Loading...
HomeMy WebLinkAboutA100.4NB A401 B A401 C A401 C A401 A A504 A A504 B A504 B A504 C A504 C A504 D A504 D A504 A A505 A A505 B A505 B A505 6'-3" 4'-0" 3'-1 1/2" CL 2'-0" CL5'-11 1/2"1'-0"2'-10" CL2'-2 1/2" CL 3'-0" CL 1'-10"6'-0" NEW MASTER BATH D03D03D03D03D03D03 +/- 8'-0" (MATCH EXISTING)3'-4"FURNISH & INSTALL (2) 30"W X 36"H FRAMELESS MIRRORS FURNISH & INSTALL (3) WALL-MOUNTED SCONCE LIGHTS FURNISH & INSTALL 72"W X 22"D X 36"H VANITY & ASSOCIATED HARDWARE FURNISH & INSTALL CULTURED MARBLE COUNTERTOP WITH BACKSPLASH & DOUBLE RECTANGULAR SINKS, (2) FAUCETS, & (2) DRAINS FURNISH & INSTALL 4X12 CERAMIC TILE WAINSCOT WITH GROUT, RUNNING BOND LAY PATTERN, WITH BULLNOSE TOP EDGE D03D03D03D03D03D03 +/- 8'-0" (MATCH EXISTING)3'-4"1'-6"FURNISH & INSTALL 4X12 CERAMIC TILE WAINSCOT WITH GROUT, RUNNING BOND LAY PATTERN, WITH BULLNOSE TOP EDGE FURNISH & INSTALL 4X12 CERAMIC TILE, FLOOR TO CEILING WITH GROUT, RUNNING BOND LAY PATTERN FURNISH & INSTALL 28"W X 78"H CLEAR FRAMELESS GLASS SHOWER DOOR WITH ASSOCIATED HARDWARE FURNISH & INSTALL 48"W X 78"H CLEAR FRAMELESS GLASS SHOWER PANEL FURNISH & INSTALL NEW TOILET FURNISH & INSTALL SOLID SURFACE BENCH TOP FURNISH & INSTALL 4X12 CERAMIC TILE WITH GROUT, RUNNING BOND LAY PATTERN, AT BENCH SIDE PROPOSED MASTER BATH NOTES: - FURNISH & INSTALL NEW 2X4 FRAMED BENCH AS SHOWN. FURNISH & INSTALL NEW 1/2 CONCRETE BACKERBOARD ON FACE & 4X12 CERAMIC TILE WITH GROUT, RUNNING BOND LAY PATTERN. FURNISH & INSTALL SOLID SURFACE BENCH TOP - FURNISH & INSTALL SOLID 2X BLOCKING SHOWER AND TOILET STUD WALLS FOR FUTURE GRAB BARS (VERIFY LOCATIONS WITH HOMEOWNER EXACT LOCATIONS & HEIGHTS) - FURNISH & INSTALL CUSTOM MUD PAN ON RECESSED FLOOR FRAMING FOR ZERO-THRESHOLD SHOWER. FURNISH & INSTALL PEBBLE TILE WITH GROUT ON SHOWER FLOOR WITH CENTER DRAIN. - FURNISH & INSTALL NEW 1/2" CONCRETE BACKERBOARD ON SHOWER WALLS FROM FLOOR TO CEILING & 4X12 CERAMIC TILE WITH GROUT, RUNNING BOND LAY PATTERN. - FURNISH & INSTALL CLEAR FRAMELESS SHOWER GLASS DOOR WITH ASSOCIATED HARDWARE & FIXED PANEL - FURNISH & INSTALL NEW MIXING VALVE & HANDLE, SHOWER HEAD, & SLIDEBAR MOUNT HAND SHOWER - FURNISH & INSTALL NEW 1/2" CONCRETE BACKERBOARD & 12" X 24" FLOOR TILE WITH GROUT, STRAIGHT LAY PATTERN, LONG EDGE PARALLEL TO VANITY FRONT - FURNISH & INSTALL NEW 40"H WAINSCOT WITH 4X12 CERAMIC TILE WITH GROUT, RUNNING BOND LAY PATTERN, WITH BULLNOSE TOP EDGE AROUND ENTIRE PERIMETER - FURNISH & INSTALL NEW TOILET, TOILET SET, & TOILET HANDLE - FURNISH & INSTALL NEW 72"W X 22"D VANITY WITH CULTURED MARBLE COUNTERTOP AND BACKSPLASH WITH (2) INTEGRAL DOUBLE RECTANGULAR SINK BOWLS, (2) FAUCETS, & (2) DRAINS - FURNISH & INSTALL (2) 30" X 36" FRAMELESS MIRRORS - FURNISH & INSTALL (1) TOILET TISSUE HOLDER, (1) 24" TOWEL BAR, (2) TOWEL RINGS, & (1) ROBE HOOK PERMIT #0 ISSUE DATE: 2020-12-22 REV: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standardwhen not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications.SCHIPP RESIDENCEMASTER SUITE / SUNROOMADDITIONDAVID & JULIE SCHIPP11111 HAVERSTICK ROADCARMEL, INDIANA 46033Approved By: Date: A401 Craig Dice Architectural Designer cdice@caseindy.com 252590170 JOB NUMBER: Dawn Ashburn Project Developler dashburn@caseindy.com ENLARGED MASTER BATHROOM FLOOR PLANA A401 A A401 SCALE: 3/8" = 1'-0" MASTER BATHROOM EAST INTERIOR ELEVATIONB A401 B A401 SCALE: 3/8" = 1'-0" MASTER BATHROOM WEST INTERIOR ELEVATIONC A401 C A401 SCALE: 3/8" = 1'-0" #1 2021-01-08 01/25/21