Loading...
HomeMy WebLinkAbout33_SU1.02-SITE UTILITY PLAN-SOUTHWESTMATCH LINE (NORTH/SOUTH) CONNECTION TO EXISTING WATER LINE WTR SAN SAN ST-102 RIM. = 782.00' INV. 776.98 (S) INV. 776.88 (NE) ST-104 RIM. = 781.09' INV. 776.77 (SW) INV. 776.77 (S) INV. 776.67 (N) ST-103 RIM. = 780.57' INV. 777.10 (N) ST-101 INV. 777.79 (N) 2 5 7 6 1 8 3 10 11 11 10 12 12 13 14 14 15 16 16 17 17 18 18 18 2 398 L.F. OF 6" PERFORATED PVC @ 0.50% MIN. SLOPE 11 11 INV. = 783.65 (6" PER. PVC) INV. = 783.65 (6" PER. PVC) INV. = 780.46(6" PER. PVC) 109 L.F. OF 6" PERFORATED PVC @ 0.50% MIN. SLOPE INV. = 781.00 (6" PER. PVC) 298 L.F. OF 12" PERFORATED PVC @ 0.50% MIN. SLOPE 385 L.F. OF 12" PERFORATED PVC @ 0.50% MIN. SLOPE 11 356 L.F. OF 6" PERFORATED PVC @ 0.50% MIN. SLOPE INV. = 781.87 (6" PER. PVC) INV. = 781.62 (12" PER. PVC) INV. = 779.70 (12" PER. PVC) INV. = 781.19 (12" PER. PVC) UNDERGROUND DETENTION CHAMBERS (SC-740) CHAMBER AREA = 196' x 102' MINIMUM FINISH GRADE ELEV. = 783.00 TOP OF STONE = 782.50 TOP OF CHAMBERS = 781.50 BOTTOM OF CHAMBERS = 779.00 BOTTOM OF STONE = 778.50 21 ROWS OF 27 CHAMBERS = 47,355 CFT. INV. 778.50 (N)6 WTR INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what's below. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! SU1.02 SITE UTILITY PLAN - SOUTHWEST CONSULTANT CARMEL CLAY SCHOOLS WWW.FHAI.COM ARCHITECT 317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. CARMEL HIGH SCHOOL 5201 E MAIN STREET CARMEL, IN 46033 HARTMAN FIELD IMPROVEMENTS NOT FOR CONSTRUCTIONTAC SUBMITTAL REV. NO.DESCRIPTION DATE TAC SUBMITTAL 02/17/2021A PROJECT NUMBER: 220127.00 PROJECT ISSUE DATE: 02/17/2021 DRAWN BY: HHW PROJECT 220127.00 WWW.TLF-ENGINEERS.COM317-334-1500 3901 W 86TH ST #200, INDIANAPOLIS, IN 46268 THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED CONSTRUCTION PLANS. DEVIATIONS FROM THE APPROVED DESIGN SHALL BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF ANY SUCH DEVIATION SHALL BE INCLUDED AS A REQUIREMENT ON AS-BUILT/RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING VELOCITIES OF 2.5 FPS OR LESS, OR 10 FPS OR GREATER (AT FULL FLOW CAPACITY) SHALL REQUIRE AS-BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION, PRIOR TO BACKFILLING THE PIPE. THE CONTRACTOR IS INSTRUCTED AS-BUILT EACH SECTION OF STORM PIPE AS IT IS BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS AND AS APPROVED BY THE CITY OF CARMEL. STORM SEWER NOTE 30 9003060 1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4.SEE SHEET G2.1 FOR GRADING PLAN. 5.THE PROPOSED STORM SEWER SYSTEM FOR THIS PROJECT WILL BE PRIVATE OWNED. 6.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 7.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 8.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. GENERAL NOTES UTILITY KEYNOTES 1.PROPOSED 12" HDPE STORM SEWER PIPE 2.PROPOSED 15" HDPE STORM SEWER PIPE 3.PROPOSED 18" HDPE STORM SEWER PIPE 4.PROPOSED 24" HDPE STORM SEWER PIPE 5.PROPOSED STORM FLARED END SECTION 6.PROPOSED STORM MANHOLE 7.PROPOSED STORM INLET 8.PROPOSED STORM TRENCH DRAIN 9.PROPOSED MECHANICAL STORMWATER QUALITY BMP 10.PROPOSED 4" PVC UNDERDRAIN 11.PROPOSED 6" PVC PERIMETER DRAIN @ 0.5% 12.PROPOSED 12" PVC PERIMETER DRAIN @ 0.5% 13.CONNECT FORCE MAIN TO EXISTING SANITARY MANHOLE 14.390 LF OF 2" WATER LINE 15.SANITARY LIFT STATION - SEE DETAIL 4 ON SHEET P3.01 16.424 LF OF SANITARY FORCE MAIN - SEE PLUMBING PLAN FOR SIZE 17.EXISTING WATER LINE - PER RECORD DRAWINGS 18.EXISTING SANITARY LINE - PER RECORD DRAWINGS UTILITY PLAN LEGEND PROPOSED 2" PVC WATER LINE PROPOSED 8" PVC SANITARY SEWER PIPE PROPOSED STORM SEWER PIPE WTR SAN ST