HomeMy WebLinkAboutFrankton - Floor Plan + NEC ElevationsCZ
0.10-4
A1
4-1.1
A1
4-2.1-KR
A1
4-3.1
A4
4DK.50-KR
ELEVATION 1
ADDITIONAL 1ST FLOOR - HEATED 0
TOTAL 1ST FLOOR 393
ADDITIONAL 2ND FLOOR - HEATED 0
TOTAL 2ND FLOOR 787
ADDITIONAL 3RD FLOOR - HEATED 0
TOTAL 3RD FLOOR 755
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2259
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 24
TOTAL ELEV. FOOTPRINT 810
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
ELEVATION 1
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.05 1.31 1.11 40.00 0 4
AT EAVE 1.57 1.31 1.67 60.00 0 24.00
TOTAL (MIN)2.62 2.62 2.78 100.00
HIGH -
RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00
AT EAVE 1.57 1.31 1.67 62.50 0 24.00
TOTAL (MIN)2.62 2.62 2.67 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION 2
ADDITIONAL 1ST FLOOR - HEATED 0
TOTAL 1ST FLOOR 393
ADDITIONAL 2ND FLOOR - HEATED 18
TOTAL 2ND FLOOR 805
ADDITIONAL 3RD FLOOR - HEATED 0
TOTAL 3RD FLOOR 755
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2277
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 24
TOTAL ELEV. FOOTPRINT 810
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
ELEVATION 2
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.05 1.31 1.11 40.00 0 4
AT EAVE 1.57 1.31 1.67 60.00 0 24.00
TOTAL (MIN)2.62 2.62 2.78 100.00
HIGH -
RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00
AT EAVE 1.57 1.31 1.67 62.50 0 24.00
TOTAL (MIN)2.62 2.62 2.67 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION 3
ADDITIONAL 1ST FLOOR - HEATED 0
TOTAL 1ST FLOOR 393
ADDITIONAL 2ND FLOOR - HEATED 0
TOTAL 2ND FLOOR 787
ADDITIONAL 3RD FLOOR - HEATED 0
TOTAL 3RD FLOOR 755
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2259
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 24
TOTAL ELEV. FOOTPRINT 810
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
ELEVATION 3
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.05 1.31 1.11 40.00 0 4
AT EAVE 1.57 1.31 1.67 60.00 0 24.00
TOTAL (MIN)2.62 2.62 2.78 100.00
HIGH -
RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00
AT EAVE 1.57 1.31 1.67 62.50 0 24.00
TOTAL (MIN)2.62 2.62 2.67 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION 3
ADDITIONAL 1ST FLOOR - HEATED 0
TOTAL 1ST FLOOR 393
ADDITIONAL 2ND FLOOR - HEATED 0
TOTAL 2ND FLOOR 787
ADDITIONAL 3RD FLOOR - HEATED 0
TOTAL 3RD FLOOR 755
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2259
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 24
TOTAL ELEV. FOOTPRINT 810
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
ELEVATION 3
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.05 1.31 1.11 40.00 0 4
AT EAVE 1.57 1.31 1.67 60.00 0 24.00
TOTAL (MIN)2.62 2.62 2.78 100.00
HIGH -
RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00
AT EAVE 1.57 1.31 1.67 62.50 0 24.00
TOTAL (MIN)2.62 2.62 2.67 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION 4
ADDITIONAL 1ST FLOOR - HEATED 0
TOTAL 1ST FLOOR 393
ADDITIONAL 2ND FLOOR - HEATED 18
TOTAL 2ND FLOOR 805
ADDITIONAL 3RD FLOOR - HEATED 0
TOTAL 3RD FLOOR 755
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2277
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 32
TOTAL ELEV. FOOTPRINT 818
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
ELEVATION 4
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 788 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.05 1.31 1.11 40.00 0 4
AT EAVE 1.58 1.31 1.67 60.00 0 24.00
TOTAL (MIN)2.63 2.63 2.78 100.00
HIGH -
RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00
AT EAVE 1.58 1.31 1.67 62.50 0 24.00
TOTAL (MIN)2.63 2.63 2.67 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION 4
ADDITIONAL 1ST FLOOR - HEATED 0
TOTAL 1ST FLOOR 393
ADDITIONAL 2ND FLOOR - HEATED 18
TOTAL 2ND FLOOR 805
ADDITIONAL 3RD FLOOR - HEATED 0
TOTAL 3RD FLOOR 755
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2277
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 32
TOTAL ELEV. FOOTPRINT 818
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
ELEVATION 4
