HomeMy WebLinkAbout10_GD1.05-SITE DEMOLITION PLAN-VARSITY BASEBALL COMPLEX- PHOTOCONSULTANTCARMEL CLAY SCHOOLSWWW.FHAI.COMARCHITECT317-848-0966350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC.CARMEL HIGHSCHOOL5201 E MAIN STREETCARMEL, IN 46033HARTMAN FIELDIMPROVEMENTSDESIGN DEVELOPMENTREV.NO.DESCRIPTIONDATEPROJECT NUMBER: 220127.00PROJECT ISSUE DATE: 02/17/2021DRAWN BY: EBPROJECT220127.00www.tlf-engineers.com317-334-15523901 W 86TH STREET, SUITE 200, INDIANAPOLIS, IN 46268WI
LLI
AME.PAYNEREGISTEREDINDIANAARCHITECT 4169STATE OFNo.GD1.05SITE DEMOLITION PLAN -VARSITY BASEBALL COMPLEXPHOTO DETAILSEXISTING 5' FENCING AND (20'+/-) CANTILEVER GATE - ALONG RIGHT FIELD LINETO BE REMOVEDEXISTING RIGHT FIELD LINE BULLPEN - SEATING BENCH TO REMAIN - PROTECTDURING CONSTRUCTION - CONTRACTOR IS TO COORDINATE STORAGE WITHOWNER PRIOR TO THE START OF CONSTRUCTIONEXISTING LEFT FIELD LINE BULLPEN - SEATING TO REMAIN - PROTECT DURINGCONSTRUCTION - CONTRACTOR IS TO COORDINATE STORAGE WITH OWNERPRIOR TO THE START OF CONSTRUCTIONEXISTING 8' DOUBLE GATE AND FENCING TO REMAIN - PROTECT DURING THESTART OF CONSTRUCTIONVISITORS SIDE 8' SINGLE GATE AND BACKSTOP TO BE REMOVEDEXISTING 5' GATE TO BE REMOVEDEXISTING CHAIN LINK FENCING ALONG HOME AND VISITOR DUGOUTS - FENCINGWITH PADS, AND LAWN TO BE REMOVEDEXISTING LEFT FIELD LINE FENCING, 5' DOUBLE GATE, AND PAVING TO BEREMOVEDEXISTING 5' FENCING TO REMAIN - STRAIGHT SECTION OF FENCING TO REMAIN -PROTECT DURING THE START OF CONSTRUCTIONEXISTING FENCING, GATE AND ENTRY PAVING TO REMAIN - PROTECT DURINGTHE START OF CONSTRUCTIONEXISTING FENCING WITH PADS, LAWN AND 8' SINGLE GATE TO BE REMOVEDEXISTING JERSEY BARRIERS TO BE RELOCATED TO JV COMPLEX - SEE SITELAYOUT PLAN G1.02 FOR FURTHER INFORMATIONEXISTING BATTING TUNNEL TO BEPROTECTED - COORDINATE STORAGEWITH OWNER PRIOR TO THE START OFCONSTRUCTIONEXISTING BATTING CAGES ( 2 ) ; 75' x 18' -TO BE REMOVED IN ITS ENTIRETYEXISTING 5' GATES ( 2 ) TO BE REMOVEDEXISTING 23' BACKSTOP FENCING TO BEREMOVED*GENERAL NOTE ; SEE SITE DEMOLITION PLANS FOR FURTHERINFORMATION*GENERAL NOTE ; PAGE READS FROM TOP OF PAGE - RIGHT TO LEFTEXISTING 5' FENCING - RIGHT FIELD LINE TO BE REMOVEDEXISTING 8' FENCING AND RIGHT FIELDFOUL POLE TO BE REMOVEDHOME SITE DUGOUTS TO REMAIN - SEEARCHITECTURAL DRAWINGS FORFURTHER INFORMATIONHOME DUGOUT FENCING - BOTH HOMEAND VISITORS SIDES TO BE REMOVED23' BACKSTOP FENCING AND ( 2 ) 8' SINGLEGATES TO BE REMOVEDEXISTING BLEACHERS TO REMAIN -PROTECT DURING CONSTRUCTION -CLEAN PRIOR TO THE CONCLUSION OFCONSTRUCTION EFFORTSEXISTING PRESS BOX - SEEARCHITECTURAL DRAWING FOR FURTHERINFORMATION4012004080