HomeMy WebLinkAboutA100.1NHB
W02W02
W05W05
W03W03
D01D01
W03W03
W01W01
W04W04
D07D07
D05D05
D05D05
D03D03
A
A501
A
A501
B
A501
B
A501
A
A502
A
A502
C
A505
C
A505
B
A502
B
A50242'-0" OUTSIDE OF EXISTING STUD TO OUTSIDE OF NEW STUD7'-2" CL 13'-3 3/4" CL26'-0"
7'-6" CL
22'-5 1/2"19'-6 1/2" O/S EXISTING STUD TO O/S NEW STUD11'-2 3/4" CL2'-8" 7'-1 1/4" 7'-1 1/4"10'-8 1/2" 14'-4" 5'-1" 13'-5"6'-4" 4'-1" 4'-8 1/2" 5'-11 1/2"3'-7"16'-0"31'-0"8'-0"12'-0"
1'-0"
3'-0" 3'-0"8'-0"4'-4" CL4'-0"
16'-0" 5'-1"
NEW FAMILY ROOM
NEW MASTER
BEDROOM
DN
NEW UTILITY ROOM
NEW MASTER
CLOSET
NEW MASTER
BATH
PROPOSED CONSTRUCTION NOTES:
- FURNISH & INSTALL NEW EXTERIOR WALLS WITH 2X6 BOTTOM
PLATE, 2X6 STUDS @ 16" O/C, DOUBLE 2X6 TOP PLATES, 7/16" OSB
EXTERIOR WALL SHEATHING, & TAPED HOUSEWRAP
- FURNISH & INSTALL NEW INTERIOR WALLS WITH 2X4 BOTTOM PLATE,
2X4 STUDS @ 16" O/C, & DOUBLE 2X4 TOP PLATES
- INSTALL HOMEOWNER-PROVIDED EXTERIOR DOOR AS SHOWN
(REFER TO DOOR SCHEDULE FOR DETAILS)
- INSTALL HOMEOWNER-PROVIDED WINDOWS AS SHOWN (REFER TO
WINDOW SCHEDULE FOR DETAILS)
- FURNISH & INSTALL R-19 KRAFT-FACED BATT INSULATION IN ALL
NEW EXTERIOR WALLS & R-30 KRAFT-FACED INSULATION IN ALL NEW
CEILING CAVITIES
- FURNISH & INSTALL NEW DROP-DOWN ATTIC ACCESS IN NEW
UTILITY ROOM
- FURNISH & INSTALL NEW 1/2" DRYWALL ON ALL NEW WALLS,
PAINTED
- FURNISH & INSTALL NEW INTERIOR DOORS AS SHOWN (REFER TO
DOOR SCHEDULE FOR DETAILS), PAINTED
- FURNISH & INSTALL NEW JAMB MATERIAL & INTERIOR CASING TO
MATCH EXISTING IN EXISTING ROUGH OPENING WHERE EXISTING
EXTERIOR DOOR WAS REMOVED, PAINTED
- FURNISH & INSTALL NEW DOOR & WINDOW CASING, BASE, & SHOE
MOLDING IN ALL NEW ROOMS, PAINTED
- FURNISH & INSTALL NEW PRE-FINISHED FIBER CEMENT EXTERIOR
TRIM, SIDING, VENTED SOFFIT, & FASCIA ON NEW ADDITION
- FURNISH & INSTALL NEW PRE-FINISHED FIBER CEMENT EXTERIOR
TRIM, SIDING, VENTED SOFFIT, & FASCIA ON EXISTING FIRST FLOOR &
SECOND FLOOR WOOD PANELED WALLS
- FURNISH & INSTALL NEW CAST-IN-PLACE CONCRETE STOOP, STEP, &
PATIO SLAB, SAND MATRIX FINISH (COLOR TBD)
- HOMEOWNER TO PROVIDE & INSTALL NEW GAS-FIRED FORCED AIR
FURNACE WITH A/C COMPRESSOR, ASSOCIATED SUPPLY & RETURN
AIR DUCTWORK, & PROGRAMMABLE THERMOSTAT. NEW HVAC
SYSTEM TO SERVE NEW ADDITION ONLY.
- FURNISH & INSTALL NEW GAS LINE TO NEW FURNACE LOCATION
- FURNISH & INSTALL NEW HOT WATER LINES, COLD WATER LINES, &
PVC DRAIN LINES AS NECESSARY FOR NEW SINKS, TOILET, SHOWER,
& HVAC CONDENSATE DRAIN AS REQUIRED.
** REFER TO ENLARGED PLANS FOR BATHROOM DETAILS**
**ALL DIMENSIONS SHOWN ARE STUD TO STUD OR CENTERLINE
OF ROUGH OPENING UNLESS NOTED OTHERWISE**
TOP OF EXISTING
SUBFLOOR =
0' 0"
TOP OF
NEW SUBFLOOR =
0' 0"
TOP OF NEW SLAB =
- 1' 3"
A
A601
A
A601
A
A601
A
A601
A
A602
A
A602
A
A602
A
A602
NEW CONCRETE PATIO
A
A401
A
A401
PERMIT
#0
ISSUE DATE:
2020-12-22
REV:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been prepared
by Case Design & Remodeling solely
for its use and should not be
reproduced or relied upon by any
other parties. Dimensions shown or
scaled are subject to change per
actual job condition and must be
verified. Materials are to be supplied
as specified as equal or standardwhen not uniquely specified. Installed
materials may vary in appearance
from drawings. Reference
manufacturer's product data for actual
appearance and specifications.SCHIPP RESIDENCEMASTER SUITE / SUNROOMADDITIONDAVID & JULIE SCHIPP11111 HAVERSTICK ROADCARMEL, INDIANA 46033Approved By:
Date:
A101
Craig Dice
Architectural Designer
cdice@caseindy.com
252590170
JOB NUMBER:
Dawn Ashburn
Project Developler
dashburn@caseindy.com
FIRST FLOOR PROPOSED FLOOR PLANA
A101
A
A101 SCALE: 3/16" = 1'-0"
#1 2021-01-08
01/25/21