ”«··§ ›‚»¿‹‚»… ”fi–‡ –†» ”¿‰» –fi ›»‰«fi»·§ fi¿‰»… ¿„¿•†›‹ ·¿‹»fi¿· ‡–“»‡»†‹ ł•» …•¿„–†¿· '» ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Ł Ø Œ »¤‰»‹ ł¶‹ª· ª ªŁ Ø ªØ ºªŒŁ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º Œ –‡‡–† ˝«–fi‹»… ¿·»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» ¿†„ŁfiÆ–—”‡†”¿Ł §·ƒ‰‡»‚—«˚Ø“¶«•˘Ø¶˝••˚˛¨Æ›¨˙fi§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Œ ª¤ ª¤Œ ª¤Œ ª¤ª¤ ª¤Œ ªº¤Œ ª¤Œ ª¤Œ ª¤Œ ª¤ª¤º Ł Ø ŒºŁ Ø Œ º Œ º º ŁØ ºØ Œ Œ Ø º Ł Ł ˝Ł ˝Ø ˝Œ ˝º ˝ ˝ ˝ ˝ ˝Ø ˝Œ ˝º ˝ ˝ ˝ ˝ ˝ ˝ ØØ ºØ Ø Œ ºŒ ŒºŁŁØºŁ˝‰¿·» ª Œ Ø —·¿‹» ””›»‹› ł¨ ˙¯…„»ˆ ¯…„»ˆ ¯ºŁˆ ¯ºŁˆ –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • º˚»fi‹ł ºØæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł ºŁ ˛» ˝‹fi»›› †‰fi ˙˝Ł –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Ø · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ¤‰»‹ ¤ ˝— ˝‹«… ˝¤ ˝— ˝‹«… ˛˝¤ ˝— ˝‹«… ¤‰»‹ ˝Ł ˝Ø˝Œ˝º¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi ·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi ¿‰•†„ ¤‰»‹ –‰ fi ¿‰•†„ ºŒ º ˝ ˛–' ¿‹ ‡•…‹Œ Ø Ł Ł •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝·· »¿fi•†„› ºŒ »¤‰»‹ Œª ł· ¿¤ –fi•ƒŒª ł ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ Ø Ł Ø Ł »¤‰»‹ ºª ł Ø ºªº ł Œ Œª ł Ø ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› º Œ Ø Ł Ø Ł º Œ »¤‰»‹ ŒªŒ ł Ø ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ºŒªŁæº ŒØ ªæ ØØ ØŁªŁæ Ł Łªºæº Ł ªæŒ ªŒ æº ªŁæ ºŁ ªŁæºŁ ªŒ æº ªæŒ ªºæº ºªŁæ ºŒªæŒ ˝ŒªæŁ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ŒŒ ¤‹»fi•–fił ŒŒ ‹– –fi†»fił˛ ‹– º ¤‹»fi•–fił º ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ł fi«›› ‹– » ”«··§ ›‚»¿‹‚»… ”fi–‡ –†» ”¿‰» –fi ›»‰«fi»·§ fi¿‰»… ¿„¿•†›‹ ·¿‹»fi¿· ‡–“»‡»†‹ ł•» …•¿„–†¿· '» ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› »¿fi•†„ ¿‹ ¶–•†‹ł› º ‰–†›•…»fi› ¿fi¿··»· ‹– „fi¿•† “¿·«» «›•†„ ˝æ— ¿†„·» ‹– „fi¿•† ”–fi‡«·¿ «•·…•†„ …»›•„†»fi ›‚–«·… “»fi•”§ ‰¿¿‰•‹§ –” »¿fi•†„ ›«fi”¿‰» —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Ø Ł Ł Ø Œ »¤‰»‹ ł¶‹ª· Œª ºªº ºª ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º Œ ˛––” ˝»‰•¿· ˝«–fi‹»… ¿·»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» ƒ†»¿—“…‹»“§fl§·ƒ‰»‚—«˚Ø“¶«•˘Ø¶˝•‡º˚˛¤Æ ›¨˙fi§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Œ ª¤ª¤ ªº¤Œ ªº¤Œ ªº¤Œ ªº¤Œ ªº¤Œ ª¤ª¤ Œ ºŁØ Œ ºŁ Ø Œ º Ø º º ŁŒ ØØ ŒŁ º Ł ˝ ˝ ˝Ł ˝Ø ˝Œ ˝º ˝ ˝ ˝ ˝ ˝ ˝Ł ˝Ø ˝Œ ˝º ˝ ˝ ˝ ˝ Œ ŒØºŁ˝‰¿·» ª Œ ØŁ —·¿‹» ””›»‹› ł¨ ˙¯ºˆ ¯ˆ ¯…„»ˆ –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛˝¤ ˝— ˝‹«… ¤‰»‹ ˝˝˝Ł˝Ø¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi ·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹º Œ Ł º •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝·· »¿fi•†„› Œ ł· ¿¤ –fi•ƒŒªŁ ł º ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ Ø Ł Œ Ł »¤‰»‹ ºªŒŒ ł Ø ºªŁ ł Œ Œª ł ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› º Œ Ø Ł Œ Ł º Œ »¤‰»‹ ºªºŒ ł Ø ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ØŁªæØ Łªæ Ł ªŁ æŒ ŁªŒæØ ªŒæº ªŒæ ŒŁ ªŒæŒŁ ªŒæº ªŒæØ ºªŁ æŒ ºŒªæ Œ ØªæØ ˝ºªŁæØ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ¤‹»fi•–fił ‹– –fi†»fił˛ ‹– ¤‹»fi•–fił ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ł ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ fi«›› ‹– » ”«··§ ›‚»¿‹‚»… ”fi–‡ –†» ”¿‰» –fi ›»‰«fi»·§ fi¿‰»… ¿„¿•†›‹ ·¿‹»fi¿· ‡–“»‡»†‹ ł•» …•¿„–†¿· '» ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Œ Ł Ł Ø Œ »¤‰»‹ ł¶‹ª· Œª ºªØ ºªŒº ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º Œ –‡‡–† ˝«–fi‹»… ¿·»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» …†Œ —”‚‹ˇ‡‚`˚§·ƒ‰“•fi†·„«`›Ł‚ˇƒ«“‡”º¿§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Œ ªº¤ ª¤Œ ª¤Œ ª¤ ª¤ ª¤Ł ª¤ ª¤Œ ªº¤ Ł Ø Œ Ø ºŒ º Ł º º º Ł ŁØØ ˝‰¿·» ª ŒŁ –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • ºŒ ˚»fi‹ł Ł Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºŒº˚»fi‹ł Œ Ł Ł Ł ˛» ˝‹fi»›› †‰fi ˙˝Ł –fiƒł Ł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Łº · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi ·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ŁªŒŁ æŒ ł‡•† Ł ªŒŁ æŒ ł‡•† Ł ¿¤ –fi•ƒªº ł ¿¤ ¸·•”‹ŁªŁ ł Ø ªŁ ł Œ ¿¤ fi¿“ŁªØØ ł ªØØ ł ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªŒæ ªŒæ ªººæ ºªººæ ºŒ ªŒæ ºŒ ªŒæ ˛ªØŒæ ªØŒæ ŁªŁæ ˝ªØæ ªŒ æŒ ºŁ ªŒæŒ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ¤‹»fi•–fił˛ ‹– †‹»fi•–fi ł ‹– Ł ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ł · «·•”‹ ¿‹ ¶–•†‹ ¿†… Ł · «·•”‹ ¿‹ ¶–•†‹ Ł Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º Œ –‡‡–†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» ‡†§‰•Œ ƒÆŁ—`»˙§·ƒ¿»‚—«˚Ø“¶«•˘Ø ¶˝••˛˚¸ØÆ ›¨˙fi§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Œ ªº¤ ª¤ ª¤Œ ªŒ¤Œ ª¤ ª¤Œ ª¤Ł ª¤ ªŒ¤Œ ª¤Œ ª¤ªº¤ Ł Ø Œ ºº Œ ŁØ º Ł Ø Ø Ø Ł Œº ºº Œº Œ Œ Œ Ł ŒŒ ŒŒ ºŒØØ ˝‰¿·» ª ŒŒ —·¿‹» ””›»‹› ł¨ ˙¯Ł ˆ ¯ºŁ ˆ –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • ººº˚»fi‹ł ºØæ ˝†–' ł—”æ—„ºæ «‡»fi ºŒ ˚»fi‹ł Ł ˛» ˝‹fi»›› †‰fi ˙˝Œ –fiƒł