HomeMy WebLinkAboutA100.4NB
A401
B
A401
C
A401
C
A401
A
A504
A
A504
B
A504
B
A504
C
A504
C
A504
D
A504
D
A504
A
A505
A
A505
B
A505
B
A505
6'-3" 4'-0"
3'-1 1/2" CL 2'-0" CL5'-11 1/2"1'-0"2'-10" CL2'-2 1/2" CL 3'-0" CL
1'-10"6'-0"
NEW MASTER
BATH
D03D03D03D03D03D03
+/- 8'-0" (MATCH EXISTING)3'-4"FURNISH & INSTALL (2) 30"W X 36"H FRAMELESS MIRRORS
FURNISH & INSTALL (3) WALL-MOUNTED SCONCE LIGHTS
FURNISH & INSTALL 72"W X 22"D X 36"H VANITY &
ASSOCIATED HARDWARE
FURNISH & INSTALL CULTURED MARBLE COUNTERTOP
WITH BACKSPLASH & DOUBLE RECTANGULAR SINKS, (2)
FAUCETS, & (2) DRAINS
FURNISH & INSTALL 4X12 CERAMIC TILE WAINSCOT
WITH GROUT, RUNNING BOND LAY PATTERN, WITH
BULLNOSE TOP EDGE
D03D03D03D03D03D03
+/- 8'-0" (MATCH EXISTING)3'-4"1'-6"FURNISH & INSTALL 4X12 CERAMIC TILE WAINSCOT
WITH GROUT, RUNNING BOND LAY PATTERN, WITH
BULLNOSE TOP EDGE
FURNISH & INSTALL 4X12 CERAMIC TILE, FLOOR TO
CEILING WITH GROUT, RUNNING BOND LAY PATTERN
FURNISH & INSTALL 28"W X 78"H CLEAR FRAMELESS
GLASS SHOWER DOOR WITH ASSOCIATED HARDWARE
FURNISH & INSTALL 48"W X 78"H CLEAR FRAMELESS
GLASS SHOWER PANEL
FURNISH & INSTALL NEW TOILET
FURNISH & INSTALL SOLID SURFACE BENCH TOP
FURNISH & INSTALL 4X12 CERAMIC TILE WITH GROUT,
RUNNING BOND LAY PATTERN, AT BENCH SIDE
PROPOSED MASTER BATH NOTES:
- FURNISH & INSTALL NEW 2X4 FRAMED BENCH AS SHOWN. FURNISH & INSTALL NEW 1/2 CONCRETE
BACKERBOARD ON FACE & 4X12 CERAMIC TILE WITH GROUT, RUNNING BOND LAY PATTERN. FURNISH &
INSTALL SOLID SURFACE BENCH TOP
- FURNISH & INSTALL SOLID 2X BLOCKING SHOWER AND TOILET STUD WALLS FOR FUTURE GRAB BARS
(VERIFY LOCATIONS WITH HOMEOWNER EXACT LOCATIONS & HEIGHTS)
- FURNISH & INSTALL CUSTOM MUD PAN ON RECESSED FLOOR FRAMING FOR ZERO-THRESHOLD
SHOWER. FURNISH & INSTALL PEBBLE TILE WITH GROUT ON SHOWER FLOOR WITH CENTER DRAIN.
- FURNISH & INSTALL NEW 1/2" CONCRETE BACKERBOARD ON SHOWER WALLS FROM FLOOR TO
CEILING & 4X12 CERAMIC TILE WITH GROUT, RUNNING BOND LAY PATTERN.
- FURNISH & INSTALL CLEAR FRAMELESS SHOWER GLASS DOOR WITH ASSOCIATED HARDWARE & FIXED
PANEL
- FURNISH & INSTALL NEW MIXING VALVE & HANDLE, SHOWER HEAD, & SLIDEBAR MOUNT HAND SHOWER
- FURNISH & INSTALL NEW 1/2" CONCRETE BACKERBOARD & 12" X 24" FLOOR TILE WITH GROUT,
STRAIGHT LAY PATTERN, LONG EDGE PARALLEL TO VANITY FRONT
- FURNISH & INSTALL NEW 40"H WAINSCOT WITH 4X12 CERAMIC TILE WITH GROUT, RUNNING BOND LAY
PATTERN, WITH BULLNOSE TOP EDGE AROUND ENTIRE PERIMETER
- FURNISH & INSTALL NEW TOILET, TOILET SET, & TOILET HANDLE
- FURNISH & INSTALL NEW 72"W X 22"D VANITY WITH CULTURED MARBLE COUNTERTOP AND
BACKSPLASH WITH (2) INTEGRAL DOUBLE RECTANGULAR SINK BOWLS, (2) FAUCETS, & (2) DRAINS
- FURNISH & INSTALL (2) 30" X 36" FRAMELESS MIRRORS
- FURNISH & INSTALL (1) TOILET TISSUE HOLDER, (1) 24" TOWEL BAR, (2) TOWEL RINGS, & (1) ROBE HOOK
PERMIT
#0
ISSUE DATE:
2020-12-22
REV:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been prepared
by Case Design & Remodeling solely
for its use and should not be
reproduced or relied upon by any
other parties. Dimensions shown or
scaled are subject to change per
actual job condition and must be
verified. Materials are to be supplied
as specified as equal or standardwhen not uniquely specified. Installed
materials may vary in appearance
from drawings. Reference
manufacturer's product data for actual
appearance and specifications.SCHIPP RESIDENCEMASTER SUITE / SUNROOMADDITIONDAVID & JULIE SCHIPP11111 HAVERSTICK ROADCARMEL, INDIANA 46033Approved By:
Date:
A401
Craig Dice
Architectural Designer
cdice@caseindy.com
252590170
JOB NUMBER:
Dawn Ashburn
Project Developler
dashburn@caseindy.com
ENLARGED MASTER BATHROOM FLOOR PLANA
A401
A
A401 SCALE: 3/8" = 1'-0"
MASTER BATHROOM EAST INTERIOR ELEVATIONB
A401
B
A401 SCALE: 3/8" = 1'-0"
MASTER BATHROOM WEST INTERIOR ELEVATIONC
A401
C
A401 SCALE: 3/8" = 1'-0"
#1 2021-01-08
01/25/21