HomeMy WebLinkAboutS001.027'-4"27'-4" 2'-2" 8'-4" 11'-6" 6'-8" 18''7'-0" 74'-2" 59'-0" 51'-4" 20'-10" 2'-0" 74'-2"10'-6"19'-8" 24'-6"54'-8"8"8"8"8"8" 8"8"8" 10" 10"1'-8 1/2" 16'-3" 8'-3"8" 8"8"8" 10"10"8" 2'-2" 14''12'-4" 2'-4" 9'-2" PORCHUNINHABITABLE54'-8"AREA WELLPER CODE SUMP PITLOCATIONMAY VARY(PREWIRE)CRAWL ACCESS 6'-0"REINFORCE PER LOCAL CODESAND ENGINEERS SPECIFICATIONSGARAGE SLABCRAWL SPACE FOUNDATION10" 10"COVEREDPORCHUNINHABITABLE1'-8 1/2"6 1/2"1'-8 1/2" 28'-6"4'-8" BEAM POCKET10.75" X 7"W BEAM POCKET10.75" X 5"W BEAM POCKET10.75" X 7"W20'-0" 16'-0" 17'-4" 20'-0" CRAWLSPACEUNINHABITABLE30X30 PAD42X42 PADW10x2616'-0"17'-4" BEAM POCKET10.75" X 7"WW10x26 W10x26 W10x19W8x1336X36 PAD42X42 PAD42X42 PAD10'-1" 10'-1" 9'-6" 20'-5" 16'-2" 12'-11" 14'-5"20'-5" 16'-6"3'-10"8" 6'-2" 10"BEAM POCKET 8.5" X 5"W BEAM POCKET 8.5" X 5"W 8" 8"David Weekley Homesare guidelines for construction use only.specifications, shown on this document,The measurements, dimensions, and otherstructure may vary. This document maynot be relied on as a representation ofThe actual specifications of the finishedwhat the completed structure will look like.AUTOCAD 2004C Scale:Rev.: Date:Lot:Blk:Sect:Proj. No.:Job No.:422400010100113612 WOODSIDE HOLLOW DRIVECARMEL, INDIANANORTH 5884-A PADDOCK INDIANAPOLIS FS-1 CN/AAS/JM Weekley Homes L.P. 20151/8" = 1'-0"06/07/16 SLWOODISDE AT WEST CLAY12/28/20