HomeMy WebLinkAbout23LV - Truss Placement8-00-00 TOP
8-00-00 TOP
9-00-00 TOP
9-00-00 TOP
9-00-00 TOP
Ladder frame
to wall
GE01
T03
GE02
GE03
GE04
GE05
GE06
GE07
T10
AG01
GE08
V01
V02
V03
V04
GE08
V01
V02
V03
V04
PBE01
PBE02
PBE03
T01(8)
T02(2)
T04(7)
M01(7)
T05(7)
T06(7)
T07(6)
T08(2)
T09(3) AT01(2)
AT02(2)
PB01(10)
PB02(3)
PB02(2)
PB02(2)
PB03(6) PB04(5)
1
2-00-00 21-08-00 6-04-00 2-00-00 9-11-00
12-08-00 10-04-00 2-08-00 2-00-00 17-11-00 19-04-00 12-00-00
2-00-00 16-00-00 33-11-00
76-11-00
17-00-08
21-04-00
10-00
39-06-08
51-03-00
1-08-00
2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00
1-08-00
IRC 2018
TPI 2014 20TLL - 10TDL - 10BDL
Wedgewood Building Company
Neff Residence
23 Laura Vista
1/4"=1'
January 8, 2021
PH
B20003908
CUSTOMER:
LOCATION:
MODEL:
JOB #:
DATE:
DESIGNER: DESIGN INFORMATION: SCALE:
9028 Old SR 67 South
Mooresville, IN 46158
(317) 834-5380
Truss Placement Guide
1) This layout is intended for the purpose of truss location
and placement only. Refer to the building plans for actual
building construction.
2) All dimensions shown 00-00-00 are in feet-inches-sixteenths.
3) Trusses are spaced 24" on center unless otherwise noted.
4) Do not cut or modify trusses.
5) Refer to the individual truss design drawings for the location
of member bracing, uplift and truss end reactions.
6) Installation of all temporary and permanent bracing is
essential. See truss drawings, BCSI-B2 Summary Sheet
and building designer requirements.
7) Non-bearing walls may not be shown on layout.
Left end of truss, as shown on engineering
drawing, is indicated by the triangle symbol