Loading...
HomeMy WebLinkAboutC1.2 Pre Construction SWPPPBELLEVUECARMEL, INC1.2 REVISIONS PRE-CONSTRUCTION STORMWATER POLLUTION PREVENTION AND DEMOLITION PLANPRE-CONSTRUCTION STORMWATER POLLUTIONPREVENTION AND DEMOLITION PLAN INDIANAPOLIS - TERRE HAUTE MUNCIE - LAFAYETTE - NEW ALBANY www.hwcengineering.com 0' (IN FEET) GRAPHIC SCALE 20' 40' 60' Call 811 or 800-382-5544 Before you Dig! BENCHMARK INFORMATION: THIS SHEET TO BE USED FOR EROSION CONTROL ONLY. PERSON ONSITE RESPONSIBLE FOR EROSION CONTROL: NOTE: SEE SHEET C8.0 FOR A LIST IN SEQUENCE OF CONSTRUCTION ACTIVITIES. DEMOLITION GENERAL NOTES: CARMEL GENERAL NOTES: INDEX OF SWPPP ELEMENTS DEMOLITION KEYNOTES: # STORMWATER POLLUTION PREVENTION NOTES: LEGEND: EXISTING REMOVENOTE: CONTRACTOR SHALL PROTECT THE EXISTING CITY DUAL DUCT BANK IN THE RIGHT-OF-WAY. IN THE EVENT OF CONFLICT WITH THE PROPOSED IMPROVEMENTS, RELOCATION OF THE DUAL DUCT BANK AND ALL ASSOCIATED/APPURTENANT/ANCILLARY ITEMS SHALL BE THE SOLE RESPONSIBILITY OF THE DEVELOPER SUBJECT TO REVIEW AND APPROVAL OF THE CITY. NOTE: ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND BRIDGES ACROSS THE FRONTAGE OF THIS DEVELOPMENT ARE INDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES AS NECESSARY OR AS REQUESTED BY THE CITY TO ACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES, MULTI-USE PATH, AND ANY OTHER REQUIRED IMPROVEMENTS TO THE PROPERTY OR THE ROADWAY. THE COST TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES WILL BE BORNE BY THE DEVELOPER. LEGEND * 01/27/21