Loading...
HomeMy WebLinkAboutFrankton - Floor Plan + NEC ElevationsCZ 0.10-4 A1 4-1.1 A1 4-2.1-KR A1 4-3.1 A4 4DK.50-KR ELEVATION 1 ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 393 ADDITIONAL 2ND FLOOR - HEATED 0 TOTAL 2ND FLOOR 787 ADDITIONAL 3RD FLOOR - HEATED 0 TOTAL 3RD FLOOR 755 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2259 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 24 TOTAL ELEV. FOOTPRINT 810 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. ELEVATION 1 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.05 1.31 1.11 40.00 0 4 AT EAVE 1.57 1.31 1.67 60.00 0 24.00 TOTAL (MIN)2.62 2.62 2.78 100.00 HIGH - RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00 AT EAVE 1.57 1.31 1.67 62.50 0 24.00 TOTAL (MIN)2.62 2.62 2.67 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION 2 ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 393 ADDITIONAL 2ND FLOOR - HEATED 18 TOTAL 2ND FLOOR 805 ADDITIONAL 3RD FLOOR - HEATED 0 TOTAL 3RD FLOOR 755 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2277 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 24 TOTAL ELEV. FOOTPRINT 810 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. ELEVATION 2 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.05 1.31 1.11 40.00 0 4 AT EAVE 1.57 1.31 1.67 60.00 0 24.00 TOTAL (MIN)2.62 2.62 2.78 100.00 HIGH - RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00 AT EAVE 1.57 1.31 1.67 62.50 0 24.00 TOTAL (MIN)2.62 2.62 2.67 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION 3 ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 393 ADDITIONAL 2ND FLOOR - HEATED 0 TOTAL 2ND FLOOR 787 ADDITIONAL 3RD FLOOR - HEATED 0 TOTAL 3RD FLOOR 755 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2259 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 24 TOTAL ELEV. FOOTPRINT 810 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. ELEVATION 3 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.05 1.31 1.11 40.00 0 4 AT EAVE 1.57 1.31 1.67 60.00 0 24.00 TOTAL (MIN)2.62 2.62 2.78 100.00 HIGH - RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00 AT EAVE 1.57 1.31 1.67 62.50 0 24.00 TOTAL (MIN)2.62 2.62 2.67 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION 3 ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 393 ADDITIONAL 2ND FLOOR - HEATED 0 TOTAL 2ND FLOOR 787 ADDITIONAL 3RD FLOOR - HEATED 0 TOTAL 3RD FLOOR 755 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2259 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 24 TOTAL ELEV. FOOTPRINT 810 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. ELEVATION 3 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.05 1.31 1.11 40.00 0 4 AT EAVE 1.57 1.31 1.67 60.00 0 24.00 TOTAL (MIN)2.62 2.62 2.78 100.00 HIGH - RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00 AT EAVE 1.57 1.31 1.67 62.50 0 24.00 TOTAL (MIN)2.62 2.62 2.67 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION 4 ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 393 ADDITIONAL 2ND FLOOR - HEATED 18 TOTAL 2ND FLOOR 805 ADDITIONAL 3RD FLOOR - HEATED 0 TOTAL 3RD FLOOR 755 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2277 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 32 TOTAL ELEV. FOOTPRINT 818 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. ELEVATION 4 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 788 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.05 1.31 1.11 40.00 0 4 AT EAVE 1.58 1.31 1.67 60.00 0 24.00 TOTAL (MIN)2.63 2.63 2.78 100.00 HIGH - RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00 AT EAVE 1.58 1.31 1.67 62.50 0 24.00 TOTAL (MIN)2.63 2.63 2.67 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION 4 ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 393 ADDITIONAL 2ND FLOOR - HEATED 18 TOTAL 2ND FLOOR 805 ADDITIONAL 3RD FLOOR - HEATED 0 TOTAL 3RD FLOOR 755 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2277 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 32 TOTAL ELEV. FOOTPRINT 818 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. ELEVATION 4 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 788 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.05 1.31 1.11 40.00 0 4 AT EAVE 1.58 1.31 1.67 60.00 0 24.00 TOTAL (MIN)2.63 2.63 2.78 100.00 HIGH - RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00 AT EAVE 1.58 1.31 1.67 62.50 0 24.00 TOTAL (MIN)2.63 2.63 2.67 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION 5 ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 393 ADDITIONAL 2ND FLOOR - HEATED 0 TOTAL 2ND FLOOR 787 ADDITIONAL 3RD FLOOR - HEATED 0 TOTAL 3RD FLOOR 755 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2259 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 24 TOTAL ELEV. FOOTPRINT 810 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. ELEVATION 5 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.05 1.31 1.11 40.00 0 4 AT EAVE 1.57 1.31 1.67 60.00 0 24.00 TOTAL (MIN)2.62 2.62 2.78 100.00 HIGH - RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00 AT EAVE 1.57 1.31 1.67 62.50 0 24.00 TOTAL (MIN)2.62 2.62 2.67 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION 5 ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 393 ADDITIONAL 2ND FLOOR - HEATED 0 TOTAL 2ND FLOOR 787 ADDITIONAL 3RD FLOOR - HEATED 0 TOTAL 3RD FLOOR 755 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2259 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 24 TOTAL ELEV. FOOTPRINT 810 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. ELEVATION 5 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.05 1.31 1.11 40.00 0 4 AT EAVE 1.57 1.31 1.67 60.00 0 24.00 TOTAL (MIN)2.62 2.62 2.78 100.00 HIGH - RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00 AT EAVE 1.57 1.31 1.67 62.50 0 24.00 TOTAL (MIN)2.62 2.62 2.67 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION 6 ADDITIONAL 1ST FLOOR - HEATED 24 TOTAL 1ST FLOOR 417 ADDITIONAL 2ND FLOOR - HEATED 24 TOTAL 2ND FLOOR 811 ADDITIONAL 3RD FLOOR - HEATED 24 TOTAL 3RD FLOOR 779 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2331 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 32 TOTAL ELEV. FOOTPRINT 842 ELEVATION 6 ADDITIONAL 1ST FLOOR - HEATED 24 TOTAL 1ST FLOOR 417 ADDITIONAL 2ND FLOOR - HEATED 24 TOTAL 2ND FLOOR 811 ADDITIONAL 3RD FLOOR - HEATED 24 TOTAL 3RD FLOOR 779 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2331 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 32 TOTAL ELEV. FOOTPRINT 842 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. ELEVATION 6 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 813 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.08 1.36 1.11 40.00 0 4 AT EAVE 1.63 1.36 1.67 60.00 0 24.00 TOTAL (MIN)2.71 2.71 2.78 100.00 HIGH - RIDGE VENT 1.08 1.36 1.13 40.30 0 0 9.00 AT EAVE 1.63 1.36 1.67 59.70 0 24.00 TOTAL (MIN)2.71 2.71 2.79 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION 6 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 813 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.08 1.36 1.11 40.00 0 4 AT EAVE 1.63 1.36 1.67 60.00 0 24.00 TOTAL (MIN)2.71 2.71 2.78 100.00 HIGH - RIDGE VENT 1.08 1.36 1.13 40.30 0 0 9.00 AT EAVE 1.63 1.36 1.67 59.70 0 24.00 TOTAL (MIN)2.71 2.71 2.79 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION 6 ADDITIONAL 1ST FLOOR - HEATED 24 TOTAL 1ST FLOOR 417 ADDITIONAL 2ND FLOOR - HEATED 24 TOTAL 2ND FLOOR 811 ADDITIONAL 3RD FLOOR - HEATED 24 TOTAL 3RD FLOOR 779 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2331 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 32 TOTAL ELEV. FOOTPRINT 842 ELEVATION 6 ADDITIONAL 1ST FLOOR - HEATED 24 TOTAL 1ST FLOOR 417 ADDITIONAL 2ND FLOOR - HEATED 24 TOTAL 2ND FLOOR 811 ADDITIONAL 3RD FLOOR - HEATED 24 TOTAL 3RD FLOOR 779 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2331 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 32 TOTAL ELEV. FOOTPRINT 842 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. ELEVATION 6 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 813 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.08 1.36 1.11 40.00 0 4 AT EAVE 1.63 1.36 1.67 60.00 0 24.00 TOTAL (MIN)2.71 2.71 2.78 100.00 HIGH - RIDGE VENT 1.08 1.36 1.13 40.30 0 0 9.00 AT EAVE 1.63 1.36 1.67 59.70 0 24.00 TOTAL (MIN)2.71 2.71 2.79 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION 6 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 813 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.08 1.36 1.11 40.00 0 4 AT EAVE 1.63 1.36 1.67 60.00 0 24.00 TOTAL (MIN)2.71 2.71 2.78 100.00 HIGH - RIDGE VENT 1.08 1.36 1.13 40.30 0 0 9.00 AT EAVE 1.63 1.36 1.67 59.70 0 24.00 TOTAL (MIN)2.71 2.71 2.79 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION 7 ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 393 ADDITIONAL 2ND FLOOR - HEATED 0 TOTAL 2ND FLOOR 787 ADDITIONAL 3RD FLOOR - HEATED 0 TOTAL 3RD FLOOR 755 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2259 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 24 TOTAL ELEV. FOOTPRINT 810 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. ELEVATION 7 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.05 1.31 1.11 40.00 0 4 AT EAVE 1.57 1.31 1.67 60.00 0 24.00 TOTAL (MIN)2.62 2.62 2.78 100.00 HIGH - RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00 AT EAVE 1.57 1.31 1.67 62.50 0 24.00 TOTAL (MIN)2.62 2.62 2.67 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION 7 ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 393 ADDITIONAL 2ND FLOOR - HEATED 0 TOTAL 2ND FLOOR 787 ADDITIONAL 3RD FLOOR - HEATED 0 TOTAL 3RD FLOOR 755 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2259 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 24 TOTAL ELEV. FOOTPRINT 810 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. ELEVATION 7 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.05 1.31 1.11 40.00 0 4 AT EAVE 1.57 1.31 1.67 60.00 0 24.00 TOTAL (MIN)2.62 2.62 2.78 100.00 HIGH - RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00 AT EAVE 1.57 1.31 1.67 62.50 0 24.00 TOTAL (MIN)2.62 2.62 2.67 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION 8 ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 393 ADDITIONAL 2ND FLOOR - HEATED 0 TOTAL 2ND FLOOR 787 ADDITIONAL 3RD FLOOR - HEATED 0 TOTAL 3RD FLOOR 755 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2259 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 24 TOTAL ELEV. FOOTPRINT 810 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. ELEVATION 8 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.05 1.31 1.11 40.00 0 4 AT EAVE 1.57 1.31 1.67 60.00 0 24.00 TOTAL (MIN)2.62 2.62 2.78 100.00 HIGH - RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00 AT EAVE 1.57 1.31 1.67 62.50 0 24.00 TOTAL (MIN)2.62 2.62 2.67 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ELEVATION 8 ADDITIONAL 1ST FLOOR - HEATED 0 TOTAL 1ST FLOOR 393 ADDITIONAL 2ND FLOOR - HEATED 0 TOTAL 2ND FLOOR 787 ADDITIONAL 3RD FLOOR - HEATED 0 TOTAL 3RD FLOOR 755 ADDITIONAL HA FLOOR - HEATED 0 TOTAL HA FLOOR 324 TOTAL ELEV. HEATED 2259 ADDITIONAL GARAGE - 2 CAR REAR 0 TOTAL GARAGE 393 ADDITIONAL BASEMENT 0 TOTAL BASEMENT 0 FRONT PORCH 24 TOTAL ELEV. FOOTPRINT 810 LIGHT & VENT SCHEDULE ROOM NAME AREA REQUIRED SUPPLIED LIGHT VENT LIGHT VENT GAME ROOM 145.30 11.62 5.81 27.40 11.70 BEDROOM 3 85.00 6.80 3.40 24.80 10.60 0.00 .00 .00 REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE. ELEVATION 8 ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE ** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 1.05 1.31 1.11 40.00 0 4 AT EAVE 1.57 1.31 1.67 60.00 0 24.00 TOTAL (MIN)2.62 2.62 2.78 100.00 HIGH - RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00 AT EAVE 1.57 1.31 1.67 62.50 0 24.00 TOTAL (MIN)2.62 2.62 2.67 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE