Loading...
HomeMy WebLinkAboutC1.8 Utility PlanEXISTING 12" D.I. WATERLINECollegeSign Wet Pond Area Ave. GOLBORNE STREETFULHAM STREETHUFFINGTON STREETBELLEVUECARMEL, INC1.8 REVISIONS INDIANAPOLIS - TERRE HAUTE LAFAYETTE - MUNCIE - NEW ALBANY www.hwcengineering.com UTILITY PLANUTILITY PLANFUTURE ROUNDABOUT LINE WORK SHOWN FOR REFERENCE PURPOSES ONLY 0' (IN FEET) GRAPHIC SCALE 20' 40' 60' Call 811 or 800-382-5544 Before you Dig! BENCHMARK INFORMATION: CARMEL GENERAL NOTES: ” LEGEND: EXISTING PROPOSED UTILITY NOTES: 9025 NORTH RIVER ROAD, SUITE 100 INDIANAPOLIS, INDIANA 46240 (317) 659-3200 SANITARY SEWER NOTES: STORM SEWER NOTES: SITE UTILITY PLAN KEYNOTES: # NOTE: SEE SHEET C1.8 FOR STORM SEWER DATA TABLE. NOTE: CONTRACTOR SHALL PROTECT THE EXISTING CITY DUAL DUCT BANK IN THE RIGHT-OF-WAY. IN THE EVENT OF CONFLICT WITH THE PROPOSED IMPROVEMENTS, RELOCATION OF THE DUAL DUCT BANK AND ALL ASSOCIATED/APPURTENANT/ANCILLARY ITEMS SHALL BE THE SOLE RESPONSIBILITY OF THE DEVELOPER SUBJECT TO REVIEW AND APPROVAL OF THE CITY. NOTE: ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND BRIDGES ACROSS THE FRONTAGE OF THIS DEVELOPMENT ARE INDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES AS NECESSARY OR AS REQUESTED BY THE CITY TO ACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES, MULTI-USE PATH, AND ANY OTHER REQUIRED IMPROVEMENTS TO THE PROPERTY OR THE ROADWAY. THE COST TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES WILL BE BORNE BY THE DEVELOPER. NOTE: ALL WATERLINES SHALL BE INSTALLED PER CARMEL CLAY WATER UTILITY SPECIFICATIONS 01/27/21