Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ALB48 First Floor System
Products PlotID Length Product Plies Net Qty G40'-2 40' 0" 14" TJI 210 joist 2 4 G20'-2 20' 0" 14" TJI 210 joist 2 6 G20' 20' 0" 14" TJI 210 joist 1 5 G18' 18' 0" 14" TJI 210 joist 1 9 G16' 16' 0" 14" TJI 210 joist 1 1 G14' 14' 0" 14" TJI 210 joist 1 17 G2' 2' 0" 14" TJI 210 joist 1 1 GBk1 2' 0" 14" TJI 210 joist 1 8 S40' 40' 0" 14" TJI 360 joist 1 7 S22' 22' 0" 14" TJI 360 joist 1 5 S20' 20' 0" 14" TJI 360 joist 1 1 M2-3 22' 0" 1 3/4" x 14" 2.0E Microllam LVL (WSO) 3 3 M1 22' 0" 1 3/4" x 14" 2.0E Microllam LVL (WSO) 1 1 M3 20' 0" 1 3/4" x 14" 2.0E Microllam LVL (WSO) 1 1 M4 6' 0" 1 3/4" x 14" 2.0E Microllam LVL (WSO) 1 1 RM1 16' 0" 1 1/8" x 14" TJ Rim Board 1 14 Total Lengths Length Product 814' 0" 14" TJI 210 joist 410' 0" 14" TJI 360 joist 114' 0" 1 3/4" x 14" 2.0E Microllam LVL (WSO) 224' 0" 1 1/8" x 14" TJ Rim Board LEVEL NOTES Current Date: 12/16/2020 File Name: 2021-0105DHa Drees ALB-48.jvl Level Name: 1st-Floor Framing Building Code - Design Methodology: IBC 2018 Members with Design Overridden: TJ-Pro Rating (Weighted Average): 46 Minimum Level TJ - Pro Rating & Joist: TJ-Pro rating = 36, joist = G20'(i24979) Maximum Level TJ - Pro Rating & Joist: TJ-Pro rating = 58, joist = G14'(i24986) FLOOR Floor Container: FC6 Use/Occupancy: ResidentialLivingAreas Floor Area Loading is: 40.0 lb/ft² Live Load & 10.0 lb/ft² Dead Load Operator Added Additional Loads Maximum Allowed Deflection: L/480 Live Load & L/240 Total Load TJ-Pro Rating Information: Weighted Average: 46 Directly Applied Ceiling: None Decking Attachment: Glue and Nail Decking Material: 23/32"x48"x96" Weyerhaeuser Edge Gold Panel (0/24) T&G SF Perpendicular Partition: No Strapping at max 8' o.c.: None Blocking at max 8' o.c.: No Poured Flooring: No Start Spacing 16" O.C. Start Spacing 19.2" O.C. Framing Connector Summary PlotID Qty Manuf Product Design Method Face Nails Top Nails Member Nails Skew Backer Blks Filler Web Stiff H1 1 Simpson HUS1.81/10 Designed 30- 10dx1.5 - 10- 10d - No No No H2 3 Simpson IUS2.06/14 Designed 12- 10dx1.5 - 2- Strong-Grip - No No No H3 2 Simpson IUS2.06/14 Designed 12- 10dx1.5 - 2- Strong-Grip - 2 No No Start Spacing XX" O.C. B1 B4 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 B1 B2 CS CS CS H2 H2 B1 BBO21 5-1/2" BBO4 M1M4 M3Toilet 10' 10 1/2"3' 7"3' 3"G16'G20'-2S20'G20'-2G20'G20'RM1RM1RM1RM1RM1RM1 RM1 RM1RM1 RM1 RM1 RM1 RM1 RM1 RM1 RM1 RM1 RM1 GBk1 H1 GBk1 S22'GBk1 1' 3 15/16" 7 1/4" 1' 3 3/16" 1' 4 9/16" 7 7/16"G40'-2S40'G40'-215' 7" 17' 8"6' 10"13' 2" 10' 4 1/16" 6' 4 1/16" 10' 1 7/8" 9 3/4"G20'8" HVAC 8" HVAC 37' 3"14' 4" 2' 11"11 9/16" G2' H3H3 2' 3 7/16"1' 1 5/8" 9 5/8" CSM2-3 CS CS G20'-2GBk1 G18'G18' G20' S40' S40' G14' G14' S22'RM1H2 S40' Joist moved over 4" to allow for proper hanger connection. Mechanical Chase Kitchen Island Hatch Legend TJI 110 TJI 210 TJI 360 TJI 560 Joists by Series Architectural Drawings Prepared By: Structural Drawings Prepared By:Drees HomesALB-48 Buchanan URevaBy DateDH 12-16-20Commentsadded HVAC holes from AirtronDrawn By:DHChecked By: Release Date:12-9-20Job # 2021-0105DHa Sheet 1 of 2 A complete Javelin ® framing plan requires the Trus Joist Installation Guide See the Trus Joist Installation Guide for Product Trademark Information SYMBOL LEGEND Bearing Length Requirements Point Load (Operator Added) Line Load (Operator Added) Area Load (Operator Added) Beam by Others Detail Callout Label (See Framer's Pocket Guide) Non-Load Bearing Wall Joist Under Wall Above BBO A10'UWALack of proper bracing during construction can result in seriousaccidents. Observe the following guidelines: WARNING NOTES: WARNING Joists are unstable until braced laterally Bracing Includes: BlockingHangers Sheathing Rim Board Strut LinesRim Joist DO NOT stack building materials on unsheathedjoists. Stack only over beams or walls. DO NOT walk on joists that are lying flat. DO NOT walk on joists until braced.INJURY MAY RESULT. Weyerhaeuser, Microllam, Parallam, TimberStrand, TJI, TJ, and Trus Joist are registered trademarks ofWeyerhaeuser NR. ©2014 Weyerhaeuser NR Company. All rights reserved. 1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed.2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also beaccomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay. 3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist. Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker orone layer of unnailed sheathing. 5. Ends of cantilevers require safety bracing on both the top and bottom flanges. 6. The flanges must remain straight within 1/2" from true alignment. 4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system.First Floor System Scale: 1/4" = 1'0"These placement plans have been developed for the specificationof products based on project information provided. This service is solelyintended for product application assurance; and, is not intended tocircumvent the need for a design professional as determined by thebuilding code. The designer of record and/or builder/framer is responsibleto assure these drawings are compatible with the overall project.01/26/21