Loading...
HomeMy WebLinkAbout42240001 - WWC 1 - Truss DetailsDE DANSCO ENGINEERING, LLC P.O. Box 3400 Apollo Beach, FL 33572 Telephone (813) 645-0166 Facsimile (813) 645-9698 The truss drawing(s) attached have been prepared by Dansco Engineering, LLC under my direct supervision and control based on the parameters provided by Stark Truss Inc. Job: 2006089-12T 86 truss design(s) 79622-W1 12/18/2020 Samuel A. Greenberg, P.E. Indiana Reg. #19700485 Indiana Residential Building Code 2020 based on IRC 2018 with Indiana specific amendments. 675 IAC 14-4.4-81 Section R802.10.1; truss design drawings, R802.10.1; truss design drawings shall be provided to the building official as required by the General Administrative Rules (675 IAC 12) for Class 1 structures or by local ordinance for Class 2 structures. Note: Gable end frames with stud lengths exceeding 4’ require permanent bracing. On structural gables, where studs may be made from two or more boards as they cross diagonals, the 4’ length is the distance from the top chord to bottom chord. The seal on these drawings indicate acceptance of professional engineering responsibility solely for the truss components shown. The suitability and use of this component for any particular building is the responsibility of the building designer, per ANSI/TPI 1-2014 Chapter 2. Warning !—Verify design parameters and read notes before use. These designs are based only upon parameters shown, and are for individual building components to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component is responsibility of building designer – not truss designer or truss engineer. Bracing shown is for lateral support of individual web members only. Additional temporary bracing to ensure stability during construction is the responsibility of the erector. Additional permanent bracing of the overall structure is the responsibility of the building designer. For general guidance regarding fabrication, quality control, storage, delivery, erection and bracing, consult ANSI/TPI 1 National Design Standard for Metal Plate Connected Wood Truss Construction and BCSI 1-03 Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses from Truss Plate Institute, 583 D’Onofrio Drive, Madison, WI 53719 DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ª¤ º Œ º ºØ˝‰¿·» ª Ł –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŁ ˚»fi‹ł ºØæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł ºŁ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ Ł · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªŁæ »‰‚¿†•‰¿· ł‡•† Ł ªæ »‰‚¿†•‰¿· ł‡•† Ł ºªŁæŒ ł‡•† Ł ¿¤ –fi•ƒºªØ ł ¿¤ ¸·•”‹ª ł Œ ª ł ºªº ł Œ ¿¤ fi¿“ªŒ ł ª ł Ø ºªŒ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił º ‹– Œ †‹»fi•–fi ł Œ ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ º · «·•”‹ ¿‹ ¶–•†‹ º · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŒŁ¿‰»†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˙¤Ø¸˚ºfl‰Æ‡fl——§…ŒŒfi››‹º˛§‡¤—fl•”¶fi¸›Ł¨”«§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ºØ ª¤ªº¤ º ŁŁ ŁŁ ŁºØŁº˝‰¿·» ª Ł –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł ºØæ ˝†–' ł—”æ—„ºæ «‡»fi ºŁ ˚»fi‹ł ºŁ ˛» ˝‹fi»›› †‰fi –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæ »‰‚¿†•‰¿· ł‡•† Ł ªæ »‰‚¿†•‰¿· ł‡•† Ł ºªºæŒ ł‡•† Ł ¿¤ –fi•ƒºªŒ ł ¿¤ ¸·•”‹ªŒ ł Œ ªŒ ł Ø ºª ł ¿¤ fi¿“ªŒ ł Ł ª ł Ø ºªº ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł ›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ º Œ · «·•”‹ ¿‹ ¶–•†‹ ¿†… Œ · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— † ‹‚» ˝ł˝ ›»‰‹•–† ·–¿…› ¿·•»… ‹– ‹‚» ”¿‰» –” ‹‚» ‹fi«›› ¿fi» †–‹»… ¿› ”fi–†‹ ł –fi ¿‰ ł ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ ªº fi¿»ƒ–•…¿· –¿…› ł·æ”‹ ˚»fi‹ ª łª ª‹–ª ł ª ª ºª łª ª‹–ª ł ª ª –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ¿‰»† •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ƒ†‚‚˚¸˙”¸«Łfi¤·“«…§…ŒŒˇfi¨¤˚»§fiˇ”¤§Łˇ»‡`–›¶fi˝„Ł˘§Ø·˝ DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤Œ ª¤ º Œ Ø Ł º º ººØº˝‰¿·» ª ŁØ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŒ ˚»fi‹ł ººŒ Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºŒ ˚»fi‹ł Ł ºŒ Ł ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł Ø †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ Ø · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤Œ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi º –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Ł –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªØæ »‰‚¿†•‰¿· ł‡•† Ł ªººæ »‰‚¿†•‰¿· ł‡•† Ł ºªæŒ ł‡•† Ł ¿¤ –fi•ƒºªØŁ ł Œ ¿¤ ¸·•”‹ªŁ ł Œ ª ł Œ ¿¤ fi¿“ªŁ ł ª ł Ø ºªŁ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ºªºØæØ ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ł · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ºŒŁ ¿‰»†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» Ł Æ˘˙¨Ø »†§…ŒŒ ˙¿Ø fi—º˘ÆØ†–¨”›„¸˛˝˚‚Œ §Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ª¤ª¤ª¤Ł ª¤Ł Ł Ø Œ º Ø º Œ Œ Œ Œ Ø ººØºº˝‰¿·» ª Ł –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŒ ˚»fi‹ł ºŒ Œ Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł Ł Ø ŒŒ Ł ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ¤‰»‹ ¤ ˝— ˝‹«… ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi º –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæ »‰‚¿†•‰¿· ł‡•† Ł ºªŒæ »‰‚¿†•‰¿· ł‡•† Ł ŁªŒæŒ ł‡•† Ł ¿¤ –fi•ƒŁªØ ł Œ ¿¤ ¸·•”‹ªŒ ł Œ ºª ł Œ ¿¤ fi¿“ªŒŒ ł ºªŁº ł ŁªŁŒ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Œ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ º Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ¿‰»†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ƒƒ¸«˚ƒˇŒ¨»ˇ›˝§…Œº……¸¿ˇ˝»˘›Œ¿º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤Œ ª¤Ł º Ł Œ Ø Ł Ł ŁØ˝‰¿·» ª Ø –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŁ ˚»fi‹ł ºØæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł ºŁ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł Ø †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Ł –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªºŁæ »‰‚¿†•‰¿· ł‡•† Ł ªŁæ »‰‚¿†•‰¿· ł‡•† Ł ºªŒŒæŒ ł‡•† Ł ¿¤ –fi•ƒºªØ ł Œ ¿¤ ¸·•”‹ª ł Œ ª ł ¿¤ fi¿“ª ł ªº ł Ø ºªº ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… –fi‰‚ ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ºŒŁ ¿‰»†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˘›˛§¸‚‰¶˚ˇ‰†‡˛§…Œº˙…¸¿ˇ˝»˘flŒ‰º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤Œ ª¤ º Œ غغ˝‰¿·» ª –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł ºØæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł ºŁ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªŁæ »‰‚¿†•‰¿· ł‡•† Ł ªæ »‰‚¿†•‰¿· ł‡•† Ł ºªŒæŁ ł‡•† Ł ¿¤ –fi•ƒºªŁŒ ł ¿¤ ¸·•”‹ªØ ł Œ ª ł ¿¤ fi¿“ªŒ ł ª ł Ø ºªº ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… –fi‰‚ ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ø »¿fi•†„ ¿‹ ¶–•†‹ł› º ‰–†›•…»fi› ¿fi¿··»· ‹– „fi¿•† “¿·«» «›•†„ ˝æ— ¿†„·» ‹– „fi¿•† ”–fi‡«·¿ «•·…•†„ …»›•„†»fi ›‚–«·… “»fi•”§ ‰¿¿‰•‹§ –” »¿fi•†„ ›«fi”¿‰» Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ø · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŒŁ ¿‰»†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» '¨˘¿¤–'˚ˇ˘¨–'ƒ§…Œº…¸¿ˇ˝»˘fi•Œ…˘º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤º ª¤ ºØØØ˝‰¿·» ª Ø –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ Œ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæ »‰‚¿†•‰¿· ł‡•† Ł ªºæ »‰‚¿†•‰¿· ł‡•† Ł ºªºæŁ ł‡•† Ł ¿¤ –fi•ƒºªŒŒ ł ¿¤ ¸·•”‹ª ł Œ ª ł ºª ł ¿¤ fi¿“ªŁ ł ªŁ ł ºªŁ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… –fi‰‚ ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ø »¿fi•†„ ¿‹ ¶–•†‹ł› º ‰–†›•…»fi› ¿fi¿··»· ‹– „fi¿•† “¿·«» «›•†„ ˝æ— ¿†„·» ‹– „fi¿•† ”–fi‡«·¿ «•·…•†„ …»›•„†»fi ›‚–«·… “»fi•”§ ‰¿¿‰•‹§ –” »¿fi•†„ ›«fi”¿‰» Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ º ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ØŒŁ ¿‰»†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ›˚„¸§Ł¸†–˙§•§…Œ ›…¸¿ˇ˝»˘‹¤Œ”º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ºØ ª¤ª¤ º Œ Ø Ł ŁŁ ŁŁ Ø˝‰¿·» ª –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł Ø ºŁººØæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł Œ ººŁ ˛» ˝‹fi»›› †‰fi –fiƒł Ø †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ Œ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªŁØæ »‰‚¿†•‰¿· ł‡•† Ł ªºæ »‰‚¿†•‰¿· ł‡•† Ł ºªºØæº ł‡•† Ł ¿¤ –fi•ƒºª ł Œ ¿¤ ¸·•”‹ªº ł ªŒ ł ºª ł ¿¤ fi¿“ªØ ł ªØ ł Ø ºª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł ›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… –fi‰‚ ·»”‹ ¿†… fi•„‚‹ »¤–›»… «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ º º · «·•”‹ ¿‹ ¶–•†‹ ¿†… Œ · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ¿†„»fił› –fi –‹‚»fi ‰–††»‰‹•–† …»“•‰»ł› ›‚¿·· » fi–“•…»… ›«””•‰•»†‹ ‹– ›«–fi‹ ‰–†‰»†‹fi¿‹»… ·–¿…ł› ØØ · …–'† ¿†… ŒŒ · « ¿‹ Ø ¿†… Ł · …–'† ¿†… Ł · « ¿‹ º ¿†… Ł · …–'† ¿†… Ø · « ¿‹ –† ‹– ‰‚–fi… ¿†… · …–'† ¿†… Ø · « ¿‹ Ø ¿†… · …–'† ¿†… º · « ¿‹ º ¿†… · …–'† ¿†… º · « ¿‹ –† –‹‹–‡ ‰‚–fi… ‚» …»›•„†æ›»·»‰‹•–† –” ›«‰‚ ‰–††»‰‹•–† …»“•‰»ł› •› ‹‚» fi»›–†›••·•‹§ –” –‹‚»fi› † ‹‚» ˝ł˝ ›»‰‹•–† ·–¿…› ¿·•»… ‹– ‹‚» ”¿‰» –” ‹‚» ‹fi«›› ¿fi» †–‹»… ¿› ”fi–†‹ ł –fi ¿‰ ł ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ ªº –†‰»†‹fi¿‹»… –¿…› ł· ˚»fi‹ Œª Łªº ª ª ª fi¿»ƒ–•…¿· –¿…› ł·æ”‹ ˚»fi‹ ª łª ª‹–Œ ª łªº ªº Œª łªº ªº‹–ØªŁ łª ª ØªŁ ł ª ª‹–Łªº ł ª ª Łªº łª ª‹–ªŒ łªŒ ªŒ ºª ł ª ª‹–ªŁ łªŒ ªŒ ªŁ łªŒ ªŒ‹–ª łªº ªº ª ł ªº ªº‹–ª łª ª ª łª ª‹–ªº łª ª –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŁŒŁ •¿„–†¿· • •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¿»‹º˛¿˛¸§‰„¶¨˝ƒ§…Œ …¸¿ˇ˝»˘‹–Œ…«º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤ º º º ŒØ ˝‰¿·» ª Ł –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºØ ˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºŁ ˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ Ø · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæ »‰‚¿†•‰¿· ł‡•† Ł ªæ »‰‚¿†•‰¿· ł‡•† Ł ºªŁæŁ ł‡•† Ł ¿¤ –fi•ƒºªŒ ł ¿¤ ¸·•”‹ªŒ ł ª ł ºª ł Œ ¿¤ fi¿“ª ł ª ł ºªŒ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… –fi‰‚ ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ø »¿fi•†„ ¿‹ ¶–•†‹ł› º ‰–†›•…»fi› ¿fi¿··»· ‹– „fi¿•† “¿·«» «›•†„ ˝æ— ¿†„·» ‹– „fi¿•† ”–fi‡«·¿ «•·…•†„ …»›•„†»fi ›‚–«·… “»fi•”§ ‰¿¿‰•‹§ –” »¿fi•†„ ›«fi”¿‰» Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ Œ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ º ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ¿‰»†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» `‚˚„”¶Æ¸˙†¶—¶§…Œ ˘…¸¿ˇ˝»˘‹˘Œ”'º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªŁ ˝ º¤ª¤º º Œ Ø Ł Ł ŁººØºº˝‰¿·» ª ØŒ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŁ ˚»fi‹ł Ø ºØ Ł˝Øæ ˝†–' ł—”æ—„ºæ «‡»fi ººŒ ˚»fi‹ł Œ ºØ Ł Øæ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł º†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ º · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Ł –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæ »‰‚¿†•‰¿· ł‡•† Ł ªæ »‰‚¿†•‰¿· ł‡•† Ł ºªæŒ ł‡•† Ł ¿¤ –fi•ƒºªŒº ł Œ ¿¤ ¸·•”‹ª ł Œ ª ł Œ ¿¤ fi¿“ªØ ł ªŁŒ ł Ø ºªØŒ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– Ø ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º·· ·¿‹»› ¿fi» ·¿‹»› «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ¿‰»†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ŒÆ‹º…˚Ł—¶‰‚¤…§˙§…Œ ˘fi ¨¤˚»§fiˇ”¤§Łˇ»‡`„›—fi˝„Ł˘§Ø·˝ DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªº¤Œ ª¤º º Œ ØØØ˝‰¿·» ª –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºº˚»fi‹ł ºØæ ˝†–' ł—”æ—„ºæ «‡»fi ºŁ ˚»fi‹ł ºŁ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł Ł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªŒŁæ »‰‚¿†•‰¿· ł‡•† Ł ªæ »‰‚¿†•‰¿· ł‡•† Ł ºªØŁæŒ ł‡•† Ł ¿¤ –fi•ƒºª ł Œ ¿¤ ¸·•”‹ª ł Œ ªØ ł Œ ¿¤ fi¿“ªØ ł ªŒ ł Ø ºª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… Ø · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ¿‰»†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» —˘¿¨‡›¸•º”'˝‚§…Œ˝˙¿Ø fi—º˘Æ ؆–¨”›fi¸Ø˝˚‚Œ §Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ª¤º ºØØØ˝‰¿·» ª –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŁ ˚»fi‹ł ºØæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł ºŁ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ Ł · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæ »‰‚¿†•‰¿· ł‡•† Ł ªºæ »‰‚¿†•‰¿· ł‡•† Ł ºªŁæŒ ł‡•† Ł ¿¤ –fi•ƒºªŁ ł ¿¤ ¸·•”‹ªŒŒ ł Œ ª ł Œ ¿¤ fi¿“ªº ł ªŁ ł ºªº ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… ŒŒ · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ¿‰»†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» Œ ¨—…º`؇•ƒØ ‡·¨§…Œ˙¿Ø fi—º˘ÆØ †–¨”›Ø¸˙†˝˚‚Œ §Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ºØ ª¤ª¤Ł º Œ Ø Ł ŁŁ ŁŁ Ø Ø ØºØº˝‰¿·» ª º –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŒ ˚»fi‹ł ºŒ Øæ ˝†–' ł—”æ—„ºæ «‡»fi ººØ ˚»fi‹ł Ł ºŁ ˛» ˝‹fi»›› †‰fi –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ · ª ß ¸˛ — ˛¤Œ ˝— – ˛¤ ˝— – ˝¤Œ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªŒæ »‰‚¿†•‰¿· ł‡•† Ł ªæ »‰‚¿†•‰¿· ł‡•† Ł ºªæŒ ł‡•† Ł ¿¤ –fi•ƒºªŒŁ ł ¿¤ ¸·•”‹ª ł ª ł ºªŁ ł ¿¤ fi¿“ªŒ ł ªŒ ł Ø ºªº ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ºªæ ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł ›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ł · «·•”‹ ¿‹ ¶–•†‹ º · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ¿†„»fił› –fi –‹‚»fi ‰–††»‰‹•–† …»“•‰»ł› ›‚¿·· » fi –“•…»… ›«””•‰•»†‹ ‹– ›«–fi‹ ‰–†‰»†‹fi¿‹»… ·–¿…ł› Łº · …–'† ¿†… Œº · « ¿‹ ºØ ¿†… · …–'† ¿†… ŁØ · « ¿‹ Ø ¿†… · …–'† ¿†… · « ¿‹ º –† ‹– ‰‚–fi… ¿†… Ł · …–'† ¿†… · « ¿‹ ºØ ¿†… º · …–'† ¿†… · « ¿‹ Ø ¿†… · …–'† ¿†… · « ¿‹ º –† –‹‹–‡ ‰‚–fi… ‚» …»›•„†æ›»·»‰‹•–† –” ›«‰‚ ‰–††»‰‹•–† …»“•‰»ł› •› ‹‚» fi»›–†›••·•‹§ –” –‹‚»fi› † ‹‚» ˝ł˝ ›»‰‹•–† ·–¿…› ¿·•»… ‹– ‹‚» ”¿‰» –” ‹‚» ‹fi«›› ¿fi» †–‹»… ¿› ”fi–†‹ ł –fi ¿‰ ł ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ ªº –†‰»†‹fi¿‹»… –¿…› ł· ˚»fi‹ ŁªŒ ªºº ª ª ª fi¿»ƒ–•…¿· –¿…› ł·æ”‹ ˚»fi‹ ª łª ª‹–Œª łªº ªº Œª łªº ªº‹–Ø ª ł ª ª ت łª ª‹–Ł ªº łª ª Łªº ł ª ª‹–ªØº łª ª ªØº łª ª‹–ª ł ªº ªº ºª łª ª‹–ªØ łª ª ªØ ł ª ª‹–ª łª ª ª łª ª‹–ª ł ªº ªº ª ł ªº ªº‹–ª łª ª –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ •¿„–†¿· • •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¨ŒŒ››¤‚˛‹•§Øfl•˚§…Œ `…¸¿ˇ˝»˘––Œ˙º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ª¤ º Œ Ø º º ŁØ ŁØ ŁØØ˝‰¿·» ª Œ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºº˚»fi‹ł ºØæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł ºŁ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł º†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi ŁØ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªØæ »‰‚¿†•‰¿· ł‡•† Ł ªæ »‰‚¿†•‰¿· ł‡•† Ł ºªºæŒ ł‡•† Ł ¿¤ –fi•ƒºªØ ł Œ ¿¤ ¸·•”‹ªØŁ ł Œ ª ł Œ ºª ł Œ ¿¤ fi¿“ª ł ªŒº ł Ø ºªŁ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ºªØºæØ ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił º ‹– Œ †‹»fi•–fi ł Œ ‹– Ø ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ º ØŁ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ¿‰»†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» •‚—”'Œ •…••`“–º§…Œ ˙¿Øfi —º˘ÆØ†–¨”›¸˙…˝˚‚Œ §Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ªº¤ ª¤ªº¤ªº¤ª¤ªº¤ ª¤ Ø Ł Œ Ł º ˝˝˝ ØØ º ØØ ØØ Ł Ø Ł Œ ºØ˝‰¿·» ª —·¿‹» ””›»‹› ł¨ ˙¯ˆ ¯Œˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºØ ˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„æ «‡»fi ºŁ ˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł †æ¿†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ Œ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒª ł ª ł ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ Ł º ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ Ł º »¤‰»‹ ªº ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ªŒæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ŁŁ –fi†»fił˛ ŁŁ ‹– Ł Ł ¤‹»fi•–fił ŁŁ ‹– Ł –fi†»fił Ł ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ł ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ ŁŒ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Œ Ł Œ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» •º˘Æ˘¶‚Ø˛'˘`§…Œ¸†Ø¸˙¸ŒŒ¸Ł ¿«•«˝ƒ‹'‡Æ–—“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ ª¤ªº¤ªº¤ª¤ ª¤ Ø Ł Œ Œ Ø º ˝ ØØ ØØ ØØ º ºº Ø ØºØ˝‰¿·» ª º —·¿‹» ””›»‹› ł¨ ˙¯Łˆ ¯…„»ˆ ¯º…„»ˆ ¯ŒŁˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝Œ –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ Ø · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒªŒ ł º ªŒ ł º ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ Ł ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› »¤‰»‹ ª ł Œª ł ŁªØŁ ł ª ł ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªºæºº ºŒªºæ ºº ˝ŁªØæº ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– –fi†»fił˛ ‹– Œ ¤‹»fi•–fił Œ ‹– Ø –fi†»fił Ø ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ł ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Œ Ł Œ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» fl„—º˘ƒØ ˘¤Ł •Œ˘¤§…Œ˝‡†Ø¸˙¸ŒŒ¸Ł¿«•«˝ƒ‹'‡`˛–·“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤Œ ª¤ªº¤ªº¤ ª¤ ª¤Œ Ø Ł Œ Œ Ø Ł º ˝ ØØ º ØØ ØØ Œ º Œ º Œ ººØØ˝‰¿·» ª Œº —·¿‹» ””›»‹› ł¨ ˙¯…„»ˆ ¯º…„»ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„æ «‡»fi ºº˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒª ł ª ł ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› »¤‰»‹ ª ł Œª ł ŁªŁ ł ª ł ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛Œ ªºæ Œ ªºæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ¤‹»fi•–fił ‹– Œ –fi†»fił Œ ‹– Œ –fi†»fił˛ Œ ‹– ¤‹»fi•–fił ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ł ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Œ Œ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» –˘›fiŒ‚˚‡Æ·flØ –Ł‹§…Œ˝†Ø¸˙¸ŒŒ¸Ł ¿«•«˝ƒ‹'‡fi“¿–·“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤ ª¤ ª¤ª¤ ª¤ Ł Ø Œ º ºŒ Ø Ł ˝˝˝˝˝˝˝ Ø Ø Ø º Ø Œ ŁºººººŁ˝‰¿·» ª ºŒ —·¿‹» ””›»‹› ł¨ ˙¯…„»ˆ ¯…„»ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝Ł –fiƒł º†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ ØŒ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒª ł ª ł ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› º Œ Ø Ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ »¤‰»‹ ºª ł ŒªºŒ ł ØªØ ł Łª ł ªŁ ł ªºŁ ł ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ŒªØæ ºªØŁ æ ªæ Ø ªØæ Œ ªØŒæ ºªæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ºŒ –fi †»fił˛ ºŒ ‹– ºº ¤‹»fi•–fił ºº ‹– Ø –fi†»fił Ø ‹– Œ ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ł ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Ł Ø Œ º ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ‚Œ `‹—Æ…Ø˘¶‡§Ø†‚‰”˚•«˚‹–¸Æ «˝˚Œ˝`„'¨`fl ˘§Ø·Ł DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤ ª¤ ª¤ª¤ ª¤ Ł Ø Œ º ºŒ Ø Ł ˝˝˝˝˝˝˝ ºŁ Ø ºŁ º º ŒŁººººŁ˝‰¿·» ª ºº —·¿‹» ””›»‹› ł¨ ˙¯…„»ˆ ¯…„»ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒªØ ł ªØ ł ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› º Œ Ø Ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ »¤‰»‹ ºªŒ ł Œª ł تº ł Łª ł ªº ł ª ł ªŒ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ØŁ ªŒæ º ŒªŒºæØ ºªæ ªŒæ Ø ŁØªŒºæ Ø Œªæ ºªŒæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ¤‹»fi•–fił ‹– º –fi†»fił ˛ º ‹– Ł ¤‹»fi•–fił Ł ‹– Œ Œ –fi†»fił ˛ ŒŒ ‹– ¤‹»fi•–fił ‹– Œ ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ł ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Ł Ø Œ º ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ºŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˛ˇ¨…„·—Æ„'‰›†'•§Ø†‚”˚•«˚‹–¸Æ «˝˚Œ˝`Æ''¨fl˘§Ø·Ł DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ªŒ¤Œ ª¤ ªŒ¤Œ ª¤ Ł Ø Œº ºŒ Œ Ø Ø Ł ˝˝˝ ˝ ˝˝ ˝ Ø Ł Ø Ø ººººººØŁ˝‰¿·» ª ºº –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºº˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝Œ –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒªŁ ł ªŁ ł ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› º Ø Ł »¤‰»‹ ª ł Ø ª ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› »¤‰»‹ ªØ ł ª ł ªŒŁ ł ºª ł تŒŁ ł Łª ł ªØ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝Œºªºæ ºØªŁØæŁ ªŁ æØØ Ø ªŁØ æŁ ªŁ æØŒ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ¤‹»fi•–fił ‹– Łº –fi†»fił ˛ Ł º ‹– Ø ¤‹»fi•–fił Ø ‹– –fi †»fił˛ ‹– Œ ¤‹»fi•–fił Œ ‹– Œ ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ł ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› º Ø Ł »¤‰»‹ ł¶‹ª· ª ªŁ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ŒŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» Øˇˇ˝'¶`„§Ø†‚”˚•«˚‹–¸Æ«˝˚Œ˝`'¨fl˘§Ø·Ł DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤ ª¤ ª¤ ª¤ Ł Ø Œ º Ł Œ Ø Łº ˝˝ ˝ ˝ ˝ ˝ ˝ Œ Ø ŒºººŒŒºŒŁ˝‰¿·» ª ººº —·¿‹» ””›»‹› ł¨ ˙¯º…„»ˆ ¯…„»ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝Ł –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Ø · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒªŒ ł º ªŒ ł º ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ Ø »¤‰»‹ ªŁ ł Ø ºªØ ł Ø ª ł Œ ªØ ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› º »¤‰»‹ ªŒ ł ºª ł ŒªØ ł تŒŁ ł ªØ ł ª ł ªŒ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ØØ ªŁŁ æ Œ ªæ ªºæŒ ªæŒ ŁŒªæŁŒ ºªºæ ºØ ªæ Œ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ¤‹»fi•–fił ‹– –fi†»fił ˛ ‹– ¤‹»fi•–fił ‹– –fi†»fił˛ ‹– Ł ¤‹»fi•–fił Ł ‹– Œ ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ł ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Ø Œ »¤‰»‹ ł¶‹ª· ª ªØ ºªØ ªØ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ØŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» …Œ…¤ƒÆ ˚¸fi§Ø†„fl”˚•«˚‹–¸Æ «˝˚Œ˝`¨'¨Łfifl˘§Ø·Ł DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤ ª¤ ª¤ ª¤ ª¤ ª¤ º Ł Ø Œ º Œ ŁØ ˝ ˝ ˝ ˝ ˝ ˝ ˝ º Ł Œ Œ Ø ŁººØØºØŁ˝‰¿·» ª ººŒ —·¿‹» ””›»‹› ł¨ ˙¯Ø …„»ˆ ¯…„»ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝Ł –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ¤‰»‹ ˝¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒªº ł º ªº ł º ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› Ł »¤‰»‹ Œª ł Ø Ø ª ł Ø ª ł Œ ª ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› Ø »¤‰»‹ Œ ªŒ ł تŒ ł ŁªŁŁ ł ªŒ ł ªŁŁ ł ªŒ ł ªØ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ŁªŁæŁ º Œ ªŁ æ º ºªŁ æŁ ªæºŒ ŁªŁæ Œ ØªŁæŁ Œ ªæºº ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ¤‹»fi•–fił ‹– –fi†»fił˛ ‹– Œ ¤‹»fi•–fił Œ ‹– Ł Ł –fi†»fił ˛ Ł Ł ‹– ¤‹»fi•–fił ‹– Œ ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ł ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Ł »¤‰»‹ ł¶‹ª· ª ª ت Œª ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ŁŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» “»·¿˘˝ƒ˙˚‡˝¨‹§Ø†„…”˚•«˚‹–¸Æ «˝˚Œ˝`„'¨Łfifl ˘§Ø·Ł DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤ ª¤ ª¤ ª¤ ª¤ ŁØ Œ º º ŁŒ Ø ˝ ˝ ˝ ˝ ˝ ˝ ˝ ºŒ Ø ºŒ Œ ºº˝‰¿·» ª ººŁ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝Ø –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ¤‰»‹ ˝¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹Ø Ø •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒª ł ª ł ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› »¤‰»‹ ªº ł Ø ºª ł Ø Œªº ł Ø ªŒ ł Œ ª ł Œ ªŒ ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ »¤‰»‹ ªØ ł ºªØ ł ŒªŁ ł ت ł ªŁ ł ªŒ ł ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝Œªæ Ł ªºØæØ ŁŒªæŁ ºªºŁ æØ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ŒŁ ¤‹»fi•–fił˛ ŒŁ ‹– †‹»fi•–fi ł ‹– Œ ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ł ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› »¤‰»‹ ł¶‹ª· ªº ª ªº Œªº ºª ª ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» †ˇ`fl ¤†fi‹˚ƒ‡ƒƒ—§…Œ˛—”˚•«˚‹–¸Æ «˝˚Œ˝`Ł'¨ŁÆ fl˘§Ø·Ł DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤ ª¤ ª¤ ª¤ ª¤ ŁØ Œ º º Ł ŁŒ Ø ˝ ˝ ˝ ˝ ˝ ˝ ˝ ºŒ Ø ºŒ Œ ºº˝‰¿·» ª ººŁ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºº˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝Œ –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Ł · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ¤‰»‹ ˝¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒª ł ª ł ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› »¤‰»‹ ªº ł Ø ºª ł Ø Œªº ł Ø ªŒ ł Œ ª ł Œ ªŒ ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› º »¤‰»‹ ªØ ł ºªØ ł ŒªŁ ł ت ł ªŁ ł ªŒ ł ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝Œªæ Ł ªºØæØ ŁŒªæŁ ºªºŁ æØ ˝ ·§ ‹fi«›› ‹– » ‰–††»‰‹»… ‹–„»‹‚»fi ¿› ”–··–'› – ‰‚–fi…› ‰–††»‰‹»… '•‹‚ … ł¤ †¿•·› ¿› ”–··–'› ¤ fi–' ¿‹ –‰ –‹‹–‡ ‰‚–fi…› ‰–††»‰‹»… '•‹‚ … ł¤ †¿•·› ¿› ”–··–'› ¤ fi–' ¿‹ –‰ ·· ·–¿…› ¿fi» ‰–†›•…»fi»… »fl«¿··§ ¿·•»… ‹– ¿·· ·•»› »¤‰»‹ •” †–‹»… ¿› ”fi–†‹ ł –fi ¿‰ ł ”¿‰» •† ‹‚» ˝ł˝ ›»‰‹•–† —·§ ‹– ·§ ‰–††»‰‹•–†› ‚¿“» »»† fi–“•…»… ‹– …•›‹fi•«‹» –†·§ ·–¿…› †–‹»… ¿› ł –fi ł «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ŒŁ ¤‹»fi•–fił˛ ŒŁ ‹– †‹»fi•–fi ł ‹– Œ ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ º fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— Œ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª Ø ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Ł ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› »¤‰»‹ ł¶‹ª· ªº ª ªº Œªº ºª ª ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— º˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ‰˘‹º•‚ºˇˇ‹Œ„§…Œ˛†Ø¸˙¸ŒŒ¸Ł¿«•«˝ƒ‹'‡ºƒ‰–·“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ‰˘‹º•‚ºˇˇ‹Œ„§…Œ˛†Ø¸˙¸ŒŒ¸Ł¿«•«˝ƒ‹'‡ºƒ‰–·“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤ ª¤ ª¤ ª¤ ª¤ Ł Ø Œ º º Ł Œ Ł Ø ˝ ˝ ˝ ˝ ˝ ˝ ˝ Ø ºŒºŒ ºŒ ºº˝‰¿·» ª ºº –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝Ø –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ¤‰»‹ ˝¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹Ø Ø •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒª ł º ª ł º ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› »¤‰»‹ ªº ł Ø ºª ł Ø Œªº ł Ø ªŒ ł Œ ª ł Œ ªŒ ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› º »¤‰»‹ ªØ ł ºªØ ł ŒªŁ ł ت ł ªŁ ł ªŒ ł ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝Œªæ Ł ªºØæØ ŁŒªæŁ ºªºŁ æØ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ŒØ ¤‹»fi•–fił˛ ŒØ ‹– †‹»fi•–fi ł ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ł ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› »¤‰»‹ ł¶‹ª· ªº ª ªº Œªº ºª ª ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» “'˝«˙º¶fi`'˚˝•«`§…Œ˛†Ø¸˙¸ŒŒ¸Ł¿«•«˝ƒ‹'‡—Æ`–‚·“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤ ª¤ ª¤ ª¤ Ł Ø Œ º Ł º Ø ŁŒ ˝ ˝ ˝ ˝ ˝º ˝Œ ˝ Ø ºº غ ØŒ ØŒ Ø Œ غºØŒØŒºØŁ˝‰¿·» ª ººŒ —·¿‹» ””›»‹› ł¨ ˙¯Œ …„»ˆ ¯Ł…„»ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝º–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒªŁ ł ªŁ ł ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ Ø º »¤‰»‹ ª ł Ø ºªŒ ł Ø ª ł Œ ª ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› º »¤‰»‹ ª ł ºªŒ ł ŒªØ ł ت ł ªØ ł ªŒ ł ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ØØ ªŁæ ºªŁ æ ªŁ æŁ ªæºº Œ ªæŁ ºªŁæ ŁØ ªæº ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ¤‹»fi•–fił ‹– ºØ –fi†»fił˛ ºØ ‹– Œºº ¤‹»fi•–fił Œ ºº ‹– Ł ØŒ –fi †»fił˛ ŁØŒ ‹– Ø ¤‹»fi•–fił Ø ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ł ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Ø Œ »¤‰»‹ ł¶‹ª· ª ª ºªŒ ª ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ‰fi„»‚'§Ø ‰–§…Œ˛†Ø¸˙¸ŒŒ¸Ł ¿«•«˝ƒ‹'‡–Æfl–„“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤ ª¤ ª¤ ª¤ Ł Ø Œ º Œ Ł Ø Łº ˝˝ ˝ ˝ ˝ ˝ ˝º Ø Ł Ø ŒºººººŒ˝‰¿·» ª ººº —·¿‹» ””›»‹› ł¨ ˙¯º…„»ˆ ¯…„»ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝Œ –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Œ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒªºº ł ªºº ł ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› º Œ Ø »¤‰»‹ ª ł Ø ª ł Œ ª ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› º »¤‰»‹ ª ł ºªŁ ł ŒªŁ ł تŒ ł ªŁ ł ªØ ł ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ØØ ªŁ æ Œ ªæ ªæ º ªŒ æŒ ŁŒªæ ºªæ Ł ªºæŒ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ¤‹»fi•–fił ‹– Ø –fi†»fił˛ Ø ‹– Ø ¤‹»fi•–fił Ø ‹– º –fi†»fił ˛ º ‹– Œ ¤‹»fi•–fił Œ ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ł ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Ø Œ º »¤‰»‹ ł¶‹ª· ª ªŁ ª ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» fi¿º¨‡—‚„•ˇ—‹»§…Œˇ“†Ø¸˙¸ŒŒ¸Ł ¿«•«˝ƒ‹'‡¤Æfl–‚'“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤ ª¤ ª¤ª¤ ª¤ Ł Ø Œ º ºŒ Ø Ł ˝˝˝ ˝ ˝˝ ˝ Ø Œ Œ ŒŒØ ºŒººº˝‰¿·» ª ºº —·¿‹» ””›»‹› ł¨ ˙¯…„»ˆ ¯…„»ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒª ł º ª ł º ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ Ø Ł Ø »¤‰»‹ ºªº ł Ø ªØ ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› Ø »¤‰»‹ ºªº ł Œª ł تŒº ł Łª ł ªŒº ł ª ł ªº ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ØŁ ªºæ Œ ªŁæ ºªŒ æ ªºØæŒ ØªŁ æŁ ŒªŒæŁ ºªºØæŒ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ¤‹»fi•–fił ‹– Ø Ł –fi†»fił˛ ØŁ ‹– Œ ¤‹»fi•–fił Œ ‹– º –fi†»fił˛ º ‹– Ø Ø ¤‹»fi•–fił Ø Ø ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ł ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Ł Ø Œ »¤‰»‹ ł¶‹ª· ªØ ºªº ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ºŁ¸ˇfi”Ø˝‰„¿—¿Ø §…Œˇ‡†Ø¸˙¸ŒŒ¸Ł ¿«•«˝ƒ‹'‡–Æ`–¶†“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤ ª¤ ª¤ª¤ ª¤ Ł Ø Œ º ºŒ Ø Ł ˝˝˝˝˝˝˝ ØŒ ººŒŒºŁ˝‰¿·» ª ºº —·¿‹» ””›»‹› ł¨ ˙¯…„»ˆ ¯…„»ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł º†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ ŁŁ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒªŒŁ ł ªŒŁ ł ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› º Œ Ø Ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ »¤‰»‹ ºªºº ł ŒªŒ ł ت ł Łª ł ª ł ªŒ ł ªºº ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ØŁ ªŒæ º Œ ªŒæº ºªŒºæØ ªºæº ŁØ ªŒæŒ Œ ªŒºæŁ ºªºæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ¤‹»fi•–fił ‹– –fi†»fił˛ ‹– Ł Ø ¤‹»fi•–fił ŁØ ‹– Ø –fi†»fił˛ Ø ‹– ¤‹»fi•–fił ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ł ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Ł Ø Œ º ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ºŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» –»'‡‡`¸¨‚¿'¨§…Œˇ‰†Ø¸˙¸ŒŒ¸Ł¿«•«˝ƒ‹'‡Æ‚–˘“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤ª¤Ł ª¤Ł ª¤Ł ª¤ª¤Ł ª¤ª¤Ł ª¤Ł ª¤Ł ª¤ ª¤ Ł Ø Œ º ºŒ Ø Ł ˝˝˝˝˝˝˝ Ø Ø º Ø ººº˝‰¿·» ª ºº —·¿‹» ””›»‹› ł¨ ˙¯…„»ˆ ¯…„»ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝Ł –fiƒł Ø †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Ø · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒª ł º ª ł º ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› º Œ Ø Ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ »¤‰»‹ ºªº ł ŒªºŁ ł ØªØ ł Łª ł ªŒ ł ªºØ ł ªŒ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ŒªŒæ ºªØŁ æ ªæ Ø ªŒæ Œ ªØŁæ ºªæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– º –fi†»fił ˛ º ‹– º ¤‹»fi•–fił º ‹– Ł –fi†»fił Ł ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ł ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Ł Ø Œ º ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝»» ˝‹¿†…¿fi… †…«›‹fi§ —•„„§¿‰ fi«›› –††»‰‹•–† »‹¿•· ”–fi –††»‰‹•–† ‹– ¿›» ‹fi«›› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ —ŒŒŁ —•„„§¿‰– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» 'Æ˘¨Æ·•˙¶§”`Œ§·¸§…ŒˇŁ”˚•«˚‹–¸Æ «˝˚Œ˝`„'¨`fl˘§Ø·Ł DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªº¤ ª¤Ł ª¤ ª¤ ªŒ¤Ł ª¤ ª¤Ł ªº¤ Ł Ø Œ º Ø Ø Øº Œ º Ø Œ Œ ŒØŒ˝‰¿·» ª º —·¿‹» ””›»‹› ł¨ ˙¯Ø…„»ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł ºØŁ Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºØ ˚»fi‹ł ØŁ Ø Ł ˛» ˝‹fi»›› †‰fi ˙˝ºº–fiƒł Œ †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ¤‰»‹ ¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ŒªŒŒæŒ ł‡•† Ł ŁªŒŒæŒ ł‡•† Ł ¿¤ –fi•ƒŁªºŒ ł ¿¤ ¸·•”‹ŒªØ ł Ø ŁªØ ł Œ ¿¤ fi¿“ŒªØŁ ł ŁªØŁ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªºæŁ ªºººæŒ ªŒ æ Ø ªŒ æ Ø ªºººæ Œ ªºæŁ ˛ØŁ ªŁ 溌 ŒØ ªŁ æºŁ ˝Øªæ Œ ªŒŒæ Ł Ł ªŒŒ æŁ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– Œ ¤‹»fi•–fił˛ Œ ‹– Œ †‹»fi•–fi ł Œ ‹– Ł ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ø · «·•”‹ ¿‹ ¶–•†‹ Œ ¿†… Ø · «·•”‹ ¿‹ ¶–•†‹ Ł Ø ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ –‡‡–†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˚…¸fl›–——‡˛”¤…˙§…º˛‰§†•Œƒ•«˙·»ƒ˝Łºº¶””¨‚‰˘fi“§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ºª¤ ª¤ ª¤ª¤ª¤º Ł Ø Œ º ºØ Œ ºŁ Œ Ł Ø ˝˝˝º ˝Œ ˝ ˝ ˝ ˝ ˝ ˝ŁŁ Œ Œ Œ ØŒ˝‰¿·» ª ŒØ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºŒ ˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝º–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛˝¤ ˝— ˝‹«… ¤‰»‹ ˝¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ¤‰»‹ Œ –‰ fi¿‰•†„ Ł ˝ fi¿‰» ¿‹ ‹ł› º Œ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒªŁ ł º ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ »¤‰»‹ ª ł ºªŁ ł Ø Øªº ł Ø ª ł Œ ªŁØ ł Œ ªºŁ ł ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ Ø »¤‰»‹ ª ł ºªŒ ł º ŁªØ ł ªº ł ªØº ł ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ¤‹»fi•–fił ‹– Œ –fi†»fił ˛ Œ ‹– Œ ¤‹»fi•–fił Œ ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ł ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ fi «›› ‹– » ”«··§ ›‚»¿‹‚»… ”fi–‡ –†» ”¿‰» –fi ›»‰«fi»·§ fi¿‰»… ¿„¿•†›‹ ·¿‹»fi¿· ‡–“»‡»†‹ ł•» …•¿„–†¿· '» ˚»fi‹•‰¿· „¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ¿†… ‚–fi•ƒ–†‹¿· „¿·» ›‹«…› ›¿‰»… ¿‹ Ł –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Œ »¤‰»‹ ł¶‹ª· ª ªºØ ª ªŁØ ت ºªŁ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ –‡‡–† ˝«–fi‹»… ¿·»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» —¿ŒŒ‰“`Ø ‹º»«§…ºˇºfi¨¤˚»§fiˇ”¤§Łˇ»‡`–›˚fi˝„Ł˘§Ø·˝ DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªº¤ ª¤Ł ª¤ ª¤Œ ª¤ ª¤Ł ª¤Œ ªº¤Œ ªŁ˝ ¤ªº¤ ªŒ¤ ª¤ ª¤ ªº¤ª¤ªŒ¤Ł ª¤ ª¤Œ ª¤º Ł Ø Œ º Œ Œ Ø Ł ØºŁº º Œ Ø Ł ºŒ ºØ ºØ Ł Ø ØØØ Ø º Ø º º ŒŒ Œ Œ ØºØ Ø Ø Ø Ø Łº º º ºº ŒŒØØºØºŒŒ˝‰¿·» ª ºº —·¿‹» ””›»‹› ł¨ ˙¯ºŒ Ł ˆ ¯Łˆ ¯ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºº˚»fi‹ł Ł ºØæ ˝†–' ł—”æ—„æ «‡»fi ºº˚»fi‹ł ºØ Ł Ł˝Øæ ˛» ˝‹fi»›› †‰fi Œ –fiƒł Ø †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Œ · ª ß ¸˛ — ˛¤ ˝— – ¤‰»‹ ¤Œ ˝— ˛¤ ˝— – ¤‰»‹ ¤ ˝— Ł ˝¤ ˝— ˝‹«… ¤‰»‹ º¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Ø –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹Ł •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæ Œ ł‡•† ªºæ Œ ł‡•† ¿¤ –fi•ƒªØ ł Ł ¿¤ ¸·•”‹ª ł ªŒØ ł ¿¤ fi¿“ªŁŒ ł Ł ªŒ ł Œ ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªæ º ªŒæ ªŒ æØ ªØæ Ł ªæŁº ªºæ غ ºªæ ºªæØ Ł ºªæØ Ł ŒºªŁæØŁ ŒŒ ªŒ æº ŒØªŒ æº Ø ŁªŒæº ØŁ ªŒ æº ØªŒæºØ ŁªŒ æ ºØ ŁªŁæ Œ ªæŁº ªŁ æ ˛ªæŁ º Ł ªŒØæŁ ØŁªæ غ ŒØªØ æ Ø ºŒªØ æ Ø ºªØæ Ø ªØ æØ ªØ æØ ªØØ æ ªØØ æ ªØØ æ ªØ æŒŁ ªØæŒŁ ˝Ł ªŁæ º ŁªŒæ Ł ØªØæ º ºØªØ æºŁ Ł ªŒæ Œº ªŁ æŁŒ ªºæº ºªŒ Œæº Ł ªæ Œ ªØæØº Œ ªØ æØ Øªæ Œ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł ›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ø ·· ·¿‹»› ¿fi» ·¿‹»› «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ł ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ ŒØ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ¿†„»fił› –fi –‹‚»fi ‰–††»‰‹•–† …»“•‰»ł› ›‚¿·· » fi –“•…»… ›«””•‰•»†‹ ‹– ›«–fi‹ ‰–†‰»†‹fi¿‹»… ·–¿…ł› Ø · …–'† ¿†… Œ · « ¿‹ Ø · …–'† ¿†… Œ · « ¿‹ Ø · …–'† ¿†… Œ · « ¿‹ Ø · …–'† ¿†… Œ · « ¿‹ ¿†… Ø · …–'† ¿†… Œ · « ¿‹ Œ ¿†… · …–'† ¿†… Ł · « ¿‹ Ł –† ‹– ‰‚–fi… ¿†… · …–'† ¿†… · « ¿‹ · …–'† ¿†… · « ¿‹ · …–'† ¿†… · « ¿‹ · …–'† ¿†… · « ¿‹ ¿†… · …–'† ¿†… · « ¿‹ Œ ¿†… · …–'† ¿†… Œ · « ¿‹ Ł –† –‹‹–‡ ‰‚–fi… ‚» …»›•„†æ›»·»‰‹•–† –” ›«‰‚ ‰–††»‰‹•–† …»“•‰»ł› •› ‹‚» fi»›–†›••·•‹§ –” –‹‚»fi› ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ˛––” ˝»‰•¿· •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» •Ø §`«–§¨–¶Ø§…º—‰§†•Œƒ•«˙·»ƒ˝Ø º`¶˘¨‚‰˘fi“§Ø· –†‹•†«»… –† ¿„» DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ ªº ºªº ºŁªŒ Ł ªº ªº ª –†‰»†‹fi¿‹»… –¿…› ł· ˚»fi‹ ŁªŁ ª ª ª ª ª ª –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ˛––” ˝»‰•¿· •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» •Ø §`«–§¨–¶Ø§…º—‰§†•Œƒ•«˙·»ƒ˝Ø º`¶˘¨‚‰˘fi“§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªº¤ ª¤Ł ª¤ ª¤Œ ª¤ ª¤Ł ª¤Œ ª¤ªº¤Œ ª¤Ł ªº¤ ª¤ ªº¤Œ ª¤º ª¤Œ ªº¤ Ø Œ º Ł ŒºØ Ł º Ł Œ Ø ºŒØ Œ ºº ŒŁ Ø Ł Ł Œ Ø Œ º º ºº Œ ºŒŁ Œ ŒŒ ŒŒØºººØŒ˝‰¿·» ª º —·¿‹» ””›»‹› ł¨ ˙¯ˆ ¯ººŁ ˆ ¯Øˆ ¯ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ººØ ˚»fi‹ł Œ Øæ ˝†–' ł—”æ—„æ «‡»fi ºŒ ˚»fi‹ł ºŁ ˛» ˝‹fi»›› †‰fi ˙˝Ø –fiƒł º†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ º · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ¤‰»‹ ºØ ¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ¤‰»‹ Œ –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹º •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªŒ æŒ ł‡•† تŒæŒ ł‡•† ¿¤ –fi•ƒØ ªØ ł ¿¤ ¸·•”‹ª ł Ø Ø ª ł Ø ¿¤ fi¿“ªŁ ł Ø ªŒØ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªØæ ŁØ ŁªØ æ º Łªæºº ªØæ ØŁ ªæŁ ªºæº ªæº ºªŁæºØ ºŒªæØ Œªæ Œ ªæŒ Ø ªæ Ø ØŁ ªŒ æ Ø ªºæºØ ŁªØæº ˛ŒØ ªæŁ Œ ºŒªŒæ ºªŁ æº ªŁ æº ªØæŁ ªæ ˝ºªŒæ Ø ºªŁŁæŒ ºªŒ æØ ŒªŒ æ Ł Øªæ ºº ØªŁæ ŁªŁØæ ºªæ ªŒ æº Œ ªŒ æŁØ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– Œ ¤‹»fi•–fił˛ Œ ‹– Œ †‹»fi•–fi ł Œ ‹– ŒŁ Ø ¤‹»fi•–fił˛ Œ ŁØ ‹– Ł Ø †‹»fi•–fi ł ŁØ ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ Ø ¿†… · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ˛––” ˝»‰•¿·– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» –˚`‹fl‹‹·¶§…º†Ø¸˙¸ŒŒ¸Ł ¿«•«˝ƒ‹'‡`»‹•–“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªº¤ ª¤Ł ª¤ ª¤Œ ª¤ ª¤ª¤ªº¤ ª¤ªº¤ ª¤ ªº¤Œ ª¤º ª¤ªº¤ Œ º Ł Ø ºŒ Ø Ł º Œ Ø Ł Ł º º º ºŁ Ł Œ Œ Œ º Œ º º º Ø º Œ º ººŒ ºŒØººººŒ˝‰¿·» ª º —·¿‹» ””›»‹› ł¨ ˙¯Œ ˆ ¯Øˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŒŁ ˚»fi‹ł Øæ ˝†–' ł—”æ—„æ «‡»fi ºº˚»fi‹ł Ł ˛» ˝‹fi»›› †‰fi ˙˝º–fiƒł º†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ¤‰»‹ º¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªŒæ Œ ł‡•† º ŒªŒŒ æŒ ł‡•† ¿¤ –fi•ƒŒ ªØ ł ¿¤ ¸·•”‹ª ł Ø Œª ł Ø ¿¤ fi¿“ªº ł º ŒªŒØ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªæ ŁŒ تŒ æ º ØŁ ªæ ºŒ Ł ªØæ Ø ªØ æº ªæ Œ ªŁ æ ºªŁæ ºªŁ æ Œ ªŁ æ ŒªæŁ ØªŁ Łæ ŒªŁæºØ ØªæØ ˛ºŒ ªæŁ ºªæ ªØæŁŒ ªØæ ŁŒ ªØ ºæŁŒ ªŁæŁ ˝ªºæ Ł ªºæ ªæØ ºªŒ æŁ ŒªæØ ØªØæ Ø ºªŒºæŁØ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– Œ ¤‹»fi•–fił˛ Œ ‹– Œ †‹»fi•–fi ł Œ ‹– º ¤‹»fi•–fił˛ º ‹– Ł †‹»fi•–fi ł Ł ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ Œ ¿†… · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ˛––” ˝»‰•¿·– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˛Ł ¿«·‰›·”˚¤ˇ§…§…ºŒ…¸¿ˇ˝»˘†Œ˘'º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªº¤ ª¤Ł ª¤ ª¤Œ ª¤ ª¤Ł ªº¤ ª¤ ª¤ªº¤ ª¤Ł ªº¤Œ ª¤ ªŒ¤Œ ª¤ Œ º Ł Ø ºŒØ Ł Ø Ł Ł º Œ º º ŁØ ºŁ Ł Œ ºØ Œ º º º Œ º ŁØ ºººØ ŒŒØŒºŒºŒŒ˝‰¿·» ª º —·¿‹» ””›»‹› ł¨ ˙¯Œˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŒØ ˚»fi‹ł Ł Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł Œ Ł ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ ºØ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ¤‰»‹ Ł º¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªºæŒ ł‡•† ŒªØ æŒ ł‡•† ¿¤ –fi•ƒŒ ªØ ł ¿¤ ¸·•”‹ª ł Ø Œª ł Ø ¿¤ fi¿“ªØŒ ł Œ ŒªŒØ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªæ ŁŒ تŒ Łæ Ø ØŁ ªŁæºØ Ł ªŒØæ Ł ªØØ æØØ ªæº ªºæØ ºªºØŒæ ºªºØ Œæ ŒªºØæ ŒªØºæ ªæ تºæ Œªæ ºŁ Ø ªæ Ø ˛ºŒ ªæŁ ºªºæ ªØæº ªæ º ªæ º ªŒæŁ ˝ºªŒæ ŁŁ Œ ªŁæŁØº Ø ªæºØ ªæ ªæ ºªŒØæŁØº ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– Œ ¤‹»fi•–fił˛ Œ ‹– Œ †‹»fi•–fi ł Œ ‹– ¤‹»fi•–fił ˛ ‹– Œ †‹»fi•–fi ł Œ ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ Œ ¿†… · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ºŒŁ ˛––” ˝»‰•¿·– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¶—¤…˘–¶˙¸ƒ†`“§‚§…º…¸¿ˇ˝»˘†Œ¿˛‹º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªº¤ ª¤Ł ª¤ ª¤Œ ª¤ ª¤ªº¤ ª¤ ª¤ªº¤ ª¤Ł ªº¤Œ ª¤ ª¤ ª¤ºª¤ Ø Œ º Ł º Ø Ł ºŒ Ø Ł Ł º Œ º Œ Œ Œ º Œ º Ø º Œ Ø º Ø ºŒ º º º Œ º Ø º Ø Œ ŒŒØ ØØºØºØºŒ˝‰¿·» ª ºŒ —·¿‹» ””›»‹› ł¨ ˙¯Œˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºº˚»fi‹ł Ø Øæ ˝†–' ł—”æ—„æ «‡»fi ºŁ ˚»fi‹ł Ł ˛» ˝‹fi»›› †‰fi ˙˝Œ –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Œ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ¤‰»‹ Ł ºŒ¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi º –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ º •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªºæ Œ ł‡•† ØªØŒæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ –fi•ƒØ ªØ ł ¿¤ ¸·•”‹ª ł Ø Ø ª ł Ø ¿¤ fi¿“ª ł Œ Ø ªŒØ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªæ ŁŒ ŁªŒ ٿ٠٠ªŁ æºŁ ªŁ æ Œ ªŒŒæŁ ªæ º ªØæ Ø ºªØŒ æØ ºªØŒ æ Ø ŒªØæ Ø Œ ªŁæ تŒæŒ Œ Øªæ Łªæ ˛ŒØ ªæŁº ºŒ ªŒæ ºªæ ªºæ Ø ªºæ Ø ªºæ ŒŁ ªŁ æŁº ˝ºªŒŁæŁ Œ ªŁæŒØŁ ŒªŒØæŁØ ºªŁæ Ł ºªØæ º Ø ªæ Ø ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– Œ ¤‹»fi•–fił Œ ‹– †‹»fi•–fi ł ‹– Œ ¤‹»fi•–fił˛ Œ ‹– ºŒ †‹»fi•–fi ł ºŒ ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ Ø ¿†… · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŒŁ ˛––” ˝»‰•¿·– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˝–‡ƒfi–fl„ˇ§‰†Ø'—§…º¶˙¿Ø fi—º˘ÆØ †–¨”›‰¸Ø˝‚Œ §Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªº¤ ª¤Ł ª¤ ª¤Œ ª¤ ª¤Ł ªº¤Œ ª¤ªº¤ ª¤Ł ªº¤Œ ª¤ ª¤ ª¤Œ ª¤ Œ º Ł Ø Ø Ł ºŒ º Œ Ø Ł Ø ºØ ºº ºº Ø º Ø ºŒŒ º º º º º º Œ ºØ Ł ŒŒØ ØŁººŁººŁØŒ˝‰¿·» ª ºŒ —·¿‹» ””›»‹› ł¨ ˙¯Œˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºº˚»fi‹ł Øæ ˝†–' ł—”æ—„æ «‡»fi ºº˚»fi‹ł ºŁ ˛» ˝‹fi»›› †‰fi ˙˝º–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Œ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— – ¤‰»‹ ¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi ŁØ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ º •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæ Œ ł‡•† ŒªŁæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ –fi•ƒŒ ªØ ł ¿¤ ¸·•”‹ª ł Ø Œ ª ł Ø ¿¤ fi¿“ªº ł Œ Œ ªŒØ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªæ Łº تºæ º Ø Łªæºº Ł ªºæŒ ªŒØæØŁ ªØŁæ Œ ªØæ º ºªæº ºªæ ŒªØ æº Œ ªŒæº ØªæØ Œ ŁªŒ ŒæØ Œ ªæº Ł ªŁØ æ Œ ˛ºŒ ªæŁ ºªŁØæ ªæŒ ªæ Œ ªºØæ ªŒ æŁº ˝ªæ ºŒ ªŒæØ ªŁ æŒ ºªŒæ Ł Œ ªººæº Œ ªŒæ ºªŒŒ æŁØ ØªØæºŒ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– Œ ¤‹»fi•–fił Œ ‹– Ø †‹»fi•–fi ł Ø ‹– ¤‹»fi•–fił˛ ‹– †‹»fi•–fi ł ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ Œ ¿†… · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ØŒŁ ˛––” ˝»‰•¿·– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ‹ˇ›‰›„‹‹flØ‹˙”¶§…ºº…¸¿ˇ˝»˘Œ˙“º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ ª¤ ª¤ ª¤Œ ª¤ ªº¤Œ ª¤ ª¤Ł ªº¤ªº¤Œ ª¤ ª¤Œ ª¤ ª¤ª¤ Œ º Ł Ø Ø Ł Œ º ºŒ Œ ºØ º Ø Ø ŁØ Ø º Ø º Ø º Œ ºº º º º Œ ººº º º ØØØºØº˝‰¿·» ª º —·¿‹» ””›»‹› ł¨ ˙¯ˆ ¯ˆ ¯ºˆ ¯Øˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŒ ˚»fi‹ł Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł Ł Ł ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Œ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ¤‰»‹ ºŒ Ø ¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Ł –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæŒ ł‡•† ŒªŁ æ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ –fi•ƒŒ ªØØ ł ¿¤ ¸·•”‹ª ł Ø ŒªŒ ł Œ ¿¤ fi¿“ªØ ł ŒªºŁ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛Ø ªŒ æŁ Ø Łªºæ ŁªØŒæ ªŁŒæ Ł ªæ ªŁæ Œ ªæŒ ªæŒ ºªŁæ Œ ºªæ Œ ªŁæ ŁŒ ŒªØŒæ ªºæ Ø ªŒæ ŒªŁæŒ ØªØØæŒŒ ˛ºŒ ªæŁŒ ºªæ ªæŁŒ ªæŁ Œ ªººæŁŒ ªæ ˝ªØæŁ ªØ Łæ ªºŒæØ ºªºŒæŁ ºªØŁæ Œ ªæŁ ºªŒæŁ Ø ªŒ æŁ ªºØ æ Œ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ¤‹»fi•–fił˛ ‹– Ł †‹»fi•–fi ł Ł ‹– Ł Ø ¤‹»fi•–fił˛ ŁØ ‹– º †‹»fi•–fi ł º ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Œ · «·•”‹ ¿‹ ¶–•†‹ Œ ¿†… · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŁŒŁ •– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¤“–'˝¤›˘˝§…ººfi››‹º˛§‡¤—fl ”fi¶¤·‡›Ł ¨”«§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ ª¤Œ ª¤ ª¤Œ ª¤ ªŒ¤Œ ª¤ ª¤Ł ªº¤ªŒ¤Œ ª¤ ª¤Œ ª¤ ª¤Œ ª¤ Œ º Ł Ø Ø Ł Œ º ºŒ Ø Œ º º ººØ º Ø ººº Ø º Œ Œ º º ºººØØŒ˝‰¿·» ª º —·¿‹» ””›»‹› ł¨ ˙¯Łˆ ¯ˆ ¯ºˆ ¯ØŁˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºº˚»fi‹ł Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł Ł Ł ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ ŒŁ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ¤‰»‹ ºŒ Ø ¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi غ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªºæŒ ł‡•† ŒªŁ ºæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ –fi•ƒŒ ªØ ł ¿¤ ¸·•”‹ªŁ ł Ø Œª ł Œ ¿¤ fi¿“ª ł ŒªŒ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛Ø ªŁ æ Ø ŁªºæŒ Łªºæ ªŒæ ªØæ ªØØæ ªØØæ ªØØ æ ºªØØ æ ºªŒ æ Œ ªŒŒæ ŁØ Œªºæ Øªæ Œªæ Œ Ø ªŁ æ ŒŒ ˛ºŒ ªºæŁ ºªæŁ ªºæŁØº ªºæŁ غ ªŒæŁØº ªæ ˝ªØæ Œ ªŁ æ Œ ªºŒæ Œ ªŒ æØŁ ºªºŒæ Ø ºªŁ æ Œ ªæ Œ ºªºæØ Øªæº ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ºº ¤‹»fi•–fił˛ ºº ‹– Ł †‹»fi•–fi ł Ł ‹– ¤‹»fi•–fił ˛ ‹– †‹»fi•–fi ł ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ Œ ¿†… Ł · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ —•„„§¿‰ ¿›»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ‡Œ fi˙Œ'fi˛§flºÆº`§…º˚˙¿Ø fi—º˘ÆØ†–¨”›¤¸¨˝Ł§‚Œ §Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªº¤ ª¤Ł ª¤ ª¤º ª¤ ªŒ¤Œ ª¤ ª¤Ł ªº¤ªŒ¤Œ ª¤ ª¤º ª¤ ª¤Œ ª¤ Œ º Ł Ø Ø Œ Ł º ºŒ Ø Œ º Ł Ø ººº º º ŁØ º ŁºŁ º ŁŁ Ł Ł Œ Ł Œ Ø Ł º ŁŁ ººŒØŒ˝‰¿·» ª ºØ —·¿‹» ””›»‹› ł¨ ˙¯ˆ ¯ºˆ ¯ØŁˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºº˚»fi‹ł Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł Ł Ł ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ ŒØ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ¤‰»‹ ºŒ Ø ¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Ł –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæŒ ł‡•† ŒªºŁæ Œ ł‡•† ¿¤ –fi•ƒŒ ªŁ ł ¿¤ ¸·•”‹ªŒ ł Ø Œª ł Œ ¿¤ fi¿“ªŁ ł Œª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ØªŒæ Øªæº ªæ Ø ŁªŁæ ŁªŁæ ªŁ æ ºªŁæ ºªŒæ Œ ªæŁŒ ŒªŒæ Œ ªºæ Ø ªºæº Œ ªŒ æØ ØªºæŒ ˛ºŒªØæØ ºªŒæŁ ªºæ ŁŁ ªºæŁ Ł ªŒ æŁ ªæØ ˝ªŁæŒ ªºæ ªŒ æØ ºªºæ Ø ºªŁ Œæ Œ Œªæ ºªæØŁ ºªŁ æŁØŒ تŒæØ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ºº ¤‹»fi•–fił˛ ºº ‹– Ł †‹»fi•–fi ł Ł ‹– ¤‹»fi•–fił ˛ ‹– †‹»fi•–fi ł ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ Œ ¿†… Œ · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ —•„„§¿‰ ¿›»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˘“…‡—`˙•†«‰·¨“§‹§…ºØ ˙¿Ø fi—º˘ÆØ†–¨”›¤¸¨¨˝Łˇ‚Œ §Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤Œ ª¤Ł ª¤Œ ªº¤ª¤Ł ª¤ Ł Ø Œ º º Œ ŒºŁ Ł Œ Œ Œ Œ Ł Ł º Œ Œ ŒºŁ ŁØ ØŁŒØ˝‰¿·» ª —·¿‹» ””›»‹› ł¨ ˙¯ºŁˆ ¯º…„»Łˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŒº˚»fi‹ł ºŒ Øæ ˝†–' ł—”æ—„ºæ «‡»fi ººŒ ˚»fi‹ł ºŒ Ł Ł ˛» ˝‹fi»›› †‰fi ˙˝Ø –fiƒł º†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ Ø · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ¤‰»‹ ¤Œ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ºªØæ »‰‚¿†•‰¿· ł‡•† Ł Øªººæ ł‡•† Ł ¿¤ –fi•ƒØªŁØ ł ¿¤ ¸·•”‹ºªŁ ł Œ ØªŁ ł Œ ¿¤ fi¿“ºªØº ł تŒ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªæ Œ ªØæŁ ªØ æ ªØæ ªŁæØŒ ªŒæØ ŁªŁæØ ºªŁŁæ ˝Œªæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ŒŒ ¤‹»fi•–fił ˛ ŒŒ ‹– Œ †‹»fi•–fi ł Œ ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… –fi ‰‚ ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ł · «·•”‹ ¿‹ ¶–•†‹ º ¿†… Ł · «·•”‹ ¿‹ ¶–•†‹ Ø ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ –‡‡–†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ƒ'Ø¿˙˚Ł‚˛`˛“‹—§…Œ …¸¿ˇ˝»˘†»Œ˙—º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ª¤ ª¤ ª¤º Ł Ø Œ º Ł ºØ Œ ˝ ˝ ˝ ˝ ˝ ˝ ˝ ŒºŁ Ł ŒŒ ŒŒ ŁØ ØŁØ˝‰¿·» ª ŒŁ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºØ ˚»fi‹ł Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºŒ ˚»fi‹ł Ł ˛» ˝‹fi»›› †‰fi ˙˝º–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ ŒØ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› Ł ł· ¿¤ –fi•ƒŒ ªŁº ł ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› º »¤‰»‹ ªØ ł ªŁ ł Ø Œ ªŒ ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› º »¤‰»‹ ªØ ł ª ł Œªº ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ºŒªŁæºŁ ŒØ ªæŒ ŁªŒŁæØº ªºæØŒ ˝ŒªØæŁ Œ ªŁæØ ŁªŒŒæºŁ ªæ º ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ¤‹»fi•–fił ‹– ŒŒ –fi†»fił˛ ŒŒ ‹– Œ ¤‹»fi•–fił Œ ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… –fi‰‚ ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ł fi «›› ‹– » ”«··§ ›‚»¿‹‚»… ”fi–‡ –†» ”¿‰» –fi ›»‰«fi»·§ fi¿‰»… ¿„¿•†›‹ ·¿‹»fi¿· ‡–“»‡»†‹ ł•» …•¿„–†¿· '» ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› º »¤‰»‹ ł¶‹ª· ªØ Œ ªŒ ªŁ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ –‡‡–† ˝‹fi«‰‹«fi¿· ¿·»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» —…›Ł‹˛§‹˘…˛«‹`ƒ§…Œ …¸¿ˇ˝»˘‹˘Œ»„fl º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ ª¤ ªŁ¤Ł ª¤º ª¤ªº¤ Ø Œ º Ł º Ø Ł Ø Ł ˝‰¿·» ª Ł —·¿‹» ””›»‹› ł¨ ˙¯ŒŁˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŁ ˚»fi‹ł ŒØ Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºŒ ˚»fi‹ł ºŒØ Ł ˛» ˝‹fi»›› †‰fi Œ –fiƒł º†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ Ł · ª ß ¸˛ — ˛¤ ˝— – ˛¤Œ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Ł –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ºªæ Œ ł‡•† ØªŁæ ł‡•† ¿¤ –fi•ƒØª ł Ł ¿¤ ¸·•”‹ºª ł Ł ØªØ ł Ł ¿¤ fi¿“ºªŒ ł ØªŁ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ŁªØæ º Łªæº ØªŁŁºæ ˛ŒªººæŁ ºªººæŁ ˝ŒªŁ ŒæØŁº ºªºæ Ł Œ ªŒæ ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł ›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… –fi‰‚ ·»”‹ ¿†… fi•„‚‹ »¤–›»… «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ø · «·•”‹ ¿‹ ¶–•†‹ Ø ¿†… · «·•”‹ ¿‹ ¶–•†‹ º Ø ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— Ł ¿†„»fił› –fi –‹‚»fi ‰–††»‰‹•–† …»“•‰»ł› ›‚¿·· » fi–“•…»… ›«””•‰•»†‹ ‹– ›«–fi‹ ‰–†‰»†‹fi¿‹»… ·–¿…ł› ºº · …–'† ¿†… Œ · « ¿‹ ¿†… ºº · …–'† ¿†… Œ · « ¿‹ ¿†… ºº · …–'† ¿†… Œ · « ¿‹ º –† –‹‹–‡ ‰‚–fi… ‚» …»›•„†æ›»·»‰‹•–† –” ›«‰‚ ‰–††»‰‹•–† …»“•‰»ł› •› ‹‚» fi»›–†›••·•‹§ –” –‹‚»fi› ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ ªº ªº ºØª –†‰»†‹fi¿‹»… –¿…› ł· ˚»fi‹ Œªºº ªºº ªºº –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ –†–•‹‰‚ •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¸—§¸Æ¸‹fl›»„»‹˚ˇ§…Œ »…¸¿ˇ˝»˘››Œ¨º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. º ·æ ”‹ ºº ·ªº¤ªº¤ ª¤ ªŒ¤Œ ª¤Œ Ø Œ º Ł ºØØØØ˝‰¿·» ª ºº –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŁº˚»fi‹ł ººŒ ØŁ Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºº˚»fi‹ł ºŒ ŁŁ Ł ˛» ˝‹fi»›› †‰fi Ø –fiƒł º†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Ø · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ºªºæŒ ł‡•† Ł ØªØ æ ł‡•† Ł ¿¤ –fi•ƒØª ł ¿¤ ¸·•”‹ºªŁ ł تºŒ ł ¿¤ fi¿“ºªŒ ł تº ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛Øªæ Ł ªºŁ æŒ Ł ªºŒæŒ ªŁ ŁæŒºŒ ºªŁæØ ˛ØªØæ ŁØ ŒªØ æŁØ Œ ªØæ ŁØ ºªØ æŁØ ˝ºªŁæØ ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– Ł ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… –fi‰‚ ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ ºŒ · «·•”‹ ¿‹ ¶–•†‹ Ø ¿†… Ł · «·•”‹ ¿‹ ¶–•†‹ º Ø ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— Ł ¿†„»fił› –fi –‹‚»fi ‰–††»‰‹•–† …»“•‰»ł› ›‚¿·· » fi –“•…»… ›«””•‰•»†‹ ‹– ›«–fi‹ ‰–†‰»†‹fi¿‹»… ·–¿…ł› · …–'† ¿†… · « ¿‹ ŁŁ –† ‹– ‰‚–fi… ‚» …»›•„†æ›»·»‰‹•–† –” ›«‰‚ ‰–††»‰‹•–† …»“•‰»ł› •› ‹‚» fi»›–†›••·•‹§ –” –‹‚»fi› † ‹‚» ˝ł˝ ›»‰‹•–† ·–¿…› ¿·•»… ‹– ‹‚» ”¿‰» –” ‹‚» ‹fi«›› ¿fi» †–‹»… ¿› ”fi–†‹ ł –fi ¿‰ ł ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ ªº ªº ª łªº ºØª –†‰»†‹fi¿‹»… –¿…› ł· ˚»fi‹ ªºº –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŒŁ¿‰·–›»…– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» fl ƒ¨…•¸¶»¤fl`¿§…‰˘…¸¿ˇ˝»˘˚Œ˘º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤º ªŁ¤Ł ªº¤Œ ª¤ªº¤ Œ Ø Ł º º Ł Ł Ł Ł Ł ŁŁŒŒ ŁŒŒ˝‰¿·» ª —·¿‹» ””›»‹› ł¨ ˙¯ºŁ ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł ººØæ ˝†–' ł—”æ—„ºæ «‡»fi ºØŒ ˚»fi‹ł Ł ºŁ ˛» ˝‹fi»›› †‰fi Œ –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤Œ ˝— – ˝¤ ˝— ˝‹«… ¤‰»‹ º¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹˛˝ł·æ ›•ƒ»ªººæŒ ł‡•† ŒªŒºæ Œ ł‡•† ¿¤ –fi•ƒŒªŁ ł ¿¤ ¸·•”‹ªŁ ł Œª ł ¿¤ fi¿“ªŒ ł Ł Œª ł Ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªººæ ŒªØæŒ ˛ºªŒØæŒŒ ªŒØæŒ Œ ªŒØ æ ŒŒ ˝ºªæŒØ ªºæŒ ºªØæº ˝ ·§ ‹fi«›› ‹– » ‰–††»‰‹»… ‹–„»‹‚»fi '•‹‚ … ł¤ †¿•·› ¿› ”–··–'› – ‰‚–fi…› ‰–††»‰‹»… ¿› ”–··–'› ¤ fi–' ¿‹ –‰ –‹‹–‡ ‰‚–fi…› ‰–††»‰‹»… ¿› ”–··–'› ¤Œ fi–'› ›‹¿„„»fi»… ¿‹ º –‰ » ‰–††»‰‹»… ¿› ”–··–'› ¤ fi–' ¿‹ –‰ ·· ·–¿…› ¿fi» ‰–†›•…»fi»… »fl«¿··§ ¿·•»… ‹– ¿·· ·•»› »¤‰»‹ •” †–‹»… ¿› ”fi–†‹ ł –fi ¿‰ ł ”¿‰» •† ‹‚» ˝ł˝ ›»‰‹•–† —·§ ‹– ·§ ‰–††»‰‹•–†› ‚¿“» »»† fi–“•…»… ‹– …•›‹fi•«‹» –†·§ ·–¿…› †–‹»… ¿› ł –fi ł «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… •†… ˝ ØŒ ˚«·‹ªº‡‚ ł ›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ Œ ¿†… Ł · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ¿†„»fił› –fi –‹‚»fi ‰–††»‰‹•–† …»“•‰»ł› ›‚¿·· » fi –“•…»… ›«””•‰•»†‹ ‹– ›«–fi‹ ‰–†‰»†‹fi¿‹»… ·–¿…ł› º · …–'† ¿†… · « ¿‹ Œ Ø · …–'† ¿†… · « ¿‹ Œ Ł · …–'† ¿†… Ł · « ¿‹ Œ ¿†… · …–'† ¿†… º · « ¿‹ ŒŒ ¿†… º · …–'† ¿†… · « ¿‹ ŁŒ –† –‹‹–‡ ‰‚–fi… ‚» …»›•„†æ›»·»‰‹•–† –” ›«‰‚ ‰–††»‰‹•–† …»“•‰»ł› •› ‹‚» fi»›–†›••·•‹§ –” –‹‚»fi› ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ ªº Œª –†‰»†‹fi¿‹»… –¿…› ł· ˚»fi‹ ºªŁ تŒ ŁªŒ ª ªº –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ –†–•‹‰‚ •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˙Łfl …Ł ¤˚§…¿fi ¨¤˚»§fiˇ”¤§Łˇ»‡`›ºfi«˝„Ł˘§Ø·˝ DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªŁ¤Ł ªŒ¤Œ ª¤Œ ªŁ¤Ł ª¤º ªº¤ ªŒ¤ª¤ª¤ ªŁ¤ª¤ºª¤Œ ª¤Œ ªŒ¤Œ ª¤Ł ª¤Ł ª¤ ªŒ¤Ł ª¤Ł ª¤Œ ªŒ¤Ł ª¤Œ ª¤ ª¤Ł ª¤Œ ª¤Ł ª¤Œ ª¤ ªŁ¤ª¤Œ ª¤ª¤Œ ª¤ ªŒ¤ ªŒ¤Œ ª¤Œ ŒŁŒ Œ ŒºØ ŒŒ ŒŒØ ºŒŁ ŒØ Ø Ø Ø Ø ØºØŒ ØØ ØŁ Ø Ł Ł ŁŒº ºŒ Ø ºŁŒ Ø Ł ºŒ Ø Ł ºººººººººŒŒ ºØ ºŁ Ø ŒŒº ºº Ø Œ Ł Ł Ł Ł Ł Ł Ł Ł Ø Ø ŁŁ Œ º ºŁ º º º Œº º ŒŒ º Ł º º ºº Ø º ºŒ ºŁ Ø º º Œ Œ º Œº Œ Œ º Œ º º غ ºŁ ºŁ º º º ŒŒ º Ł ººŒ ºŁºØº˝‰¿·» ª Ø —·¿‹» ””›»‹› ł¨ ˙¯Œˆ ¯ˆ ¯Ł ˆ ¯Ł ˆ ¯ˆ ¯ºˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł ºØæ ˝†–' ł—”æ—„æ «‡»fi ºØ ˚»fi‹ł ºŒ ºŁ ˛» ˝‹fi»›› †‰fi Ł –fiƒł Ł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Ø · ª ß ¸˛ — ˛¤Œ ˝— ˛¤Ł ˝— ¤‰»‹ ¤ ˝— – ˝¤ ˝— ˝‹«… ¤‰»‹ ¤Œ ˝— – ؤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˛˝ł·æ ›•ƒ»ŁªŒŒØæŒ ł‡•† Ł ªŒæŒ ł‡•† Ł ¿¤ ¸·•”‹ŁªØ ł Ł ª ł Ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªŒæŁŒ ªŁŁæ ºªŒ æ ºº ºªŒæºº ŒªŒæºº Œ ªŒæºº Ø ªØ æºŁ ºØªØæºŁ ºŁ ªØ æºŁ ŒŁ ªØ æºŁ ŒªØæŒ ªØ æŒ ªØ æŒ Ø ªØ æŒ ØªØ æŒ ªØæŒ Ł ªØæŒ ŁªæØŒ ªæØŒ ºªæØŒ ºŒ ªæØ Œ ŒªæØŒ ØªæØŒ ØŁ ªæØ Œ ŁªæØŒ ªæØŒ ºªŒŒ æºŒŁØ ºªŒŒæºŒŁØ ºªŒŒ æºŒŁØ ºªŒŒæ ºŒŁØ ºªŒŒæºŒŁØ ººªŒŒ æºŒŁØ ºªŒŒæºŒŁØ ºªæŒ ºººªæ Œ ºººªæŒ ººŒªæ Œ ŒºŒªæŒ Œ ºØªæ Œ ºØºŁ ªæŒ Ø ºŁªæ Œ Ø Ł ªºæ ˛ªæØ ºªºŒæŁº ºªºæŁØ Œ ªºŁ æØ Œªºæ Ł ªŁŒæ º Œ ªººŁæº ŒŒªººŁæº ŁŒ ªººŁæ º ŁŒªººŁæº ŒŒªººŁæº Œ ŒºªººŁæº Ø ŒºªººŁæº ØŒŒ ªØ ºæ ŒŒ ŒªØºæ ŒŒØªØ ºæ ºŒØªØºæ ºªØºæ ŒŁ ªØ ºæ ŒŁŒ ªØºæ Œ ªØ ºæ Ø ªŒŒæ ØØªŒŒæ ØØ ªŒ Œæ Ø ªŒŒ æ Ø ªŒ Œ æ ØØ ªŒŒæ تŒŒæ غªŁØ æŁ ØºØ ŒªŁØæŁ ØŒªŁØæŁ ØØ ªŁØ æŁ ØØ ØŁªŁØæŁ ØŁ ØªŁØæŁ Ø ªŁØæŁ ˝ªŒºæ ªØŁæº ªæ Œ ªºŒ ŒæŁØ Œ ŁªºŁæŒ Œ Œ ªØæ Œ ŒŁ ªŁæ ŒØ ªæº Ø ØªŒæ ŁØ ªæØØ Ł ºªºæŒº ªŒºæ ªºŁæ ªæ º ªŒæ º ªŒæº ªæŒ ªŁæº ªŁØ æ ŒŒŒ Œ ªŒØæº Ø ªæŒŁ ˝ ·§ ‹fi«›› ‹– » ‰–††»‰‹»… ‹–„»‹‚»fi '•‹‚ … ł¤ †¿•·› ¿› ”–··–'› – ‰‚–fi…› ‰–††»‰‹»… ¿› ”–··–'› ¤Œ fi–'› ›‹¿„„»fi»… ¿‹ –‰ –‹‹–‡ ‰‚–fi…› ‰–††»‰‹»… ¿› ”–··–'› ¤Ł fi–'› ›‹¿„„»fi»… ¿‹ –‰ ¤ fi–' ¿‹ –‰ » ‰–††»‰‹»… ¿› ”–··–'› ¤ fi–' ¿‹ –‰ ·· ·–¿…› ¿fi» ‰–†›•…»fi»… »fl«¿··§ ¿·•»… ‹– ¿·· ·•»› »¤‰»‹ •” †–‹»… ¿› ”fi–†‹ ł –fi ¿‰ ł ”¿‰» •† ‹‚» ˝ł˝ ›»‰‹•–† —·§ ‹– ·§ ‰–††»‰‹•–†› ‚¿“» »»† fi–“•…»… ‹– …•›‹fi•«‹» –†·§ ·–¿…› †–‹»… ¿› ł –fi ł «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ºŒŁ ˛––” ˝»‰•¿· •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» •«˛¤'Æ„˚«•¶•'§…«fi ¨¤˚»§fiˇ”¤§Łˇ»‡`fl›fi'§˝„Ł˘§Ø·˝ –†‹•†«»… –† ¿„» DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… Ø · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ¿†„»fił› –fi –‹‚»fi ‰–††»‰‹•–† …»“•‰»ł› ›‚¿·· » fi –“•…»… ›«””•‰•»†‹ ‹– ›«–fi‹ ‰–†‰»†‹fi¿‹»… ·–¿…ł› ŒŒ · …–'† ¿†… · « ¿‹ · …–'† ¿†… ŁØ · « ¿‹ · …–'† ¿†… ŁØ · « ¿‹ Œ · …–'† ¿†… ŁØ · « ¿‹ Ł ŒŒ · …–'† ¿†… · « ¿‹ ŒŒ · …–'† ¿†… · « ¿‹ ŒŒ · …–'† ¿†… · « ¿‹ ŒŒ · …–'† ¿†… · « ¿‹ Œ ŒŒ · …–'† ¿†… · « ¿‹ Ł ŒŒ · …–'† ¿†… · « ¿‹ ŒŒ · …–'† ¿†… · « ¿‹ ŒŒ · …–'† ¿†… · « ¿‹ ŒŒ · …–'† ¿†… · « ¿‹ Œ ŒŒ · …–'† ¿†… · « ¿‹ Ł ŒŒ · …–'† ¿†… · « ¿‹ ŒŒ · …–'† ¿†… · « ¿‹ ŒŒ · …–'† ¿†… · « ¿‹ ŒŒ · …–'† ¿†… · « ¿‹ Œ ŒŒ · …–'† ¿†… · « ¿‹ Ł ŒŒ · …–'† ¿†… · « ¿‹ ŒŒ · …–'† ¿†… · « ¿‹ ŒŒ · …–'† ¿†… · « ¿‹ ŒŒ · …–'† ¿†… · « ¿‹ Œ ŒŒ · …–'† ¿†… · « ¿‹ Ł ŒŒ · …–'† ¿†… · « ¿‹ º ŒŒ · …–'† ¿†… · « ¿‹ º ¿†… ŒŒ · …–'† ¿†… · « ¿‹ º ¿†… ŒŒ · …–'† ¿†… · « ¿‹ ºŒ –† ‹– ‰‚–fi… ¿†… ºØ · …–'† ¿†… · « ¿‹ ØØ · …–'† ¿†… º · « ¿‹ ØØ · …–'† ¿†… º · « ¿‹ Œ ØØ · …–'† ¿†… º · « ¿‹ Ł ºØ · …–'† ¿†… · « ¿‹ ºØ · …–'† ¿†… · « ¿‹ ºØ · …–'† ¿†… · « ¿‹ ºØ · …–'† ¿†… · « ¿‹ Œ ºØ · …–'† ¿†… · « ¿‹ Ł ºØ · …–'† ¿†… · « ¿‹ ºØ · …–'† ¿†… · « ¿‹ ºØ · …–'† ¿†… · « ¿‹ ºØ · …–'† ¿†… · « ¿‹ Œ ºØ · …–'† ¿†… · « ¿‹ Ł ºØ · …–'† ¿†… · « ¿‹ ºØ · …–'† ¿†… · « ¿‹ ºØ · …–'† ¿†… · « ¿‹ ºØ · …–'† ¿†… · « ¿‹ Œ ºØ · …–'† ¿†… · « ¿‹ Ł ºØ · …–'† ¿†… · « ¿‹ ºØ · …–'† ¿†… · « ¿‹ ºØ · …–'† ¿†… · « ¿‹ ºØ · …–'† ¿†… · « ¿‹ Œ ºØ · …–'† ¿†… · « ¿‹ Ł ºØ · …–'† ¿†… · « ¿‹ º ºØ · …–'† ¿†… · « ¿‹ º ¿†… ºØ · …–'† ¿†… · « ¿‹ º ¿†… ºØ · …–'† ¿†… · « ¿‹ ºŒ –† –‹‹–‡ ‰‚–fi… ‚» …»›•„†æ›»·»‰‹•–† –” ›«‰‚ ‰–††»‰‹•–† …»“•‰»ł› •› ‹‚» fi»›–†›••·•‹§ –” –‹‚»fi› ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ Ø ªŒ ª ª Ł ª –†‰»†‹fi¿‹»… –¿…› ł· ˚»fi‹ ª ªŒº ª ªº ª ª ª ª ª ºªº Œªº ت Ł ª ª ª ª ª ª ª ºª Œª ت Ł ª ª ºª ºª ºª ºª ºª ººª ºŒª ºØª ºŁª ºªŒ º ŒªŒº Œª Œ ª Œª Œª Œºª ŒŒª ŒØª ŒŁª Œ ª Ø ª ت ت Ø ª ت غª ØŒª ØØª ØŁª Ø ª Łª Ł ª –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ºŒŁ ˛––” ˝»‰•¿· •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» •«˛¤'Æ„˚«•¶•'§…«fi ¨¤˚»§fiˇ”¤§Łˇ»‡`fl›fi'§˝„Ł˘§Ø·˝ DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ªŒ¤Œ ªŒ¤Œ ªŁ¤Ł ª¤ ªº¤Œ ª¤ ªŁ¤ ªŒ¤Œ ªŒ¤Œ ªŁ ˝ ¤ ªŒ¤Œ ª¤ºª¤ºª¤Œ ª¤Œ ªŒ¤Ł ªŒ¤Ł ª¤Œ ª¤ªŒ¤Œ ª¤Œ ª¤ ªŒ¤Ł ª¤Œ ª¤ªŒ¤Œ ª¤Œ ªº¤Œ ª¤Œ ªŁ¤Ł ª¤ ª¤Œ ªŒ¤Œ ªŁ¤ Ø Œ ºŁ Ø Œ º Ł ººŒŒ Ø Ł Ø Ł º ºººŒº Ł Ø ŒºŒºº Ø ŒºŒº Œ Ø º ºØ ºŁ ŒŁ غŒ º º Œ Œ Ł Ø Œ Œ Œ Œ Œ Œ Œ Œ º Œ Œ Œ º ºØØºŒØ ºº Ł ŒºØ ŁØº º º ºØ ºŁ Œ Œ Œ Œ Œ ŒØººŁºØºØººØº˝‰¿·» ª Ø —·¿‹» ””›»‹› ł¨ ˙¯Łˆ ¯ˆ ¯ºŁˆ ¯ººˆ ¯Ø Łˆ ¯Œ ˆ ¯Ł Ł ºˆ ¯ˆ ¯Œ ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŁ ˚»fi‹ł Ł æ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł ºŁ Ł˝Øæ ˛» ˝‹fi»›› †‰fi ˙˝Ø –fiƒł Ø Œ †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ º · ª ß ¸˛ — ˛¤Ł ˝— ¤‰»‹ º¤Œ ˝— ˛¤Œ ˝— ¤‰»‹ ¤ ˝— ˝‹«… ¤ ˝— – ˝¤ ˝— ˝‹«… ¤‰»‹ º¤Œ ˝— – ØŒ¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi ºº –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ¤‰»‹ Œ –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹Ł Œ º •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ŒªæŒ ł‡•† º ªŁ æŒ ł‡•† ¿¤ –fi•ƒªº ł ¿¤ ¸·•”‹Œ ª ł ªŁº ł ¿¤ fi¿“Œ ªº ł ªº ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªæ Ł ªººæØ ªŁºæº ªØŁæŒØ ºªØŁæŒØ ººªØŁ æŒØ ºŒ ªØŁæŒØ ŒŒ ªØŁ æŒØ ŒØ ªØæØ ØŁªØæØ ŁªØºæ ªºæŒ ªºæŒ Ø ªºæº ØŁ ªºæ º Łªºæº ªºØæØ ªºŒ 挺 ªºØæºØ ªŁ æº ºªæŁ ªºæŒ ºŒ ªŒ æ ˛ªØ æŒ ªæ Ø ªæ º Ł ªºæØ ºŁªŁ æ Œ ØªŁ æº ºŒ ªŁ æØ º ºªæº ªæº ªŁŁ æº ªŒºæº ªŒºæº ªŁæŁ Ł ªŁæ Ł Ø ŁªŁ æŁŒŒ Œ ØªŁ æŒ ˝ªØ æº Œ ŁªŁºØæ ŁªØ æ Łªæ Øªæ ºØªæº Œ ŒªæŒŒ Œ ŁªŒŁæ ªºæ Œ Ł ºªæºŁ ŁŒªæºº ºªŁæ ªæŁ Ł ªŒ æ Ø ªØæ ªæ Ł ªæº ªŒæº ªºŁ 挌 ªŒæŁŁ ªæŒŁ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Ø ‹– Ø ¤‹»fi•–fił˛ Ø ‹– Ł Ø †‹»fi•–fi ł ŁØ ‹– ººŒ ¤‹»fi•–fił˛ ººŒ ‹– Œ ŁŒ †‹»fi•–fi ł Œ ŁŒ ‹– Œºº ƒ–†» ‰¿†‹•·»“»fi fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º—fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Œ ·· ·¿‹»› ¿fi» ·¿‹»› «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ø ·· ·¿‹»› ¿fi» ¤Œ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ł ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ Œ ¿†… Łº · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŒŁ •– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» …َƒˇ”Æ–'“¨Ł›˝˘§…“fi ¨¤˚»§fiˇ”¤§Łˇ»‡`„¨›¸fi'Œ ˝„Ł˘§Ø·˝ DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ªŒ¤Ł ªº¤Œ ªŒ¤Œ ªŒ¤Œ ª¤ª¤ ª¤Ł ªº¤Œ ª¤ªŒ¤Œ ª¤ªŒ¤Œ ª¤ º Ł Ø Œº Ø Ł ºŒ Ø ŁŒ º Œ Ø Ł ºººº º º ØØ Ø Œ ØØ Ø Ø Œ Œ Ł Ø Œ Ø Œ ŒŁ º Ø ºŁ ºº ºº ŒŒ ºŁ Ø ºØ Ø Œ Œ Ł Ø Œ Ø Œ Ø Œ Ø Œ ØŒ ŁºŁºŁºŁºº˝‰¿·» ª Ø —·¿‹» ””›»‹› ł¨ ˙¯ˆ ¯Ł ˆ ¯Łˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºØ ˚»fi‹ł Œ Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł ºŁ ˛» ˝‹fi»›› †‰fi ˙˝Ł –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤Œ ˝— – ˛¤Œ ˝— ˝¤ ˝— – ¤‰»‹ Ø Ł ¤ ˝— ˝‹«… ¤Œ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ º Œ ŁØ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªŒæŒ ł‡•† º ºªŒŁæŒ ł‡•† ¿¤ –fi•ƒºª ł Ø ¿¤ ¸·•”‹ªØ ł ºª ł ¿¤ fi¿“ªº ł ºªŁº ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªØŒŁæ ØŁ ŒªØæºŒ Œ ªØŒæºŒ ØªŁ ºæŒŁ Ø ŁªŁºæŒŁ Ł ªŁºæŒŁ ºªŁºæŒŁ ºŒªºæØ Œ تºæØ Ø ªºæØ ŁªºæØ Ł ªØæŒŁº ªºæŒŁ º ªŒæº ªØæºŁ ªæ Œ ªæ Ø ªØŁ æ º ªŁ Łæº ªŁŁ æ ºªæ ªæØ ˛ªŁ æº ªŁæº ªºæØ ªºæØ ªŒºæŁº ŁªºØæº ØŁ ªºØæº Œ Øªæ ºŒªæ ºªæ ªŁ 挌 ˝ªæ Œ ªŒæ Ł ªŒæ Ø ªŁØ 溌 ºªºæŒ ºªºæŒ ªæŁ ªºŁæ ªŒæ Ø ºªØ ŁæŁº ºªŁØæ ŒªŒ ºæ Ł ªŁæ ŁØªØ ºæŁ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Ø ‹– ¤‹»fi•–fił ˛ ‹– †‹»fi•–fi ł ‹– ºØ ¤‹»fi•–fił ˛ ºØ ‹– º †‹»fi•–fi ł º ‹– Œºº ƒ–†» ‰¿†‹•·»“»fi fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º—fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Œ ·· ·¿‹»› ¿fi» ¤Œ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ º ¿†… Ø · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ØŒŁ •– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» Ł ¤§flfl „Œ ˚ƒƒ›˛§…'fi››‹º˛§‡¤—fl…¶‰›Ł¨”«§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤Ł ªŒ¤Ł ªº¤Œ ª¤Œ ª¤Œ ªŒ¤Œ ª¤Œ ªŒ¤Œ ª¤ ª¤ ª¤ª¤Œ ª¤Œ ª¤Ł ª¤ª¤ ª¤Œ ªº¤Œ ªŒ¤Œ ª¤ ª¤Œ ª¤Œ ª¤ ªŒ¤Œ ªº¤Ł ªŒ¤Ł ª¤Œ Ø Œ ºŁØ Œ º Ł Ł Ø Œ ºŒ Ø Łº º Œ ºº Ł Œ ŒØŒØŒØŒØ Ø Ł º Ł ŁŁØ ºº ºŁ º º º Ł Œºº ºº ŒØ ºº ŒØ Œ º Œ ØŁ ŁŁ º º Ø ºŁ ºº ØŁ ºº ºŁŒ ŒØ ºº ŒØ ºº ŒØŒØŒØ ŁØºŁØºŒØºº˝‰¿·» ª Ø —·¿‹» ””›»‹› ł¨ ˙¯Ł ˆ ¯ºˆ ¯ˆ ¯ºŁŁˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºØ ˚»fi‹ł Øæ ˝†–' ł—”æ—„æ «‡»fi ºŒ ˚»fi‹ł Ł ˛» ˝‹fi»›› †‰fi ˙˝Œ –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤Œ ˝— – ˛¤Œ ˝— – ˝¤ ˝— – ¤‰»‹ ¤ ˝— ˝‹«… ¤Œ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œº –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Ø º –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹º Ł º Ø Ł Œ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæ Œ ł‡•† تŒæ Œ ł‡•† ¿¤ –fi•ƒØ ª ł Ø ¿¤ ¸·•”‹ª ł Ø Ø ªŒ ł ¿¤ fi¿“ªº ł ØªØ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛Ł ªºæ Łªæ Œ ªºæººØ ªŒæºŁ ªØ æØ Œ ªØæØº ªæŁ Ł ªæŁŁ ºªæŁŁ ºŒªºæ Ł Œ تºæŁ تºæŁ ªºæŁ Ł ªºæŁ ŁºªØ æŁØŒ ºªØ æŁØŒ ªØæŁØØ ŒªŒæŁ ŒªºæŁ ØªŁæŁº ØŁ ªØØæØ Ł ªŁæ Ø ªŒæØŁº ªºŒæŒº Ø ªŒŁæºº ªæº ˛ºŒ ªæ ºªŒŒæØŁ ªŒŒæØŁ ªæØ ªºæ ªºæ ªºŒæØ Ł ªººæØ ØŁ ªºŁæ ŒØªºŁæ ºŒªºŁ æØØº ˝ºªŁæ Œ Łªæ ºŁ ŁªŒØ æº Œ ªŁæ Ł ºªŒæØ ºªŒŁ æŒŁ ªØŁæŁŁ ªæŁŒ ªºØæ ªæ ºªØ æŒ ºªæ Ø Øªæ ŁØ ŁªŒØæºŁ ŁªŁŒØæº ºªºæŁ Œªæ Œ ŒªæØØ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Ø ‹– †‹»fi•–fi ł ‹– º ¤‹»fi•–fił˛ º ‹– †‹»fi•–fi ł ‹– ŁŁ ¤‹»fi•–fił ˛ Ł Ł ‹– ºŒ †‹»fi•–fi ł ºŒ ‹– Œºº ƒ–†» ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º—fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Œ ·· ·¿‹»› ¿fi» ¤Œ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Œ · «·•”‹ ¿‹ ¶–•†‹ Ø ¿†… · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŁŒŁ •– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¤¨—Øˇ“˝·“º˚‹†§…fi››‹º˛§‡¤—fl §¶…˚›Ł ¨”«§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ºº ·æ”‹ª¤Ł ªŒ¤Ł ªº¤Œ ª¤Œ ª¤Œ ªŒ¤Œ ª¤Œ ªŒ¤Œ ª¤ ª¤ ª¤ª¤Œ ª¤Œ ª¤Ł ª¤ª¤ ª¤ ª¤Œ ªŒ¤Œ ª¤ ªº¤Œ ª¤Œ ª¤ ªŒ¤Ł ªŁ¤Ł ªŒ¤Ł ªŁ ˝ ¤ Ø Œ ºŁ Ø Œ º Ł ØŒ Ł º ºŒ Ø Ł º Œ ºº Ł ŒØŒŒØŒØŒØ º ºØ ØØ ØØ ØØ Œº ºŒ Œº º ŒºŒº ŁŒ Œº º Œ º Œ Ø Ø º ºØ ºØØ ØØ Œ Œ Ø Ø ŒŒ ºŁ Œ ŒºŒº º Œº ŁŒ Œº ºŒ Œº ººŁØ˝‰¿·» ª Œ —·¿‹» ””›»‹› ł¨ ˙¯ˆ ¯Œ ˆ ¯ˆ ¯ºˆ ¯ºŁ ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºØØ ˚»fi‹ł Øæ ˝†–' ł—”æ—„æ «‡»fi ºŒŒ ˚»fi‹ł Ł Ł˝Øæ ˛» ˝‹fi»›› †‰fi ˙˝ŁŒ –fiƒł º†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Ł · ª ß ¸˛ — ˛¤Œ ˝— – ¤‰»‹ º¤Œ ˝— ˛¤Œ ˝— – ˝¤ ˝— – ¤‰»‹ ¤ ˝— ˝‹«… ¤ ˝— Œº º ¤Œ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Ł –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹º Ł Œ º Ø Ł Ł •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªºŁŒæŒ ł‡•† º Øªæ Œ ł‡•† ¿¤ –fi•ƒØ ªØ ł Ø ¿¤ ¸·•”‹ª ł Ø ªº ł ¿¤ fi¿“ªŒ ł Ø ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛Ł ªºæŒ º Ł ªŒæØ ªŁæŁ Ł ªæºŁ ªæŒŁ ªŁØæØºŒ ªŁØæØºŒ ªæŁØ ºªæŁØ ºŒ ªŒŒŒæØ ŒØ ªŒŒŒæØ تŒŒŒ æØ Ł ªŒŒŒæØ ŁªŒ æº ªŒ æº ªŒ æ º ºªŒ ØæØ ºªØæº ŒªŒæºŒ ŒØªØæºØ Ø ªŒ æŁ ŁªŒæŁºŒ ŁªºØºæŁØ تŒ æ ºØ ªŒ ŒæŁ ˛ºŒ ªØ æ ºªæŁŁ ªæŁŁ ªæŁØ ªººæ ªººæ ªŒæŒ Ł ªºŒ æ ØŁ ªŁ æ ŒŁ ŒØªŁ æŒŁ ºŒªØŁ æØ ˝Œ ªæ Œ ºªŁ æŒŁ ŁªæŁ ŁªØºæ Œªºæ ºªºŒºæØ ºªŁ æ ºªæŒŒ ŒªŒŒ æŁ ªØæ º ªºØ æ ªŁŒæ ªŁæ ºªŁ ŁæŁŁ ºªæºŁ ØªŁØæŁ ŁªØæØ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Ø ‹– Œ †‹»fi•–fi ł Œ ‹– Œ ¤‹»fi•–fił˛ Œ ‹– Ł †‹»fi•–fi ł Ł ‹– Łº ¤‹»fi•–fił˛ Ł º ‹– º †‹»fi•–fi ł º ‹– Œº ƒ–†» ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º—fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Œ ·· ·¿‹»› ¿fi» ·¿‹»› «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ º · «·•”‹ ¿‹ ¶–•†‹ Ø ¿†… · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ ªº ªŒ ºªº Łªº ت –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ —•„„§¿‰ ¿›»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˇ«Ł'»¸“§¨ƒ‰¿§“§…fi ¨¤˚»§fiˇ”¤§Łˇ»‡`„›»fi§fl˝„Ł˘§Ø·˝ –†‹•†«»… –† ¿„» DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. fi¿»ƒ–•…¿· –¿…› ł·æ”‹ ˚»fi‹ ºªŒ‹–ª ª‹–Œª Œ ª‹–Ø ªŒ تŒ ‹–ªº ªº‹–Ł ªºŒ –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ —•„„§¿‰ ¿›»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˇ«Ł'»¸“§¨ƒ‰¿§“§…fi ¨¤˚»§fiˇ”¤§Łˇ»‡`„›»fi§fl˝„Ł˘§Ø·˝ DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ºº ·æ”‹ª¤Ł ªŒ¤Ł ªº¤Œ ª¤Œ ª¤ ªŒ¤Œ ª¤Œ ªº¤Œ ª¤ ª¤ ª¤ ª¤Œ ª¤Œ ª¤Ł ª¤ª¤ ª¤ ª¤Œ ª¤Œ ªŒ¤Œ ª¤ ª¤Œ ªº¤Œ ªŒ¤ ªŁ¤Ł ªŁ¤Ł ªŁ ˝ Œ¤ Ø Œ ºŁ Ø Œ º Ł ØŒŁ º ºŒ Ø Ł º Œ ºŒ º Ł ØŒ Œ Ø Œ Ø Œ Ø º ºº ØØ ØØ ØØ Œº ºŒ Œº º ŒºŒº ŁŒ Œº º Œ º Œ Ø Ø ºº ºØØ ØØ Œ Œ ØØ Œ Œ ºŁŒ ŒºŒ º º Œº ŁŒ Œº ºŒ Œº ººŁºØ˝‰¿·» ª —·¿‹» ””›»‹› ł¨ ˙¯Ø Ł ˆ ¯ˆ ¯ºŁ…„»ˆ ¯ºŁˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł Øæ ˝†–' ł—”æ—„æ «‡»fi ººŁ ˚»fi‹ł Ł Ł Ł˝Øæ ˛» ˝‹fi»›› †‰fi ˙˝Œ –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤Œ ˝— – ˛¤Œ ˝— – ˝¤ ˝— – ¤‰»‹ ¤ ˝— ˝‹«… ¤Œ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi ŒŒ –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹º Ø º Ø Ł Œ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæŒ ł‡•† ºŁ ØªæŒ ł‡•† ¿¤ –fi•ƒØ ª ł ¿¤ ¸·•”‹ªØ ł Ø ª ł ¿¤ fi¿“ª ł ØªŁ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛Ł ªºæ Ł ªæ ªæŒ ªŒæºŒ ªæºØ ªŒØŒæØ ªŒØŒæØ ªºæŁ ºªºæŁ ºŒ ªŁæŁ ŒØ ªŁæŁ ØªŁ æŁ Ł ªŁæŁ ŁªØæŁŁ ªØæŁ Ł ªØæŁŁ ºªŒæŁ ºªæØ Œ ªŁŒ æØŒŒ ŒØ ªºæØŁ ØŁ ªŒØæØŁ ŁªºæŁ ªŒæ Øªæº ªæØ ˛ºŒ ªŒ æØ ºªæØŒŒ ªæØŒŒ ªæŒØŒ ªŁ æº ªŁæº ªºæØ Ł ªŒ æºØ ØŁ ªŒæ ºØ ŒØªŒ æØŁ ºŒªºæ ˝ºªŁ ØæºŁ ªŒæºØ ØªŁæØØ ØªØ ØØæŁ Œ ªØŒæŒ Œ ªæ ºªæŁ ºªØ Łæ ªæ ªŒæ ØØ ªºæº ºªŒ ŁæŒŁ ºªŁæº ØªŁºæ Ł Ł ªŒæØ ŁªŁ Œæ ŒªŁŒæŁ Ł Œ ªØŒæºØ ºªæ ŁŁ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Ø ‹– Ł †‹»fi•–fi ł Ł ‹– Œ ¤‹»fi•–fił˛ Œ ‹– Ł †‹»fi•–fi ł Ł ‹– Ł º ¤‹»fi•–fił ˛ Ł º ‹– ºº †‹»fi•–fi ł ºº ‹– Œº ƒ–†» ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º—fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Œ ·· ·¿‹»› ¿fi» ·¿‹»› «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ Ø ¿†… Ø · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ ªº ªŒ ºªº ت –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ —•„„§¿‰ ¿›»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¨fiÆ«¨˙†‹¿›‹†§…Œ ‰§†•Œƒ•«˙·»ƒ˝‡ºØ‡¶˘¨‚‰˘fi“§Ø· –†‹•†«»… –† ¿„» DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. fi¿»ƒ–•…¿· –¿…› ł·æ”‹ ˚»fi‹ ºªŒ‹–ª ª‹–ŒªŁ ŒªŁ ‹–Ø ª ت‹–Ł ª Łª‹–ªº ªº‹–ªºŒ –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ —•„„§¿‰ ¿›»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¨fiÆ«¨˙†‹¿›‹†§…Œ ‰§†•Œƒ•«˙·»ƒ˝‡ºØ‡¶˘¨‚‰˘fi“§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ºº ·æ”‹ª¤Ł ªº¤Ł ª¤Œ ª¤Œ ª¤ ªŒ¤Œ ª¤Œ ª¤ ª¤Œ ª¤Œ ª¤ ª¤ ª¤Œ ª¤Œ ª¤Ł ª¤ ª¤ ªº¤Œ ª¤Œ ªŒ¤Œ ªŒ¤Œ ªŒ¤Œ ªº¤Œ ª¤ ª¤Ł ªº¤Œ ªº¤Œ ª¤ Ł Ø Œ ºŁ Ø Œ º Ł Ø Œ ººŒ Ø Ł º Œ ºŒ ºØŒ Œ Ø Œ Ø Œ Ø Ł º ºº Ł º º ºº Ø º ØØ Œ º ºŒ Œº º Œº ŁŒ Œ º º ŒºØØ ØØ ºº ººº º ØØ ØØ Œº ºŒ Œº º Œº ŁŒ Œ º º ŒºØ Œ ºŁŒºŁºØ˝‰¿·» ª —·¿‹» ””›»‹› ł¨ ˙¯ˆ ¯ØŁˆ ¯ºˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł Øæ ˝†–' ł—”æ—„æ «‡»fi ºº˚»fi‹ł Ł ˛» ˝‹fi»›› †‰fi Ł –fiƒł Œ º†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤Œ ˝— – ˛¤Œ ˝— – ˝¤ ˝— – ¤‰»‹ ¤ ˝— ˝‹«… ¤Œ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Ø –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ¤‰»‹ Œ –‰ fi¿‰•†„ Ø Ł ˝ ˛–' ¿‹ ‡•…‹Œ Ł º Œ Œ Ł Ø Ø •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ºªŁæŒ ł‡•† Ø ªæ Œ ł‡•† ŁªØŒæŒ ł‡•† ¿¤ –fi•ƒŁ ªºØ ł ¿¤ ¸·•”‹ºªØ ł Ø Ø ª ł ŁªŁ ł ¿¤ fi¿“ºªØ ł ºØ Ø ªŁº ł ŁªØ Ł ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªæŒ Ø ªŁŒæØ º ªØæ ªºØæ ªºæº ªºæºŁ ªºæºŁ ªºæºŒº ºªºæºŒº ºŒªºæºŒº ŒØ ªØ æºØ ØŁªØæºØ Ł ªØæºØ ªØ æºØ ºªºæº ºªºæº ªØºØæ º Œ ªØŁæ Ø Ł ªŒæ Ł ªºæŁ ªŁ Øæ Ł Ł ªØæ ºªŒæŒ ˛ØŁ ªæºŁ Œ ØªŁæ Ł ºŒªØæ ºªæ º ªæ º ªæ º ªæº ªºæº ªæŒ º Ł ªæŒ º Ø ŁªºæØ ŒØªæ ˝Œ ªŁæØ º ŒªºØæ ªæ غ Ł ªæ ŒªºŒ æº Œ ªØæØ ºªŁ æØ ºªŁŒ æ ªØæ Łº Œ ªØŁæØŁ Ł ªŁŒæŁ ªŁæŁ ŒØ ªºØæØ ØªæŁ Ø ªŁŁæ Ł Ł ªØŒæØ ت溺 Ø ªŁ æŒ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Ø ‹– Ł †‹»fi•–fi ł Ł ‹– Œ ¤‹»fi•–fił˛ Œ ‹– Ł †‹»fi•–fi ł Ł ‹– Ł º ¤‹»fi•–fił ˛ Ł º ‹– ºº †‹»fi•–fi ł ºº ‹– Œº ƒ–†» ‰¿†‹•·»“»fi fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º—fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Œ ·· ·¿‹»› ¿fi» ¤Œ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ł · «·•”‹ ¿‹ ¶–•†‹ Ł Ø · «·•”‹ ¿‹ ¶–•†‹ º ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ø ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ —•„„§¿‰ ¿›»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ‡¸‚˙¶‡˝†–†˙”¸`‡Œ§…‹fl˙¿Ø fi—º˘ÆØ†–¨”›¸¸˝‰‚Œ§Ø· –†‹•†«»… –† ¿„» DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ ªº ªŒ Œ ªº ºŁª fi¿»ƒ–•…¿· –¿…› ł·æ”‹ ˚»fi‹ Œ ªŒ‹–ªØ ªØ‹–ت Ø ª‹–Ł ª Łª‹–ªº ªº‹–ªºŒ –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ —•„„§¿‰ ¿›»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ‡¸‚˙¶‡˝†–†˙”¸`‡Œ§…‹fl˙¿Ø fi—º˘ÆØ†–¨”›¸¸˝‰‚Œ§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤Œ ªº¤Œ ª¤Œ ª¤Ł ªº¤Œ ª¤Œ ª¤º ª¤º ª¤ºª¤Œ ª¤º ª¤º ª¤Œ ª¤º ª¤º ª¤Œ ªº¤Œ ªŒ¤Ł ª¤Œ ª¤Ł Ø Œ º ººŒ Ø Œ Ø Ł º ºŒ Ø Ł Ł Ø Œ º ºØ ºº ºØ º ºŒ º ºŁ Œ º غ Ø Ł Ł Œ Łº Œ ŒŒ º ŒŒ ºØ ØºØŁ ºØ ØŁ ººŁŁ˝‰¿·» ª Ø ŒØ —·¿‹» ””›»‹› ł¨ ˙¯ˆ ¯ˆ ¯Łˆ ¯…„»Łˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŒ ˚»fi‹ł ŒØ Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł Œ ŒØ Ł ˛» ˝‹fi»›› †‰fi ˙˝ŁŁ –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ ŁŒ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— – ¤‰»‹ ¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi غ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Ø –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ ºØ ºŒ Ø ˝ ˛–'› ¿‹ æ ‹›Ł •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªŁ æŒ ł‡•† ªØŒæŒ ł‡•† ¿¤ –fi•ƒªŁ ł º ¿¤ ¸·•”‹ª ł ªŁŁ ł ¿¤ fi¿“ªŁ ł ªŁº ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªºæ Ø ªØ æ ªŒæ Ø ªºŁæ ªºæŁ ªæŒŁ ºªæŒŁ ººªæŒŁ ºŒ ªºŒæ º Œ تºŒæ º ØŒ ªŒØºæ Ł ŒØªŒØºæ Ł Ł Ø ªŒØºæŁ ŁªŁºæ ªŁºæ ªŒ æŒ ªŁæŒŒ ªæŒØ ˛ªºæº ªæ Łºº Łªºæ Ø ØŁªºæ Ø ŒØªºØæ Ł ºŒ ªŒæ ºŁ ºªŒæºŁ ªØæŒŒ ˝ªæŒ ªºØæ Ł ªæ ªæŁ Œ ªºŁæŁ ØªØ Œæº ºØ ªŒæŁ ØŒ ªæºº Ø ªŁŒæ ŁªæŁØ ŁªŒŁ æº ªØŒæ ŒØ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Ø ‹– †‹»fi•–fi ł ‹– Œ ¤‹»fi•–fił˛ Œ ‹– †‹»fi•–fi ł ‹– Łº ¤‹»fi•–fił Łº ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º—fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ ŁŁ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ —•„„§¿‰ ¿›»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ›Æ ”fi ¸‚ˇº“٧…·§…Ł”…¸¿ˇ˝»˘–§Œ˝ŒºÆº§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ªŁ ˝ ¤ ªŁ¤Ł ª¤ ªŒ¤Œ ª¤ ªŁ¤Ł ªº¤Ł ª¤ ªŒ¤Ł ªº¤Ł ª¤Œ ª¤Ł ª¤ ªŒ¤Ł ªŒ¤Ł ª¤Œ ªŒ¤Ł ª¤Ł ª¤ ªŁ¤Ł ªŒ¤Œ ªº¤Œ ªº¤Ł ª¤Œ Ø Ł Ł Ø Œ º ººŒ Ø Ł Œ º ºŒ Ø Œ Ø Œ Ø Œ Ø Œ Ø Œ º Ł º º º º ºº ºØ º Ł º Œ º ºŁ Œºººº º º ºØ º Ł º Œ º º ººŁŒ˝‰¿·» ª Ø º —·¿‹» ””›»‹› ł¨ ˙¯ˆ ¯ˆ ¯ŁŁ ˆ ¯Ł Ø Łˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºº˚»fi‹ł Œ Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł Œ Ł Ł˝Øæ ˛» ˝‹fi»›› †‰fi Ł –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ º · ª ß ¸˛ — ˛¤Œ ˝— – ˛¤ ˝— ˝¤ ˝— – ¤‰»‹ ¤ ˝— Œ º º ¤ ˝— ˝‹«… ¤Œ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ ºŁ Łº ˛˝ł·æ ›•ƒ»ªŁ æ Œ ł‡•† ªæ Œ ł‡•† º ¿¤ –fi•ƒªŁ ł ¿¤ ¸·•”‹ªŒ Œº ł Ł ªº ł ¿¤ fi¿“ªŒ ł º ªŒØ ł º ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªŒ ØŁæ ªºŒ æ ØØ ªØ ØŁØæ ºØ ºªØØŁØæºØ ººªØ ØŁØæ ºØ ºŒªºŒæŒº ŒØªºŒ æ Œº ØŁªºŒ 挺 ŁªØŒæŒ ªØ ŒæŒ Œ ªØŒ æŒ Œ ªØŒ æŒ ªØ æØ ªØ Øæ ªŒæŒº ˛ªØ æºØŁØ ªØæºØŁØ ªØæºØŁØ ªºæ ŁŒ ªŁØæŒŁ ªŁØæŒŁ ŁªŁØæŒŁ Ø ŁªŁ Łæ Ł Œ Ø ªŁŁ æ Ł ºŒªŁŁæ Ł ºªŒ æ ˝ªØæØº ªŁŁŁæ ªŁ æŁ ªæ ººŁ ªŁ 溌 ªŁºæØº ºªºæ ºŁ ªæº Ø ŁªŒæº Ł ŁªºŁ æ ŁØØ Ł ºªºæŒ ºªºæŒŒ ºªØºŒæ ªæŒ ªºæØ ˝ ·§ ‹fi«›› ‹– » ‰–††»‰‹»… ‹–„»‹‚»fi '•‹‚ … ł¤ †¿•·› ¿› ”–··–'› – ‰‚–fi…› ‰–††»‰‹»… ¿› ”–··–'› ¤Œ fi–'› ›‹¿„„»fi»… ¿‹ –‰ –‹‹–‡ ‰‚–fi…› ‰–††»‰‹»… ¿› ”–··–'› ¤ º fi–'› ›‹¿„„»fi»… ¿‹ –‰ » ‰–††»‰‹»… ¿› ”–··–'› ¤ fi–' ¿‹ –‰ ·· ·–¿…› ¿fi» ‰–†›•…»fi»… »fl«¿··§ ¿·•»… ‹– ¿·· ·•»› »¤‰»‹ •” †–‹»… ¿› ”fi–†‹ ł –fi ¿‰ ł ”¿‰» •† ‹‚» ˝ł˝ ›»‰‹•–† —·§ ‹– ·§ ‰–††»‰‹•–†› ‚¿“» »»† fi–“•…»… ‹– …•›‹fi•«‹» –†·§ ·–¿…› †–‹»… ¿› ł –fi ł «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» «‡»fi ªŒ ·¿‹» „fi• ªŒ º ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ Œ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Ø —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ł ·· ·¿‹»› ¿fi» ·¿‹»› «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ º · «·•”‹ ¿‹ ¶–•†‹ ¿†… ŒŒº · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ —•„„§¿‰ ¿›» •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¸Œº˝˘˝Æ„¤“¤¨“flÆ §…”˙¿Øfi —º˘ÆØ†–¨”›¸¨¨˝Æ‚Œ §Ø· –†‹•†«»… –† ¿„» DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ¿†„»fił› –fi –‹‚»fi ‰–††»‰‹•–† …»“•‰»ł› ›‚¿·· » fi–“•…»… ›«””•‰•»†‹ ‹– ›«–fi‹ ‰–†‰»†‹fi¿‹»… ·–¿…ł› Ø · …–'† ¿†… Œ · « ¿‹ Ł ØŒŒ · …–'† ¿†… غ · « ¿‹ Œ · …–'† ¿†… Ł · « ¿‹ ¿†… Œ · …–'† ¿†… · « ¿‹ ¿†… ŁºØ · …–'† ¿†… Œ · « ¿‹ Œ Ł –† –‹‹–‡ ‰‚–fi… ‚» …»›•„†æ ›»·»‰‹•–† –” ›«‰‚ ‰–††»‰‹•–† …»“•‰»ł› •› ‹‚» fi»›–†›••·•‹§ –” –‹‚»fi› ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ ªº ªŒ ªº ª –†‰»†‹fi¿‹»… –¿…› ł· ˚»fi‹ ªŁºØ ØªØ Ł ªØŒŒ ªŒ ªŒ –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ —•„„§¿‰ ¿›» •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¸Œº˝˘˝Æ„¤“¤¨“flÆ §…”˙¿Øfi —º˘ÆØ†–¨”›¸¨¨˝Æ‚Œ §Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ªº¤Œ ªº¤Œ ª¤ ª¤ ª¤ ª¤Ł ªº¤ ª¤ ª¤ ª¤Œ ªŁ ˝ ¤ªº¤Ł ªº¤Œ ª¤Ł ª¤ Œ º Ł Ø Ł ºŒ Ø Œ º Ø Ł º Ł Ø Ł Œ Ł Ł Ł ŒºŁ Ø Ł Œ ŁŁ Ł Œ˝‰¿·» ª ºº —·¿‹» ””›»‹› ł¨ ˙¯Øºˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł ºŒ Øæ ˝†–' ł—”æ—„æ «‡»fi ººº˚»fi‹ł ºŒ Ł Ł˝Øæ ˛» ˝‹fi»›› †‰fi ˙˝ŒØ –fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— Œº º ¤‰»‹ ¤ ˝— – ˛¤ ˝— – ˝¤ ˝— – ¤‰»‹ ¤ ˝— Œ º º ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹Œ Ø Ł Ø º º º •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªŒŁæŒ ł‡•† Ø Œªæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ –fi•ƒŒ ªŒ ł Ø ¿¤ ¸·•”‹ªØ ł ŒªŁ ł ¿¤ fi¿“ªºŒØ ł ŒªŒŁ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛Œ ªŒ æØ ªŁæŁ تŒæ º تŒ æº ªŒæº ŁªŒæ º ºŁªŒ æ º ºŒªŁæ Œ ªŁæ Ø ªŁ æ ØŁ ªºæØŒ ŁªºŒØ æØ ˛ºªØŒæŁ ªØŒæ Ł ªŁæŁ ªŁæŁ ªºæØº ˝ØªŒŒæØ Łªæ Ø ªØ æ ºªºæŁ ºªæ ŒŁ ªºæº ªŒºæ ºªŒæ Ø ºªŁŁæ ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– ØØ †‹»fi•–fi ł ØØ ‹– º ¤‹»fi•–fił º ‹– Ø ƒ–†» ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ º·· ·¿‹»› ¿fi» ·¿‹»› «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ł · «·•”‹ ¿‹ ¶–•†‹ Œ ¿†… Ø · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ØŒŁ—•„„§¿‰ ¿›»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» Œ Æ›‹'–‹'†•ˇ…¤§…Ø ‰§†•Œƒ•«˙·»ƒ˝ºŁ ¶…†¨‚‰˘fi“§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤Œ ª¤Œ ªŒ¤ ª¤ª¤Œ ª¤Ł ªº¤ ª¤ ª¤ºª¤ ª¤Œ ª¤Œ ª¤Œ Ł ºŒ ºŒ Ø Ł ØŒ ØŁ Ł ØŒ º Ł Ł Ł Ł ØŒ ØŁ Ł ØŒ º ŁŁ Łºº˝‰¿·» ª ºŁ —·¿‹» ””›»‹› ł¨ ˙¯Łˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł ºØæ ˝†–' ł—”æ—„æ «‡»fi ºŒ ˚»fi‹ł Ł ˛» ˝‹fi»›› †‰fi ˙˝º–fiƒł Ł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Ł –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ ØŁ Ø Œ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ŁªæŒ ł‡•† ªæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ ¸·•”‹Łª ł ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªØæºŒ ªØæºŁ ªØæŒ ºªØ æŒ ºªØæŒ ŒªØ æ Œ ºŒªØæ Œ ºŒªØæŒ Œ ØªØæºŁ ØŁªØ 溌 ˛ªºŁæ Ø ªºŁæ Ø ªºŁæØ ªºŁæØ ˝Øªºæ ªæº ªºæ ªŒæ ªŒæ ŒªŒ æ Œªæº ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fi ł ‹– º ¤‹»fi•–fi ł º ‹– Ø –fi†»fi ł Ø ‹– Ø ƒ–†» ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› º˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Œ —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł Ø ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ºŒŁ ·¿‹– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» –†–…`‹˘“ا…†Ø¸˙¸ŒŒ¸Ł ¿«•«˝ƒ‹'‡‹‹—–»“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤Œ ª¤Œ ªŒ¤ ª¤ª¤Œ ª¤Ł ªº¤ ª¤ ª¤ºª¤ ª¤Œ ª¤Œ ª¤Œ Ł ºŒ ºŒ Ø ŁØŒ ØŁ Ł ØŒ º Ł Ł Ł ŁØŒ ØŁ Ł ØŒ º ŁŁ ŁŁ Ł˝‰¿·» ª ºØŁ —·¿‹» ””›»‹› ł¨ ˙¯Łˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŁ ˚»fi‹ł ºØæ ˝†–' ł—”æ—„æ «‡»fi ºŒŒ ˚»fi‹ł Ł ˛» ˝‹fi»›› †‰fi ˙˝º–fiƒł Ł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Ø · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Łº –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ ØŁ Ø Œ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ŁªæŒ ł‡•† ªæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ ¸·•”‹Łª ł ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªŒ 溌 ªæ Ł ªŒæºº ºªŒæºº ºªŒæºº Œ ªŒæºº ºŒªŒæºº ºŒªŒ 溺 ŒØ ªæŁ ØŁ ªŒæºŒ ˛ªŁæ ªŁæ ªŁæ ªŁ æ ˝ØªºæºŒ ªØ æº ªºæ ºŒ ªØºæØ ªØæ ŒªØºæØ ŒªØ æº ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fi ł ‹– º ¤‹»fi•–fi ł º ‹– Ø –fi†»fi ł Ø ‹– Ø ƒ–†» ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› º˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Œ —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł Ø ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŒŁ ·¿‹– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˘º¨†–˝¤ˇ‰flˇ›—‚˛»§…º˙¿Ø fi—º˘ÆØ †–¨”›¤¸˛˝Ø¸‚Œ §Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ªŁ¤Ł ªŁ¤Ł ªŁ¤Ł ª¤ ªŒ¤Œ ªŁ˝ Œ¤ ª¤ªŁ ˝ Œ¤ ª¤Ł ªŒ¤Ł ªŒ¤Ł ªŒ¤Ł ªŒ¤Ł ªŒ¤ ªŒ¤Ł ªŒ¤ ªŒ¤ ªŒ¤Œ Ø Ł Ł ØŒ ºŁ Ø Œ ºŒ ºØ Ł Œ º ºØŒººŁ ººººº º ºŒŁŁ Œ ºº Œººº º ŒŁ ŒØ ŁŒ ºŒ º ºº ºØŁØŒŁºŒŁŒŁºØŁ˝‰¿·» ª Ł Ł —·¿‹» ””›»‹› ł¨ ˙¯Ł ˆ ¯ˆ ¯ºŒŁ ˆ ¯Ø Ł ŒŁ ˆ ¯Ł Ł ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºØ ˚»fi‹ł Ł ºØæ ˝†–' ł—”æ—„æ «‡»fi ºØ ˚»fi‹ł ºŁ Ł˝æ ˛» ˝‹fi»›› †‰fi غ–fiƒł Œ †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Œº · ª ß ¸˛ — ˛¤Ł ˝— ¤‰»‹ ¤ ˝— ˛¤ ˝— ˝¤ ˝— ˝‹«… ¤‰»‹ Ø ¤Œ ˝— ٤ ˝— – »”‹ ¤ ˝— ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˛˝ł·æ ›•ƒ»ªŒ æŒ ł‡•† Ł ŒªººæŒ ł‡•† ¿¤ –fi•ƒªº ł º ¿¤ ¸·•”‹ªºŒ ł ŒªŁ ł ¿¤ fi¿“ªŒ ł ŒªºØØ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªØ ٿ٨ ªŁ ØØ æ ºªºŒæ ººŁ ºªŁºæ ŒªŁºæ ŒºªŁºæ غªŁºæ ØŁªŁŒ ŒæŒØ ŁªŁŒ ŒæŒ Ø ªŁŒŒ æŒØ ªŁ æº ªŁæº Œ ªŁ æ º Œ ªŁ æ º ªæØØ º ºªæØØº ºŒªººØæŒ ˛Ø ªæØŁ Ø Łªæ ØŁ Łªæ ØŁ ªæØŁ ªæØŁ Ł ªæØ Ł Ł ªŁæŒŒŒ ªŁ æŒ ŒŒ ØªŁ æŒŒŒ Œ Ø ªººŁæºŒ ºŒªººŁæºŒ ºªØºæ ªØºæ ªØºæ ªØŒ æº ªØŒ æº ªØŒæº Ł ªºæŁØŒ Ø ŁªºæŁØŒ ˝ªºØæŒ ŁªØ æºº Ł ªŁØæ Œºªºæ Ł Ø ªØæØØ ººªæº ºØªŒØæŁ ºØ ªæŒ Ø ªŒ ºæŒº غªŒ Øæ Ø Ø ªººæŁº ªŁ ŁæØŒ ªºæ Œ ªºæ ªæºØ ŁªæŒ ØªŒ Œæ تŒ Œæº ˝ ·§ ‹fi«›› ‹– » ‰–††»‰‹»… ‹–„»‹‚»fi '•‹‚ … ł¤ †¿•·› ¿› ”–··–'› – ‰‚–fi…› ‰–††»‰‹»… ¿› ”–··–'› ¤ fi–'› ›‹¿„„»fi»… ¿‹ –‰ ¤Ł fi–'› ›‹¿„„»fi»… ¿‹ –‰ ¤ fi–' ¿‹ –‰ –‹‹–‡ ‰‚–fi…› ‰–††»‰‹»… ¿› ”–··–'› ¤ fi–'› ›‹¿„„»fi»… ¿‹ Ø –‰ » ‰–††»‰‹»… ¿› ”–··–'› ¤ fi–' ¿‹ –‰ ¤Œ fi–'› ›‹¿„„»fi»… ¿‹ –‰ ·· ·–¿…› ¿fi» ‰–†›•…»fi»… »fl«¿··§ ¿·•»… ‹– ¿·· ·•»› »¤‰»‹ •” †–‹»… ¿› ”fi–†‹ ł –fi ¿‰ ł ”¿‰» •† ‹‚» ˝ł˝ ›»‰‹•–† —·§ ‹– ·§ ‰–††»‰‹•–†› ‚¿“» »»† fi–“•…»… ‹– …•›‹fi•«‹» –†·§ ·–¿…› †–‹»… ¿› ł –fi ł «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł ›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… «‡»fi ªŒ ·¿‹» „fi• ªŒ º ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ Œ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ł —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ ·· ·¿‹»› ¿fi» ·¿‹»› «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ØŒŁ ¿·” • •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¨–·‡fl›§‚—fl ‰§Ł§…†Ø¸˙¸ŒŒ¸Ł ¿«•«˝ƒ‹'‡·¤‰–¿“†»‡§Ø· –†‹•†«»… –† ¿„» DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ·· ·¿‹»› ¿fi» ¤Œ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ł · «·•”‹ ¿‹ ¶–•†‹ Œ ¿†… ºŒ · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ¿†„»fił› –fi –‹‚»fi ‰–††»‰‹•–† …»“•‰»ł› ›‚¿·· » fi –“•…»… ›«””•‰•»†‹ ‹– ›«–fi‹ ‰–†‰»†‹fi¿‹»… ·–¿…ł› · …–'† ¿†… · « ¿‹ ØØ · …–'† ¿†… · « ¿‹ ŁºŒ · …–'† ¿†… · « ¿‹ Œ ØŁ · …–'† ¿†… Ł · « ¿‹ Ł ØŒŒ · …–'† ¿†… غ · « ¿‹ · …–'† ¿†… · « ¿‹ ¿†… º · …–'† ¿†… · « ¿‹ ¿†… ØØŒ · …–'† ¿†… · « ¿‹ Œ Ł –† –‹‹–‡ ‰‚–fi… ‚» …»›•„†æ›»·»‰‹•–† –” ›«‰‚ ‰–††»‰‹•–† …»“•‰»ł› •› ‹‚» fi»›–†›••·•‹§ –” –‹‚»fi› ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ ªº ºªŒ Œ ª –†‰»†‹fi¿‹»… –¿…› ł· ˚»fi‹ Œ ªº ºªØØŒ Ø ª ŁªØ Ø ªŁºŒ ªØŁ ªØ ŒŒ ª –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ØŒŁ ¿·” • •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¨–·‡fl›§‚—fl ‰§Ł§…†Ø¸˙¸ŒŒ¸Ł ¿«•«˝ƒ‹'‡·¤‰–¿“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ªº¤Ł ª¤Œ ª¤Œ ª¤ ªŒ¤Œ ªŒ¤Ł ª¤ ªŒ¤Œ ª¤Ł ª¤ ª¤Œ ª¤Ł ª¤ ªŁ ˝ º¤ª¤ ª¤Ł ª¤Œ ª¤ ª¤Ł ª¤ ª¤Ł ªŒ¤Œ ª¤Œ ª¤ ªº¤ ªº¤Œ ªŒ¤Œ ªŒ¤Œ ª¤ººººŁºŒ ØºØ ŒºŁ ºŒºŒŒ Œ Œ ŒºŒŒ ŒØ ŒŁŁŒ Ø Ø ººŒŒØŁ ØŁ ºŒ ØŁ ººººŒ ØŒºŒ Ø Ł Ø Ł Ø Ł Ø Ł Ø Ł Ø Ł Ø Ł Ø º ºŒ Ł ŒºØ ºŒ Œ ºŒ º º ŒŒ ŒºØ ºŒ Œ º ºŁ Œ º ºººØººººººº˝‰¿·» ª Ł Ł —·¿‹» ””›»‹› ł¨ ˙¯ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºº˚»fi‹ł Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł ººŁ Ł˝æ ˛» ˝‹fi»›› †‰fi Ł –fiƒł Ø †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ ØŁ · ª ß ¸˛ — ˛¤Œ ˝— ˛¤Œ ˝— ˝¤ ˝— ˝‹«… ¤‰»‹ Œ ¤ ˝— – ¤Œ ˝— ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Ł –‰ fi¿‰•†„ ˛˝ł·æ ›•ƒ»ØªŁ æ Œ ł‡•† ªŁŒŒæ Œ ł‡•† ¿¤ –fi•ƒªŒŒ ł ¿¤ ¸·•”‹ØªØŁ ł ªŁØ ł ¿¤ fi¿“ت ł ªŁ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªæ ªººæ Łº ªØ ºØæŁ ªØºŁæŁ ºªØºæŁ º ºªØºŁæŁ ºªØºŁ æŁ Œ ºªØ ºŁ æŁ Œ ŒªŁæºŒŒ Œ ØªŁæºŒ Œ Ø ŁªŁ æºŒŒ Ø ŁªŁ æºŒŒ ØªŁ æºŒŒ ŁªŁæºŒ Œ ŁªŁæºŒŒ ªŁæºŒŒ ªŁæºŒŒ ªæºº ªæºº ªæ ºº ªæºº ªæºº ºªæºº ºªæºº Œ ªŒ ŒæŒ ŒØªŒ Œ æŒ Ø ŁªŒŒæŒ ŁªŒŒæŒ ªŒ Œæ Œ ªŒŒ æŒ ºªŒŒæ Œ ººªŒŒæŒ ººªŁØ æŁ Ø ººªŁ ØæŁØ Œ ºªŁØæ ŁØ ŒØ ªŒæºŁ ªØŁæŁ ˛ªØºæºº ªØæŒ ºªººæ Łº ººªººæŁ º ºººªººæŁº Ł ººªººæ Łº ŁºŒ ªŁ æº Ø ºŒªŁ æ º Ø ºØªŁæº ŒºØªŁ æ º ŒºŁªŁ æº ºŁ ºªŁæ º ºŒ ªŁ æº ºŒªŁæ º ºªººæº Œ ªººæ º Œªººæ º Œªººæº ŒŒ ªººæ º Œ ªººæº ŒªººŁæŁØº Œ Œ ºªººŁæŁØº ŒºªººŁæŁØº ªººŁæŁØº Œ ŒªººŁ æŁØº ŒŒªººŁæŁØº ŒØªŁØæ ŁØ ŒØŒ ŁªŁØæŁ Ø Ł ŒŁªŁØæŁØ ˝ŒŁ ªØæºŒ ªØ Œæº Ł ªæ ØŁ ºŁªØ æŒ Œ Ł ªºŒŁæº ŒŒªŁæº Œ ºªØŒ æº Łºªººæ Ł ºªŁºæ ªºæ Œ ªØ æ ªººæŁ ªæ ŁØ ªæ Ł ªºæºŁ ªºŁ æ ØŁ ºªØ ºæØ ºŁ ªØ æ ªŁæ Œ ªºæØØ ªØ 溌 ˝ ·§ ‹fi«›› ‹– » ‰–††»‰‹»… ‹–„»‹‚»fi '•‹‚ … ł¤ †¿•·› ¿› ”–··–'› – ‰‚–fi…› ‰–††»‰‹»… ¿› ”–··–'› ¤Œ fi–'› ›‹¿„„»fi»… ¿‹ –‰ ¤ fi–' ¿‹ –‰ –‹‹–‡ ‰‚–fi…› ‰–††»‰‹»… ¿› ”–··–'› ¤Œ fi–'› ›‹¿„„»fi»… ¿‹ –‰ » ‰–††»‰‹»… ¿› ”–··–'› ¤ fi–' ¿‹ –‰ ·· ·–¿…› ¿fi» ‰–†›•…»fi»… »fl«¿··§ ¿·•»… ‹– ¿·· ·•»› »¤‰»‹ •” †–‹»… ¿› ”fi–†‹ ł –fi ¿‰ ł ”¿‰» •† ‹‚» ˝ł˝ ›»‰‹•–† —·§ ‹– ·§ ‰–††»‰‹•–†› ‚¿“» »»† fi–“•…»… ‹– …•›‹fi•«‹» –†·§ ·–¿…› †–‹»… ¿› ł –fi ł «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł ›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… «‡»fi ªŒ ·¿‹» „fi• ªŒ –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŁŒŁ ¿·” • •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˛«Ł•¸'˘ŁŒ„·•§…Æ˙˙¿Ø fi—º˘ÆØ †–¨”›‰¸¨˝‚Œ §Ø· –†‹•†«»… –† ¿„» DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. º ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ Œ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ł —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ ·· ·¿‹»› ¿fi» ·¿‹»› «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ ØŁ · «·•”‹ ¿‹ ¶–•†‹ Ø ¿†… ŁØ · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ¿†„»fił› –fi –‹‚»fi ‰–††»‰‹•–† …»“•‰»ł› ›‚¿·· » fi –“•…»… ›«””•‰•»†‹ ‹– ›«–fi‹ ‰–†‰»†‹fi¿‹»… ·–¿…ł› º · …–'† ¿†… · « ¿‹ ŒŁ Ł · …–'† ¿†… · « ¿‹ Ł Ł · …–'† ¿†… · « ¿‹ Ł · …–'† ¿†… · « ¿‹ Ł · …–'† ¿†… · « ¿‹ Ł · …–'† ¿†… · « ¿‹ Œ Ł · …–'† ¿†… · « ¿‹ Ł Ł · …–'† ¿†… · « ¿‹ Ł · …–'† ¿†… · « ¿‹ Ł · …–'† ¿†… · « ¿‹ Ł · …–'† ¿†… · « ¿‹ Œ Ł · …–'† ¿†… · « ¿‹ Ł Ł · …–'† ¿†… · « ¿‹ Ł · …–'† ¿†… · « ¿‹ Ł · …–'† ¿†… · « ¿‹ Ł · …–'† ¿†… · « ¿‹ Œ Ł · …–'† ¿†… · « ¿‹ Ł Ł · …–'† ¿†… · « ¿‹ Ł · …–'† ¿†… · « ¿‹ Ł · …–'† ¿†… · « ¿‹ Ł · …–'† ¿†… · « ¿‹ Œ ¿†… Ł · …–'† ¿†… · « ¿‹ Ł ¿†… Ł · …–'† ¿†… · « ¿‹ º –† ‹– ‰‚–fi… ¿†… Œ · …–'† ¿†… · « ¿‹ ŒŁ º · …–'† ¿†… Œ · « ¿‹ Œ º · …–'† ¿†… Œ · « ¿‹ Ł º · …–'† ¿†… Œ · « ¿‹ º · …–'† ¿†… Œ · « ¿‹ º · …–'† ¿†… Œ · « ¿‹ º · …–'† ¿†… Œ · « ¿‹ Œ º · …–'† ¿†… Œ · « ¿‹ Ł º · …–'† ¿†… Œ · « ¿‹ º · …–'† ¿†… Œ · « ¿‹ º · …–'† ¿†… Œ · « ¿‹ º · …–'† ¿†… Œ · « ¿‹ Œ º · …–'† ¿†… Œ · « ¿‹ Ł º · …–'† ¿†… Œ · « ¿‹ º · …–'† ¿†… Œ · « ¿‹ º · …–'† ¿†… Œ · « ¿‹ º · …–'† ¿†… Œ · « ¿‹ Œ º · …–'† ¿†… Œ · « ¿‹ Ł º · …–'† ¿†… Œ · « ¿‹ º · …–'† ¿†… Œ · « ¿‹ º · …–'† ¿†… Œ · « ¿‹ º · …–'† ¿†… Œ · « ¿‹ Œ ¿†… º · …–'† ¿†… Œ · « ¿‹ Ł ¿†… ŒØ · …–'† ¿†… · « ¿‹ º –† –‹‹–‡ ‰‚–fi… ‚» …»›•„†æ›»·»‰‹•–† –” ›«‰‚ ‰–††»‰‹•–† …»“•‰»ł› •› ‹‚» fi»›–†›••·•‹§ –” –‹‚»fi› ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ ªº ªº Œ ªŒ Ø ª –†‰»†‹fi¿‹»… –¿…› ł· ˚»fi‹ ªŁ ŒªØ Ø ªØ ªØº ª ªŒ ª ªŒ ªŒ ªŒ ª ª ª ºª Œª Łª ª ª ª ª ª ª ºª Œª ت ª ºª ºª ºª ºªŒ ºªŒ ººªŒ ºŒªŒ ºØªŒ ºŁªŒ ºªŒ ŒªŒ ŒªŒ ŒªŒ Œ ªŒ Œ ªŒ ŒºªŒ ŒŒªŒ ŒØªŒ ŒŁªŒ Œ ªŒ تŒ –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŁŒŁ ¿·” • •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˛«Ł•¸'˘ŁŒ„·•§…Æ˙˙¿Ø fi—º˘ÆØ †–¨”›‰¸¨˝‚Œ §Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤Œ ª¤ ªŒ¤Œ ª¤ºª¤Ł ª¤ ª¤Ł ª¤Ł ª¤º ªŒ¤Œ ª¤ ª¤Œ ª¤ Œ ºº Œ ØŁ Ø Ł º Œ Ł Ø Ø º Œ ˝ ˝º˝ ˝ ˝ ˝ ˝º˝ ˝ ˝ Œ ØŒŁ ŒŁ ŒØ Ø Ł Œ Ø Ł ØŒŒŒŒŒØŒ ˝‰¿·» ª Œ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ººŒ ˚»fi‹ł Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºŁ ˚»fi‹ł ŁºŁ ˛» ˝‹fi»›› †‰fi ˙˝ºº–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ º · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ¤‰»‹ Œ –‰ fi¿‰•†„ ºŒ º •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªŒŁæŒ ł‡•† Ł ŒªŒŁæ ł‡•† Ł ¿¤ –fi•ƒŒª ł ¿¤ ¸·•”‹ª ł Ø Œ ª ł Œ ¿¤ fi¿“ªØØŁ ł Œ ªØØŁ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªŁæ ºŁ ªæº ªæ Ł ªŁæ ºØ ºªæŁ ºŒªØºæºØ Œ ØªØ æŁŒ ØŁªØæ Ł ªØ æ ŒØ ªæ ªæ ªŁæ ªŁæŒ ªººæ Ł Œ ªØæ º ªØæŁ ˛ºªæº ªºæºŁ ªŁæ ºŁ ªŒæ ØØ ªŒ æØØ ªŁ æØ ŁªŁ æ Ø Ø ŁªØæ º Œ تŒ æŒ ºŒªŁ æŒ ˝ºªºæ Ø ºØªæº Ø ªŁºæ ŁªŁ æ ØªŁæØ ŁªæŁØ Łªæ ºªºæŁŁ ºªºæŒ ºªØæ Ø ºªŁºæØŁ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ¤‹»fi•–fił˛ ‹– †‹»fi•–fi ł ‹– Ø ƒ–†» ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ·· ·¿‹»› ¿fi» º¤ «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ø ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ Ł ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› »¿fi•†„ ¿‹ ¶–•†‹ł› Œ ‰–†›•…»fi› ¿fi¿··»· ‹– „fi¿•† “¿·«» «›•†„ ˝æ — ¿†„·» ‹– „fi¿•† ”–fi‡«·¿ «•·…•†„ …»›•„†»fi ›‚–«·… “»fi•”§ ‰¿¿‰•‹§ –” »¿fi•†„ ›«fi”¿‰» —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ Œ ¿†… · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ˛––” ˝»‰•¿· ˝«–fi‹»… ¿·»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˝…„•–“fi·‹†˝fi·˛·¶§…“‡…¸¿ˇ˝»˘Œ Ł º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ªº¤ ª¤º ªŒ¤Œ ªº¤ªº¤ª¤Œ ªº¤ ªº¤ ªŒ¤Œ ª¤ºªº¤ Ł ØŒ º Ø ºº Œ Ł Ł Ø ŒŁ Ø ŒØ Ø ŒŒ Œ Ø Œ ŁŒØºØºØºŒ˝‰¿·» ª Ł –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºØ ˚»fi‹ł Øæ ˝†–' ł—”æ—„æ «‡»fi ºŒ ˚»fi‹ł Ł ˛» ˝‹fi»›› †‰fi ˙˝ºŒ –fiƒł Ł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ ŁŁ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Ł –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ŁªØæ Œ ł‡•† Ł ªØæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ –fi•ƒªº ł ¿¤ ¸·•”‹ŁªØ ł Ø ªŁ ł Œ ¿¤ fi¿“Łª ł ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªºæ ªŁ Øæ Œ ªºæŒ ºªæ Œ ºªŁŁŒæŒ Œ ªæ ˛ªæŒØ ªæ Ø Łªæ ˝ªØØæŒ ªæ ªæŁ ªŒæº ªŁæ ºªæŁ Œªæ Œ ŒŁªØæŒ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– Ł †‹»fi•–fi ł Ł ‹– ¤‹»fi•–fił˛ ‹– †‹»fi•–fi ł ‹– Ø ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º—fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ł »¿fi•†„ ¿‹ ¶–•†‹ł› Ł ‰–†›•…»fi› ¿fi¿··»· ‹– „fi¿•† “¿·«» «›•†„ ˝æ— ¿†„·» ‹– „fi¿•† ”–fi‡«·¿ «•·…•†„ …»›•„†»fi ›‚–«·… “»fi•”§ ‰¿¿‰•‹§ –” »¿fi•†„ ›«fi”¿‰» —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ł · «·•”‹ ¿‹ ¶–•†‹ ¿†… Ø · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ˛––” ˝»‰•¿·– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» §–Ø `…‰˛¨ˇ„flا…›fl…¸¿ˇ˝»˘›ÆŒ˘ƒ`º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤º ªŒ¤Œ ªº¤ªº¤ª¤Œ ªº¤ ªº¤ ªŒ¤Œ ª¤ºª¤ Ł ØŒ º Ø ºº Œ ŒŁ º Ł Ł Ø ŒØ Ø ŒŒ Œ Ø Œ ŁŒºººŒ˝‰¿·» ª Ł –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŒ ˚»fi‹ł Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł Ł ˛» ˝‹fi»›› †‰fi ˙˝º–fiƒł ºŁ †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi º –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi º –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ ŒŁ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ŁªØæ Œ ł‡•† Ł ªØæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ –fi•ƒª ł ¿¤ ¸·•”‹ŁªØ ł Ø ªØ ł Œ ¿¤ fi¿“ŁªŁ ł ªØ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªØŁ æŒ ªØ ºæ Ł ªŁæØ ºªŁæ ºªØæº Œ ªØØ æ ˛ªæºØ ªæ Łº Łªæ Ł ˝ªØ æŁ ªŒæŁº ªØæ ŁŁ Œ ŁªØ Łæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ¤‹»fi•–fił˛ ‹– †‹»fi•–fi ł ‹– Ø ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º—fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ł »¿fi•†„ ¿‹ ¶–•†‹ł› Ł ‰–†›•…»fi› ¿fi¿··»· ‹– „fi¿•† “¿·«» «›•†„ ˝æ— ¿†„·» ‹– „fi¿•† ”–fi‡«·¿ «•·…•†„ …»›•„†»fi ›‚–«·… “»fi•”§ ‰¿¿‰•‹§ –” »¿fi•†„ ›«fi”¿‰» —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ø · «·•”‹ ¿‹ ¶–•†‹ ¿†… Ø · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ˛––” ˝»‰•¿·– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» Ł“‡˚˛·º`flƒˇŁº‚§…›”fi¨¤˚»§fiˇ”¤§Łˇ»‡`†•›ˇfi˝˝„Ł˘§Ø·˝ DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤Ł ª¤ ªŁ ˝ º¤ª¤Œ ªŁ ˝ º¤ ª¤ ª¤Ł ª¤ Œ Ł Ø ºº Œ º Œ Ł Œ Ł Œ Ø ŒØ Ø ŒŒ Œ Ø ŒŁŒººººŒ˝‰¿·» ª —·¿‹» ””›»‹› ł¨ ˙¯Œˆ ¯Œ ˆ ¯ØŁ ˆ ¯ŁŁˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł ØŁ Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł ØŁ Ł Ł˝Øæ ˛» ˝‹fi»›› †‰fi ˙˝º–fiƒł Œ †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝ł·æ ›•ƒ»ŒªØºæ Œ ł‡•† Ł ªØºæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ –fi•ƒª ł ¿¤ ¸·•”‹Œª ł Ø ª ł Œ ¿¤ fi¿“ŒªŁØ ł ªŁØŒ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªŁ æ ºŁ ªŁæ ªŁæ ªŒæ ªºæ ªŒ ºæ ªºæŁ ªŁ æ ªŁºæ ºªŁØ æ ººªŁŁ æ ºŒªŁæØº ˛Ø ŁªŒæŁ ˝ŁªæŒ ŁªŁæ ŁªØæ تŒŁ æØ Ø ªØ æ ºØªŁØ æ º ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– Ø ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º—fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Œ ·· ·¿‹»› ¿fi» ·¿‹»› «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› »¿fi•†„ ¿‹ ¶–•†‹ł› Œ ‰–†›•…»fi› ¿fi¿··»· ‹– „fi¿•† “¿·«» «›•†„ ˝æ— ¿†„·» ‹– „fi¿•† ”–fi‡«·¿ «•·…•†„ …»›•„†»fi ›‚–«·… “»fi•”§ ‰¿¿‰•‹§ –” »¿fi•†„ ›«fi”¿‰» —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Œ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ˛––” ˝»‰•¿·– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» –¿‹˚¶fi˙”‡†¿‰ˇ›§…›ˇ‰§†•Œƒ•«˙·»ƒ˝Æ„ºˇ¶»¨‚‰˘fi“§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ ª¤Ł ªº¤Œ ª¤ª¤ ª¤ ª¤Œ ª¤Œ ª¤ ª¤ ª¤ ªº¤ ª¤Ł ª¤ Ł ºŒ Œ Ø Ł Øº Ø Œ Łºº Ł Ł ŒŁ ŒŁ Œ ŒØ Ø Ł ŒŒ Œ ØŒŒºŒºŒºŒŁŒ˝‰¿·» ª ŒŒ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŁ ˚»fi‹ł Øæ ˝†–' ł—”æ—„æ «‡»fi ºŁ ˚»fi‹ł Ø Ł ˛» ˝‹fi»›› †‰fi ˙˝ºŁ –fiƒł Ł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Ø · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ¤‰»‹ ¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi º –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ŁªØØæ »‰‚¿†•‰¿· ł‡•† Ł ªØØæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ –fi•ƒª ł ¿¤ ¸·•”‹Łªº ł Ø ªŒ ł Œ ¿¤ fi¿“ŁªØ ł ªŁ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªæ ºŁ ºªØ æ ºŒªØ æ ŒªØ æ ªæ Ł ªºæ ºªŒ æØ ºŒªæ Œ Ø ªØŁæØ ØŁªØ Łæ Ø Ø ŁªØŁæ Ø ØŁªæº ˛ªºæ ªæØ ªæ Ø ªæºŁ ˝ªºæ Ł ªæ ªºæŁØ Œ ªºæŒ Ø ªŒæº ºªŒºæºØ ªØæ ªŒ æŒ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– Ø ƒ–†» ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º—fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Œ · «·•”‹ ¿‹ ¶–•†‹ ¿†… º · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ˛––” ˝»‰•¿·– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ‰˝ƒ¸†ˇ”‡˘¿§˛–fl§…fifi ¨¤˚»§fiˇ”¤§Łˇ»‡`…›˝fi˝„Ł˘§Ø·˝ DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤Œ ª¤º ªº¤Œ ª¤ª¤ªº¤ ªº¤ ª¤º ª¤Œ Œ Ł Ø º Œ º Œ ŁŒŁ ŒŁ ŒØ ŒØ Ø ŒŒ Œ Ø Œ ŁØº˝‰¿·» ª –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł Ø Ł Øæ ˝†–' ł—”æ—„æ «‡»fi ºŁ ˚»fi‹ł ºØŁ Ł ˛» ˝‹fi»›› †‰fi ˙˝Œ –fiƒł Œ †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ¤‰»‹ º¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi º –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi ŁŁ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ŒªØŁŒæ »‰‚¿†•‰¿· ł‡•† Ł ªØŁŒæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ ¸·•”‹ŒªŒ ł ªŒ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªØ Łæº ªØ æØ ªØ Œæ º ªØ Œæº ºªØ æ ºŒªØ æº ˛Ø ŁªæØ ˝Ł ªºæŁ ŁªŁ æ ØªŁæ ºØªºæ º ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fi ł ƒ–†» ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› º˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› Œ —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Œ · «·•”‹ ¿‹ ¶–•†‹ ¿†… Œ · «·•”‹ ¿‹ ¶–•†‹ Œ Ø ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ºŒŁ ˛––” ˝»‰•¿·– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» flº`¶¸˘•«fi¨'„·§…†‚˙¿Øfi —º˘ÆØ†–¨”›¿¸Ø˝º„‚Œ §Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªº¤ ª¤º ª¤º ªº¤Œ ªº¤Œ ª¤ªº¤ ªº¤ ªŁ ˝ ¤ª¤Ł ª¤ Ø Ł ºŒ Ł ºŒ ºØ º º ºº ŒŁ Œ Ł ŒØ ŒØ Ø ºº ŒØ ŒŒŁŁØØ ŁººŁººŁººŁØ˝‰¿·» ª ºŒ —·¿‹» ””›»‹› ł¨ ˙¯ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºØ ˚»fi‹ł Ø Ł Øæ ˝†–' ł—”æ—„æ «‡»fi ºŁ ˚»fi‹ł ºŁ Ł Ł˝Øæ ˛» ˝‹fi»›› †‰fi ˙˝ºŒ –fiƒł ºØ †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— – ¤‰»‹ º¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Ł –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ŒØ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ØªØŁŒæ »‰‚¿†•‰¿· ł‡•† Ł ªØØæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ –fi•ƒª ł Œ ¿¤ ¸·•”‹ØªØ ł ª ł ¿¤ fi¿“تŒ ł Œ ªŒ ł Œ ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªŁºæ ªŁ ºæ ªŁØæ ªŁØØæ ºªŁŒæ ºŒªŁ Œæ ŒØªŁæ Ø ªæŒ ˛Ł ªæŁº ˝ªºæ ªŒŒæŁ ŁªŒ ŁæŒ ŒŁªŁæØØ ªæ ºº ªºæØŁ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Ł ‹– ¤‹»fi•–fił˛ ‹– Ø †‹»fi•–fi ł Ø ‹– ƒ–†» ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º—fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Œ ·· ·¿‹»› ¿fi» ·¿‹»› «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ø · «·•”‹ ¿‹ ¶–•†‹ Ø ¿†… · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŒŁ ¿·” •– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¸„»§‰`¶¤§…·»‰§†•Œƒ•«˙·»ƒ˝«º«¶”˚¨‚‰˘fi“§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªº¤ ª¤º ªº¤Œ ªº¤Œ ª¤ªº¤ ªº¤ ªŁ ˝ ¤ª¤Ł ª¤ Ø Ł ºŒ Ø ºŒ ŒŁ Œ Ł Œ Ø ŒØ Ø ŒŒ ŒØ Œ ŁØ غغغ˝‰¿·» ª Œ —·¿‹» ””›»‹› ł¨ ˙¯ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºØº˚»fi‹ł Ø Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł Ł Ł˝Øæ ˛» ˝‹fi»›› †‰fi ˙˝ŒŁ –fiƒł Ø †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi ºŁ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ŒØ Ł •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ØªØŁæ »‰‚¿†•‰¿· ł‡•† Ł ªØŒæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ –fi•ƒªŁ ł Œ ¿¤ ¸·•”‹ØªŁ ł ªØ ł ¿¤ fi¿“تŒ ł Œ ªØ ł Œ ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªŒ Ł æ ªØ æ Œ ªØ æŒ ºªØ Øæ ºŒ ªØØ æ ŒØ ªØŁæŒ ˛ªæ ŁªºæŒŁ ˝ªºæŒ ªØæŁ º ªºØæØ Ø ŁªØ æ Œ ŁªŁæØº ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Ł ‹– º ¤‹»fi•–fił˛ º ‹– ŁŁ Ł †‹»fi•–fi ł Ł ŁŁ ‹– ƒ–†» ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º—fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Œ ·· ·¿‹»› ¿fi» ·¿‹»› «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ł · «·•”‹ ¿‹ ¶–•†‹ Ø ¿†… Ø · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ØŒŁ ¿·” •– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» º‹…`Ł…˝ƒÆ fi…„§…fi ¨¤˚»§fiˇ”¤§Łˇ»‡`‚‰›˝»fiÆ»˝„Ł˘§Ø·˝ DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªŁ ˝ ¤ ªŒ¤Ł ª¤ ªŒ¤Œ ªŒ¤Ł ª¤ ª¤ªº¤ ª¤ ªŁ¤Ł ªº¤Ł ŁºŒ Ø Ø Ł Œ º ŁºŒ ºØ ººŒ Œ º ººØ ºØºØºº˝‰¿·» ª º —·¿‹» ””›»‹› ł¨ ˙¯…„»ˆ ¯º…„»ˆ ¯ØŒŒ ˆ ¯Ł ŁŒ ˆ ¯Ł Œ ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŁ ˚»fi‹ł ØŁ Øæ ˝†–' ł—”æ—„æ «‡»fi º˚»fi‹ł Œ ØŁ Ł Ł˝Øæ ˛» ˝‹fi»›› †‰fi Œ –fiƒł Œ †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Ł · ª ß ¸˛ — ˛¤ ˝— – ˛¤Ł ˝— ˝¤ ˝— – ¤‰»‹ ٤Œ ˝— – ¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi ºŁº –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ ˝ ˛–' ¿‹ ‡•…‹ºŒ ˛˝ł·æ ›•ƒ»ŒªŁººæ »‰‚¿†•‰¿· ł‡•† Ł ªØŒæ »‰‚¿†•‰¿· ł‡•† Ł ¿¤ –fi•ƒªØ ł º ¿¤ ¸·•”‹ŒªºŁ ł ªØ ł ¿¤ fi¿“ŒªŁº ł ªØØŁ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªŒØæ Ø ªºæ Ł ªºæŁ ªØ 挺 ºªØæŒº ºŒ ªØŒ æŒ ªØ Œæ ˛ªºŁ æ Łº ªºŁ æŁº ŁªºŁæŁ º Ł ºªŁæ ºŒªŁ æ ŒØªŁ æ Ø ØªŁ æ ˝ªæºŒº ªŒ æŁº ŁªŒ Œæº ŁªØæ ºº ØªæŒ Ø ªæ Œ ºØªºæØØ ˝ ·§ ‹fi«›› ‹– » ‰–††»‰‹»… ‹–„»‹‚»fi '•‹‚ … ł¤ †¿•·› ¿› ”–··–'› – ‰‚–fi…› ‰–††»‰‹»… ¿› ”–··–'› ¤ fi–' ¿‹ –‰ ¤Œ fi–'› ›‹¿„„»fi»… ¿‹ –‰ –‹‹–‡ ‰‚–fi…› ‰–††»‰‹»… ¿› ”–··–'› ¤Ł fi–'› ›‹¿„„»fi»… ¿‹ º –‰ » ‰–††»‰‹»… ¿› ”–··–'› ¤ fi–' ¿‹ –‰ ·· ·–¿…› ¿fi» ‰–†›•…»fi»… »fl«¿··§ ¿·•»… ‹– ¿·· ·•»› »¤‰»‹ •” †–‹»… ¿› ”fi–†‹ ł –fi ¿‰ ł ”¿‰» •† ‹‚» ˝ł˝ ›»‰‹•–† —·§ ‹– ·§ ‰–††»‰‹•–†› ‚¿“» »»† fi–“•…»… ‹– …•›‹fi•«‹» –†·§ ·–¿…› †–‹»… ¿› ł –fi ł «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» «‡»fi ªŒ ·¿‹» „fi• ªŒ º ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ Œ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Ø —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ł ·· ·¿‹»› ¿fi» ·¿‹»› «†·»›› –‹‚»fi'•›» •†…•‰¿‹»… ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› ˛»”»fi ‹– „•fi…»fił› ”–fi ‹fi«›› ‹– ‹fi«›› ‰–††»‰‹•–†› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ ºŁ · «·•”‹ ¿‹ ¶–•†‹ Œ ¿†… Ø · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ¿†„»fił› –fi –‹‚»fi ‰–††»‰‹•–† …»“•‰»ł› ›‚¿·· » fi –“•…»… ›«””•‰•»†‹ ‹– ›«–fi‹ ‰–†‰»†‹fi¿‹»… ·–¿…ł› Ø · …–'† ¿†… · « ¿‹ Ł Ø · …–'† ¿†… · « ¿‹ ŒŒ · …–'† ¿†… · « ¿‹ Œ Œ · …–'† ¿†… · « ¿‹ ŒŒ · …–'† ¿†… · « ¿‹ Œ Œ Œ · …–'† ¿†… · « ¿‹ Ł ŒŒ · …–'† ¿†… · « ¿‹ ¿†… ŒŒ · …–'† ¿†… · « ¿‹ ¿†… ŒŒ · …–'† ¿†… · « ¿‹ –† –‹‹–‡ ‰‚–fi… ‚» …»›•„†æ›»·»‰‹•–† –” ›«‰‚ ‰–††»‰‹•–† …»“•‰»ł› •› ‹‚» fi»›–†›••·•‹§ –” –‹‚»fi› –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŁŒŁ ¿·” • •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¿‹˚¨‹††•–…¨‡Æ§…•·˙¿Ø fi—º˘ÆØ †–¨”›¸¨˝‚Œ §Ø· –†‹•†«»… –† ¿„» DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ ªº ºªŒ Œª –†‰»†‹fi¿‹»… –¿…› ł· ˚»fi‹ ªŒŒ ªØ ªØ ªŒŒ ºªŒŒ ŒªŒŒ تŒŒ Ł ªŒŒ ªŒŒ –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŁŒŁ ¿·” • •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¿‹˚¨‹††•–…¨‡Æ§…•·˙¿Ø fi—º˘ÆØ †–¨”›¸¨˝‚Œ §Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ªº¤ ª¤º ª¤ ªº¤Œ ª¤ªº¤ Ø Œ º Ł º º º º ØŒ º Ø Œ º ºØº˝‰¿·» ª º –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł ºŒ Øæ ˝†–' ł—”æ—„æ «‡»fi ºº˚»fi‹ł ŒØ Ł ˛» ˝‹fi»›› †‰fi º–fiƒł º†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ Ł · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ºªŁæŒ ł‡•† Ł ØªæŁ ł‡•† Ł ¿¤ –fi•ƒØªŒ ł ¿¤ ¸·•”‹ºªØØ ł تŒ ł ¿¤ fi¿“ºªŁ ł تºŒ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛Ø ªºæŁ ªæ ŒŒ ˝Œ ªæºŒ ºªæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł ›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… –fi‰‚ ·»”‹ ¿†… fi•„‚‹ »¤–›»… «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ª ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª «ªº •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ¿…»fl«¿‹» …fi¿•†¿„» ‹– fi »“»†‹ '¿‹»fi –†…•†„ Ø ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ł —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Œ · «·•”‹ ¿‹ ¶–•†‹ Ø ¿†… ØØ · «·•”‹ ¿‹ ¶–•†‹ º ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ¿†„»fił› –fi –‹‚»fi ‰–††»‰‹•–† …»“•‰»ł› ›‚¿·· » fi –“•…»… ›«””•‰•»†‹ ‹– ›«–fi‹ ‰–†‰»†‹fi¿‹»… ·–¿…ł› · …–'† ¿†… · « ¿‹ ¿†… Œ · …–'† ¿†… ŁØ · « ¿‹ º ¿†… · …–'† ¿†… ŁŒ · « ¿‹ Ø –† ‹– ‰‚–fi… ¿†… Ø · …–'† ¿†… · « ¿‹ ¿†… · …–'† ¿†… Œ · « ¿‹ º ¿†… · …–'† ¿†… · « ¿‹ Ø –† –‹‹–‡ ‰‚–fi… ‚» …»›•„†æ›»·»‰‹•–† –” ›«‰‚ ‰–††»‰‹•–† …»“•‰»ł› •› ‹‚» fi»›–†›••·•‹§ –” –‹‚»fi› ˝ł ˝ ˝‹¿†…¿fi… »¿… ı ˝†–' ł ¿·¿†‰»… «‡»fi †‰fi»¿›»ªº —·¿‹» †‰fi»¿›»ªº ¸†•”–fi‡ –¿…› ł·æ”‹ ˚»fi‹ ªº ªº ªŒ ºØª –†‰»†‹fi¿‹»… –¿…› ł· ˚»fi‹ ªØ ŒªŒ ºª ªº ªŁ ª –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ¿‰·–›»… •fi…»fi – ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ‹„¸›˛`º¿‡˛§…˚†Ø¸˙¸ŒŒ¸Ł ¿«•«˝ƒ‹'‡`–¶…“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ª¤ºªº¤ ª¤ ª¤Œ Œ º Ø Ł º º º Ø Ł Ł Ł ºŁ Ø Œ Ø ŒºŁŒØºŁŒ˝‰¿·» ª —·¿‹» ””›»‹› ł¨ ˙¯º…„»ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł ºŒ ºØæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł Ø ºŒ ºŁ ˛» ˝‹fi»›› †‰fi ˙˝–fiƒł º†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Œ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ¤‰»‹ ¤Œ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ºªæŒ ł‡•† Ł ŒªæŁ ł‡•† Ł ¿¤ –fi•ƒŒªŁ ł Œ ¿¤ ¸·•”‹ºª ł Œ Œªº ł ¿¤ fi¿“ºªØ ł Œª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ŒªŒæ ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił º ‹– Œ †‹»fi•–fi ł Œ ‹– Ø ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… –fi‰‚ ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ˛¿•† ›«fi‰‚¿fi„» ¿·•»… ‹– ¿·· »¤–›»… ›«fi”¿‰»› '•‹‚ ›·–»› ·»›› ‹‚¿† ºæ •† ¿‰‰–fi…¿†‰» '•‹‚ ŒŁ ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ º · «·•”‹ ¿‹ ¶–•†‹ Œ ¿†… · «·•”‹ ¿‹ ¶–•†‹ º Ø ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ¿‰·–›»…– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¿`˛`fl˝‰fi¶‰‹fi'Ƨ…¸‰†Ø¸˙¸ŒŒ¸Ł ¿«•«˝ƒ‹'‡˝'Ł–˘“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ª¤ºªº¤ ª¤º ª¤ªº¤ Ø Œ º Ł º ºØ Œ Ø ŒºØº˝‰¿·» ª Ø –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł ºŒ Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºº˚»fi‹ł ºŒ Ł ˛» ˝‹fi»›› †‰fi –fiƒł º†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ Ø · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ºªŒæŒ ł‡•† Ł ØªØæŁ ł‡•† Ł ¿¤ –fi•ƒØªŁŒ ł Œ ¿¤ ¸·•”‹ºª ł Œ تº ł ¿¤ fi¿“ºª ł ØªØ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛Ø ªŁ æ Łªºæ º ˛ØªŒæ º ªŒ æº ŒªŒæº ºŒªŒæº ˝ºªæŒŒ ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił º ‹– Œ †‹»fi•–fi ł Œ ‹– Ø ƒ–†» ‰¿†‹•·»“»fi ·»”‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ »¤–›»… –fi‰‚ ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ º · «·•”‹ ¿‹ ¶–•†‹ Ø ¿†… · «·•”‹ ¿‹ ¶–•†‹ º Ø ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ ¿‰·–›»…– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» Ł”‹Œ†¤Ø˙'º¨›ƒ§…ˇŒ…¸¿ˇ˝»˘fi¨Œ…º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ªº¤ ª¤ ª¤ ºŒ ŒŁº ºŒº˝‰¿·» ª Ł —·¿‹» ””›»‹› ł¨ ˙¯Œ ˆ ¯Œˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł Œ Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł Œ Ł ˛» ˝‹fi»›› †‰fi ˙˝º–fiƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi º –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝ł·æ ›•ƒ»ªºæ ł‡•† Ł ªºæ ł‡•† Ł ¿¤ –fi•ƒªŁ ł ¿¤ ¸·•”‹ªŁ ł Œ ªŁ ł Ø ¿¤ fi¿“ª ł ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªºæ ªºæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– ¤‹»fi•–fił ˛ ‹– º †‹»fi•–fi ł º ‹– ŒŁ ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ł · «·•”‹ ¿‹ ¶–•†‹ ¿†… Ł · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ –‡‡–†– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¶`'“¨§‚Ł ¨ƒ‰fi›˙'¤§…ØÆ”†Ø¸˙¸ŒŒ¸Ł ¿«•«˝ƒ‹'‡º„Æfl–·“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ªº¤ªº¤ªº¤ ª¤ªº¤ªº¤ ª¤ Ø Ł Œ º ŁØ ˝ ˝˝ ŒŁº ºŒº˝‰¿·» ª Œ —·¿‹» ””›»‹› ł¨ ˙¯ˆ ¯Œˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºŒ ˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝Ł –fiƒł Œ †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi º –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› º ł· ¿¤ –fi•ƒªŁ ł ªŁ ł ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› Ł ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› Ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ºŁªŁæºØ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– ¤‹»fi•–fił ‹– –fi†»fił˛ ‹– º ¤‹»fi•–fił º ‹– ŒŁ ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi „fi»¿‹»fi –” ‡•† fi––” ·•“» ·–¿… –” ›” –fi ‹•‡»› ”·¿‹ fi––” ·–¿… –” º ›” –† –“»fi‚¿†„› †–†‰–†‰«fifi»†‹ '•‹‚ –‹‚»fi ·•“» ·–¿…› Ø ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ Ł ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Ł –† ˝‹¿†…¿fi… »¿fi •†„ ‰–†…•‹•–† ˛»“•»' fi»fl«•fi»… ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ŒŁ –‡‡–† ˝«–fi‹»… ¿·»– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» Ø ¤¸º˛˘˘¤Ł‚˛“‰·§…ØÆ†Ø¸˙¸ŒŒ¸Ł ¿«•«˝ƒ‹'‡ºƒ–“†»‡§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ ª¤ªº¤ª¤ ˝ Ł Ø ŁºŁ˝‰¿·» ª –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝ł·æ ›•ƒ»ªØŒæŁ ł‡•† Ł ªºŒæŁ ł‡•† Ł ªæ Ł ł‡•† Ł ¿¤ –fi•ƒªŁ ł ¿¤ ¸·•”‹ª ł Ø ªŁ ł ª ł Œ ¿¤ fi¿“ª ł ªØ ł ªºº ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ªØæØ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił º ‹– º †‹»fi•–fi ł º ‹– Ø ¤‹»fi•–fił ˛ Ø ‹– ØØ †‹»fi•–fi ł ØØ ‹– Ø ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ Ł · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ˚ŒŁ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» Œ ‡“…¨…Œ¿Œ˝«§…Œ‰†˙¿Ø fi—º˘ÆØ†–¨”›¸˙˝˝¤‚Œ§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ ª¤ªº¤ª¤ ˝ º º Łº Łº ºŁ˝‰¿·» ª Œ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºŁ ˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝º–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ º · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi ºº –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝ł·æ ›•ƒ»ªŒæº ł‡•† Ł ªŒæº ł‡•† Ł ªæ º ł‡•† Ł ¿¤ –fi•ƒªº ł ¿¤ ¸·•”‹ªŁ ł Ø ªºŒ ł Œ ¿¤ fi¿“ªŁ ł ªŁ ł ªŁ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ł · «·•”‹ ¿‹ ¶–•†‹ ¿†… ºŒ · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ˚ŒŁ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» `Ø—›–—ؤ…¿ˇ…§…Œ‰¶fi ››‹º˛§‡¤—fl·–¶fi•›Ł ¨”«§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ ª¤ ª¤ Ø Œ º ØŁ˝‰¿·» ª —·¿‹» ””›»‹› ł¨ ˙¯…„»ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ Œ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Ø –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªæ Ø ł‡•† Ł ªæØ ł‡•† Ł ¿¤ –fi•ƒª ł ¿¤ ¸·•”‹ª ł Œ ª ł Ø ¿¤ fi¿“ª ł ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ˚ŒŁ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» '¨§”˙‡ƒfi ”•§…Œ‰‚…¸¿ˇ˝»˘¤Œ„˙º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤Ł ªº¤ªº¤ ª¤ªº¤ªº¤ªº¤ª¤ Ł Ø Œ º ˝ ˝ Œº Œº Ø Ł ŒŒ˝‰¿·» ª –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝Ø –fi•ƒł Œ †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˝ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› ł· ¿¤ –fi•ƒª ł ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ Ł »¤‰»‹ تº ł Œ ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ »¤‰»‹ ØªØ ł Łªº ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ªºæ ŒŒ ªŒæŁ ªØŒæ ªØæŒØ ˛ŁªæºØ ˝Ø ªŁ æ Łªºæ Ł ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– †‹»fi•–fi ł ‹– º ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª •† ”·¿‹ fi––” ›†–' ·–¿… „–“»fi†› ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Œ Ł »¤‰»‹ ł¶‹ª· تº Ø ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ˚ŒŁ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¸'”»˙§”'–fl—§…Œ‰‰fi ¨¤˚»§fiˇ”¤§Łˇ»‡`–›˛•fiŁ˝„Ł˘§Ø·˝ DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ºªº¤ªº¤ªº¤ªº¤ º Ł ˝ Ł ŁºØºØ˝‰¿·» ª –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºŒ ˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝ł·æ ›•ƒ»ªŒæ Ł ł‡•† Ł ªØæŁ ł‡•† Ł ºªæŁ ł‡•† Ł ¿¤ –fi•ƒª ł ¿¤ ¸·•”‹ªº ł ºªØØ ł Œ ¿¤ fi¿“ª ł ª ł ºªºØ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ŁªæŁ ˛ºªºæŁº ˝ºªØæ ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Ø ‹– Ø †‹»fi•–fi ł Ø ‹– Œ ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ º · «·•”‹ ¿‹ ¶–•†‹ ¿†… ØØ · «·•”‹ ¿‹ ¶–•†‹ º Ø ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ˚ºŒŁ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¨¸˚`¸˚•º¶‚‹˝§…Œ —fi¨¤˚»§fiˇ”¤§Łˇ»‡`‡›“fiŁ•˝„Ł˘§Ø·˝ DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ªº¤ªº¤ªº¤ªº¤ º Ł ˝ Œ Œ˝‰¿·» ª Ł –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝Ø –fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝ł·æ ›•ƒ»ªŒæ Œ ł‡•† Ł ªæŒ ł‡•† Ł ºªæ Œ ł‡•† Ł ¿¤ –fi•ƒªŒ ł ¿¤ ¸·•”‹ª ł ª ł ºª ł Œ ¿¤ fi¿“ª ł ªŒ ł ºª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ºªæØ ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Ø ‹– †‹»fi•–fi ł ‹– ŒŁŒ ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ º Ø ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ˚ŒŒŁ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¤‹Ø –Łº§‰‡§¿»§…Œ fi››‹º˛§‡¤—fl ¶‰¶fl›Ł ¨”«§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Ø ª¤ªº¤ªº¤ Œ Œ Œ ˝‰¿·» ª Ł –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªºæŒ ł‡•† Ł ªºæ Œ ł‡•† Ł ¿¤ –fi•ƒªŁ ł ¿¤ ¸·•”‹ª ł Œ ª ł Œ ¿¤ fi¿“ªŁŒ ł ªŁŒ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† — ˛ŒªØØ æØ ˝ •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił Ø ‹– Ø †‹»fi•–fi ł Ø ‹– ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ º‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Œ —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ø ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ˚ØŒŁ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˛›·º˚‹…†¶§…Œ …¸¿ˇ˝»˘“flŒ…«º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªº¤ªº¤ ª¤ªº¤ ª¤ªº¤ Œ º Ł Ø ˝ Ł Ł Ø ºØŁ ºØŁŁØº˝‰¿·» ª —·¿‹» ””›»‹› ł¨ ˙¯…„»Łˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºŁ ˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤˛ »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi ºØŁ –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝ł·æ ›•ƒ»ªŁæºØŁ ł‡•† Ł ºªæ ºØŁ ł‡•† Ł ŒªŒ æºØ Ł ł‡•† Ł ¿¤ –fi•ƒŒªŒ ł ¿¤ ¸·•”‹ªŁ ł ºª ł Œªº ł ¿¤ fi¿“ªŁ ł ºª ł ŒªŒ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˛ºŒ ªŒºæºº ºªŒ ºæ ºº ˝ºªæØ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ‹– Ł ¤‹»fi•–fił˛ Ł ‹– Ł †‹»fi•–fi ł Ł ‹– ºº ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Ø fi «›› ‹– » ”«··§ ›‚»¿‹‚»… ”fi–‡ –†» ”¿‰» –fi ›»‰«fi»·§ fi¿‰»… ¿„¿•†›‹ ·¿‹»fi¿· ‡–“»‡»†‹ ł•» …•¿„–†¿· '» Ł ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ º · «·•”‹ ¿‹ ¶–•†‹ Œ Ł · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ º ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ˚ŁŒŁ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ¨››˛Ł¿“ه˛˚»¤•˛‹…`§…Œ˙…”˚•«˚‹–¸Æ «˝˚Œ˝`§'¨fl ˘§Ø·Ł DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªº¤ ªº¤ ª¤ªº¤ªº¤ªº¤ ª¤ Ø Œ º Ł ˝ ˝ ºŁ Ł Ł Œ º ºŁººØŁºº˝‰¿·» ª –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºØ ˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi º –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝·· »¿fi•†„› ºŁ ł· ¿¤ –fi•ƒØª ł Ø ¿¤ ¸·•”‹·· «·•”‹ ł· –fi ·»›› ¿‹ ¶–•†‹ł› Œ Ø »¤‰»‹ ºª ł Ø ¿¤ fi¿“·· fi»¿‰‹•–†› º ł· –fi ·»›› ¿‹ ¶–•†‹ł› º Œ Ø ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ºªŁØæ ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ‹– Ł –fi †»fił˛ Ł ‹– Ł ¤‹»fi•–fił Ł ‹– ƒ–†» ‰¿†‹•·»“»fi fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Ø ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ Ł ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› »¿fi•†„ ¿‹ ¶–•†‹ł› Ø ‰–†›•…»fi› ¿fi¿··»· ‹– „fi¿•† “¿·«» «›•†„ ˝æ— ¿†„·» ‹– „fi¿•† ”–fi‡«·¿ «•·…•†„ …»›•„†»fi ›‚–«·… “»fi•”§ ‰¿¿‰•‹§ –” »¿fi•†„ ›«fi”¿‰» —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ł› Ø Œ »¤‰»‹ ł¶‹ª· ºªŁ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ¿ »‹'»»† •†›•…» –” ‹– ‰‚–fi… »¿fi•†„ ¿†… ”•fi›‹ …•¿„–†¿· –fi “»fi‹•‰¿· '» ›‚¿·· †–‹ »¤‰»»… º•† ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ˚ŒŁ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ˙¨··˝˝«—˘˚»¤“¶§…Œ˙”˚•«˚‹–¸Æ «˝˚Œ˝`'¨”fl ˘§Ø·Ł DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ªº¤ªº¤ ª¤ªº¤ ª¤ º Œ ˝ Ł Ł º ºººŁŁŁØº˝‰¿·» ª –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºº˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝º–fi•ƒł †æ¿†æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˝¤ ˝— ˝‹«… ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› »¤‰»‹ »†… “»fi‹•‰¿·› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝ł·æ ›•ƒ»ªŁæ ł‡•† Ł ªæ ł‡•† Ł ºªæ ł‡•† Ł ¿¤ –fi•ƒºªŒ ł ¿¤ ¸·•”‹ª ł Ø ªŒ ł ºªº ł ¿¤ fi¿“ª ł ªŒŒ ł ºª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… –fi†»fił ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ fi«›› …»›•„†»… ”–fi '•†… ·–¿…› •† ‹‚» ·¿†» –” ‹‚» ‹fi«›› –†·§ –fi ›‹«…› »¤–›»… ‹– '•†… ł†–fi‡¿· ‹– ‹‚» ”¿‰» ›»» ˝‹¿†…¿fi… †…«›‹fi§ ¿·» †… »‹¿•·› ¿› ¿·•‰¿·» –fi ‰–†›«·‹ fl«¿·•”•»… «•·…•†„ …»›•„†»fi ¿› »fi ˝æ— ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª º¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† Œ ¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Ø ¿·» ›‹«…› ›¿‰»… ¿‹ –‰ Ł ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ º · «·•”‹ ¿‹ ¶–•†‹ º · «·•”‹ ¿‹ ¶–•†‹ ¿†… Œ · «·•”‹ ¿‹ ¶–•†‹ ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ˚ŒŁ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» ƒ¶˚¿`Æ·¤§¿†Œ•—Œ‚§…Œ¨“”˚•«˚‹–¸Æ «˝˚Œ˝`''¨˛fl˘§Ø·Ł DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ ª¤ ª¤ Ł Œ Œ Łº˝‰¿·» ª —·¿‹» ””›»‹› ł¨ ˙¯…„»ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• ºº˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºº˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ Œ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªØæŁ ł‡•† Ł ªØæŁ ł‡•† Ł ¿¤ –fi•ƒªº ł ¿¤ ¸·•”‹ª ł Œ ª ł Ø ¿¤ fi¿“ª ł ª ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ˚ŒŁ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» —flƒ›˝„…˘“»§“˛–‰¶§…”˚•«˚‹–¸Æ«˝˚Œ˝`¸'fi¨fl ˘§Ø·Ł DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ ª¤ªº¤ª¤ ˝ ºŒ ºº ºŒ˝‰¿·» ª Ł –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi º˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝º–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ º · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛˝¤ ˝— ˝‹«… ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi ºŒ –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi Œ –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…»˛˝ł·æ ›•ƒ»ªºæºŒ ł‡•† Ł ªºæºŒ ł‡•† Ł ªæ ºŒ ł‡•† Ł ¿¤ –fi•ƒªºº ł ¿¤ ¸·•”‹ªŁ ł Ø ªºŁ ł Œ ¿¤ fi¿“ªŁ ł ªŁ ł ªØ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ Ł · «·•”‹ ¿‹ ¶–•†‹ ¿†… ºŁ · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ˚ŒŁ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» Œ ¨†¨–˝”•º—…«‹»Œ§…Œ˚¿…¸¿ˇ˝»˘'Œ ”§º§Ø· DE Job # 79622-W1 Dansco Engineering, LLC Date: 12/18/2020 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. ª¤ ª¤ ª¤ ŁØ º ŁØ˝‰¿·» ª —·¿‹» ””›»‹› ł¨ ˙¯…„»ˆ –¿…•†„ł›”˝¿‰•†„˝•†ł·–‰·æ…»”·æ…—˝˛— łfi––”—·¿‹» fi• º˚»fi‹ł †æ¿†æ¿Øæ ˝†–' ł—”æ—„ºæ «‡»fi ºº˚»fi‹ł †æ¿†æ¿ ˛» ˝‹fi»›› †‰fi ˙˝–fi•ƒł †æ¿†æ¿ –…»˛Łæ—¿‹fi•¤— »•„‚‹ Œ · ª ß ¸˛ — ˛¤ ˝— – ˛¤ ˝— – ˛ — ˛˝‹fi«‰‹«fi¿· '––… ›‚»¿‹‚•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ «fi·•†› ˛˛•„•… ‰»•·•†„ …•fi»‰‹·§ ¿·•»… –fi –‰ fi¿‰•†„ •» fi»‰–‡‡»†…› ‹‚¿‹ ˝‹¿•·•ƒ»fi› ¿†… fi»fl«•fi»… ‰fi–›› fi¿‰•†„ » •†›‹¿··»… …«fi•†„ ‹fi«›› »fi»‰‹•–† •† ¿‰‰–fi…¿†‰» '•‹‚ ˝‹¿•·•ƒ»fi †›‹¿··¿‹•–† „«•…» ˛˝ł·æ ›•ƒ»ªŒæŁØ ł‡•† Ł ªŒæŁØ ł‡•† Ł ¿¤ –fi•ƒªº ł ¿¤ ¸·•”‹ª ł Œ ª ł Ø ¿¤ fi¿“ªŁ ł ªŁ ł ˛˝ł· ¿¤ –‡æ¿¤ »† ·· ”–fi‰»› º ł· –fi ·»›› »¤‰»‹ '‚»† ›‚–'† ˝ ¸†¿·¿†‰»… fi––” ·•“» ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† •†… ˝ ØŒ ˚«·‹ªº‡‚ ł›»‰–†… „«›‹ ˚¿›…ª‡‚ ªŒ›” ªŒ›” ‚ªº”‹ ¿‹ ¤ †‰·–›»… ˛˝ ł»†“»·–» »¤‹»fi•–fi ƒ–†» ¿†… ¤‹»fi•–fił ƒ–†» ‰¿†‹•·»“»fi ·»”‹ ¿†… fi•„‚‹ »¤–›»… »†… “»fi‹•‰¿· ·»”‹ ¿†… fi•„‚‹ »¤–›»… ”–fi ‡»‡»fi› ¿†… ”–fi‰»› œ ˛˝ ”–fi fi»¿‰‹•–†› ›‚–'† «‡»fi ªŒ ·¿‹» „fi• ªŒ ˝ Ø Œ —fiª ›” łfi––” «‡ ªº —·¿‹» ªº —„ª ›” —”ªº ›” ł«‡ ªº —·¿‹» ªº ›ª ˛–«„‚ ¿‹ —¿fi‹•¿··§ ¤ »ª ›ª ‹ª ¸†¿·¿†‰»… ›†–' ·–¿…› ‚¿“» »»† ‰–†›•…»fi»… ”–fi ‹‚•› …»›•„† º¿·» fi»fl«•fi»› ‰–†‹•†«–«› –‹‹–‡ ‰‚–fi… »¿fi•†„ Œ ‚•› ‹fi«›› ‚¿› »»† …»›•„†»… ”–fi ¿ ›” –‹‹–‡ ‰‚–fi… ·•“» ·–¿… †–†‰–†‰«fifi»†‹ '•‹‚ ¿†§ –‹‚»fi ·•“» ·–¿…› Ø —fi–“•…» ‡»‰‚¿†•‰¿· ‰–††»‰‹•–† ł§ –‹‚»fi› –” ‹fi«›› ‹– »¿fi•†„ ·¿‹» ‰¿¿·» –” '•‹‚›‹¿†…•†„ · «·•”‹ ¿‹ ¶–•†‹ ¿†… · «·•”‹ ¿‹ ¶–•†‹ Ł ‚•› ‹fi«›› •› …»›•„†»… •† ¿‰‰–fi…¿†‰» '•‹‚ ‹‚» Ł †‹»fi†¿‹•–†¿· ˛»›•…»†‹•¿· –…» ›»‰‹•–†› ˛º ¿†… ˛Ł ¿†… fi»”»fi»†‰»… ›‹¿†…¿fi… ˝æ— ˝ł ˝ ˝‹¿†…¿fi… –fi«››fi«›› §»ˇ‹§—·§ ––…›•…» ¿‹ »›‹ ·¿§ –‹ ˚ŒŁ ˚¿··»§– ˛»”»fi»†‰» ł–‹•–†¿· ˛«† Ł ˝ ‰‹ —fi•†‹ Ł ˝ ‰‹ •» †…«›‹fi•»› †‰ fi• »‰ Ł Ł º—¿„» `‡˙…“fiƒ¶¨º›¤–§§…Œ˚…¸¿ˇ˝»˘¤Œ„º§Ø·