Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Second Floor System
Framing Connector SummaryPlotIDQty ManufProduct Design Method Face Nails Top Nails Member Nails SkewBacker Blks Filler Web StiffH3 56Simpson IUS2.06/11.88 Designed 10- 10dx1.5 - 2- Strong-Grip - No No NoH4 16Simpson IUS2.37/11.88 Designed 10- 10dx1.5 - 2- Strong-Grip - No No NoH5 1 Simpson U14X SKL45 Designed 14- 10dx1.5 - 6- 10dx1.5 45 (L)No No NoH6 1 Simpson SUL2.1/11 Designed 16- 10dx1.5 - 2- 10dx1.5 45 (L)No No NoH8 3 Simpson HUS1.81/10 Designed 30- 10dx1.5 - 10- 10d - No No NoH9 2 Simpson U14X SKR45 Designed 14- 10dx1.5 - 6- 10dx1.5 45 (R)No No NoProductsPlotIDLength Product Plies Net QtyF32'32' 0"11 7/8" TJI 210 joist 1 12F20'20' 0"11 7/8" TJI 210 joist 1 3F18'18' 0"11 7/8" TJI 210 joist 1 15F16'16' 0"11 7/8" TJI 210 joist 1 9F14'14' 0"11 7/8" TJI 210 joist 1 1F4' 4' 0" 11 7/8" TJI 210 joist 1 1FBk1 2' 0" 11 7/8" TJI 210 joist 1 51F2' 2' 0" 11 7/8" TJI 210 joist 1 39R20'20' 0"11 7/8" TJI 360 joist 1 10R18'18' 0"11 7/8" TJI 360 joist 1 5M1-2 16' 0"1 3/4" x 16" 2.0E Microllam LVL (WSO) 2 2M2 32' 0"1 3/4" x 11 7/8" 2.0E Microllam LVL (WSO)1 1M3-4 22' 0"1 3/4" x 11 7/8" 2.0E Microllam LVL (WSO)4 4M4 20' 0"1 3/4" x 11 7/8" 2.0E Microllam LVL (WSO)1 1M5 18' 0"1 3/4" x 11 7/8" 2.0E Microllam LVL (WSO)1 1M6 16' 0"1 3/4" x 11 7/8" 2.0E Microllam LVL (WSO)1 2TS1-2 18' 0"1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2TS2-2 10' 0"1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2TS3 4' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 3TS4 2' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 2RM1 16' 0"1 1/8" x 11 7/8" TJ Rim Board 1 13AccessoriesPlotIDLength Product Plies Net Qty23/32"x48"x96" Weyerhaeuser Edge Gold Panel (0/24) T&G SF 1 60Total LengthsLength Product1056' 0"11 7/8" TJI 210 joist290' 0" 11 7/8" TJI 360 joist32' 0" 1 3/4" x 16" 2.0E Microllam LVL (WSO)190' 0" 1 3/4" x 11 7/8" 2.0E Microllam LVL (WSO)72' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL208' 0" 1 1/8" x 11 7/8" TJ Rim BoardLEVEL NOTESCurrent Date: 11/25/2020File Name: 2021-0073lh, drees indy, ash lawn (g), alb-5.jvlLevel Name: 2nd-Floor FramingBuilding Code - Design Methodology: IBC 2018Members with Design Overridden:TJ-Pro Rating (Weighted Average): 43Minimum Level TJ - Pro Rating & Joist: TJ-Pro rating = 37, joist = F18'(i8110)Maximum Level TJ - Pro Rating & Joist: TJ-Pro rating = 56, joist = F14'(i8063)FLOORFloor Container: FC2, FC3Use/Occupancy: ResidentialLivingAreasFloor Area Loading is: 40.0 lb/ft² Live Load & 10.0 lb/ft² Dead LoadMaximum Allowed Deflection: L/480 Live Load & L/240 Total LoadTJ-Pro Rating Information:Weighted Average: FC2: 41; FC3: 43Directly Applied Ceiling: Gypsum 1/2"Decking Attachment: Glue and NailDecking Material: 23/32"x48"x96" Weyerhaeuser Edge Gold Panel (0/24) T&G SFPerpendicular Partition: NoStrapping at max 8' o.c.: NoneBlocking at max 8' o.c.: NoPoured Flooring: No Start Spacing 19.2" O.C. Start Spacing 19.2" O.C. Start Spacing 19.2" O.C. Start Spacing 19.2" O.C.E1E1E1E1 E1A3A3 A3A3E1B4B4B1TS1-2M3-4BBO7M1-2 RM1RM1RM1 RM1RM1RM1RM1RM1FBk1FBk1RM1RM1RM1FBk1M6 2' 0" FBk1TS3 M5 TS3 F2'M6M4TS4H8H8F14' Dropped Steel BeamRM1Dropped LVLM22' 0"TS3H3FBk1BBO10TS2-2F4' H9TS4H9FBk1ToiletTubFBk1H3 6 1/2" 1' 8 3/16"1' 2 11/16"Toilet7"1' 0 3/16"ShowerToiletTubFBk11' 9 3/16"1' 3 5/8" 1' 1 7/8"1' 5 5/16"H337' 11"16' 0 1/2" 4' 8"15' 5"3' 7" 1' 1"17' 2 1/2"56' 11"20' 10" 36' 1"30' 6 1/2"21' 8 1/2"6' 0" 21' 1" 14' 1 1/2" 1' 0 3/16" 1' 6 9/16"1' 2 3/8" H8H5H62' 0"F16'FBk1H3F16'F18'F18' F2' F2'F2'F32'R20'R20' R18'F20' H4 H4H3H3 H4H3H3 H3TJI 110TJI 210TJI 230TJI 360TJI 560Joists by Series Mechanical ChaseKitchen IslandHatch LegendArchitectural Drawings Prepared By: Structural Drawings Prepared By:84 Lumber CompanyDrees HomesAsh Lawn - ALB-5Rev By Date Comments Drawn By:LHChecked By: Release Date:GL 11/25/2020Job #2021-0073LHSheet2 of 2A complete Javelin ® framing plan requires the Trus Joist Installation GuideSee the Trus Joist Installation Guide for Product Trademark InformationSYMBOL LEGENDBearing Length RequirementsPoint Load (Operator Added)Line Load (Operator Added)Area Load (Operator Added)Beam by OthersDetail Callout Label(See Framer's Pocket Guide)Non-Load Bearing WallJoist Under Wall AboveBBOA10'UWALack of proper bracing during construction can result in seriousaccidents. Observe the following guidelines:WARNING NOTES:WARNINGJoists are unstable until braced laterallyBracing Includes:BlockingHangersSheathingRim BoardStrut LinesRim JoistDO NOT stack buildingmaterials on unsheathedjoists. Stack only overbeams or walls.DO NOT walk on joiststhat are lying flat.DO NOT walk on joistsuntil braced.INJURY MAY RESULT.Weyerhaeuser, Microllam, Parallam, TimberStrand, TJI, TJ, and Trus Joist are registered trademarks ofWeyerhaeuser NR. ©2014 Weyerhaeuser NR Company. All rights reserved.1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed.2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also beaccomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay.3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist.Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker orone layer of unnailed sheathing.5. Ends of cantilevers require safety bracing on both the top and bottom flanges.6. The flanges must remain straight within 1/2" from true alignment.4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system.Flat blocking panels betweeneach joist. Nail to top platewith connections equivalentto floor panel schedule.Less than 5"E9 118" TJ ® Rim Board or 1 14" TimberStrand® LSL. Attach tojoist with one 10d (0.131" x 3") nail at top and bottomflanges. Nail rim to blocking panel and blocking panel toplate with connections equivalent to floor panel schedule.TJI® JoistWARNINGJoists are unstable until laterally bracedSafety bracing required during installation2'-0" Max2" 2x6(min) or 1-18" x 4-1/2" (min) TJ® rim boardnailed to top plate w/8d (0.113" x 2-3/8") nailsat 6" o/c at panel edges and in field.Block must be full length between joists andtight to each flange2416 span rated sheathing (716" min). Attachwith 8d (0.113" x 2-38") nails at 6" o.c. alongpanel edges and field. Use pressure treatedplywood for ground level cantilevers1-18" TJ® rim boardto match joist depthLateral load transfer of detail = 220 PLF.Additional connections may be requiredto transfer loads from wall aboveSecond Floor SystemScale: 1/4" = 1'0"These placement plans have been developed for the specificationofproducts based on project information provided. This service is solelyintended for product application assurance; and, is not intended tocircumvent the need for a design professional as determined by thebuilding code. The designer of record and/or builder/framer is responsibleto assure these drawings are compatible with the overall project.01/26/21