Carmel Plan Commission
COMMERCIAL COMMITTEE
Tuesday, February 2, 2021 Department Report
5. Docket No. PZ-2020-00210 DP Amend/ADLS Amend: Pennwood Office Park.
6. Docket No. PZ-2020-00225 V: Secondary vehicular entrances shall not be through residential areas.
Requesting emergency vehicle-only secondary access from Washington Blvd.
The applicant seeks site plan, design, and variance approval for three, one-story office buildings to be constructed
on 3.76 acres. The site is located at approximately 11505 N. Pennsylvania Street. It is zoned B-5/Business and is
located within the West Homeplace Commercial Corridor, High Intensity Overlay Zone. Filed by Kevin Buchheit
of Krieg DeVault on behalf of the owner, SCB Home Office, LLC.
*Updates to the Dept. Report are in blue.
Project Overview:
The Petitioner proposes to construct three new one-story buildings that will complete the Pennwood Office development.
This site has been through four previous approvals and building designs. The first was in 2007 under Docket No.
06070008 DP/ADLS. Then, an updated design of that two-story building was proposed under Docket No. 16080012
DP/ADLS. In 2018, under Docket No. 18070013 ADLS Amend, a three-story building was proposed and approved.
Lastly, in December 2019, the three-story building was reduced to a two-story building.
To the north is an office building for the Police and Fireman’s Insurance Association, zoned B-5 and within the West
Home Place Commercial Corridor – High Intensity Area. Directly south are the other two Pennwood office buildings, also
zoned B-5 and in the West Home Place Commercial Corridor – High Intensity Area. To the west are the three Penn Mark
office buildings, zoned MC/Meridian Corridor. To the east are single family residential homes, zoned R-1. Please see the
Petitioner’s Information packet for more details.
Combined Hearing Information:
This petition will be reviewed as part of the “Combo Committee” option, which was enacted to approve development
proposals. Instead of the Petitioner going before both the Plan Commission and the Board of Zoning Appeals (BZA), the
Plan Commission will act as both bodies to review the entire petition together. This process combines the Plan
Commission’s review of the site plan, architectural design, landscaping, signage, etc. with any variances (which do not
meet development standards of the UDO) that would have been reviewed by the BZA.
Unified Development Ordinance (UDO) Standards this project MEETS:
West Home Place Commercial Corridor:
• Building Height: 45’ allowed, 21’ proposed
• Front Yard Setback: minimum 5’allowed,
about 15’ proposed
• Side Yard Setback: minimum 10’ allowed,
115’ proposed south, 10’ proposed north
• Rear Yard Setback: 15’ next to existing
residence, 47’ proposed
• Building Orientation: must face Penn. St.
• Pedestrian facilities: connection from
Pennsylvania Street to front door required
and provided in 3 locations
• Architectural design
• Bufferyards: 10’ wide next to residential, 30’ proposed
• Site lighting: 21’ tall max allowed, 20’ proposed
• Parking standards: interconnected to adjacent sites
• Parking amount: 1 space per 250 sq. ft. of floor area (27,323
sq. ft.) required = 110 spaces, 115 spaces provided
• Bicycle parking: 4 spaces required per building and
provided
• Dumpster enclosure matches building design
Unified Development Ordinance (UDO) Standards NOT MET, therefore modifications are required: None
Previous Variances Granted:
• Docket No. 18070014 V: UDO SECTION 3.06.B.3.f.: “All buildings shall be designed with respect to the general
character of the US 31 Corridor and, particularly, with due consideration to buildings located on lots that abut the
subject property.” (This variance was heard and approved by the PC at the October 16, 2018 meeting.)
• Docket No. 16120010 V – ZO Ch. 23E.07.C: No parking allowed in front yard required & parking shall be
screened; parking in front yard requested. (This variance was heard and approved at the Jan. 23, 2017 BZA mtg.)
7
West Home Place Commercial Corridor – High Intensity Area Overlay Zone:
The West Home Place Commercial Corridor is in place to create appropriate site design and architectural transitions
between US 31 and the residential areas to the east. The buildings in this corridor will act as a buffer from the more
intensive building heights and uses in the US 31 Corridor. One of the standards in the overlay zone states that “All
buildings shall be designed with respect to the general character of the US 31 Corridor and, particularly, with due
consideration to buildings located on lots that abut the subject property.” The proposed height reduction to one story will
respect the character of the surrounding buildings, being both residential structures and single- and two -story office
buildings.
Site Plan, Parking and Engineering:
The overall site plan is laid out in roughly the same way as the 2019 approved plan; it just has a new building directly
fronting Pennsylvania Street. Access into the site is still from the shared entry point from Pennsylvania Street and the
access road to the Police & Fireman’s Insurance building to the north is maintained. This placement of the building and
associated parking located in front of the building required a variance, as no parking is allowed in the Front Yard. This
variance request was heard and approved at the January 23, 2017 BZA meeting.
Parking required for this building is calculated under the General Office category, which requires one space for every 250
sq. ft. of floor area. There is 27,323 sq. ft. of floor area, so that would require 110 parking spaces. 115 spaces are
provided, six of which are ADA accessible. The parking is located between the buildings and to the south of Building 1.
A new vehicular entrance is proposed at the northeast corner of the site, connecting to Washington Blvd. While the Dept.
is normally supportive of additional connectivity, the West Homeplace Commercial Corridor does not allow for secondary
entrances to be through residential areas. Thus, a variance has been requested to approve this entrance as an emergency
only access. This was requested by the Fire Dept. to be provided. The Department is in support of this access to
Washington Blvd. as emergency only.
Regarding detention and stormwater, there is a large pond to the south of this building that this project will tie into. The
Engineer is working on the plan and does not propose for the pond to be expanded, as was proposed in the previous
petition. The developer continues to work with the City Engineer’s office on plan approval.
Active Transportation:
There is an existing multi-use path on Pennsylvania Street, and two new sidewalks will be constructed to connect it to the
new buildings and the existing development to the south. Currently sidewalks are proposed on the south and east faces of
Building 1 and on the west and north sides of Buildings 2 and 3. The Petitioner has also added direct pedestrian
connections from the front doors facing Pennsylvania to the path along Pennsylvania Street, as required by the UDO. Bike
parking will be provided for each building. Two racks, which is four spaces, will be provided.
Sidewalk (5’ wide) is also required along Washington Blvd., as it is a public street frontage. However, the Petitioner has
decided to contribute to the Non-Reverting Thoroughfare Fund for the cost of the sidewalk, rather than build it now. There
are currently no other facilities on Washington Blvd. and it would require the removal of a lot of trees. The Department is
supportive of the contribution in lieu of construction at this time.
A Plan Commission member had concerns about pedestrian access through the parking lot, because it was three rows
deep. The Petitioner added a crosswalk area through the center of the site by removing two parking spaces. The pedestrian
access specification mentioned by the PC member is a listed requirement in the Carmel Drive/Range Line Road Overlay,
but is a good safety measure for any parking lot throughout the City.
Architectural Design:
The buildings will be constructed of the following primary materials – cast stone, architectural metal panels, glass, and
brick. Using three of these materials meets one of the requirements of the West Home Place Commercial Corridor. Other
requirements are for entrances to be clearly defined and to have consistent architectural style all around. The entrances are
defined by taller façade treatments. The increased use of stone and brick on the building facades will complement the
existing red brick buildings in the Pennwood development to the south, as well as the other office buildings surrounding
the site. Rooftop equipment will be screened by the parapet walls. The dumpster enclosure design will be brick surrounds
with a stone cap.
8
Lighting:
Site lighting is proposed through five parking lot pole lights. They will be LED lights with 90 degree cut off lenses. The
photometric plan meets the requirements for 0.3 footcandles at the west and north property lines and the 0.1 footcandle at
the east property line. The Petitioner will be adding under soffit lighting, to help illuminate the building façade and
provide lighting for pedestrians.
Landscaping:
Building base, street trees and parking lot perimeter landscaping will be provided. There is a good stand of trees along the
east property line, which provide a good buffer between the commercial and residential areas. These trees will be
preserved, as well as supplemented to fill in any gaps to complete the buffer. The Urban Forester is currently reviewing
the proposed plan revisions. An update will be provided at the Committee meeting.
Signage:
There is an existing ground sign in the center median of the entrance to the development that says “Pennwood.” This will
remain as the identifying sign for the overall development. The elevations show signage facing Pennsylvania for the
westernmost building. Additional work will be needed on signage to ensure it complies with the UDO requirements. The
Petitioner has stated they will return to the Dept. for administrative ADLS Amendment approval of the sign plan for this
building.
January 19 Public Hearing Recap:
The Petitioner went over the project and discussed the site history. No one from the public submitted letters in favor of or
against this project. The Plan Commission had questions regarding pedestrian access through the parking lot, the proposed
emergency access along Washington Blvd. – how it will be secured and its location, sidewalk requirements for
Washington Blvd., design of the garage building not matching the buildings, and the access drive easements and
agreements for use. This was sent to the Commercial Committee with the Committee having final voting authority. All
were in favor.
DOCS Remaining Comments/Concerns:
1. Engineering Dept. approval
2. Landscaping plan approval needed
Recommendation:
The Department of Community Services recommends the Commercial Committee votes to Approve this item this
evening subject to Engineering Dept. and Urban Forestry approvals.