Loading...
HomeMy WebLinkAboutC8.7 Carmel Water DetailsC8.7 REVISIONS INDIANAPOLIS - TERRE HAUTE LAFAYETTE - MUNCIE - NEW ALBANY www.hwcengineering.com CONSTRUCTION DETAILSCONSTRUCTION DETAILSASPHALT PAVEMENT LAP JOINT DETAIL TYPE 3 HANDICAP ACCESS RAMP POND OUTLET CONTROL STRUCTURE (STR.#103) VEHICLE BARRIER POST POND CROSS SECTION EMERGENCY SPILLWAY CROSS SECTION & PATH 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. NOTES: 2. DO NOT SCALE DRAWINGS. OPTIONAL FLOATING DEVICE BOTTOM OF POND 1. THE ONLY ASSEMBLY REQUIRED IS TO ATTACH THE MOTOR HOUSING TO THE BASE, WITH THE HARDWARE PROVIDED AND TO ATTACH THE FLEXIBLE DISCHARGE HOSE. 2. YOU WILL HAVE TO MEASURE THE DEPTH OF THE POND AT THE LOCATION YOU WILL BE INSTALLING YOUR UNIT. CUT YOUR FLEXIBLE HOSE 0' TO 3' BELOW THE SURFACE. THE CLOSER TO THE SURFACE THE BIGGER THE WATER BOIL WILL BE. AFTER CUTTING THE HOSE TO PROPER LENGTH ATTACH THE HOSE TO THE DISCHARGE TUBE WITH THE STAINLESS STEEL HOSE CLAMP. TIGHTEN SECURELY. THE UNIT IS NOW READ TO BE INSTALED IN YOUR POND. 3. YOU YOU WILL NEED TWO (2) PIECES OF NYLON ROPE, ONE TO INSTALL YOUR UNIT WHICH SHOULD BE TWICE THE DEPTH OF YOUR POND AND ONE FOR RETRIEVAL, WHICH CAN EXTEND FROM YOUR AERATOR BASE TO SHORE OR FROM YOUR AERATOR BASE TO YOUR FLOATING DEVICE. 4. ONE END OF THE NYLON ROPE FOR YOUR RETRIEVAL LINE SHOULD BE ATTACHED THROUGH THE HOLE DRILLED IN THE AERATOR BASE, THE OTHER END SHOULD BE ATTACHED TO A FLOAT DEVICE OR BACK TO THE SHORE LINE. THIS LINE IS USED TO REMOVE YOUR UNIT FROM THE WATER AFTER IT HAS BEEN INSTALLED. WARNING: NEVER REMOVE YOUR UNIT FROM THE POND BY PULLING ON THE POWER CABLE, DAMAGE TO THE UNIT WILL RESULT AND VOID THE WARRANTY. 5. THE NYLON ROPE FOR INITIAL INSTALLATION IS RUN THROUGH THE S-HOOK ON THE UNIT. CAREFULLY LOWER THE UNIT TO THE BOTTOM OF THE POND, MAKING SURE THE BASE SITS AS FLAT AS POSSIBLE. AFTER THE FINAL PLACEMENT, PULL ONE END OF THE ROPE OUT THE S-HOOK, DONT LEAVE THIS ROPE IN THE WATER. 6. FOR INITIAL OPERATION, INTRODUCE YOUR AERATOR INTO THE PONDS ENVIRONMENT BY SETTING YOUR ON-OFF TIMER TO FOUR HOUR INTERVALS. NOTE: THE INSTALLATION ROPE ON 1-5 HP UNITS ARE RUN THROUGH THE S-HOOK ON THE DISCHARGE TUBE ASSEMBLY. THERE IS ALSO A S-HOOK ON THE FLOATTO TIE THE RETRIEVAL LINE TO. THIS AIDS IN REMOVAL OF UNIT. INSTALLING "S" HOOK INSTALLING ROPE RETRIEVAL LINE SHORE OR FLOAT POND AERATOR EXCLUDING EVAPORATION RATES AND EXTENDED DRY PERIODS, CONSTRUCTED WET PONDS MUST BE ABLE TO HOLD NORMAL POOL ELEVATION. WET PONDS MUST BE LINED WITH A LOW PERMEABILITY LINER IF ONE OR MORE OF THE FOLLOWING ARE EVIDENT; INFILTRATION RATE OF SOILS IN A PROPOSED WET POND LOCATION POSE A RISK TO THIS REQUIREMENT, IT IS FOUND THAT THE POND CANNOT MAINTAIN NORMAL POOL DURING THE COURSE OF CONSTRUCTION, OR IT IS FOUND THAT THE POND CANNOT MAINTAIN NORMAL POOL PRIOR TO ACCEPTANCE OF ALL INSTALLED IMPROVEMENTS BY THE CITY OF CARMEL. THE LINER MUST BE DESIGNED BY A CERTIFIED ENGINEER AND THE LINER MUST BE ACCEPTABLE TO THE CITY ENGINEER. LINER DETAILS AND LOCATIONS MUST BE INCLUDED IN AS-BUILT SUBMITTALS. BELLEVUECARMEL, INNOTE: MODEL # AQUA AIR ULTRA 1 - (1 3) HP PATH CROSS SECTION 01/27/21