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 788 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.05 1.31 1.11 40.00 0 4
AT EAVE 1.58 1.31 1.67 60.00 0 24.00
TOTAL (MIN)2.63 2.63 2.78 100.00
HIGH -
RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00
AT EAVE 1.58 1.31 1.67 62.50 0 24.00
TOTAL (MIN)2.63 2.63 2.67 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION 5
ADDITIONAL 1ST FLOOR - HEATED 0
TOTAL 1ST FLOOR 393
ADDITIONAL 2ND FLOOR - HEATED 0
TOTAL 2ND FLOOR 787
ADDITIONAL 3RD FLOOR - HEATED 0
TOTAL 3RD FLOOR 755
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2259
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 24
TOTAL ELEV. FOOTPRINT 810
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
ELEVATION 5
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.05 1.31 1.11 40.00 0 4
AT EAVE 1.57 1.31 1.67 60.00 0 24.00
TOTAL (MIN)2.62 2.62 2.78 100.00
HIGH -
RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00
AT EAVE 1.57 1.31 1.67 62.50 0 24.00
TOTAL (MIN)2.62 2.62 2.67 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION 5
ADDITIONAL 1ST FLOOR - HEATED 0
TOTAL 1ST FLOOR 393
ADDITIONAL 2ND FLOOR - HEATED 0
TOTAL 2ND FLOOR 787
ADDITIONAL 3RD FLOOR - HEATED 0
TOTAL 3RD FLOOR 755
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2259
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 24
TOTAL ELEV. FOOTPRINT 810
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
ELEVATION 5
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.05 1.31 1.11 40.00 0 4
AT EAVE 1.57 1.31 1.67 60.00 0 24.00
TOTAL (MIN)2.62 2.62 2.78 100.00
HIGH -
RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00
AT EAVE 1.57 1.31 1.67 62.50 0 24.00
TOTAL (MIN)2.62 2.62 2.67 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION 6
ADDITIONAL 1ST FLOOR - HEATED 24
TOTAL 1ST FLOOR 417
ADDITIONAL 2ND FLOOR - HEATED 24
TOTAL 2ND FLOOR 811
ADDITIONAL 3RD FLOOR - HEATED 24
TOTAL 3RD FLOOR 779
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2331
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 32
TOTAL ELEV. FOOTPRINT 842
ELEVATION 6
ADDITIONAL 1ST FLOOR - HEATED 24
TOTAL 1ST FLOOR 417
ADDITIONAL 2ND FLOOR - HEATED 24
TOTAL 2ND FLOOR 811
ADDITIONAL 3RD FLOOR - HEATED 24
TOTAL 3RD FLOOR 779
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2331
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 32
TOTAL ELEV. FOOTPRINT 842
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
ELEVATION 6
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 813 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.08 1.36 1.11 40.00 0 4
AT EAVE 1.63 1.36 1.67 60.00 0 24.00
TOTAL (MIN)2.71 2.71 2.78 100.00
HIGH -
RIDGE VENT 1.08 1.36 1.13 40.30 0 0 9.00
AT EAVE 1.63 1.36 1.67 59.70 0 24.00
TOTAL (MIN)2.71 2.71 2.79 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION 6
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 813 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.08 1.36 1.11 40.00 0 4
AT EAVE 1.63 1.36 1.67 60.00 0 24.00
TOTAL (MIN)2.71 2.71 2.78 100.00
HIGH -
RIDGE VENT 1.08 1.36 1.13 40.30 0 0 9.00
AT EAVE 1.63 1.36 1.67 59.70 0 24.00
TOTAL (MIN)2.71 2.71 2.79 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION 6
ADDITIONAL 1ST FLOOR - HEATED 24
TOTAL 1ST FLOOR 417
ADDITIONAL 2ND FLOOR - HEATED 24
TOTAL 2ND FLOOR 811
ADDITIONAL 3RD FLOOR - HEATED 24
TOTAL 3RD FLOOR 779
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2331
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 32
TOTAL ELEV. FOOTPRINT 842
ELEVATION 6
ADDITIONAL 1ST FLOOR - HEATED 24
TOTAL 1ST FLOOR 417
ADDITIONAL 2ND FLOOR - HEATED 24
TOTAL 2ND FLOOR 811
ADDITIONAL 3RD FLOOR - HEATED 24
TOTAL 3RD FLOOR 779
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2331
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 32
TOTAL ELEV. FOOTPRINT 842
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
ELEVATION 6
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 813 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.08 1.36 1.11 40.00 0 4
AT EAVE 1.63 1.36 1.67 60.00 0 24.00
