HomeMy WebLinkAboutC010.22_2 of 2-GUILFORD RD MEDIAN CONSTRUCTION MOTSB S. GUILFORD ROAD
NB S. GUILFORD ROAD
25' (TYP.)
Work Zone
25' (TYP.)11'Channeling
Device 11'CENTRAL MIDDLE SCHOOLDRIVE APPROACHJ.J.H.
RECOMMENDED
FOR APPROVAL
DESIGN ENGINEER DATE
DESIGNED:
CHECKED:
DRAWN:
CHECKED:
SURVEY BOOK
CONTRACT
DESIGNATION
SHEETS
of
PROJECT
BRIDGE FILEHORIZONTAL SCALE
FANNING HOWEY
T.E.N.
J.J.H.
T.E.N.
1/13/2021 VERTICAL SCALE
2
WP
O
N
T E
E.
SINTE E
T
RINE NGEER
A NDNI
LONAOE
F
I
SS
I A
STATE OF
19700381
RGE DE RRT
PRDIRECTORY PATH: R:\Active\Carmel\Carmel Middle School-Guilford Rd\CADFILENAME: CONSTR-DETAILS.dwgDATE/USER: 1/13/2021 3:29 PM / JhochstetlerGUILFORD RD MEDIAN
CONSTRUCTION MAINTENANCE OF TRAFFIC
1"=10'
N/A
Note:
'Road Construction Ahead' and 'End Road
Work' signs shall be placed at the nearest
intersection north and south of the work zone.
Work shall be performed under traffic. If a
lane closure is required during construction,
traffic shall be flagged.
2
ROAD
WORK
AHEAD
W20-1
END
CONSTRUCTION
XG20-2
150'
ROAD
WORK
AHEAD
W20-1
END
CONSTRUCTION
XG20-2
150'