Ł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi ·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ŁªŒŁ æŒ ł‡•† Ł ªŒŁ æŒ ł‡•† Ł ¿¤ –fi•ƒªº ł ¿¤ ¸·•”‹ŁªŁ ł Ø ªŁ ł Œ ¿¤ fi¿“ŁªØØ ł ªØØ ł ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ºªØæØ ºªæ ØŒ ŒªØ Øæº ŒØªŒ æ ØªŒæ Œ ŁªŒ æØ ŁªŒæ ºªØØæº ºªæ Œ ŒªØæŒ Ø ªØŁŒæŒ ŒŁªØ ŁŒæº ˛ªØŁæ ªØ 溺 ªºæŒºŁ ªŒæŒºŁ ªØŁæ ºªØæ ˝ªæØ ªŒæŒ ŒªæŒ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ¤‹»fi•–fił˛ ‹– †‹»fi•–fi ł ‹– Ł ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ł · «·•”‹ ¿‹ ¶–•†‹ ¿†… Ł · «·•”‹ ¿‹ ¶–•†‹ Ł Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º Œ ˛––” ˝»‰•¿·– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» Ƨ§¿¨fi`“˙˙˚˚ƒ»`»Œ•fi†·„«`›Ł‚ˇƒ“»˛…º¿§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Œ ª¤ ª¤Œ ªº¤ª¤ª¤ ª¤Œ ª¤ ª¤ ª¤ ª¤ ª¤Œ ªº¤Œ ª¤Ł ª¤Œ ª¤ ª¤ ª¤ ªº¤Œ ª¤Œ ªŒ¤Œ ª¤Ł Ø Œ º Ø Ł ºØ Œº Œ º º Ł ŒŒ Ø Ł ØØ Ø ŒºŒŒ Œ Œº º ŒŒ Ø Œº Œ Œº º ŒºŒŒ Œ ŒŒ Ø Œº ŒºŁŁØºŁ˝‰¿·» ª Œ Ø —·¿‹» ””›»‹› ł¨ ˙¯ˆ ¯…„»Łˆ –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • ºŒ ˚»fi‹ł Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºº˚»fi‹ł Œ Ł ˛» ˝‹fi»›› †‰fi ˙˝Œ –fiƒł Œ †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ¤‰»‹ ¤ ˝— ˝‹«… ˝¤ ˝— ˝‹«… ¤‰»‹ ŁŒ ؤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Ł –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ØŒ ºŒ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæŒ ł‡•† Œ ªæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ –fi•ƒª ł ¿¤ ¸·•”‹ªØ ł Ø ª ł Œ ¿¤ fi¿“ªº ł ªºØ ł ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªŁ æ ªŁ æŁ ªØŒ æº ºªŒºæ ºªŁæ ªŒæ Œªæº ŒºªæØ ºŒªŒæØ ØŒ ªØæ º ØŁªŁºŒæ Ł ªŁ ŁæØ Ø ªºæŁ Ø ªæŁŒ ªºŒæØŁ ªØØæŒ ˛ŁªŁŁæ ØŁ ªºæ Ø Œ تºæØ ºŒªæºŁ ºªæ ºŁ ªæØŁ ˝ªŁæ ªŒŁæ ªæ ŒŒªºæŁŁ ØŒªŒºæ ºŁ ªŁæŒ ªºæØ ØªæØ Łªæ ºŒ ªæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– Œ †‹»fi•–fi ł Œ ‹– ¤‹»fi•–fił˛ ‹– º †‹»fi•–fi ł º ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… Ø · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º Œ ˛––” ˝»‰•¿·– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» flØ˙ƃŒ¸›†”¸fl¸–«Ł‰˙§·ƒ»‚—«˚Ø“¶«•˘Ø ¶˝•»˝˚˚ÆÆ ›¨˙fi§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Œ ª¤ ª¤Œ ªº¤ª¤ª¤ ª¤Œ ª¤ ª¤ ª¤ ª¤ ª¤Œ ªº¤Œ ª¤Ł ª¤Œ ª¤ ª¤ ª¤ ªŒ¤Œ ª¤Œ ªº¤Œ ª¤Ł Ø Œ º Œ Ł ºØ º Œ º º Ł ŒŒ Ø Ł Ø ŒºŒŒ Œ Œº º ŒŒ Ø Œº Œ ŒºŒº º ŒŒ Ø ŒŒ Œ Œº ŒºŁŁØºŁ˝‰¿·» ª Œ ºŁ —·¿‹» ””›»‹› ł¨ ˙¯ˆ ¯…„»Łˆ –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • ºŒ ˚»fi‹ł Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºº˚»fi‹ł ºŁ ˛» ˝‹fi»›› †‰fi ˙˝Ø –fiƒł Œ †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ¤‰»‹ ¤ ˝— ˝‹«… ˝¤ ˝— ˝‹«… ¤‰»‹ ŁŒ ؤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi ·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹Øº ºº •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæŒ ł‡•† º ªæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ –fi•ƒª ł ¿¤ ¸·•”‹ª ł Ø ª ł Œ ¿¤ fi¿“ªºŁ ł ªºŁ ł ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªŁ æ ªŁ æŁ ªØŒ æº ºªŒºŒæ ºªæ ªŒæ Œªæº ŒªæŒ ºªŒæŒ غªŁæ ØŁªŁŒæ Ł ªŁ ŁØæ Œ ªæŁŁ Œ ªØæŁ ªæŒ ªØŁæŒ ˛ØŁªºæ ŒØ ªºŁæ Ł ºŒªºŁæŁ ºªæºŁº ªæ ºŁº ªæØºŁ ˝ŁªŁØæ ªŒŁæŁ Łªæº ŒºªæŁŁ غªŒŒæ ºØ ªŒŁæŒŒ ªºæØ Øªæº Ł ªºØæº تºæº ººªæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– Œ †‹»fi•–fi ł Œ ‹– ¤‹»fi•–fił ˛ ‹– º †‹»fi•–fi ł º ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º ºŒ ˛––” ˝»‰•¿·– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» flØ˙ƃŒ¸›†”¸fl¸–«Ł‰˙§·ƒ»‚—«˚Ø“¶«•˘Ø ¶˝•»˙˚¸„Æ ›¨˙fi§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Œ ªº¤Œ ª¤ºªº¤ª¤ ªº¤Œ ªŒ¤Ł ª¤ª¤ ª¤Œ ª¤Œ ªº¤ ªº¤Œ ª¤Ł ª¤Œ ª¤ ª¤ ª¤Œ ª¤ ªŒ¤Œ ªº¤Œ ª¤ Ø Œ º Ł Ø Ł ºØ Œº Œ ºŒ Œ Ł Ł ØØ º Ø Œ ŒºŒº º Œº Ø ŒØŁ ØŁ Œº Œ Œ Œ ØØ ŒºŒº º Œº Ø Œº ŒºŁŁØºŁ˝‰¿·» ª Œ غ —·¿‹» ””›»‹› ł¨ ˙¯ˆ ¯…„»Ł ˆ ¯ŁŁ ˆ –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • ºŒ ˚»fi‹ł ºØæ ˝†–' ł—”æ—„ºæ «‡»fi ºº˚»fi‹ł ºŁ ˛» ˝‹fi»›› †‰fi ˙˝Œ –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ º · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ¤‰»‹ ¤ ˝— ˝‹«… ˝¤ ˝— ˝‹«… ¤‰»‹ ŁØ¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi ·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ¤‰»‹ º –‰ fi¿‰•†„ Ł Œ –‰ fi¿‰•†„ ŒØ ˝ ˛–' ¿‹ ‡•…‹ºº Ø º •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæŒ ł‡•† º ªæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ –fi•ƒª ł ¿¤ ¸·•”‹ª ł Ø ª ł Œ ¿¤ fi¿“ªºŁ ł ªºŁ ł ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªŁæ Ø ªØæ ªæ ªæ ØŒ ºªºæ ºªŒ æ ªŒæŁ ŒªºæØ Œºªºæº ºŒ ªŒæ Œ ØŒªæ ØŁ ªØæ ŁªŁ Œæ Ø ªæ ØªØæŁ ªŁØæŁ ªæŒ ˛ªŁØæØ ŁªØŒæº ºŒ ªºæ ºªæºŁº ªæºŁº ªæØºŁ ˝ŁªæŒŁ ºŁªæ ØØ ººªŁæ ŒºªæŁØ غªŒºæºØ Øªæ Ł ªºØæº ºŒªŁØºæŒ ŒŁ ªŒ æŒŁº ªæŁ ªŒŁæŒ Œ ªæºº ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– Œ †‹»fi•–fi ł Œ ‹– Ø ¤‹»fi•–fił ˛ Ø ‹– º †‹»fi•–fi ł º ‹– Ø ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º ºŒ ˛––” ˝»‰•¿·– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» flØ˙ƃŒ¸›†”¸fl¸–«Ł‰˙§·ƒ»‚—«˚Ø“¶«•˘Ø¶˝•…˚Æ–Æ ›¨˙fi§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Œ ª¤ ªŒ¤Œ ª¤Œ ªŒ¤Œ ª¤ ª¤ ª¤ ª¤Œ ªº¤Œ ª¤Ł ª¤Œ ª¤ ª¤ ª¤ ªŒ¤Œ ª¤Œ ªŒ¤Œ ª¤Ł Ø Œ º Œ Ł ºØ º Œ Œ Ø Œºº Œº Ł ŒºŒº Œ ŒºŒº Œ Œº Œº Œº Ł Œº Œ ŒºŒºŒº Œ Œº ŒºØºŁ˝‰¿·» ª Œ ØŁ —·¿‹» ””›»‹› ł¨ ˙¯ˆ ¯ˆ ¯…„»Łˆ –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • ºŒ ˚»fi‹ł Œ Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºº˚»fi‹ł ºŒŁ Ł ˛» ˝‹fi»›› †‰fi ˙˝ØŒ –fiƒł Ł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ º · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— – ¤‰»‹ ¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi ·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ºŒ Ø Œ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæŒ ł‡•† ªæ Œ ł‡•† ¿¤ –fi•ƒªŁ ł º ¿¤ ¸·•”‹ª ł Ø ª ł Œ ¿¤ fi¿“ªŒ ł ªŒ ł ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªØæ ªŁæ ªºŒæ ºªºŁæŒ ºªŒºæŒ ªºŁ 溌 ŒªººØæØØ ŒªººØæØ Ø ºªºŁæºŒ غªŒºæ Œ ØŁªºŁæŒ Ł ªºŒæ Œ ªØæ Œ ªŒæ ªºŒæº ªºŒæº ˛ªæŒ Ł Ł ªºæ Ø ŁªŒæØŒº ŒØªŒæØŒº ºŒªŁæ ØŒ ºªŁæ ØŒ ªæ ˝ºŒªŒ æºŁ ŒŒªŒæ Ø ØŒªŒ æºŁ ªŒ æØŒ ªºæØ Œ ºŁªæ Øªæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ¤‹»fi•–fił˛ ‹– ŁØ †‹»fi•–fi ł Ł Ø ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ ·· ·¿‹»› ¿fi» ¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º ŒŒ –‡‡–†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» flØ˙ƃŒ¸›†”¸fl¸–«Ł‰˙§·ƒ»‚—«˚Ø“¶«•˘Ø ¶˝•»Œ˚§Æ›¨˙fi§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Œ ª¤ªº¤ªº¤ ª¤ ª¤ªº¤ªº¤ªº¤ ª¤ º Ł Ø Œ ºŁ ØŒ ˝ ˝˝ Œº ŒŒ ØŁ º Ł Ł ŒŒ ˝‰¿·» ª –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fi•ƒł º†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Œ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› Œ Œ ł· ¿¤ –fi•ƒªØ ł Œ ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› º »¤‰»‹ Œª ł Ø ª ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› º »¤‰»‹ ŒªŁ ł تŒ ł ªŁ ł ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ØªŁæØ ªæ Ł ŒªæŁ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Ł ‹– Ł †‹»fi•–fi ł Ł ‹– Ł ¤‹»fi•–fił˛ Ł ‹– †‹»fi•–fi ł ‹– Œ Œ ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› º »¤‰»‹ ł¶‹ª· ª Œª Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º ˚Œ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» ««¶”˛…‡›ƒŁ »º§·ƒ¸»‚—«˚Ø“¶«•˘Ø ¶˝•˚˛–Æ ›¨˙fi§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Œ ª¤º ª¤Œ ªº¤ª¤º ˝ Œº Œ ºŁŒ Œ Œ ˝‰¿·» ª º –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • ºº˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝ł·æ ›•ƒ»ªØ æŒ ł‡•† ªØæŒ ł‡•† ªŁºæŒ ł‡•† ¿¤ –fi•ƒªº ł Œ ¿¤ ¸·•”‹ªº ł ªº ł ª ł Œ ¿¤ fi¿“ªØØ ł º ªØØ ł Œ ªŒ ł ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªæŒ ªØæºº ªºæº ªæº ªŒ æŒ ªŁ æŒ ˛ªŁ æŒ ªŁæŒ ˝ªØºæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Ł ‹– Ł †‹»fi•–fi ł Ł ‹– Œ ¤‹»fi•–fił ˛ Œ ‹– †‹»fi•–fi ł ‹– Œ ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ º · «·•”‹ ¿‹ ¶–•†‹ º · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º ˚Œ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» ««¶”˛…‡›ƒŁ»º§·ƒ¸»‚—«˚Ø“¶«•˘Ø¶˝•„˚Æ ›¨˙fi§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Œ ª¤ªº¤ ª¤ ª¤ ˝ Œº ŁŒ Ł Ø ŁŒ˝‰¿·» ª –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Ł Œ –‰ «fi ·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝ł·æ ›•ƒ»ªºæŁŒ ł‡•† Ł ªºæŁŒ ł‡•† Ł ªºæŁŒ ł‡•† Ł ¿¤ –fi•ƒªº ł ¿¤ ¸·•”‹ª ł Œ ª ł Ø ªØº ł Œ ¿¤ fi¿“ªØ ł ªØ ł ªºŁ ł ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªŒ æº ªºæ ªæ ªºæº ˝ªæØŒ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Ł ‹– Ł †‹»fi•–fi ł Ł ‹– ¤‹»fi•–fił˛ ‹– غ †‹»fi•–fi ł غ ‹– Ł Œ ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ · «·•”‹ ¿‹ ¶–•†‹ ¿†… غ · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º ˚Œ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» º†»‚¨˝¿…·†˚…§·ƒ¸»‚—«˚Ø“¶«•˘Ø ¶˝•˚—Æ ›¨˙fi§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Œ ª¤ ª¤ ª¤ Œº Œ Ł Œ ˝‰¿·» ª Ł —·¿‹» ””›»‹› ł¨ ˙¯…„»ˆ –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi ·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªŒ æŒ ł‡•† Ł ªŒ æŒ ł‡•† Ł ¿¤ –fi•ƒªØ ł Œ ¿¤ ¸·•”‹ªŒ ł Œ ªŒ ł Ø ¿¤ fi ¿“ªŁ ł ªŁ ł ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªæŒ ˛ªæŁ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Œ · «·•”‹ ¿‹ ¶–•†‹ ¿†… Œ · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º ˚Œ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» º†»‚¨˝¿…·†˚…§·ƒ¸»‚—«˚Ø“¶«•˘Ø ¶˝•·˚˛fiÆ›¨˙fi§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ł ª¤ ª¤ ª¤ Ø Ł Œ Ø Ł º ˝ ˝ ˝ ˝ ˝ º Ø º Œ º º ØØ˝‰¿·» ª Œº –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • ºØ ˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝º–fi•ƒł Ø †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ Ł · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi ·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› Ø ł· ¿¤ –fi•ƒªØ ł ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› Ł ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› Ø Ł ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Œ ‹– Œ †‹»fi•–fi ł Œ ‹– º ¤‹»fi•–fił ˛ º ‹– Ł †‹»fi•–fi ł Ł ‹– Ø º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Œ ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º ˚ºŒ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» ›„·‰˘fl ·ƒ·‹˛'˚˘ƒfiº`•fi †·„«`›Ł‚ˇƒ'‚“†¨‚º¿§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ł ª¤ ª¤ªº¤ª¤ ˝ º ŁØ ŁŒ ŁØØ˝‰¿·» ª Ø –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • ºØ ˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºº˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Ł Ø –‰ «fi ·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝ł·æ ›•ƒ»ªæŁØ ł‡•† Ł ªæŁØ ł‡•† Ł ªººæŁØ ł‡•† Ł ¿¤ –fi•ƒªØ ł ¿¤ ¸·•”‹ª ł ª ł ª ł Œ ¿¤ fi¿“ªØ ł ªØ ł ªŒº ł ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªæŁ ªæŁ ˝ªºØæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Œ ‹– Œ †‹»fi•–fi ł Œ ‹– ¤‹»fi•–fił˛ ‹– Ø †‹»fi•–fi ł Ø ‹– Ł Øº ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º ˚ŒŒ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» ƒˇƒˇ…ˇ»“˚“`›ƒ˚¿`ƒfiº¶§•fi†·„«`›Ł‚ˇƒ‹˙“Æ„º¿§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ł ª¤ ª¤ªº¤ª¤ ˝ º ºØºŒ ºØØ˝‰¿·» ª –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝º–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi ºØ –‰ «fi ·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝ł·æ ›•ƒ»ªŒ æºØ ł‡•† Ł ªŒæºØ ł‡•† Ł ªŒ æºØ ł‡•† Ł ¿¤ –fi•ƒªº ł ¿¤ ¸·•”‹ªŒ ł Œ ª ł Ø ªŁ ł Œ ¿¤ fi¿“ªŁ ł ªŁ ł ªº ł ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Œ · «·•”‹ ¿‹ ¶–•†‹ · «·•”‹ ¿‹ ¶–•†‹ ¿†… Ł · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º ˚ØŒ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» Æ”˘˝„‚«fl˝…ƒ„`‰ƒfiº¶“•fi†·„«`›Ł‚ˇƒ'ˇ“‡‚º¿§§` DE Job # 79125-W1 Dansco Engineering, LLC Date: 12/03/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ł ª¤ ª¤ ª¤ º ØŒ ØØ˝‰¿·» ª º —·¿‹» ””›»‹› ł¨ ˙¯…„»ˆ –¿…•†„ł ›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi • º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºº˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ º · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Ø –‰ «fi ·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæØ ł‡•† Ł ªæØ ł‡•† Ł ¿¤ –fi•ƒª ł ¿¤ ¸·•”‹ªº ł Œ ªº ł Ø ¿¤ fi ¿“ªº ł ªº ł ˛˝ł· ¿¤ –‡æ ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ ØŒ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł «‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ º · «·•”‹ ¿‹ ¶–•†‹ ¿†… º · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ fi¿‡»fi‰§ –‹ º ˚ŁŒ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ »… »‰ Ø Ø —¿„» ›¤–‚”Ø¿“`«•˛flƒfiº¶«•fi †·„«`›Ł‚ˇƒ¤“†º‚ºº¿§§`