TOTAL (MIN)2.71 2.71 2.78 100.00
HIGH -
RIDGE VENT 1.08 1.36 1.13 40.30 0 0 9.00
AT EAVE 1.63 1.36 1.67 59.70 0 24.00
TOTAL (MIN)2.71 2.71 2.79 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION 6
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 813 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.08 1.36 1.11 40.00 0 4
AT EAVE 1.63 1.36 1.67 60.00 0 24.00
TOTAL (MIN)2.71 2.71 2.78 100.00
HIGH -
RIDGE VENT 1.08 1.36 1.13 40.30 0 0 9.00
AT EAVE 1.63 1.36 1.67 59.70 0 24.00
TOTAL (MIN)2.71 2.71 2.79 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION 7
ADDITIONAL 1ST FLOOR - HEATED 0
TOTAL 1ST FLOOR 393
ADDITIONAL 2ND FLOOR - HEATED 0
TOTAL 2ND FLOOR 787
ADDITIONAL 3RD FLOOR - HEATED 0
TOTAL 3RD FLOOR 755
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2259
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 24
TOTAL ELEV. FOOTPRINT 810
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
ELEVATION 7
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.05 1.31 1.11 40.00 0 4
AT EAVE 1.57 1.31 1.67 60.00 0 24.00
TOTAL (MIN)2.62 2.62 2.78 100.00
HIGH -
RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00
AT EAVE 1.57 1.31 1.67 62.50 0 24.00
TOTAL (MIN)2.62 2.62 2.67 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION 7
ADDITIONAL 1ST FLOOR - HEATED 0
TOTAL 1ST FLOOR 393
ADDITIONAL 2ND FLOOR - HEATED 0
TOTAL 2ND FLOOR 787
ADDITIONAL 3RD FLOOR - HEATED 0
TOTAL 3RD FLOOR 755
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2259
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 24
TOTAL ELEV. FOOTPRINT 810
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
ELEVATION 7
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.05 1.31 1.11 40.00 0 4
AT EAVE 1.57 1.31 1.67 60.00 0 24.00
TOTAL (MIN)2.62 2.62 2.78 100.00
HIGH -
RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00
AT EAVE 1.57 1.31 1.67 62.50 0 24.00
TOTAL (MIN)2.62 2.62 2.67 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION 8
ADDITIONAL 1ST FLOOR - HEATED 0
TOTAL 1ST FLOOR 393
ADDITIONAL 2ND FLOOR - HEATED 0
TOTAL 2ND FLOOR 787
ADDITIONAL 3RD FLOOR - HEATED 0
TOTAL 3RD FLOOR 755
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2259
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 24
TOTAL ELEV. FOOTPRINT 810
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
ELEVATION 8
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.05 1.31 1.11 40.00 0 4
AT EAVE 1.57 1.31 1.67 60.00 0 24.00
TOTAL (MIN)2.62 2.62 2.78 100.00
HIGH -
RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00
AT EAVE 1.57 1.31 1.67 62.50 0 24.00
TOTAL (MIN)2.62 2.62 2.67 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE
ELEVATION 8
ADDITIONAL 1ST FLOOR - HEATED 0
TOTAL 1ST FLOOR 393
ADDITIONAL 2ND FLOOR - HEATED 0
TOTAL 2ND FLOOR 787
ADDITIONAL 3RD FLOOR - HEATED 0
TOTAL 3RD FLOOR 755
ADDITIONAL HA FLOOR - HEATED 0
TOTAL HA FLOOR 324
TOTAL ELEV. HEATED 2259
ADDITIONAL GARAGE - 2 CAR REAR 0
TOTAL GARAGE 393
ADDITIONAL BASEMENT 0
TOTAL BASEMENT 0
FRONT PORCH 24
TOTAL ELEV. FOOTPRINT 810
LIGHT & VENT SCHEDULE
ROOM NAME AREA
REQUIRED SUPPLIED
LIGHT VENT LIGHT VENT
GAME ROOM 145.30 11.62 5.81 27.40 11.70
BEDROOM 3 85.00 6.80 3.40 24.80 10.60
0.00 .00 .00
REFER TO LIGHT & VENT SCHEDULE ON COVER SHT. FOR INFORMATION NOT SHOWN HERE.
ELEVATION 8
ATTIC VENT SCHEDULE
VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE
** CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS
* SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION
ROOF AREA "A"SQ FTG 787 AT / NEAR RIDGE AT / NEAR EAVE
VENT TYPE
SQ. FT.
REQUIRED
RANGE
SQ. FT.
SUPPLIED
PERCENT
OF TOTAL
SUPPLIED
POT LARGE
(SQ. IN. EACH)
POT SMALL
(SQ. IN. EACH)
RIDGE VENT
(SQ. IN. PER LF)
EAVE VENT
(SQ. IN. EACH)
CONT. VENT
(SQ. IN. PER LF)
61.00 40.00 18.00 28.00 10.00
HIGH - POT
VENTS ONLY 1.05 1.31 1.11 40.00 0 4
AT EAVE 1.57 1.31 1.67 60.00 0 24.00
TOTAL (MIN)2.62 2.62 2.78 100.00
HIGH -
RIDGE VENT 1.05 1.31 1.00 37.50 0 0 8.00
AT EAVE 1.57 1.31 1.67 62.50 0 24.00
TOTAL (MIN)2.62 2.62 2.67 100.00
ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE